Amendment 14 - Panelboards.pdf
PDF 744 KB Posted
- Solicitation number
- N4008520R0021
About this file
This package includes panelboard schedules and specifications for electrical work on the P-381 Multi-Mission Dry Dock #1 project at Portsmouth Naval Shipyard in Kittery, Maine. The schedules provide details on the electrical load, circuit information, panel ratings and locations for the pump station, utility enclosure and associated areas. The project involves constructing additions to dry dock #1 to accommodate two new bays for maintenance of Virginia-class submarines. Work includes concrete structures, new pump wells and station, cranes, utilities and modifications to existing facilities. The Navy solicitation seeks bids for design-build-construction of these additions and upgrades to ensure fully operational dry docks.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K
IT
T E
R Y
M
A
IN
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
C A
P
IT
A L
IIM
P
R O
V E
M E
N T
C O
R E
N A
V A
L S
T A
T
IO
N N
O R
F O
LK
, V
IR
G
IN
IA
P -3
M
U L
T I-
M
IS
S
IO
N D
R Y
D O
C K
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C L A S S
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
JDM
CONSTR. CONTR. NO.
DRW CHKCSADES
SCALE: AS SHOWN
EPROJECT NO.: 1604959
JRC
C
U se rs
P u b lic
D o c u m e n ts
L o c a l_ R e v it F i le s\ D
R Y
D S
W
TR
-1
-E C
A ss in i.
rv t
/1
/2
:1
:5
A
M
P U
M P
S T
A T
IO
N
P
A N
E L B
O A
R D
S C
H E
D U
L E
S
PE606
12823513
Total... 29 A 29 A 29 A Total Load: 8.12 kVA 8.12 kVA 8.12 kVA
41 0.00 -- -- -- 42 39 0.00 -- -- -- 40 37 0.00 3 20 A Spare 38 35 -- -- -- 0.00 0.94 -- -- -- 36 33 -- -- -- 0.00 0.94 -- -- -- 34 31 Spare 20 A 3 0.00 0.94 3 20 A KV-3 32 29 -- -- -- 0.00 0.83 -- -- -- 30 27 -- -- -- 0.00 0.83 -- -- -- 28 25 Spare 20 A 3 0.00 0.83 3 20 A GV-8 26 23 -- -- -- 0.94 0.83 -- -- -- 24 21 -- -- -- 0.94 0.83 -- -- -- 22
19 GV-4 20 A 3 0.94 0.83 3 20 A GV-7 20
17 -- -- -- 0.94 0.94 -- -- -- 18 15 -- -- -- 0.94 0.94 -- -- -- 16
13 GV-2 20 A 3 0.94 0.94 3 20 A GV-3 14
11 -- -- -- 0.58 0.94 -- -- -- 12 9 -- -- -- 0.58 0.94 -- -- -- 10
7 BFV-1 20 A 3 0.58 0.94 3 20 A GV-1 8
5 -- -- -- 0.58 0.58 -- -- -- 6 3 -- -- -- 0.58 0.58 -- -- -- 4
1 BFV-3 20 A 3 0.58 0.58 3 20 A BFV-2 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: NA
Mounting: SURFACE Wires: 3 Mains Rating: 100 A
Supply From: PS-SWBD1-S Phases: 3 Mains Type: MLO
Location: MEZZANINE Volts: 480V K.A.I.C. Rating: 42K
Branch Panel: PS-HV-S1
Total... 120 A 120 A 120 A Total Load: 33.14 kVA 33.14 kVA 33.14 kVA
