About this file
Written by GovTribe AI
· Dec 28, 2023
This solicitation is for a design-build contract to remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron at Hill Air Force Base. The scope of work includes dismantling and replacing existing sunshade shelters, removing and relocating crew shacks, and remarking the apron. The contractor will be responsible for the complete design and construction documents prior to replacing the approximately 40-year old 12-inch PCC pavement with a 15-inch section incorporating a stabilized drainage layer and new subbase course material. The Department of the Army Corps of Engineers Engineering District Sacramento is the issuing agency.
Other files
File
Type
Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf
PDF
Aug 1, 2022
W9123822R0008 A0013 20220801.pdf
PDF
Aug 1, 2022
Attachment 5 Price Schedule 20220729.pdf
PDF
Aug 1, 2022
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf
PDF
Jul 6, 2022
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf
PDF
Jul 6, 2022
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf
PDF
Jul 6, 2022
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf
PDF
Jul 6, 2022
W9123822R0008-A0012 - 20220706.pdf
PDF
Jul 6, 2022
W9123822R0008011 Spec 2419 2022-APR-14.pdf
PDF
Apr 14, 2022
W9123822R0008011 388th Apron Amendment 011.pdf
PDF
Apr 14, 2022
W9123822R0008 AMENDMENT 0010.pdf
PDF
Apr 7, 2022
Attachment 19 Revised Drawings.pdf
PDF
Apr 7, 2022
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf
PDF
Apr 7, 2022
W9123822R0008-0009 AMENDMENT 0009.pdf
PDF
Apr 5, 2022
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf
PDF
Apr 5, 2022
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf
PDF
Apr 5, 2022
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf
PDF
Apr 5, 2022
W9123822R0008-0008 AMENDMENT 0008.pdf
PDF
Mar 29, 2022
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf
PDF
Mar 29, 2022
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf
PDF
Mar 29, 2022
Attachment 7 2021_Value Study Report Guide.pdf
PDF
Mar 29, 2022
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf
PDF
Mar 29, 2022
Attachment 13 PCASE ACC Shoulder .pdf
PDF
Mar 29, 2022
Attachment 9 Revised Drawing Cut Sheets.pdf
PDF
Mar 29, 2022
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf
PDF
Mar 29, 2022
Attachment 11 Hill AFB Seed Mixture.pdf
PDF
Mar 29, 2022
Attachment 15 Crew Shelters As-Built Drawings.pdf
PDF
Mar 29, 2022
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf
PDF
Mar 29, 2022
Phase 2 Attachment 3 Site Visit Map.pdf
PDF
Mar 29, 2022
West 388th Apron Site Visit Sign In.pdf
PDF
Mar 18, 2022
Phase 2 Attachment 2 CWRR Heavy and Building.pdf
PDF
Mar 10, 2022
Phase 3 Attachment 3 Site Visit Map.pdf
PDF
Mar 10, 2022
Phase 2 Attachment 4 Drawings.pdf
PDF
Mar 10, 2022
Phase 2 Attachment 6 Pre-Award Survey .pdf
PDF
Mar 2, 2022
Phase 2 Attachment 4 CWRR Heavy and Building.pdf
PDF
Mar 2, 2022
Phase 2 Attachment 2 Drawings.pdf
PDF
Mar 2, 2022
Phase 2 Attachment 1 Specifications .pdf
PDF
Mar 2, 2022
1442 W9123822R0008 A0007.pdf
PDF
Mar 2, 2022
Phase 2 Attachment 5 Price Schedule.pdf
PDF
Mar 2, 2022
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf
PDF
Mar 2, 2022
W9123822R0008 Amendment 0006.pdf
PDF
Dec 29, 2021
28 December 2021 W9123822R0008 Interested Vendors List.docx
DOCX document
Dec 28, 2021
W9123822R0008 AMENDMENT 0005.pdf
PDF
Dec 15, 2021
W9123822R0008 AMENDMENT 0004.pdf
PDF
Dec 14, 2021
Attachment 4 Part 1 BUILDING Wage Determination.pdf
PDF
Dec 10, 2021
W9123822R0008 AMENDMENT 0003.pdf
PDF
Dec 10, 2021
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf
PDF
Dec 10, 2021
Attachment 5 - PROJECT INFORMATION FORM.pdf
PDF
Dec 10, 2021
W9123822R0008 AMENDMENT 0002.pdf
PDF
Dec 7, 2021
W9123822R0008 AMENDMENT 0001.pdf
PDF
Dec 6, 2021
On GovTribe
Work with this file
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Mar 18, 2022 .