Phase 2 Attachment 3 Site Visit Map.pdf
PDF 6 MB Posted
- Attached to
- West 388th/419th Fighter Wing Apron at Hill AFB
- Solicitation number
- W9123822R0008
About this file
This document provides details for a federal design-build contract opportunity for the West 388th/419th Fighter Wing Apron at Hill Air Force Base. The scope of work involves removing and replacing the existing 40-year old pavement and sunshade shelters on the apron where F-35 aircraft are parked. The 12-inch thick Portland cement concrete pavement will be replaced with a 15-inch section incorporating a stabilized drainage layer and new subbase materials. In addition to the new parking apron and shoulders, one additional crew shack will be provided alongside dismantling and replacing the existing sunshades. The awarded contractor will be responsible for the complete design and construction documents in accordance with the criteria and standards specified, including re-marking the apron. The solicitation was issued by the Department of the Army Corps of Engineers Sacramento District for offers due by the specified closing date.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE Utah Resident Office (URO) Building
Hill AFB South Gate l2pmphak Text Box POC Day of Site Visit:
Tom Stonehocker 801-777-1430
USACE Utah Resident Office (URO) Building
Hill AFB South Gate
Project Location
GBSD Mission Integration Facility - Charrette Location Nov 27-30, 2018
File details come from the government source that posted it. Updated .