MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Open Pre-Solicitation Posted
- Solicitation number
- FA8903-27-OT-001
- Agency
-
Air Force Installation Contracting Agency
Air Force Installation and Mission Support Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- San Antonio, Texas 78226, United States
- Points of contact
-
- 772 ESS/PKA 772ess.pka.mach1@us.af.mil
Notice details come from SAM.gov. Updated .
About this opportunity
The Air Force Installation Contracting Agency is soliciting Area of Interest (AOI) responses from commercial partners for horizontal airfield infrastructure work under MACH-1 AOI FA8903-27-OT-001, with Phase 1 Solution Briefs due January 15, 2027 at 10:00 AM CST. No set-aside is used, and any resulting agreement will be an Other Transaction Agreement (OTA) under 10 U.S.C. 2808a. The 772nd Enterprise Sourcing Squadron is the submission point, at 772ESS.PKA.MACH1@us.af.mil. Solution Briefs are limited to five pages.
Respondents must demonstrate at least three completed airfield pavement projects on Department of War installations or FAA Part 139 airports, each exceeding $10 million in value, within the past ten years. Scope covers planning, design, engineering, alteration, repair, and construction of runways, taxiways, aprons, airfield lighting and electrical systems, drainage, utility corridors, and related civil and geotechnical work, with incidental civil and electrical work authorized. Designs must comply with Air Force Corporate Standards, Department of War Unified Facilities Criteria (UFC), and Anti-Terrorism/Force Protection standards. Attachment 1 lists projects at Davis-Monthan AFB, Kirtland AFB, Laughlin AFB, Tinker AFB, Vance AFB, and Eareckson Air Station on Wake Island and Shemya Island in Alaska. One example is a Davis-Monthan runway 12/30 full-depth replacement of approximately 166,417 square yards of Portland Cement Concrete.
Line of Effort 1 (Design & Planning) advances a site-specific design package from approximately 35% to 65% completion and produces an open-book Guaranteed Maximum Price with cost substantiation. Line of Effort 2 covers final design and physical construction. Selected firms enter a Solutions Repository for twelve months and are invited to Phase 2 (Oral Presentation) or Phase 3 (Full Proposal) when specific projects are funded. Award may be made through a Request for Solutions to one uniquely advantaged respondent or an Evaluation Amplification Letter to three or more pre-qualified firms. Evaluation criteria are relevance to the AOI, constructability concept merit, company viability and federal standing, and schedule execution risk. NAICS 237990 and PSC Y1BD apply.
Notice text
The scope of this AOI encompasses planning, design, engineering, alteration, repair, and physical construction for airfield pavement assets and associated systems. Incidental civil, electrical, mechanical, utility, environmental, and site work directly supporting the primary airfield infrastructure is authorized and included within this scope. All facility types, infrastructure systems, technical specialties, and testing capabilities identified throughout this document are expressly illustrative and non-exhaustive, including but not limited to:
- Horizontal airfield pavements and operating surfaces, including but not limited to runways, taxiways, aircraft parking aprons, arm/de-arm pads, compass swing bases, holding pads, alert pads, aircraft wash-rack pavements, access roadways, perimeter security paths, and all associated horizontal airfield pavements.
- Airfield visual and electrical systems, including but not limited to runway edge and centerline lighting, threshold and end lighting, taxiway guidance lighting, approach lighting systems, precision approach path indicators (PAPIs), airfield signage, electrical duct banks, vault infrastructure, counterpoise grounding grids, automated Airfield Lighting Control and Monitoring Systems (ALCMS), mobile aircraft arresting systems (MAAS), and related navigational and visual aids.
- Civil, drainage, and safety infrastructure, including but not limited to subsurface stormwater drainage networks, detention and retention basins, culverts, erosion and sediment control systems, aircraft arresting system foundations and containment vaults, blast deflectors, airfield perimeter security fencing, and related site-civil infrastructure.
- Subsurface utility corridors and distribution, including but not limited to utility distribution pathways, aircraft grounding grids, communication ductways, fuel servicing distribution pathways supporting horizontal operations, and associated utility routing.
- All other civil, geotechnical, electrical, safety, and operational horizontal airfield infrastructure elements necessary to meet mission requirements, regardless of whether specifically itemized above.
Files
| File | Type | Posted |
|---|---|---|
| MACH1_AOI_FA890327OT001_Horizontal Airfield Infrastructure_16Nov26_Final.docx | DOCX document | |
| ATTACHMENT_1__PROJECT_LISTINGS.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Pre-Solicitation | |
| MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB | Pre-Solicitation | |
| MACH1_AOI_F-47 Future Campus at Nellis AFB | Pre-Solicitation | |
| MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2_Amend 1 | Pre-Solicitation | |
| MACH1_AOI_Military Working Dog Kennels at JBSA-LOE1_Amend 1 | Pre-Solicitation | |
| MACH-1 Modernized Agile Construction Horizons | Pre-Solicitation | |
| MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2 | Special Notice | |
| MACH1_AOI_Military Working Dog Kennels at JBSA-LOE1 | Special Notice | |
| MACH-1 Modernized Agile Construction Horizons | Special Notice |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity