This solicitation package includes design and construction documents for a design-build project to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The project scope involves removing the existing 12-inch PCC pavement and replacing it with a new 15-inch PCC section incorporating a stabilized drainage layer and new subbase course material. The existing sunshade shelters and crew shacks on the apron will also be dismantled and replaced. One additional crew shack will be provided. The awarded contractor will be responsible for design and construction activities, including re-marking the apron, in accordance with the criteria and standards specified. The Department of the Army Corps of Engineers Engineering District Sacramento is the issuing agency. The solicitation number is W9123822R0008.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
DESIGN FILE SHEET NO. DESCRIPTION
GENERAL
CIVIL
G-001 G-002 G-003
GC100
GC101
GC102
GC103
GC104
GC501
GC502
COVER SHEET
INDEX OF DRAWINGS
PROJECT LOCATION PLAN
OVERALL PHASING PLAN
PHASING PLAN - CAZ #1
PHASING PLAN - CAZ #2
CONSTRUCTION SAFETY AND PHASING PLAN NOTES
CONSTRUCTION SAFETY AND PHASING PLAN NOTES
LOW PROFILE BARRICADES AND ROPE & BARREL FENCING DETAILS
MISCELLANEOUS CONSTRUCTION DETAILS
HU09_CD101.DWG
HU09_CD102.DWG
HU09_CD103.DWG
HU09_CD104.DWG
HU09_CD201.DWG
HU09_CS101.DWG
HU09_CS102.DWG
HU09_CS103.DWG
HU09_CS104.DWG
HU09_CS501.DWG
HU09_CS502.DWG
HU09_CS503.DWG
HU09_CP101.DWG
HU09_CP102.DWG
HU09_CP103.DWG
HU09_CP104.DWG
HU09_CP201.DWG
HU09_CP401.DWG
HU09_CP402.DWG
HU09_CP403.DWG
HU09_CP404.DWG
HU09_CP501.DWG
HU09_CP502.DWG
HU09_CP503.DWG
HU09_CP504.DWG
HU09_CG101.DWG
HU09_CG102.DWG
HU09_CG103.DWG
HU09_CG104.DWG
HU09_CG501.DWG
CD101
CD102
CD103
CD104
CD201
CS101
CS102
CS103
CS104
CS501
CS502
CS503
CP101
CP102
CP103
CP104
CP201
CP401
CP402
CP403
CP404
CP501
CP502
CP503
CP504
CG101
CG102
CG103
CG104
CG501
ELECTRICAL
HU09_G-001.DWG
HU09_G-002.DWG
HU09_G-003.DWG
HU09_GC100.DWG
HU09_GC101.DWG
HU09_GC102.DWG
HU09_GC103.DWG
HU09_GC104.DWG
HU09_GC501.DWG
HU09_GC502.DWG
HU09_E-001.DWG
HU09_ES101.DWG
HU09_ES102.DWG
HU09_ES103.DWG
HU09_ES701.DWG
HU09_ET101.DWG
HU09_ET102.DWG
HU09_ET103.DWG
E-001
ES101
ES102
ES103
ES701
ET101
ET102
ET103
ELECTRICAL ABBREVIATIONS AND LEGEND
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN 2
ELECTRICAL SITE PLAN 3
ELECTRICAL EQUIPMENT PICTURE
ELECTRICAL TELECOMMUNICATIONS SITE PLAN
ELECTRICAL TELECOMMUNICATIONS SITE PLAN 2
ELECTRICAL TELECOMMUNICATIONS CABINET
DEMOLITION PLAN - AREA A
DEMOLITION PLAN - AREA B
DEMOLITION PLAN - AREA C
DEMOLITION PLAN - AREA D
REPLACEMENT REMOVAL SECTIONS
SITE PLAN - AREA A
SITE PLAN - AREA B
SITE PLAN - AREA C
SITE PLAN - AREA D
PAVEMENT MARKING DETAILS - SHEET 1 OF 2
PAVEMENT MARKING DETAILS - SHEET 2 OF 2
TIE DOWN AND STATIC GROUND PLAN & DETAILS
PAVING PLAN - AREA A
PAVING PLAN - AREA B
PAVING PLAN - AREA C
PAVING PLAN - AREA D
REPLACEMENT PAVEMENT SECTIONS
JOINT LAYOUT PLAN - AREA A
JOINT LAYOUT PLAN - AREA B
