Phase 2 Attachment 3 Supplemental Contract Requirements.pdf

PDF 141 KB Posted

Attached to
West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This document outlines requirements for a design-build contract to replace a fighter wing apron at Hill Air Force Base in Utah. The contract will remove and replace the pavement and sunshade shelters on the West portion of the 388th/419th Fighter Wing apron, with the majority of the existing 40-year old pavement identified as needing replacement. The scope of work involves removing the existing 12-inch thick concrete and replacing it with 15-inch thick concrete incorporating a stabilized drainage layer and new subbase materials. It will also dismantle and replace the sunshade shelters, remove and relocate existing crew shacks, and add one additional crew shack. The performance period is 730 calendar days, with liquidated damages of $1,927.18 per day of delay. The applicable wage determination is General Decision No. UT20210083 from SAM.gov.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

SUPPLEMENTAL CONTRACT REQUIREMENTS

1. Performance Period: Refer to contract section 00700, FAR 52.211-10. The performance period for the work stated above shall be 730 calendar days.

2. Liquidated Damages: Refer to contract section 00700, FAR 52.211-12, Liquidated Damages-Construction. Liquidated damages for this work are $1,927.18 for each day of delay.

3. Authorities: “Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.”

4. Wage Determination: General Decision No. UT20210083, or its most current modification at the time of award is hereby applicable to work performed under this task order.

The most current decision or its modification can be found at:

SAM.gov

6. Time Extensions For Unusually Severe Weather: Refer to FAR 52.249-10, Default (Fixed- Priced Construction). All weather delay will need to be submitted and approved by the Contracting Officer Representative.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK-HILL AFB

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

(22) (19) (15) (07) (04) (03) (01) (02) (02) (05) (15) (22) https://sam.gov/wage-determination/UT20210083/5

File details come from the government source that posted it. Updated .