W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf

PDF 793 KB Posted

Attached to
West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This solicitation package includes design and construction documents for a design-build project to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The project scope involves removing the existing 12-inch PCC pavement and replacing it with a new 15-inch PCC section incorporating a stabilized drainage layer and new subbase course material. The existing sunshade shelters and crew shacks on the apron will also be dismantled and replaced. One additional crew shack will be provided. The awarded contractor will be responsible for design and construction activities, including re-marking the apron, in accordance with the criteria and standards specified. The Department of the Army Corps of Engineers Engineering District Sacramento is the issuing agency. The solicitation number is W9123822R0008.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

DESIGN FILE SHEET NO. DESCRIPTION

GENERAL

CIVIL

G-001 G-002 G-003

GC100

GC101

GC102

GC103

GC104

GC501

GC502

COVER SHEET

INDEX OF DRAWINGS

PROJECT LOCATION PLAN

OVERALL PHASING PLAN

PHASING PLAN - CAZ #1

PHASING PLAN - CAZ #2

CONSTRUCTION SAFETY AND PHASING PLAN NOTES

CONSTRUCTION SAFETY AND PHASING PLAN NOTES

LOW PROFILE BARRICADES AND ROPE & BARREL FENCING DETAILS

MISCELLANEOUS CONSTRUCTION DETAILS

HU09_CD101.DWG

HU09_CD102.DWG

HU09_CD103.DWG

HU09_CD104.DWG

HU09_CD201.DWG

HU09_CS101.DWG

HU09_CS102.DWG

HU09_CS103.DWG

HU09_CS104.DWG

HU09_CS501.DWG

HU09_CS502.DWG

HU09_CS503.DWG

HU09_CP101.DWG

HU09_CP102.DWG

HU09_CP103.DWG

HU09_CP104.DWG

HU09_CP201.DWG

HU09_CP401.DWG

HU09_CP402.DWG

HU09_CP403.DWG

HU09_CP404.DWG

HU09_CP501.DWG

HU09_CP502.DWG

HU09_CP503.DWG

HU09_CP504.DWG

HU09_CG101.DWG

HU09_CG102.DWG

HU09_CG103.DWG

HU09_CG104.DWG

HU09_CG501.DWG

CD101

CD102

CD103

CD104

CD201

CS101

CS102

CS103

CS104

CS501

CS502

CS503

CP101

CP102

CP103

CP104

CP201

CP401

CP402

CP403

CP404

CP501

CP502

CP503

CP504

CG101

CG102

CG103

CG104

CG501

ELECTRICAL

HU09_G-001.DWG

HU09_G-002.DWG

HU09_G-003.DWG

HU09_GC100.DWG

HU09_GC101.DWG

HU09_GC102.DWG

HU09_GC103.DWG

HU09_GC104.DWG

HU09_GC501.DWG

HU09_GC502.DWG

HU09_E-001.DWG

HU09_ES101.DWG

HU09_ES102.DWG

HU09_ES103.DWG

HU09_ES701.DWG

HU09_ET101.DWG

HU09_ET102.DWG

HU09_ET103.DWG

E-001

ES101

ES102

ES103

ES701

ET101

ET102

ET103

ELECTRICAL ABBREVIATIONS AND LEGEND

ELECTRICAL SITE PLAN

ELECTRICAL SITE PLAN 2

ELECTRICAL SITE PLAN 3

ELECTRICAL EQUIPMENT PICTURE

ELECTRICAL TELECOMMUNICATIONS SITE PLAN

ELECTRICAL TELECOMMUNICATIONS SITE PLAN 2

ELECTRICAL TELECOMMUNICATIONS CABINET

DEMOLITION PLAN - AREA A

DEMOLITION PLAN - AREA B

DEMOLITION PLAN - AREA C

DEMOLITION PLAN - AREA D

REPLACEMENT REMOVAL SECTIONS

SITE PLAN - AREA A

SITE PLAN - AREA B

SITE PLAN - AREA C

SITE PLAN - AREA D

PAVEMENT MARKING DETAILS - SHEET 1 OF 2

PAVEMENT MARKING DETAILS - SHEET 2 OF 2

TIE DOWN AND STATIC GROUND PLAN & DETAILS

PAVING PLAN - AREA A

PAVING PLAN - AREA B

PAVING PLAN - AREA C

PAVING PLAN - AREA D