JOINT LAYOUT PLAN - AREA C
JOINT LAYOUT PLAN - AREA D
JOINT DETAILS
JOINT SEALANT DETAILS
REINFORCEMENT DETAILS
HYDRANT FUEL PIT SURFACE DRAINAGE DETAIL
GRADING AND DRAINAGE PLAN - AREA A
GRADING AND DRAINAGE PLAN - AREA B
GRADING AND DRAINAGE PLAN - AREA C
GRADING AND DRAINAGE PLAN - AREA D
SUBDRAIN DETAILS
EXISTING CONDITIONS
HU09_VF100.DWG
HU09_VF101.DWG
HU09_VF102.DWG
HU09_VF103.DWG
HU09_VF104.DWG
VF100
VF101
VF102
VF103
VF104
TOPOGRAPHIC SURVEY INFORMATION PLAN
EXISTING CONDITIONS PLAN - AREA A
EXISTING CONDITIONS PLAN - AREA B
EXISTING CONDITIONS PLAN - AREA C
EXISTING CONDITIONS PLAN - AREA D
AS-BUILTS
HU09_M-901.DWG M-901 AVFUEL HYDRANT FUEL SYSTEM DETAILS AS-BUILTS
HU09_S-901.DWG
HU09_S-902.DWG
HU09_S-903.DWG
S-901 S-902 S-903
SUN SHADE CANOPY AS-BUILTS - SHEET 1 OF 3
SUN SHADE CANOPY AS-BUILTS - SHEET 2 OF 3
SUN SHADE CANOPY AS-BUILTS - SHEET 3 OF 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
PR
O D
U C
TI
O
N D
AT
A
1%
PR
O
D U
C
TI
O N
D
AT
A 2%
PR
O D
U C
TI
O
N D
AT
A
3%
PR
O
D U
C
TI
O N
D
AT
A 4%
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
W
2C
XX
XX
JA
N
U
AR
Y
SP
EC
N O
FI
LE
N
AM
E:
AN
SI
D
W
2R
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H R
EP
AI
R W
ES
T
8T
H /4
TH
F W
F -3
AP
R O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
AM
G
EN
ER
AL
R
EV
IS
IO
N S
AM
G
EN
ER
AL
R
EV
IS
IO
N S
AM
G
EN
ER
AL
R
EV
IS
IO
N S
N
EW
D
R
AW
IN
G
S
AD
D
ED
AM
G
EN
ER
AL
R
EV
IS
IO
N S
7/ 1/
4/ 6/
4/ 4/
3/
/2
H U
_G
-0
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
IN
D
EX
O
F D
R
AW
IN
G
S
G-002
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SD SD SD
TRTR
TR
W
E
W
W
W
U
U
U
U
C
W W
TR
TR
CAZ #1
PARKING
POSITION
#1
PARKING
POSITION
#2
PARKING
POSITION
#3
PARKING
POSITION
#4
PARKING
POSITION
#5
PARKING
POSITION
#6
PARKING
POSITION
#7
PARKING
POSITION
#8
PARKING
POSITION
#9
PARKING
POSITION
#10
PARKING
POSITION
#11
PARKING
POSITION
#12
PARKING
POSITION
#13
PARKINGPOSITION#26
PARKINGPOSITION#25
PARKINGPOSITION#24
PARKINGPOSITION#23
PARKINGPOSITION#22
PARKINGPOSITION#21
PARKINGPOSITION#20
PARKINGPOSITION#19
PARKINGPOSITION#18
PARKINGPOSITION#17
PARKINGPOSITION#16
PARKINGPOSITION#15
PARKINGPOSITION#14
CAZ #2
TA
XI
W
AY
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
PR
O D
U C
TI
O
N D
AT
A
1%
PR
O
D U
C
TI
O N
D
AT
A 2%
PR
O D
U C
TI
O
N D
AT
A
3%
PR
O
D U
C
TI
O N
D
AT
A 4%
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
W
2C
XX
XX
JA
N
U
AR
Y
SP
EC
N O
FI
LE
N
AM
E:
AN
SI
D
W
2R
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H R
EP
AI
R W
ES
T
8T
H /4
TH
F W
F -3
AP
R O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
AM
G
EN
ER
AL
R
EV
IS
IO
N S
AM
G
EN
ER
AL
R
EV
IS
IO
N S
7/ 1/
3/
/2
H U
_G
C
0.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
O
VE
R
AL
L
PH
AS
IN
G P
LA
N
GC100
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A1 SCALE: 1" = 100' - 0"
OVERALL PHASING PLAN
1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE
INFORMATION.
