Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf

PDF 28 KB Posted

Attached to
West 388th/419th Fighter Wing Apron at Hill AFB
Solicitation number
W9123822R0008
Issued by

About this file

This document provides guidelines for preparing an in-brief presentation for a value engineering workshop related to a federal design-build contract opportunity for a fighter wing apron replacement project at Hill Air Force Base. The presentation guidelines outline topics the designer should cover, including the scope of design work, participating firms, site conditions, regulatory requirements, basis of design, design concepts, user input received, constraints imposed by the owner, applicable codes, cost estimate, and construction phasing. Providing this information will help the value engineering team understand the factors that influenced the design and avoid duplicating prior efforts. The federal contract opportunity involves removing and replacing the pavement and sunshade shelters on the West portion of the 388th/419th Fighter Wing apron at Hill Air Force Base, which has exceeded its 40-year design life. In addition to new pavement and shoulders, one additional crew shack will be provided and the apron will be re-marked. The awarded design-build contractor is responsible for completing the design and construction in accordance with the criteria and standards specified.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
W9123822R0008 AMENDMENT 0010.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preparing the In Brief Presentation for Day 1

General guidelines

The Designer, the Client, and the VE team are all actively involved in the planning and design of the project and are vested in providing the best solutions available to make each and every project a success. They have spent a great deal of time and effort in developing the design and their insight is invaluable in further evaluating the options and alternatives that could potentially be implemented.

The design, typical for most projects, is influenced by outside input from many sources. To perform our work most efficiently, the value engineering team needs to understand the factors that have influenced the design to date. The goal is to avoid duplication of efforts and to aid the VE team in becoming familiar with the project.

To achieve this objective, the Designer is asked to give a presentation at the beginning of the VE workshop session on day one. To assist the Designer, the following information, at a minimum, is listed to guide the discussion:

● Scope of the Designer's effort

● Participating firms

● Existing site conditions

● Regulatory requirements

● Basis of design

● Rationale and steps in the development of design

● Design concepts for civil, landscaping, etc.

● Pertinent information from user participation

● Constraints imposed by the Owner

● Appropriate codes

● Explanation of information provided by the Designer to the VE team

● Summary of the cost estimate

● Construction phasing

This information is provided as an outline to aid the discussion. The presentation is the Designers’ responsibility and they may conduct the initial presentation in the manner they feel most comfortable.

File details come from the government source that posted it. Updated .