Phase 2 Attachment 5 Price Schedule.pdf
PDF 153 KB Posted
- Attached to
- West 388th/419th Fighter Wing Apron at Hill AFB
- Solicitation number
- W9123822R0008
About this file
This document includes a price schedule and details for a federal design-build contract opportunity. The contract is for repair and replacement of the West 388th/419th Fighter Wing apron at Hill Air Force Base in Utah.
The scope of work involves removing the existing 12-inch thick concrete pavement and replacing it with 15-inch concrete, along with installing a stabilized drainage layer and new subbase materials. It will also replace approximately 34,335 square feet of asphalt and dismantle and replace 26 existing sunshade shelters on the apron. The project includes removing and relocating existing crew shacks and adding one additional crew shack. The apron will also be re-marked. The contractor will be responsible for the complete design and construction documents. The price schedule provides unit pricing for various contract line items including mobilization, demolition, concrete and asphalt work, shade structures, electrical work, and crew shack installation. The contract also includes optional items for unstable soil replacement and asbestos pipe removal. The period of performance is 730 days and the solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123822R0008 Bid / Price Schedule Page 1 of 1
W9123822R0008 HAFB Repair West 388th Apron Price Schedule
PRICING
ELEMENT
DESCRIPTION QTY
UNIT OF
MEASUR
E UNIT PRICE TOTAL PRICE PERIOD of
PERFORMANCE
Contract Line-Item Number 0001: HAFB Repair West 388th Apron Repairs
01 Mobilization and Demobilization 1 Job 730 dys. ANP
02 Demolition 1 Job 730 dys. ANP
03 Concrete Batch Plant 1 Job 730 dys. ANP
04 New PCC Pavement and Markings
1 Job 730 dys. ANP
Asphalt 34,335 Square
Feet 730 dys. ANP
06 Demolition of Shade Structure 26 Each
730 dys. ANP
07 Installation of Shade Structure 26 Each
730 dys. ANP
08 Electrical and Communication 1 Job
730 dys. ANP
09 Remove and Reinstall Crew Shack 1 Job
730 dys. ANP
10 New Crew Shack 1 Job 730 dys. ANP
CLIN 0001 COST
PRICING
ELEMENT
DESCRIPTION QTY
UNIT OF
MEASUR
E UNIT PRICE TOTAL PRICE PERIOD of
PERFORMANCE
Option Contract Line Item Numbers
1001 Unstable Soil Replacement 4,206 Cubic
Yards 730 dys. ANP
1002 Asbestos Pipe Removal 500 Linear
Feet 730 dys. ANP
TOTAL COST (including all options)
File details come from the government source that posted it. Updated .