W9123822R0008-A0012 - 20220706.pdf
PDF 157 KB Posted
- Attached to
- West 388th/419th Fighter Wing Apron at Hill AFB
- Solicitation number
- W9123822R0008
About this file
This is a modification to a federal solicitation for design-build services to repair the West 388th Apron at Hill Air Force Base in Utah. The scope of work includes removing and replacing deteriorated pavement, installing new sunshades, relocating crew shacks, and re-marking the apron. The modification extends the proposal due date to July 14, 2022, updates wage determinations and drawings, breaks out optional work into separate contract line items for unstable soil replacement, asbestos removal, and installing additional sunshades, and incorporates required FAR clauses. The Department of the Army Corps of Engineers is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0012 is issued to:
1. Extend Offeror proposal validity through 30 September 2022.
2. Revise solicitation Attachment 2 to include only w age determination UT20220083 for building construction.
3. Add Attachment 22 to include revised w age determination UT20220091 for heavy construction.
4. Update the CLIN structure to break out optional w ork, as stated in solicitation section 00 10 00.
5. Update Attachment 5, Price Schedule, to the revised version dated 6 July 2022.
6. Incorporate Attachment 21, Revised Draw ings G-002, and GC-100, 101, and 102.
7. Change the proposal due date to 14 July 2022 at 1300 / 1:00 PM PST. Extension authorizes changes to price proposals only; non-price (technical factor) proposal changes are not allow ed.
8. Incorporate required FAR clause 52.211-18, DFARS provision 252.215-7013, and DFARS clause 252.215-7016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123822R0008
X 9B. DATED (SEE ITEM 11)
29-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jul-2022
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123822R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been deleted:
SF 30 CONTINUATION PAGE
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT
TYPE
DESCRIPTION PAGES DATE
Attachment 1 HAFB W 388th Specification Number 2419
641 03-JAN-2022
Attachment 2 Construction Wage Rate Req.
UT20220083
11 25-FEB-2022
Attachment 3 Site Visit Map 2 03-JAN-2022 Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020 Attachment 8 Value Engineering Preparing the In
Brief Presentation Guidelines
1 29-MAR-2022
Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN
STANDARD
106 12-OCT-2020
Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th
Apron Preliminary Geotechnical Information
47 22-JAN-2020
Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE
PCC_4DL_6SUBBASE_TRAFFIC
AREA_A
1 14-JUN-2021
Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010 Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022
Attachment 17 Revised Specifications 2419 AMD
128 04 -APR-2022
Attachment 18 SOW VE in Design Build Design Phase
5 01-JAN-2011
Attachment 19
Revised Drawings
6 06-APR-2022
Attachment 20 Revised Specification 55 14-APR-2022 to:
Exhibit/Attachment Table of Contents
DOCUMENT
TYPE
DESCRIPTION PAGES DATE
Attachment 1 HAFB W 388th Specification Number 2419
641 03-JAN-2022
Attachment 2 DoL Construction Wage Rate Requirement UT20220083
6 01-APR-2022
Attachment 3 Site Visit Map 2 03-JAN-2022 Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 06-JUL-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines
1 29-MAR-2022
Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 Base Facility Design Standard 106 12-OCT-2020 Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014
Attachment 12 Hill AFB West 388th & 419th Apron Preliminary Geotechnical Information
47 22-JAN-2020
Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021
Attachment 14
PCASE PCC_4DL_6SUBBASE
_TRAFFIC AREA_A
1 14-JUN-2021
Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010 Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022
Attachment 17 Revised Specifications 2419 AMD
128 04 -APR-2022
Attachment 18 SOW VE in Design Build Design Phase
5 01-JAN-2011
Attachment 19 Revised Drawings 6 06-APR-2022
Attachment 20 Revised Specification 55 14-APR-2022
Attachment 21 Revised Drawings G-002 & GC-100, 101, and 102
4 01-JUL-2022
Attachment 22 DoL Construction Wage Rate Requirement UT20220091
5 01-JUL-2022
The following have been deleted:
TABLE OF CONTENTS
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-Apr-2022 10:00 AM to 14-Jul-
2022 01:00 PM.