REPLACEMENT PAVEMENT SECTIONS

JOINT LAYOUT PLAN - AREA A

JOINT LAYOUT PLAN - AREA B

JOINT LAYOUT PLAN - AREA C

JOINT LAYOUT PLAN - AREA D

JOINT DETAILS

JOINT SEALANT DETAILS

REINFORCEMENT DETAILS

HYDRANT FUEL PIT SURFACE DRAINAGE DETAIL

GRADING AND DRAINAGE PLAN - AREA A

GRADING AND DRAINAGE PLAN - AREA B

GRADING AND DRAINAGE PLAN - AREA C

GRADING AND DRAINAGE PLAN - AREA D

SUBDRAIN DETAILS

EXISTING CONDITIONS

HU09_VF100.DWG

HU09_VF101.DWG

HU09_VF102.DWG

HU09_VF103.DWG

HU09_VF104.DWG

VF100

VF101

VF102

VF103

VF104

TOPOGRAPHIC SURVEY INFORMATION PLAN

EXISTING CONDITIONS PLAN - AREA A

EXISTING CONDITIONS PLAN - AREA B

EXISTING CONDITIONS PLAN - AREA C

EXISTING CONDITIONS PLAN - AREA D

AS-BUILTS

HU09_M-901.DWG M-901 AVFUEL HYDRANT FUEL SYSTEM DETAILS AS-BUILTS

HU09_S-901.DWG

HU09_S-902.DWG

HU09_S-903.DWG

S-901 S-902 S-903

SUN SHADE CANOPY AS-BUILTS - SHEET 1 OF 3

SUN SHADE CANOPY AS-BUILTS - SHEET 2 OF 3

SUN SHADE CANOPY AS-BUILTS - SHEET 3 OF 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

PR

O D

U C

TI

O

N D

AT

A

1%

PR

O

D U

C

TI

O N

D

AT

A 2%

PR

O D

U C

TI

O

N D

AT

A

3%

PR

O

D U

C

TI

O N

D

AT

A 4%

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

W

2C

XX

XX

JA

N

U

AR

Y

SP

EC

N O

FI

LE

N

AM

E:

AN

SI

D

W

2R

H

IL

L

AI

R F

O R

C E

BA

SE

, U

TA

H R

EP

AI

R W

ES

T

8T

H /4

TH

F W

F -3

AP

R O

N

AD

VE

R

TI

SE

M

EN

T

SE

T

AM

G

EN

ER

AL

R

EV

IS

IO

N S

AM

G

EN

ER

AL

R

EV

IS

IO

N S

AM

G

EN

ER

AL

R

EV

IS

IO

N S

N

EW

D

R

AW

IN

G

S

AD

D

ED

AM

G

EN

ER

AL

R

EV

IS

IO

N S

7/ 1/

4/ 6/

4/ 4/

3/

/2

H U

_G

-0

.d w g

M . H

U C

KL

E

B.

G

O

LI

BE

R

B.

G

O

LI

BE

R

K.

H

AL

L

IN

D

EX

O

F D

R

AW

IN

G

S

G-002

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

SD SD SD

TRTR

TR

W

E

W

W

W

U

U

U

U

C

W W

TR

TR

CAZ #1

PARKING

POSITION

#1

PARKING

POSITION

#2

PARKING

POSITION

#3

PARKING

POSITION

#4

PARKING

POSITION

#5

PARKING

POSITION

#6

PARKING

POSITION

#7

PARKING

POSITION

#8

PARKING

POSITION

#9

PARKING

POSITION

#10

PARKING

POSITION

#11

PARKING

POSITION

#12

PARKING

POSITION

#13

PARKINGPOSITION#26

PARKINGPOSITION#25

PARKINGPOSITION#24

PARKINGPOSITION#23

PARKINGPOSITION#22

PARKINGPOSITION#21

PARKINGPOSITION#20

PARKINGPOSITION#19

PARKINGPOSITION#18

PARKINGPOSITION#17

PARKINGPOSITION#16

PARKINGPOSITION#15

PARKINGPOSITION#14

CAZ #2

TA

XI

W

AY

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

PR

O D

U C

TI

O

N D

AT

A

1%

PR

O

D U

C

TI

O N

D

AT

A 2%

PR

O D

U C

TI

O

N D

AT

A

3%

PR

O

D U

C

TI

O N

D

AT

A 4%

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

W

2C

XX

XX

JA

N

U

AR

Y

SP

EC

N O

FI

LE

N

AM

E:

AN

SI

D

W

2R

H

IL

L

AI

R F

O R

C E

BA

SE

, U

TA

H R

EP

AI

R W

ES

T

8T

H /4

TH

F W

F -3

AP

R O

N

AD

VE

R

TI

SE

M

EN

T

SE

T

AM

G

EN

ER

AL

R

EV

IS

IO

N S

AM

G

EN

ER

AL

R

EV

IS

IO

N S

7/ 1/

3/

/2

H U

_G

C

0.

dw g

M . H

U C

KL

E

B.

