This amendment modifies a solicitation for a design-build contract. The scope of work involves removing and replacing the West portion of an aircraft parking apron and sunshade shelters at Hill Air Force Base in Utah. The project will demolish the existing 12-inch thick concrete pavement that has exceeded its design life and replace it with a 15-inch thick section incorporating a stabilized drainage layer and new subbase materials. It will also dismantle and replace the existing sunshade shelters to provide a shelter for each new parking row. The Department of the Army Corps of Engineers Engineering District Sacramento issued the solicitation and will award the contract. The amendment adds two attachments providing further details on the statement of work and revised design drawings.

View the file

Other files

File Type Posted
Attachment 23 Revised Drawings G 002 and GC 100.pdf PDF
W9123822R0008 A0013 20220801.pdf PDF
Attachment 5 Price Schedule 20220729.pdf PDF
W9123822R0008 Attachment 5 - Price Schedule - 20220706.pdf PDF
W9123822R0008 Attachment 22 - DoL CWRR UT20220091 - 20220701.pdf PDF
W9123822R0008 Attachment 2 - DoL CWRR UT20220083 - 20220401.pdf PDF
W9123822R0008 Attachment 21 Revised Drawings G-002 GC-100 GC 101 and GC 102.pdf PDF
W9123822R0008-A0012 - 20220706.pdf PDF
W9123822R0008011 Spec 2419 2022-APR-14.pdf PDF
W9123822R0008011 388th Apron Amendment 011.pdf PDF
Attachment 19 Revised Drawings.pdf PDF
Attachment 18 SOW VE HAFB W388thApron Design Build design phase 7Apr22.pdf PDF
W9123822R0008-0009 AMENDMENT 0009.pdf PDF
Attachment 16 Revised Drawings AM0009- 4 April 2022.pdf PDF
Attachment 17 Spec 2419 AM0009 (2022-APR-05).pdf PDF
INFORMATION ONLY Hydrant_Fuel_Pit_Detials.pdf PDF
W9123822R0008-0008 AMENDMENT 0008.pdf PDF
Attachment 10 BASE FACILITY DESIGN STANDARD.pdf PDF
Attachment 12 Hill AFB West 388th 419th Apron Preliminary Geotechnical Information.pdf PDF
Attachment 7 2021_Value Study Report Guide.pdf PDF
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines.pdf PDF
Attachment 13 PCASE ACC Shoulder .pdf PDF
Attachment 9 Revised Drawing Cut Sheets.pdf PDF
Attachment 1 Spec 2419 (Searchable Hill AFB West 388th Apron).pdf PDF
Attachment 11 Hill AFB Seed Mixture.pdf PDF
Attachment 15 Crew Shelters As-Built Drawings.pdf PDF
Attachment 14 PCASE PCC_4DL_6SUBBASE_TRAFFIC AREA_A.pdf PDF
Phase 2 Attachment 3 Site Visit Map.pdf PDF
West 388th Apron Site Visit Sign In.pdf PDF
West 388th apron site walk photos.pdf PDF
Phase 2 Attachment 2 CWRR Heavy and Building.pdf PDF
Phase 3 Attachment 3 Site Visit Map.pdf PDF
Phase 2 Attachment 4 Drawings.pdf PDF
Phase 2 Attachment 6 Pre-Award Survey .pdf PDF
Phase 2 Attachment 4 CWRR Heavy and Building.pdf PDF
Phase 2 Attachment 2 Drawings.pdf PDF
Phase 2 Attachment 1 Specifications .pdf PDF
1442 W9123822R0008 A0007.pdf PDF
Phase 2 Attachment 5 Price Schedule.pdf PDF
Phase 2 Attachment 3 Supplemental Contract Requirements.pdf PDF
W9123822R0008 Amendment 0006.pdf PDF
28 December 2021 W9123822R0008 Interested Vendors List.docx DOCX document
W9123822R0008 AMENDMENT 0005.pdf PDF
W9123822R0008 AMENDMENT 0004.pdf PDF
Attachment 4 Part 1 BUILDING Wage Determination.pdf PDF
W9123822R0008 AMENDMENT 0003.pdf PDF
Attachment 4 Part 2 HEAVY CONSTRUCTION Wage Determination.pdf PDF
Attachment 5 - PROJECT INFORMATION FORM.pdf PDF
W9123822R0008 AMENDMENT 0002.pdf PDF
W9123822R0008 AMENDMENT 0001.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add the follow ing attachments:

Attachment 18 SOW VE in Design Build Design Phase Attachment 19 Revised Draw ings

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123822R0008

X 9B. DATED (SEE ITEM 11)

29-Nov-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Apr-2022

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123822R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

DOCUMENT

TYPE

DESCRIPTION PAGES DATE

Attachment 1 HAFB W 388th Specification Number 2419

641 03-JAN-2022

Attachment 2 Construction Wage Rate Req.

UT20220083

11 25-FEB-2022

Attachment 3 Site Visit Map 2 03-JAN-2022 Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020 Attachment 8 Value Engineering Preparing the In

Brief Presentation Guidelines

1 29-MAR-2022

Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN

STANDARD

106 12-OCT-2020

Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th

Apron Preliminary Geotechnical Information

47 22-JAN-2020

Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE

PCC_4DL_6SUBBASE_TRAFFIC

AREA_A

1 14-JUN-2021

Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010

Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022 Attachment 17 Revised Specifications 2419 AMD

128 04 -APR-2022

to:

DOCUMENT

Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report

Guide

25 14-DEC-2020

Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines

1 29-MAR-2022

Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN

STANDARD

106 12-OCT-2020

Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th

Apron Preliminary Geotechnical Information

47 22-JAN-2020

Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE

PCC_4DL_6SUBBASE_TRAFFIC

AREA_A

1 14-JUN-2021

Attachment 15 Crew Shelters As-Built Drawings

39 01-AUG-2010

Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022 Attachment 17 Revised Specifications 2419

AMD 0009

128 04 -APR-2022

Attachment 18 SOW VE in Design Build Design Phase

5 01-JAN-2011

Attachment 19

Revised Drawings

6 06-APR-2022

The following have been modified:

TABLE OF CONTENTS

DOCUMENT

Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020 Attachment 8 Value Engineering Preparing the In

Brief Presentation Guidelines

1 29-MAR-2022

Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN

STANDARD

106 12-OCT-2020

Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th

Apron Preliminary Geotechnical Information

47 22-JAN-2020

Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE

PCC_4DL_6SUBBASE_TRAFFIC

AREA_A

1 14-JUN-2021

Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010 Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022 Attachment 17 Revised Specifications 2419 AMD

128 04 -APR-2022

Attachment 18 SOW VE in Design Build Design Phase

5 01-JAN-2011

Attachment 19

Revised Drawings

6 06-APR-2022

(End of Summary of Changes)