2. SEE SHEETS GC101 AND GC102 FOR ADDITIONAL PHASING REQUIREMENTS.
3. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN
NOTES.
CONSTRUCTION AREA ZONECAZ
CONTRACTOR
HAUL ROUTE
GENERAL SHEET NOTES
LEGEND
1. THE PHASING PLAN HAS BEEN DEVELOPED SO THAT ONLY 2 SHELTERED
PARKING ROWS AT A TIME WILL BE INACCESSIBLE FOR HILL AFB OPERATIONS. AT
NO TIME DURING CONSTRUCTION SHALL MORE THAN 2 PARKING ROWS BE CLOSED
TO AIRCRAFT OPERATIONS.
2. FLAGGERS SHALL BE PROVIDED TO MARSHAL CONSTRUCTION EQUIPEMENT
ACROSS TAXIWAY E. PAVEMENT SHALL BE KEPT FREE OF FOD AT ALL TIMES
DURING CONSTRUCTION. SEE SHEET GC103 FOR FOD CONTROL REQUIREMENTS.
3. AN AIR SHOW IS SCHEDULED FOR THE 3RD WEEK OF JUNE IN 2022. THE
CONTRACTOR SHALL NOT WORK THE MONDAY BEFORE THE AIRSHOW THROUGH
THE MONDAY AFTER THE AIRSHOW. ALL PAVEMENT SHALL BE CLEAR OF FOD AND
NO AREAS WILL BE ALLOWED TO BE UNPAVED FOR THAT WEEK. ANY PAVEMENT
THAT HAS BEEN REMOVED SHALL BE PAVEMENT WITH THE PERMANENT PCC
PAVEMENT SECTION OR A TEMPORARY PCC OR ACC PAVEMENT SECTION. THE
CONTRACTOR SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA
DURING THE AIR SHOW.
4. AN AIR SHOW IS SCHEDULED FOR THE 3RD WEEK OF JUNE IN 2024. THE
CONTRACTOR SHALL NOT WORK THE MONDAY BEFORE THE AIRSHOW THROUGH
THE MONDAY AFTER THE AIRSHOW. ALL PAVEMENT SHALL BE CLEAR OF FOD AND
NO AREAS WILL BE ALLOWED TO BE UNPAVED FOR THAT WEEK. ANY PAVEMENT
THAT HAS BEEN REMOVED SHALL BE PAVEMENT WITH THE PERMANENT PCC
PAVEMENT SECTION OR A TEMPORARY PCC OR ACC PAVEMENT SECTION. THE
CONTRACTOR SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA
DURING THE AIR SHOW.
5. ALL CONCRETE, ASPHALT, BASE COURSE AND SUBGRADE REMOVED FROM THE
PREOJCT SHALL BE DISPOSED OF OFF HILL AFB CONTROLLED LANDS.
GENERAL PHASING NOTES
CONTRACTOR
STAGING AREA
CAZ #1
CAZ #2
FLAGGER REQUIRED
AT THIS LOCATION
CONSTRUCT SUNSHADE SHELTERS
AS PART OF THE BASIC CONTRACT
FOR PARKING POSITIONS #1 - #18
CONSTRUCT SUNSHADE SHELTERS
AS PART OF OPTION #3 FOR
PARKING POSITIONS #19 & #20
CONSTRUCT SUNSHADE SHELTERS
AS PART OF OPTION #4 FOR
PARKING POSITIONS #21 & #22
CONSTRUCT SUNSHADE SHELTERS
AS PART OF OPTION #5 FOR
PARKING POSITIONS #23 & #24
CONSTRUCT SUNSHADE SHELTERS
AS PART OF OPTION #6 FOR
PARKING POSITIONS #25 & #26
TR
W
E
W
W
W
U
U
U
U
C
W W
TR
TR
CAZ #1
PARKING
ROW A
PARKING
ROW B
PARKING
ROW C
PARKING
ROW D
PARKING
ROW E
PARKING
ROW F
PARKING
ROW G
110'
TA
XI
W
AY
E
EXISTING
PAVEMENT
TO REMAIN
EXISTING
PAVEMENT
TO REMAIN
EXISTING
PAVEMENT
TO REMAIN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
PR
O D
U C
TI
O
N D
AT
A
1%
PR
O
D U
C
TI
O N
D
AT
A 2%
PR
O D
U C
TI
O
N D
AT
A
3%
PR
O
D U
C
TI
O N
D
AT
A 4%
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
W
2C
XX
XX
JA
N
U
AR
Y
SP
EC
N O
FI
LE
N
AM
E:
AN
SI
D
W
2R
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H R
EP
AI
R W
ES
T
8T
H /4
TH
F W
F -3
AP
R O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
AM
G
EN
ER
AL
R
EV
IS
IO
N S
7/ 1/
H U
_G
C
1.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
PH
AS
IN
G
P
LA
N
C
AZ
GC101
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A1 SCALE: 1" = 100' - 0"
CONSTRUCTION AREA ZONE #1 PHASING PLAN
1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE
INFORMATION.
2. SEE SHEET GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN
NOTES.
CONSTRUCTION AREA ZONECAZ
CONTRACTOR HAUL ROUTE
GENERAL SHEET NOTES
LEGEND
1. PARKING ROWS A AND B WILL BE CLOSED TO AIRCRAFT OPERATIONS DURING
WORK WITHIN CAZ #1. ALL OTHER PAVEMENT AREAS ON THE APRON, OUTSIDE OF
THE CONSTRUCTION FREE ZONE, WILL BE OPEN TO AIRCRAFT OPERATIONS.
2. REMOVE THIS EXISTING PAVEMENT DURING WORK WITHIN CAZ #1. REPLACE THE
PAVEMENT WHILE WORKING WITHIN CAZ #2.
3. WORK WITHIN CAZ #1 INCLUDES BUT IS NOT LIMITED TO: REMOVING EXISTING
CONCRETE AND ASPHALT PAVEMENT SECTIONS; CONSTRUCTING A NEW SUBDRAIN
SYSTEM; CONSTRUCTING THE NEW PCC AND ACC PAVEMENT SECTIONS;
RE-MARKING THE APRON.
4. THIS PROJECT IS LOCATED WITHIN A RESTRICTED AREA. CONSTRUCTION
ACTIVITIES SHALL NOT BEGIN UNTIL A FREE ZONE APPLICATION IS APPROVED BY
THE 388TH FIGHTER WING AND THE AIRFIELD MANAGER.
5. SEE SHEET GC501 FOR LOW PROFILE BARRICADES & ROPE AND BARREL
FENCING DETAILS. EXACT LOCATION OF ALL LOW PROFILE BARRICADES & ROPE
AND BARREL FENCING SHALL BE COORDINATED WITH THE AIRFIELD MANAGER,
THROUGH THE CONTRACTING OFFICER.
GENERAL PHASING NOTES
CONTRACTOR STAGING AREA
CAZ #1
SEE GENERAL PHASING NOTE 2
FLAGGER REQUIRED AT
THIS LOCATION
ROPE AND BARREL FENCE
(REF A7, E7, A13,
E13 & G13: GC501)
LOW PROFILE BARRICADES
(REF A1, E1 & E7: GC501)
TR
W
E
W
W
W
U
U
U
U
C
W W
TR
TR
PARKING
POSITION
#1
PARKING
POSITION
#2
PARKING
POSITION
#3
PARKING
POSITION
#4
PARKING
POSITION
#5
PARKING
POSITION
#6
PARKING
POSITION
#7
PARKING
POSITION
#8
PARKING
POSITION
#9
PARKING
POSITION
#10
PARKING
POSITION
#11
PARKING
POSITION
#12
PARKING
POSITION
#13
PARKINGPOSITION#26
PARKINGPOSITION#25
PARKINGPOSITION#24
PARKINGPOSITION#23
PARKINGPOSITION#22
PARKINGPOSITION#21
PARKINGPOSITION#20
PARKINGPOSITION#19
PARKINGPOSITION#18
PARKINGPOSITION#17
PARKINGPOSITION#16
PARKINGPOSITION#15
PARKINGPOSITION#14
PARKING
ROW A
PARKING
ROW B
PARKING
ROW C
PARKING
ROW D
PARKING
ROW E
PARKING
ROW F
PARKING
ROW G
TA
XI
W
AY
E
EXISTING
PAVEMENT
TO REMAIN
EXISTING
PAVEMENT
TO REMAIN
EXISTING
PAVEMENT
TO REMAIN
390'
400'
55'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
PR
O D
U C
TI
O
N D
AT
A
1%
PR
O
D U
C
TI
O N
D
AT
A 2%
PR
O D
U C
TI
O
N D
AT
A
3%
PR
O
D U
C
TI
O N
D
AT
A 4%
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
W
2C
XX
XX
JA
N
U
AR
Y
SP
EC
N O
FI
LE
N
AM
E:
AN
SI
D
W
2R
H
IL
L
AI
R F
O R
C E
BA
SE
, U
TA
H R
EP
AI
R W
ES
T
8T
H /4
TH
F W
F -3
AP
R O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
AM
G
EN
ER
AL
R
EV
IS
IO
N S
7/ 1/
H U
_G
C
2.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
PH
AS
IN
G
P
LA
N
C
AZ
GC102
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A1 SCALE: 1" = 100' - 0"
CONSTRUCTION AREA ZONE #2 PHASING PLAN
1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE
INFORMATION.
2. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN
NOTES.
CONSTRUCTION AREA ZONECAZ
CONTRACTOR HAUL ROUTE
GENERAL SHEET NOTES
LEGEND
1. PARKING ROWS B AND C WILL BE CLOSED TO AIRCRAFT OPERATIONS DURING
WORK WITHIN CAZ #2. ALL OTHER AIRFIELD PAVEMENT, OUTSIDE OF THE
CONSTRUCTION FREE ZONE, WILL BE OPEN TO AIRCRAFT OPERATIONS.
2. PAVEMENT REMOVED DURING WORK WITHIN CAZ #1 SHALL BE REPLACED WHILE
WORKING WITHIN CAZ #2.
3. WORK WITHIN CAZ #2 INCLUDES BUT IS NOT LIMITED TO: REMOVING EXISTING
CONCRETE AND ASPHALT PAVEMENT SECTIONS; REMOVING AND RECYCLING THE
EXISTING SUN SHADE STRUCTURES; REMOVING AND STORING THE EXISTING CREW
SHACK AND ASSOCIATED EQUIPMENT AT PARKING ROW C; CONSTRUCTING THE
NEW PCC AND ACC PAVEMENT SECTIONS; CONSTRUCTING THE NEW SUN SHADE
SHELTERS AND ASSOCIATED ROOF DRAIN SYSTEM; CONSTRUCTING A NEW CREW
SHACK AND ASSOCIATED EQUIPMENT AT PARKING ROW B AND REINSTALLING THE
CREW SHACK AND ASSOCIATED EQUIPMENT AT PARKING ROW C; INSTALLING
LIGHTNING PROTECTION, COMM AND ELECTRICAL PORTS AT EACH PARKING
POSITION; CONSTRUCTING A NEW SUBDRAIN SYSTEM; AND RE-MARKING THE
APRON.
4. THIS PROJECT IS LOCATED WITHIN A RESTRICTED AREA. CONSTRUCTION
ACTIVITIES SHALL NOT BEGIN UNTIL A FREE ZONE APPLICATION IS APPROVED BY
THE 388TH FIGHTER WING.
5. SEE SHEET GC501 FOR LOW PROFILE BARRICADES & ROPE AND BARREL
FENCING DETAILS. EXACT LOCATION OF ALL LOW PROFILE BARRICADES & ROPE
AND BARREL FENCING SHALL BE COORDINATED WITH THE AIRFIELD MANAGER,
THROUGH THE CONTRACTING OFFICER.
6. AIRCRAFT WILL UTILIZE THE PARKING POSITIONS IN ROW D DURING
CONSTRUCTION WITHIN CAZ #2. ALL AIRCRAFT UTILIZING THE PARKING POSITIONS
IN ROW D WILL BE TOWED IN AND OUT OF THE POSITIONS.
GENERAL PHASING NOTES
CONTRACTOR STAGING AREA
CAZ #2
SEE GENERAL PHASING NOTE 2
FLAGGER REQUIRED AT
THIS LOCATION
ROPE AND BARREL FENCE
(REF A7, E7, A13,
E13 & G13: GC501)
LOW PROFILE BARRICADES
(REF A1, E1 & E7: GC501)
| HU09_G-002 |
| HU09_GC100 |
| HU09_GC101 |
| HU09_GC102 |
File details come from the government source that posted it. Updated .