G

O

LI

BE

R

B.

G

O

LI

BE

R

K.

H

AL

L

O

VE

R

AL

L

PH

AS

IN

G P

LA

N

GC100

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

A1 SCALE: 1" = 100' - 0"

OVERALL PHASING PLAN

1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE

INFORMATION.

2. SEE SHEETS GC101 AND GC102 FOR ADDITIONAL PHASING REQUIREMENTS.

3. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN

NOTES.

CONSTRUCTION AREA ZONECAZ

CONTRACTOR

HAUL ROUTE

GENERAL SHEET NOTES

LEGEND

1. THE PHASING PLAN HAS BEEN DEVELOPED SO THAT ONLY 2 SHELTERED

PARKING ROWS AT A TIME WILL BE INACCESSIBLE FOR HILL AFB OPERATIONS. AT

NO TIME DURING CONSTRUCTION SHALL MORE THAN 2 PARKING ROWS BE CLOSED

TO AIRCRAFT OPERATIONS.

2. FLAGGERS SHALL BE PROVIDED TO MARSHAL CONSTRUCTION EQUIPEMENT

ACROSS TAXIWAY E. PAVEMENT SHALL BE KEPT FREE OF FOD AT ALL TIMES

DURING CONSTRUCTION. SEE SHEET GC103 FOR FOD CONTROL REQUIREMENTS.

3. AN AIR SHOW IS SCHEDULED FOR THE 3RD WEEK OF JUNE IN 2022. THE

CONTRACTOR SHALL NOT WORK THE MONDAY BEFORE THE AIRSHOW THROUGH

THE MONDAY AFTER THE AIRSHOW. ALL PAVEMENT SHALL BE CLEAR OF FOD AND

NO AREAS WILL BE ALLOWED TO BE UNPAVED FOR THAT WEEK. ANY PAVEMENT

THAT HAS BEEN REMOVED SHALL BE PAVEMENT WITH THE PERMANENT PCC

PAVEMENT SECTION OR A TEMPORARY PCC OR ACC PAVEMENT SECTION. THE

CONTRACTOR SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA

DURING THE AIR SHOW.

4. AN AIR SHOW IS SCHEDULED FOR THE 3RD WEEK OF JUNE IN 2024. THE

CONTRACTOR SHALL NOT WORK THE MONDAY BEFORE THE AIRSHOW THROUGH

THE MONDAY AFTER THE AIRSHOW. ALL PAVEMENT SHALL BE CLEAR OF FOD AND

NO AREAS WILL BE ALLOWED TO BE UNPAVED FOR THAT WEEK. ANY PAVEMENT

THAT HAS BEEN REMOVED SHALL BE PAVEMENT WITH THE PERMANENT PCC

PAVEMENT SECTION OR A TEMPORARY PCC OR ACC PAVEMENT SECTION. THE

CONTRACTOR SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA

DURING THE AIR SHOW.

5. ALL CONCRETE, ASPHALT, BASE COURSE AND SUBGRADE REMOVED FROM THE

PREOJCT SHALL BE DISPOSED OF OFF HILL AFB CONTROLLED LANDS.

GENERAL PHASING NOTES

CONTRACTOR

STAGING AREA

CAZ #1

CAZ #2

FLAGGER REQUIRED

AT THIS LOCATION

CONSTRUCT SUNSHADE SHELTERS

AS PART OF THE BASIC CONTRACT

FOR PARKING POSITIONS #1 - #18

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #3 FOR

PARKING POSITIONS #19 & #20

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #4 FOR

PARKING POSITIONS #21 & #22

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #5 FOR

PARKING POSITIONS #23 & #24

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #6 FOR

PARKING POSITIONS #25 & #26

TR

W

E

W

W

W

U

U

U

U

C

W W

TR

TR

CAZ #1

PARKING

ROW A

PARKING

ROW B

PARKING

ROW C

PARKING

ROW D

PARKING

ROW E

PARKING

ROW F

PARKING

ROW G

110'

TA

XI

W

AY

E

EXISTING

PAVEMENT

TO REMAIN

EXISTING

PAVEMENT

TO REMAIN

EXISTING

PAVEMENT

TO REMAIN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

PR

O D

U C

TI

O

N D

AT

A

1%

PR

O

D U

C

TI

O N

D

AT

A 2%

PR

O D

U C

TI

O

N D

AT

A

3%

PR

O

D U

C

TI

O N

D

AT

A 4%

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

W

2C

XX

XX

JA

N

U

AR

Y

SP

EC

N O

FI

LE

N

AM

E:

AN

SI

D

W

2R

H

IL

L

AI

R F

O R

C E

BA

SE

, U

TA

H R

EP

AI

R W

ES

T

8T

H /4

TH

F W

F -3

AP

R O

N

AD

VE

R

TI

SE

M

EN

T

SE

T

AM

G

EN

ER

AL

R

EV

IS

IO

N S

7/ 1/

H U

_G

C

1.

dw g

M . H

U C

KL

E

B.

G

O

LI

BE

R

B.

G

O

LI

BE

R

K.

H

AL

L

PH

AS

IN

G

P

LA

N

C

AZ

GC101

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

A1 SCALE: 1" = 100' - 0"

CONSTRUCTION AREA ZONE #1 PHASING PLAN

1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE

INFORMATION.

2. SEE SHEET GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN

NOTES.

CONSTRUCTION AREA ZONECAZ

CONTRACTOR HAUL ROUTE

GENERAL SHEET NOTES

LEGEND

1. PARKING ROWS A AND B WILL BE CLOSED TO AIRCRAFT OPERATIONS DURING

WORK WITHIN CAZ #1. ALL OTHER PAVEMENT AREAS ON THE APRON, OUTSIDE OF

THE CONSTRUCTION FREE ZONE, WILL BE OPEN TO AIRCRAFT OPERATIONS.

2. REMOVE THIS EXISTING PAVEMENT DURING WORK WITHIN CAZ #1. REPLACE THE

PAVEMENT WHILE WORKING WITHIN CAZ #2.

3. WORK WITHIN CAZ #1 INCLUDES BUT IS NOT LIMITED TO: REMOVING EXISTING

CONCRETE AND ASPHALT PAVEMENT SECTIONS; CONSTRUCTING A NEW SUBDRAIN

SYSTEM; CONSTRUCTING THE NEW PCC AND ACC PAVEMENT SECTIONS;

RE-MARKING THE APRON.

4. THIS PROJECT IS LOCATED WITHIN A RESTRICTED AREA. CONSTRUCTION

ACTIVITIES SHALL NOT BEGIN UNTIL A FREE ZONE APPLICATION IS APPROVED BY

THE 388TH FIGHTER WING AND THE AIRFIELD MANAGER.

5. SEE SHEET GC501 FOR LOW PROFILE BARRICADES & ROPE AND BARREL

FENCING DETAILS. EXACT LOCATION OF ALL LOW PROFILE BARRICADES & ROPE

AND BARREL FENCING SHALL BE COORDINATED WITH THE AIRFIELD MANAGER,

THROUGH THE CONTRACTING OFFICER.

GENERAL PHASING NOTES

CONTRACTOR STAGING AREA

CAZ #1

SEE GENERAL PHASING NOTE 2

FLAGGER REQUIRED AT

THIS LOCATION

ROPE AND BARREL FENCE

(REF A7, E7, A13,

E13 & G13: GC501)

LOW PROFILE BARRICADES

(REF A1, E1 & E7: GC501)

TR

W

E

W

W

W

U

U

U

U

C

W W

TR

TR

PARKING

POSITION

#1

PARKING

POSITION

#2

PARKING

POSITION

#3

PARKING

POSITION

#4

PARKING

POSITION

#5

PARKING

POSITION

#6

PARKING

POSITION

#7

PARKING

POSITION

#8

PARKING

POSITION

#9

PARKING

POSITION

#10

PARKING

POSITION

#11

PARKING

POSITION

#12

PARKING

POSITION

#13

PARKINGPOSITION#26

PARKINGPOSITION#25

PARKINGPOSITION#24

PARKINGPOSITION#23

PARKINGPOSITION#22

PARKINGPOSITION#21

PARKINGPOSITION#20

PARKINGPOSITION#19

PARKINGPOSITION#18

PARKINGPOSITION#17

PARKINGPOSITION#16

PARKINGPOSITION#15

PARKINGPOSITION#14

PARKING

ROW A

PARKING

ROW B

PARKING

ROW C

PARKING

ROW D

PARKING

ROW E

PARKING

ROW F

PARKING

ROW G

TA

XI

W

AY

E

EXISTING

PAVEMENT

TO REMAIN

EXISTING

PAVEMENT

TO REMAIN

EXISTING

PAVEMENT

TO REMAIN

390'