The offeror acceptance period has increased by 76 from 90 to 166.
The performance payment bonds calendar days 10 has been added.
CLIN 0001
The CLIN description has changed from HAFB Repair West 388th Apron to HAFB
WEST 388TH APRON REPAIR.
The CLIN extended description has changed from:
The Contractor shall provide all labor, management, supervision, tools, materials, equipment, and transportation for the West 388th Apron project at Hill Air Force Base, in accordance with this contract and all associated documents, drawings, and specifications.
To:
The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to repair the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.
CLIN 1001
The CLIN description has changed from Unstable Soil Replacement to UNSTABLE
SOIL REPLACEMENT.
The CLIN extended description has changed from:
The Contractor shall provide all labor, management, supervision, tools, materials, equipment, and transportation for removal and replacement of unstable soil at the West 388th Apron project at Hill Air Force Base, in accordance with this contract and all associated documents, drawings, and specifications.
design-build construction services required to remove and replace unstable soil at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.
CLIN 1002
The CLIN description has changed from Asbestos Pipe Removal to ASBESTOS PIPE
REMOVAL.
The CLIN extended description has changed from:
The Contractor shall provide all labor, management, supervision, tools, materials, equipment, and transportation for removal of asbestos pipes at the West 388th Apron project at Hill Air Force Base, in accordance with this contract and all associated documents, drawings, and specifications.
design-build construction services required to remove asbestos pipes at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.
CLIN 1003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1003 2 Each
OPTION SHADE STRUCTURES 19 & 20
FFP
The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 19 and 20 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.
This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.
FOB: Destination
PSC CD: Z2LA
NET AMT
CLIN 1004 is added as follows:
1004 2 Each
OPTION SHADE STRUCTURES 21 & 22
FFP
The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 21 and 22 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.
This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.
CLIN 1005 is added as follows:
1005 2 Each
OPTION SHADE STRUCTURES 23 & 24
FFP
The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 23 and 24 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.
This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.
CLIN 1006 is added as follows:
1006 2 Each
OPTION SHADE STRUCTURES 25 & 26
FFP
The Contractor shall provide all materials, equipment, labor, supervision, and perform all other design-build construction services required to provide and install sunshades in aircraft parking positions 25 and 26 at the West 388th Apron at Hill Air Force Base, Utah, in accordance with the terms of the contract, project plans, specifications, and all other attachments.
This optional contract line item may be exercised by written notice to the Contractor at any time within the contract period of performance. No extension to the contract period of performance or change in applicable wage determination will be granted for exercising this option, provided that the option is exercised within seven-hundred-thirty (730) calendar days from the date the Contractor receives the Notice to Proceed.
The following Delivery Schedule for CLIN 1003 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
730 dys. ANP 2 UTAH AREA OFFICE
7227 6TH STREET (COE) BUILDING 366
HILL AFB UT 84056-5214
W91238
The following Delivery Schedule for CLIN 1004 has been added:
CAGE
730 dys. ANP 2 UTAH AREA OFFICE
7227 6TH STREET (COE) BUILDING 366
HILL AFB UT 84056-5214
The following Delivery Schedule for CLIN 1005 has been added:
CAGE
730 dys. ANP 2 UTAH AREA OFFICE
7227 6TH STREET (COE) BUILDING 366
HILL AFB UT 84056-5214
The following Delivery Schedule for CLIN 1006 has been added:
CAGE
730 dys. ANP 2 UTAH AREA OFFICE
7227 6TH STREET (COE) BUILDING 366
HILL AFB UT 84056-5214
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by reference:
252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
JAN 2018
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 1003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 1004:
The following Acceptance/Inspection Schedule was added for CLIN 1005:
The following Acceptance/Inspection Schedule was added for CLIN 1006:
The following have been added by reference:
52.211-18 Variation in Estimated Quantity APR 1984 252.215-7016 Notification to Offerors--Postaward Debriefings MAR 2022
(End of Summary of Changes)