W9123822R0008 AMENDMENT 0010.pdf
PDF 537 KB Posted
- Attached to
- West 388th/419th Fighter Wing Apron at Hill AFB
- Solicitation number
- W9123822R0008
About this file
This amendment modifies a solicitation for a design-build contract. The scope of work involves removing and replacing the West portion of an aircraft parking apron and sunshade shelters at Hill Air Force Base in Utah. The project will demolish the existing 12-inch thick concrete pavement that has exceeded its design life and replace it with a 15-inch thick section incorporating a stabilized drainage layer and new subbase materials. It will also dismantle and replace the existing sunshade shelters to provide a shelter for each new parking row. The Department of the Army Corps of Engineers Engineering District Sacramento issued the solicitation and will award the contract. The amendment adds two attachments providing further details on the statement of work and revised design drawings.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add the follow ing attachments:
Attachment 18 SOW VE in Design Build Design Phase Attachment 19 Revised Draw ings
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123822R0008
X 9B. DATED (SEE ITEM 11)
29-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Apr-2022
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123822R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
DOCUMENT
TYPE
DESCRIPTION PAGES DATE
Attachment 1 HAFB W 388th Specification Number 2419
641 03-JAN-2022
Attachment 2 Construction Wage Rate Req.
UT20220083
11 25-FEB-2022
Attachment 3 Site Visit Map 2 03-JAN-2022 Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020 Attachment 8 Value Engineering Preparing the In
Brief Presentation Guidelines
1 29-MAR-2022
Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN
STANDARD
106 12-OCT-2020
Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th
Apron Preliminary Geotechnical Information
47 22-JAN-2020
Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE
PCC_4DL_6SUBBASE_TRAFFIC
AREA_A
1 14-JUN-2021
Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010
Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022 Attachment 17 Revised Specifications 2419 AMD
128 04 -APR-2022
to:
DOCUMENT
Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report
Guide
25 14-DEC-2020
Attachment 8 Value Engineering Preparing the In Brief Presentation Guidelines
1 29-MAR-2022
Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN
STANDARD
106 12-OCT-2020
Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th
Apron Preliminary Geotechnical Information
47 22-JAN-2020
Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE
PCC_4DL_6SUBBASE_TRAFFIC
AREA_A
1 14-JUN-2021
Attachment 15 Crew Shelters As-Built Drawings
39 01-AUG-2010
Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022 Attachment 17 Revised Specifications 2419
AMD 0009
128 04 -APR-2022
Attachment 18 SOW VE in Design Build Design Phase
5 01-JAN-2011
Attachment 19
Revised Drawings
6 06-APR-2022
The following have been modified:
TABLE OF CONTENTS
DOCUMENT
Attachment 4 HAFB W 388th Plans 55 03-JAN-2022 Attachment 5 Price Schedule 1 02-MAR-2022 Attachment 6 Pre-Award Survey 4 02-MAR-2022 Attachment 7 2021_Value Study Report Guide 25 14-DEC-2020 Attachment 8 Value Engineering Preparing the In
Brief Presentation Guidelines
1 29-MAR-2022
Attachment 9 Revised Drawing Cut Sheets 8 29-MAR-2022 Attachment 10 BASE FACILITY DESIGN
STANDARD
106 12-OCT-2020
Attachment 11 Hill AFB Seed Mixture 2 25-FEB-2014 Attachment 12 Hill AFB West 388th & 419th
Apron Preliminary Geotechnical Information
47 22-JAN-2020
Attachment 13 PCASE ACC Shoulder 1 14-JUN-2021 Attachment 14 PCASE
PCC_4DL_6SUBBASE_TRAFFIC
AREA_A
1 14-JUN-2021
Attachment 15 Crew Shelters As-Built Drawings 39 01-AUG-2010 Attachment 16 Revised Drawing AMD 0009 17 04 -APR-2022 Attachment 17 Revised Specifications 2419 AMD
128 04 -APR-2022
Attachment 18 SOW VE in Design Build Design Phase
5 01-JAN-2011
Attachment 19
Revised Drawings
6 06-APR-2022
(End of Summary of Changes)
File details come from the government source that posted it. Updated .