West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This solicitation is for a design-build contract to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base. The scope of work includes dismantling and recycling existing sunshades and installing new sunshades, removing existing crew shacks and relocating or adding new crew shacks, and removing 12-inch PCC pavement and replacing it with a 15-inch PCC section incorporating a stabilized drainage layer and new subbase materials. The awarded contractor will be responsible for the complete design and construction documents prior to construction. The Department of the Army Corps of Engineers Engineering District Sacramento is the issuing agency. The contractor shall perform all work according to this solicitation, included concept design drawings, and supplemental contract requirements.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

andy Polygonal Line andy Line andy Typewritten Text 8 x #8 DOWELLS, 2 PER SIDE.

andy Line andy Line andy Line andy Line andy Line andy Line andy Line

Line

SHOULD BE FACTORY CUT.

andy

SHOULD BE FACTORY CUT.

Polygonal Line

H-WO-054186-G001.pdf
001 G001
H-WO-054186-G002
002 G002
H-WO-054186-G003
003 G003
H-WO-054186-G004
004 G004
H-WO-054186-G005
005 G005
H-WO-054186-AE101
011 AE101
H-WO-054186-AE201
012 AE201
H-WO-054186-AE301
013 AE301
H-WO-054186-AE501
014 AE501
H-WO-054186-AE502
015 AE502
H-WO-054186-AE601
016 AE601
H-WO-054186-AE602
017 AE602
H-WO-054186-SE001
006 SE001
H-WO-054186-SF101
007 SF101
H-WO-054186-SF501
008 SF501
H-WO-054186-SF511
009 SF511
H-WO-054186-SF601
010 SF601
H-WO-054186-FP101
019 FP101
H-WO-054186-MH001
018 MH001
H-WO-054186-MH101
020 MH101
H-WO-054186-MH501
021 MH501
H-WO-054186-MH601
022 MH601
H-WO-054186-PL101
023 PL101
H-WO-054186-EG001
024 EG001
H-WO-054186-EG002
025 EG002
H-WO-054186-EG003
026 EG003
H-WO-054186-EG501
027 EG501
H-WO-054186-EG502
028 EG502
H-WO-054186-EL101
030 EL101
H-WO-054186-EL601
031 EL601
H-WO-054186-EP101
032 EP101
H-WO-054186-EP601
033 EP601
H-WO-054186-EP701
034 EP701
H-WO-054186-EP801
035 EP801
H-WO-054186-EP802
036 EP802
H-WO-054186-EP803
037 EP803
H-WO-054186-ES101
029 ES101
H-WO-054186-EY101
038 EYY101
H-WO-054186-EY102
039 EY102

File details come from the government source that posted it. Updated .