41 -- -- -- 0.00 0.00 -- -- -- 42 39 -- -- -- 0.00 0.00 -- -- -- 40 37 Spare 20 A 3 0.00 0.00 3 20 A Spare 38 35 -- -- -- 0.00 14.41 -- -- -- 36 33 -- -- -- 0.00 14.41 -- -- -- 34 31 Spare 20 A 3 0.00 14.41 3 100 A PS-AC-1 32 29 -- -- -- 2.11 2.11 -- -- -- 30 27 -- -- -- 2.11 2.11 -- -- -- 28
25 SG-7 20 A 3 2.11 2.11 3 20 A SG-8 26
23 -- -- -- 2.11 2.11 -- -- -- 24 21 -- -- -- 2.11 2.11 -- -- -- 22
19 SG-5 20 A 3 2.11 2.11 3 20 A SG-6 20
17 -- -- -- 2.11 2.11 -- -- -- 18 15 -- -- -- 2.11 2.11 -- -- -- 16
13 SG-4 20 A 3 2.11 2.11 3 20 A SG-3 14
11 -- -- -- 2.11 2.11 -- -- -- 12 9 -- -- -- 2.11 2.11 -- -- -- 10
7 SG-1 20 A 3 2.11 2.11 3 20 A SG-2 8
5 -- -- -- 0.94 0.94 -- -- -- 6 3 -- -- -- 0.94 0.94 -- -- -- 4
1 KV-2 20 A 3 0.94 0.94 3 20 A KV-1 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: NA
Mounting: SURFACE Wires: 3 Mains Rating: 225 A
Supply From: PS-SWBD1-S Phases: 3 Mains Type: MLO
Location: MEZZANINE Volts: 480V K.A.I.C. Rating: 42K
Branch Panel: PS-HV-S2
Total... 112 A 111 A 107 A Total Load: 13.36 kVA 13 kVA 13 kVA
41 Spare 20 A 1 0.00 0.00 -- -- Space 42 39 -- -- -- 2.33 0.00 -- -- Space 40 37 -- -- -- 2.33 0.00 -- -- Space 38 35 PS-AC-3 30 A 3 2.33 0.00 -- -- Space 36 33 -- -- -- 2.33 0.00 -- -- Space 34 31 -- -- -- 2.33 0.00 -- -- Space 32 29 PS-AC-2 30 A 3 2.33 0.00 1 20 A Spare 30 27 PS-AD-2 20 A 1 0.50 0.00 1 20 A Spare 28 25 PS-AD-1 20 A 1 0.50 0.00 1 20 A Spare 26 23 -- -- -- 3.33 0.00 1 20 A Spare 24 21 -- -- -- 3.33 0.58 -- -- -- 22
19 PS-GEN-LV 60 A 3 3.33 0.58 -- -- -- 20
17 PS-VAS-DHU/CRAC &... 20 A 1 1.00 0.58 3 15 A PS-SP-01 18
15 SMDP-2H - MOTOR HEATER 20 A 1 1.00 1.00 1 20 A PS-FT-01 16
13 SMDP-1H - MOTOR HEATER 20 A 1 1.00 1.00 1 20 A PS-BAS-EF AND UH 14
11 CONV RECEPT LOWER LEVEL 20 A 1 0.54 1.00 1 20 A SMDP-3H - MOTOR HEATER 12
9 PS-UH-2 20 A 1 0.72 0.54 1 20 A CONV RECEPT LOWER LEVEL 10
7 PS-SF-1 20 A 1 0.86 0.54 1 20 A CONV RECEPT 1ST FL 8
5 PS-UH-2 20 A 1 0.70 1.00 1 20 A PAS-BAS-MSTR & AHU1 6
3 CONV RECEPT MEZZANINE 20 A 1 0.36 0.54 1 20 A CONV RECEPT 1ST FL 4
1 ROOF RECEPTACLE 20 A 1 0.18 0.70 1 20 A PS-UH-1 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: 225 A
Mounting: SURFACE Wires: 4 Mains Rating: 225 A
Supply From: PS-TLV Phases: 3 Mains Type: MCB
Location: PS-MEZZANINE Volts: 208/120V K.A.I.C. Rating: 65K
Branch Panel: PS-LV
Total... 80 A 67 A 69 A Total Load: 9.52 kVA 8 kVA 8 kVA