400'

55'

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

PR

O D

U C

TI

O

N D

AT

A

1%

PR

O

D U

C

TI

O N

D

AT

A 2%

PR

O D

U C

TI

O

N D

AT

A

3%

PR

O

D U

C

TI

O N

D

AT

A 4%

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

W

2C

XX

XX

JA

N

U

AR

Y

SP

EC

N O

FI

LE

N

AM

E:

AN

SI

D

W

2R

H

IL

L

AI

R F

O R

C E

BA

SE

, U

TA

H R

EP

AI

R W

ES

T

8T

H /4

TH

F W

F -3

AP

R O

N

AD

VE

R

TI

SE

M

EN

T

SE

T

AM

G

EN

ER

AL

R

EV

IS

IO

N S

7/ 1/

H U

_G

C

2.

dw g

M . H

U C

KL

E

B.

G

O

LI

BE

R

B.

G

O

LI

BE

R

K.

H

AL

L

PH

AS

IN

G

P

LA

N

C

AZ

GC102

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

A1 SCALE: 1" = 100' - 0"

CONSTRUCTION AREA ZONE #2 PHASING PLAN

1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE

INFORMATION.

2. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN

NOTES.

CONSTRUCTION AREA ZONECAZ

CONTRACTOR HAUL ROUTE

GENERAL SHEET NOTES

LEGEND

1. PARKING ROWS B AND C WILL BE CLOSED TO AIRCRAFT OPERATIONS DURING

WORK WITHIN CAZ #2. ALL OTHER AIRFIELD PAVEMENT, OUTSIDE OF THE

CONSTRUCTION FREE ZONE, WILL BE OPEN TO AIRCRAFT OPERATIONS.

2. PAVEMENT REMOVED DURING WORK WITHIN CAZ #1 SHALL BE REPLACED WHILE

WORKING WITHIN CAZ #2.

3. WORK WITHIN CAZ #2 INCLUDES BUT IS NOT LIMITED TO: REMOVING EXISTING

CONCRETE AND ASPHALT PAVEMENT SECTIONS; REMOVING AND RECYCLING THE

EXISTING SUN SHADE STRUCTURES; REMOVING AND STORING THE EXISTING CREW

SHACK AND ASSOCIATED EQUIPMENT AT PARKING ROW C; CONSTRUCTING THE

NEW PCC AND ACC PAVEMENT SECTIONS; CONSTRUCTING THE NEW SUN SHADE

SHELTERS AND ASSOCIATED ROOF DRAIN SYSTEM; CONSTRUCTING A NEW CREW

SHACK AND ASSOCIATED EQUIPMENT AT PARKING ROW B AND REINSTALLING THE

CREW SHACK AND ASSOCIATED EQUIPMENT AT PARKING ROW C; INSTALLING

LIGHTNING PROTECTION, COMM AND ELECTRICAL PORTS AT EACH PARKING

POSITION; CONSTRUCTING A NEW SUBDRAIN SYSTEM; AND RE-MARKING THE

APRON.

4. THIS PROJECT IS LOCATED WITHIN A RESTRICTED AREA. CONSTRUCTION

ACTIVITIES SHALL NOT BEGIN UNTIL A FREE ZONE APPLICATION IS APPROVED BY

THE 388TH FIGHTER WING.

5. SEE SHEET GC501 FOR LOW PROFILE BARRICADES & ROPE AND BARREL

FENCING DETAILS. EXACT LOCATION OF ALL LOW PROFILE BARRICADES & ROPE

AND BARREL FENCING SHALL BE COORDINATED WITH THE AIRFIELD MANAGER,

THROUGH THE CONTRACTING OFFICER.

6. AIRCRAFT WILL UTILIZE THE PARKING POSITIONS IN ROW D DURING

CONSTRUCTION WITHIN CAZ #2. ALL AIRCRAFT UTILIZING THE PARKING POSITIONS

IN ROW D WILL BE TOWED IN AND OUT OF THE POSITIONS.

GENERAL PHASING NOTES

CONTRACTOR STAGING AREA

CAZ #2

SEE GENERAL PHASING NOTE 2

FLAGGER REQUIRED AT

THIS LOCATION

ROPE AND BARREL FENCE

(REF A7, E7, A13,

E13 & G13: GC501)

LOW PROFILE BARRICADES

(REF A1, E1 & E7: GC501)

HU09_G-002
HU09_GC100
HU09_GC101
HU09_GC102

File details come from the government source that posted it. Updated .