P-381 multi-mission dry dock #1, portsmouth naval shipyard (PNSY), kittery maine
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N4008520R0021
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Kittery, Maine, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is for the design-bid-build construction of additions to Dry Dock 1 at the Portsmouth Naval Shipyard in Kittery, Maine. The Department of the Navy Naval Facilities Engineering Command seeks to construct two new dry dock bays labeled Dry Dock 1 North and Dry Dock 1 West of sufficient size to support maintenance and overhaul of Virginia-class submarines. Offerors must have experience with similar naval facilities and deliver fully operational dry docks by the completion date of 2,009 calendar days from award. Proposals will be evaluated on price, corporate experience, management approach, safety, past performance, and small business participation. The deadline for proposals is February 26, 2021.
The place of performance is Kittery, Maine. The work includes new concrete structures, pump wells, a pump station building, crane rails, mooring hardware, mechanical and electrical systems with a total estimated value between $25M-$75M. The NAICS code for the design portion is 541310 and PSC code for construction is W912BU. No set-aside is specified. The incumbent contractor is the current operator of Dry Dock 1, Portsmouth Naval Shipyard. Upon completion, the expanded facility will provide two additional dry dock bays for maintenance of Virginia-class submarines at the shipyard.
Notice text
2 versions
Update #2 · Latest ·
DESIGN-BID-BUILD, P-381, MULTI-MISSION DRY DOCK #1 LOCATED AT PORTSMOUTH NAVAL SHIPYARD IN KITTERY, MAINE
This project constructs a partitioned addition to dry dock #1 (DD1) w ithin the superflood basin area. The addition w ill consist of tw o bays, labeled dry dock #1 North (DD1N) and dry dock #1 West (DD1W). The existing dry dock #1 w ill be renamed dry dock #1 East. Both DD1N and DD1W w ill be of sufficient size and depth to support the maintenance and overhaul of Virginia (VA) Class submarines, Blocks I-IV. New construction w ill include concrete floors, w alls, and center w all separating DD1N and DD1W, new pump w ell systems, pump station building, portal crane rails, mooring hardw are, mechanical and electrical utilities, utility tunnels, and all appurtenances required to ensure an operational dry dock. Modifications w ill be made to the existing basin closure w all and to Berths 1 and 11 to prevent undermining and support fully dew atered conditions. The existing DD1 pumpw ell w ill be connected to the new pumpw ell system and the interior modified.
Update #1 ·
DESIGN-BID-BUILD, P-381, MULTI-MISSION DRY DOCK #1 LOCATED AT PORTSMOUTH NAVAL SHIPYARD IN KITTERY, MAINE
This project constructs a partitioned addition to dry dock #1 (DD1) w ithin the superflood basin area. The addition w ill consist of tw o bays, labeled dry dock #1 North (DD1N) and dry dock #1 West (DD1W). The existing dry dock #1 w ill be renamed dry dock #1 East. Both DD1N and DD1W w ill be of sufficient size and depth to support the maintenance and overhaul of Virginia (VA) Class submarines, Blocks I-IV. New construction w ill include concrete floors, w alls, and center w all separating DD1N and DD1W, new pump w ell systems, pump station building, portal crane rails, mooring hardw are, mechanical and electrical utilities, utility tunnels, and all appurtenances required to ensure an operational dry dock. Modifications w ill be made to the existing basin closure w all and to Berths 1 and 11 to prevent undermining and support fully dew atered conditions. The existing DD1 pumpw ell w ill be connected to the new pumpw ell system and the interior modified.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| P-381 multi-mission dry dock #1, portsmouth naval shipyard (PNSY), kittery maine | Award Notice | |
| This notice | Solicitation | |
| P-381 multi-mission dry dock #1, portsmouth naval shipyard (PNSY), kittery maine | Pre-Solicitation | |
| P-381 multi-mission dry dock #1, portsmouth naval shipyard (PNSY), kittery maine | Pre-Solicitation | |
| P-381, multi-mission dry dock #1, portsmouth naval shipyard, kittery, maine | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement | Naval Sea Systems Command | No set-aside | |
| P084 next generation torpedo integration lab, naval station newport, newport RI | Naval Facilities Engineering Command | No set-aside | |
| Misty Barge Dry Dock Services | Forest Service | Total Small Business | |
| Subsafe MAC IDIQ | Naval Sea Systems Command | No set-aside | |
| USCG STA panama city (45633) FY27 drydock repairs | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity