Attachment 23 Revised Drawings G 002 and GC 100.pdf

PDF 598 KB Posted

Attached to
West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This solicitation is for a design-build contract to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base in Utah. The scope of work involves removing the existing 12-inch thick Portland cement concrete pavement that is approximately 40 years old and has exceeded its design life, and replacing it with a new 15-inch thick PCC section incorporating a stabilized drainage layer and new subbase course material. It also includes dismantling and recycling the existing sunshade shelters and installing new sunshades, removing and relocating existing crew shacks, and adding one additional crew shack. The apron will be re-marked as part of the project. The contractor will perform design work prior to construction and is responsible for the complete design. The Army Corps of Engineers Engineering District Sacramento is the contracting agency.

View the file

Other files

File Type Posted
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H U

\H

U G

-0 .d w g

:2

:0

A

M

/1 /2

P D

A

E C p d f.

p lt c fg

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

O M

A H

A D

IS

T

R

IC

T

C A

P

IT

O L

A V

E

O M

A H

A

N E

W C

X X

X X

J A

N U

A R

Y

S P

E C

N O

F

IL

E N

A M

E

A N

S I

D

W R

H

IL

L A

IR

F

O R

C E

B A

S E

U

T A

H

R E

P A

IR

W

E S

T

T

H /4

T

H F

W F

-3 A

P R

O N

A D

V E

R T

IS

E

M E

N T

S E

T

A M

G E

N E

R A

L R

E V

IS

IO

N S

A M

G E

N E

R A

L R

E V

IS

IO

N S

A M

G E

N E

R A

L R

E V

IS

IO

N S

A M

G

E N

E R

A L

R E

V

IS

IO

N

S

N E

W D

R A

W

IN

G S

A D

D E

D

A M

G

E N

E R

A L

R E

V

IS

IO

N

S

/1

/2

/1

/2

/6

/2

/4

/2

/1

/2

H U

G

-0 .d w g

M H

U C

K L

E

B

G O

L

IB

E R

B

G O

L

IB

E R

K

H A

L L

IN

D

E X

O F

D R

A W

IN

G

S

G-002

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

INDEX

DESIGN FILE SHEET NO. DESCRIPTION

GENERAL

CIVIL

GC502

GC501

GC104

GC103

GC102

GC101

GC100

G-003

G-002

G-001

MISCELLANEOUS CONSTRUCTION DETAILS

LOW PROFILE BARRICADES AND ROPE & BARREL FENCING DETAILS

CONSTRUCTION SAFETY AND PHASING PLAN NOTES

CONSTRUCTION SAFETY AND PHASING PLAN NOTES

PHASING PLAN - CAZ #2

PHASING PLAN - CAZ #1

OVERALL PHASING PLAN

PROJECT LOCATION PLAN

INDEX OF DRAWINGS

COVER SHEET

HU09_CG501.DWG

HU09_CG104.DWG

HU09_CG103.DWG

HU09_CG102.DWG

HU09_CG101.DWG

HU09_CP504.DWG

HU09_CP503.DWG

HU09_CP502.DWG

HU09_CP501.DWG

HU09_CP404.DWG

HU09_CP403.DWG

HU09_CP402.DWG

HU09_CP401.DWG

HU09_CP201.DWG

HU09_CP104.DWG

HU09_CP103.DWG

HU09_CP102.DWG

HU09_CP101.DWG

HU09_CS503.DWG

HU09_CS502.DWG

HU09_CS501.DWG

HU09_CS104.DWG

HU09_CS103.DWG

HU09_CS102.DWG

HU09_CS101.DWG

HU09_CD201.DWG

HU09_CD104.DWG

HU09_CD103.DWG

HU09_CD102.DWG

HU09_CD101.DWG

CG501

CG104

CG103

CG102

CG101

CP504

CP503

CP502

CP501

CP404

CP403

CP402

CP401

CP201

CP104

CP103

CP102

CP101

CS503

CS502

CS501

CS104

CS103

CS102

CS101

CD201

CD104

CD103

CD102

CD101

ELECTRICAL

HU09_GC502.DWG

HU09_GC501.DWG

HU09_GC104.DWG

HU09_GC103.DWG

HU09_GC102.DWG

HU09_GC101.DWG

HU09_GC100.DWG

HU09_G-003.DWG

HU09_G-002.DWG

HU09_G-001.DWG

HU09_ET103.DWG

HU09_ET102.DWG

HU09_ET101.DWG

HU09_ES701.DWG

HU09_ES103.DWG

HU09_ES102.DWG

HU09_ES101.DWG

HU09_E-001.DWG

ET103

ET102

ET101

ES701

ES103

ES102

ES101

E-001

ELECTRICAL TELECOMMUNICATIONS CABINET

ELECTRICAL TELECOMMUNICATIONS SITE PLAN 2

ELECTRICAL TELECOMMUNICATIONS SITE PLAN

ELECTRICAL EQUIPMENT PICTURE

ELECTRICAL SITE PLAN 3

ELECTRICAL SITE PLAN 2

ELECTRICAL SITE PLAN

ELECTRICAL ABBREVIATIONS AND LEGEND

SUBDRAIN DETAILS

GRADING AND DRAINAGE PLAN - AREA D

GRADING AND DRAINAGE PLAN - AREA C

GRADING AND DRAINAGE PLAN - AREA B

GRADING AND DRAINAGE PLAN - AREA A

HYDRANT FUEL PIT SURFACE DRAINAGE DETAIL

REINFORCEMENT DETAILS

JOINT SEALANT DETAILS

JOINT DETAILS

JOINT LAYOUT PLAN - AREA D

JOINT LAYOUT PLAN - AREA C

JOINT LAYOUT PLAN - AREA B

JOINT LAYOUT PLAN - AREA A

REPLACEMENT PAVEMENT SECTIONS

PAVING PLAN - AREA D

PAVING PLAN - AREA C

PAVING PLAN - AREA B

PAVING PLAN - AREA A

TIE DOWN AND STATIC GROUND PLAN & DETAILS

PAVEMENT MARKING DETAILS - SHEET 2 OF 2

PAVEMENT MARKING DETAILS - SHEET 1 OF 2

SITE PLAN - AREA D

SITE PLAN - AREA C

SITE PLAN - AREA B

SITE PLAN - AREA A

REPLACEMENT REMOVAL SECTIONS

DEMOLITION PLAN - AREA D

DEMOLITION PLAN - AREA C

DEMOLITION PLAN - AREA B

DEMOLITION PLAN - AREA A

EXISTING CONDITIONS

HU09_VF104.DWG

HU09_VF103.DWG

HU09_VF102.DWG

HU09_VF101.DWG

HU09_VF100.DWG

VF104

VF103

VF102

VF101

VF100

EXISTING CONDITIONS PLAN - AREA D

EXISTING CONDITIONS PLAN - AREA C

EXISTING CONDITIONS PLAN - AREA B

EXISTING CONDITIONS PLAN - AREA A

TOPOGRAPHIC SURVEY INFORMATION PLAN

AS-BUILTS

HU09_M-901.DWG M-901 AVFUEL HYDRANT FUEL SYSTEM DETAILS AS-BUILTS

HU09_S-903.DWG

HU09_S-902.DWG

HU09_S-901.DWG

S-903

S-902

S-901

SUN SHADE CANOPY AS-BUILTS - SHEET 3 OF 3

SUN SHADE CANOPY AS-BUILTS - SHEET 2 OF 3

SUN SHADE CANOPY AS-BUILTS - SHEET 1 OF 3

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SD SD SD

TRTR

TR

W

E

W

W

W

U

U

U

U

C

W W

TR

TR

CAZ #1

PARKING

POSITION

#1

PARKING

POSITION

#2

PARKING

POSITION

#3

PARKING

POSITION

#4

PARKING

POSITION

#5

PARKING

POSITION

#6

PARKING

POSITION

#7

PARKING

POSITION

#8

PARKING

POSITION

#9

PARKING

POSITION

#10

PARKING

POSITION

#11

PARKING

POSITION

#12

PARKING

POSITION

#13

PARKINGPOSITION#26

PARKINGPOSITION#25

PARKINGPOSITION#24

PARKINGPOSITION#23

PARKINGPOSITION#22

PARKINGPOSITION#21

PARKINGPOSITION#20

PARKINGPOSITION#19

PARKINGPOSITION#18

PARKINGPOSITION#17

PARKINGPOSITION#16

PARKINGPOSITION#15

PARKINGPOSITION#14

CAZ #2

TA

XI

W

AY

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

PR

O D

U C

TI

O

N D

AT

A

1%

PR

O

D U

C

TI

O N

D

AT

A 2%

PR

O D

U C

TI

O

N D

AT

A

3%

PR

O

D U

C

TI

O N

D

AT

A 4%

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

W

2C

XX

XX

JA

N

U

AR

Y

SP

EC

N O

FI

LE

N

AM

E:

AN

SI

D

W

2R

H

IL

L

AI

R F

O R

C E

BA

SE

, U

TA

H R

EP

AI

R W

ES

T

8T

H /4

TH

F W

F -3

AP

R O

N

AD

VE

R

TI

SE

M

EN

T

SE

T

AM

G

EN

ER

AL

R

EV

IS

IO

N S

AM

G

EN

ER

AL

R

EV

IS

IO

N S

AM

G

EN

ER

AL

R

EV

IS

IO

N S

7/

/2

7/

1/

3/

/2

H U

_G

C

0.

dw g

M . H

U C

KL

E

B.

G

O

LI

BE

R

B.

G

O

LI

BE

R

K.

H

AL

L

O

VE

R

AL

L

PH

AS

IN

G P

LA

N

GC100

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

A1 SCALE: 1" = 100' - 0"

OVERALL PHASING PLAN

1. SEE SHEET G-003 FOR PROPOSED BATCH PLANT AND HAUL ROUTE

INFORMATION.

2. SEE SHEETS GC101 AND GC102 FOR ADDITIONAL PHASING REQUIREMENTS.

3. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN

NOTES.

CONSTRUCTION AREA ZONECAZ

CONTRACTOR

HAUL ROUTE

GENERAL SHEET NOTES

LEGEND

1. THE PHASING PLAN HAS BEEN DEVELOPED SO THAT ONLY 2 SHELTERED

PARKING ROWS AT A TIME WILL BE INACCESSIBLE FOR HILL AFB OPERATIONS. AT

NO TIME DURING CONSTRUCTION SHALL MORE THAN 2 PARKING ROWS BE CLOSED

TO AIRCRAFT OPERATIONS.

2. FLAGGERS SHALL BE PROVIDED TO MARSHAL CONSTRUCTION EQUIPEMENT

ACROSS TAXIWAY E. PAVEMENT SHALL BE KEPT FREE OF FOD AT ALL TIMES

DURING CONSTRUCTION. SEE SHEET GC103 FOR FOD CONTROL REQUIREMENTS.

3. AN AIR SHOW IS SCHEDULED FOR THE 3RD WEEK OF JUNE IN 2022. THE

CONTRACTOR SHALL NOT WORK THE MONDAY BEFORE THE AIRSHOW THROUGH

THE MONDAY AFTER THE AIRSHOW. ALL PAVEMENT SHALL BE CLEAR OF FOD AND

NO AREAS WILL BE ALLOWED TO BE UNPAVED FOR THAT WEEK. ANY PAVEMENT

THAT HAS BEEN REMOVED SHALL BE PAVEMENT WITH THE PERMANENT PCC

PAVEMENT SECTION OR A TEMPORARY PCC OR ACC PAVEMENT SECTION. THE

CONTRACTOR SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA

DURING THE AIR SHOW.

4. AN AIR SHOW IS SCHEDULED FOR THE 3RD WEEK OF JUNE IN 2024. THE

CONTRACTOR SHALL NOT WORK THE MONDAY BEFORE THE AIRSHOW THROUGH

THE MONDAY AFTER THE AIRSHOW. ALL PAVEMENT SHALL BE CLEAR OF FOD AND

NO AREAS WILL BE ALLOWED TO BE UNPAVED FOR THAT WEEK. ANY PAVEMENT

THAT HAS BEEN REMOVED SHALL BE PAVEMENT WITH THE PERMANENT PCC

PAVEMENT SECTION OR A TEMPORARY PCC OR ACC PAVEMENT SECTION. THE

CONTRACTOR SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA

DURING THE AIR SHOW.

5. ALL CONCRETE, ASPHALT, BASE COURSE AND SUBGRADE REMOVED FROM THE

PREOJCT SHALL BE DISPOSED OF OFF HILL AFB CONTROLLED LANDS.

GENERAL PHASING NOTES

CONTRACTOR

STAGING AREA

CAZ #1

CAZ #2

FLAGGER REQUIRED

AT THIS LOCATION

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #3 FOR

PARKING POSITIONS #1 THRU #7

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #4 FOR

PARKING POSITIONS #8 THRU #13

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #5 FOR

PARKING POSITIONS #14 THRU #20

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #6 FOR

PARKING POSITIONS #21 THRU #23

CONSTRUCT SUNSHADE SHELTERS

AS PART OF OPTION #7 FOR

PARKING POSITIONS #24 THRU #2613

HU09_G-002
HU09_GC100

File details come from the government source that posted it. Updated .