41 CHART RECORDERS 20 A 1 0.10 0.00 1 20 A Spare 42 39 WORK STATION REC. 20 A 1 0.72 0.00 1 20 A Spare 40 37 WORK STATION REC. 20 A 1 0.36 0.00 1 20 A Spare 38 35 DEWATERING DCP 30 A 1 2.00 0.00 1 20 A Spare 36 33 Lighting - DD1W 20 A 1 0.42 0.00 1 20 A Spare 34 31 Lighting - PS Main Level 20 A 1 0.60 0.00 1 20 A Spare 32 29 Lighting - Exterior 20 A 1 0.70 1.00 1 20 A ASWP 3 & 4 LCP 30 27 Lighting - DD1W 20 A 1 0.42 1.00 1 20 A ASWP-1 & 2 LCP 28 25 Lighting - DD1W 20 A 1 0.30 0.50 1 20 A DP-1 LCP 26 23 Lighting - DD1W 20 A 1 0.30 0.70 1 20 A DP-2 &3 3 LCP 24 21 FIRE ALARM CABINET (UTIL... 20 A 1 0.10 0.64 1 20 A Lighting - Dwelling Unit 22 19 PCV-06 20 A 1 1.00 1.20 1 20 A Lighting - Utility Tunnel 20
17 PCV-05 20 A 1 1.00 0.43 -- -- -- 18
15 PCV-04 20 A 1 1.00 0.72 -- -- -- 16
13 PCV-03 20 A 1 1.00 0.97 3 100 A PS-LVIT-S 14
11 Lighting - PS Drainage Pump Valve... 20 A 1 0.50 0.00 1 20 A FLOW METERS-UTILITY TUNNEL 12 9 Lighting - Mezzanine High Bay 20 A 1 0.55 0.50 1 20 A Lighting - PS ASW Pump Pit 10 7 Lighting - Mezzanine 20 A 1 0.64 0.02 1 20 A Lighting - PS Main Level 8 5 Lighting - PS Lower Level 20 A 1 1.29 0.31 1 20 A Lighting - PS Stair 6 3 Lighting 20 A 1 0.60 1.41 -- -- -- 4 1 Lighting - Utility Tunnel 20 A 1 1.65 1.41 2 25 A PS-CRAC-1 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: 225 A
Mounting: SURFACE Wires: 4 Mains Rating: 225 A
Supply From: PS-TLV-S Phases: 3 Mains Type: MCB
Location: PS MEZZANINE Volts: 208/120V K.A.I.C. Rating: 65K
Branch Panel: PS-LV-S
3 3
Total... 29 A 29 A 29 A Total Load: 8.16 kVA 8.16 kVA 8.16 kVA
41 -- -- -- 0.00 0.00 -- -- -- 42 39 -- -- -- 0.00 0.00 -- -- -- 40 37 Spare 20 A 3 0.00 0.00 3 20 A Spare 38 35 -- -- -- 0.83 0.00 -- -- -- 36 33 -- -- -- 0.83 0.00 -- -- -- 34 31 GV-6 20 A 3 0.83 0.00 3 20 A Spare 32 29 -- -- -- 0.83 0.33 -- -- -- 30 27 -- -- -- 0.83 0.33 -- -- -- 28
25 GV-5 20 A 3 0.83 0.33 3 20 A OV-2 26
23 -- -- -- 0.83 0.83 -- -- -- 24 21 -- -- -- 0.83 0.83 -- -- -- 22
19 GV-16 20 A 3 0.83 0.83 3 20 A GV-15 20
17 -- -- -- 0.83 0.83 -- -- -- 18 15 -- -- -- 0.83 0.83 -- -- -- 16
13 GV-14 20 A 3 0.83 0.83 3 20 A GV-13 14
11 -- -- -- 0.83 0.83 -- -- -- 12 9 -- -- -- 0.83 0.83 -- -- -- 10
7 GV-12 20 A 3 0.83 0.83 3 20 A GV-11 8
5 -- -- -- 0.33 0.83 -- -- -- 6 3 -- -- -- 0.33 0.83 -- -- -- 4
1 OV-1 20 A 3 0.33 0.83 3 20 A GV-10 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: NA
Mounting: SURFACE Wires: 3 Mains Rating: 100 A
Supply From: PS-SWBD1-S Phases: 3 Mains Type: MLO
Location: MEZZANINE Volts: 480V K.A.I.C. Rating: 42
Branch Panel: PS-HV-S3
A m en dm en t 1
-2
0-
C S
A
A m en dm en t 1
-1
6-
C S
A
1 1
T E
R Y
M
A
IN
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
C A
P
IT
A L
IIM
P
R O
V E
M E
N T
C O
R E
N A
V A
L S
T A
T
IO
N N
O R
F O
LK
, V
IR
G
IN
IA
P -3
M
U L
T I-
M
IS
S
IO
N D
R Y
D O
C K
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C L A S S
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
JDM
CONSTR. CONTR. NO.
