Phase 2 Attachment 5 Price Schedule.pdf

PDF 153 KB Posted

Attached to
West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This document includes a price schedule and details for a federal design-build contract opportunity. The contract is for repair and replacement of the West 388th/419th Fighter Wing apron at Hill Air Force Base in Utah.

The scope of work involves removing the existing 12-inch thick concrete pavement and replacing it with 15-inch concrete, along with installing a stabilized drainage layer and new subbase materials. It will also replace approximately 34,335 square feet of asphalt and dismantle and replace 26 existing sunshade shelters on the apron. The project includes removing and relocating existing crew shacks and adding one additional crew shack. The apron will also be re-marked. The contractor will be responsible for the complete design and construction documents. The price schedule provides unit pricing for various contract line items including mobilization, demolition, concrete and asphalt work, shade structures, electrical work, and crew shack installation. The contract also includes optional items for unstable soil replacement and asbestos pipe removal. The period of performance is 730 days and the solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123822R0008 Bid / Price Schedule Page 1 of 1

W9123822R0008 HAFB Repair West 388th Apron Price Schedule

PRICING

ELEMENT

DESCRIPTION QTY

UNIT OF

MEASUR

E UNIT PRICE TOTAL PRICE PERIOD of

PERFORMANCE

Contract Line-Item Number 0001: HAFB Repair West 388th Apron Repairs

01 Mobilization and Demobilization 1 Job 730 dys. ANP

02 Demolition 1 Job 730 dys. ANP

03 Concrete Batch Plant 1 Job 730 dys. ANP

04 New PCC Pavement and Markings

1 Job 730 dys. ANP

Asphalt 34,335 Square

Feet 730 dys. ANP

06 Demolition of Shade Structure 26 Each

730 dys. ANP

07 Installation of Shade Structure 26 Each

730 dys. ANP

08 Electrical and Communication 1 Job

730 dys. ANP

09 Remove and Reinstall Crew Shack 1 Job

730 dys. ANP

10 New Crew Shack 1 Job 730 dys. ANP

CLIN 0001 COST

PRICING

ELEMENT

DESCRIPTION QTY

UNIT OF

MEASUR

E UNIT PRICE TOTAL PRICE PERIOD of

PERFORMANCE

Option Contract Line Item Numbers

1001 Unstable Soil Replacement 4,206 Cubic

Yards 730 dys. ANP

1002 Asbestos Pipe Removal 500 Linear

Feet 730 dys. ANP

TOTAL COST (including all options)