DRW CHKCSADES
SCALE: AS SHOWN
EPROJECT NO.: 1604959
JRC
C
U se rs
P u b lic
D o c u m e n ts
L o c a l_ R e v it F i le s\ D
R Y
D S
W
TR
-1
-E C
A ss in i.
rv t
/1
/2
:1
:5
A
M
U T
IL
IT
Y E
N C
L O
S U
R E
P
A N
E L B
O A
R D
S C
H E
D U
L E
S
UE606
12823691
Total... 150 A 150 A 150 A Total Load: 41.45 kVA 41.45 kVA 41.45 kVA
41 -- -- -- 0.00 0.00 -- -- -- 42 39 -- -- -- 0.00 0.00 -- -- -- 40 37 Spare 20 A 3 0.00 0.00 3 20 A Spare 38 35 -- -- -- 8.00 2.15 -- -- -- 36 33 -- -- -- 8.00 2.15 -- -- -- 34
31 UE-EWH-1 40 A 3 8.00 2.15 3 20 A MATERIAL LIFT 32
29 -- -- -- 1.05 7.20 -- -- -- 30 27 -- -- -- 1.05 7.20 -- -- -- 28
25 SIDE STREAM FILTER #4 15 A 3 1.05 7.20 3 35 A UE-ACCU-02 26
23 -- -- -- 1.05 1.05 -- -- -- 24 21 -- -- -- 1.05 1.05 -- -- -- 22
19 SIDE STREAM FILTER #2 15 A 3 1.05 1.05 3 15 A SIDE STREAM FILTER #3 20
17 -- -- -- 2.11 1.05 -- -- -- 18 15 -- -- -- 2.11 1.05 -- -- -- 16
13 UE-ACCU-3 15 A 3 2.11 1.05 3 15 A SIDE STREAM FILTER #1 14
11 -- -- -- 2.11 2.11 -- -- -- 12 9 -- -- -- 2.11 2.11 -- -- -- 10
7 PURE WATER PUMP #1 20 A 3 2.11 2.11 3 20 A PURE WATER PUMP #2 8
5 -- -- -- 13.57 0.00 1 20 A Spare 6 3 -- -- -- 13.57 0.00 1 20 A Spare 4 1 UE-ACCU-01 60 A 3 13.57 0.00 1 20 A Spare 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: NA
Mounting: Surface Wires: 3 Mains Rating: 400 A
Supply From: LC19 WEST Phases: 3 Mains Type: MCB
Location: THIRD FLOOR Volts: 480V K.A.I.C. Rating: 65K
Branch Panel: UE-HV2
Total... 99 A 108 A 120 A Total Load: 11.83 kVA 12.78 kVA 14.24 kVA
41 Spare 20 A 1 0.00 0.00 -- -- Space 42 39 Spare 20 A 1 0.00 0.00 -- -- Space 40 37 Spare 20 A 1 0.00 0.00 -- -- Space 38 35 -- -- -- 4.83 0.00 -- -- Space 36 33 -- -- -- 4.83 0.00 -- -- Space 34 31 WHEELER CONTROL PANEL 60 A 3 4.83 0.00 -- -- Space 32 29 -- -- -- 0.67 0.00 -- -- Space 30 27 -- -- -- 0.67 0.00 -- -- Space 28 25 UE-CUH-3 20 A 3 0.67 0.00 -- -- Space 26
23 OUTDOOR CONVINIENCE RECEPT 20 A 1 0.54 1.20 1 20 A UE-TP-7 24
21 Spare 20 A 1 0.00 1.38 -- -- -- 22 19 Spare 20 A 1 0.00 3.61 -- -- -- 20
17 UE-BAS-EF/FW 20 A 1 1.20 3.04 3 150 A UE-LV2 18
15 CONVINIENCE RECPT GROUND... 20 A 1 0.54 1.20 1 20 A UE-TP-6 16
13 UE-BAS-HPA4 20 A 1 1.20 0.00 1 20 A Spare 14
11 UE-CHP-2 20 A 1 1.00 0.54 1 20 A ROOF CONVINIENCE RECEPT 12
9 TRAP PRIMERS - 3RD FLR NORTH 20 A 1 0.06 2.61 1 20 A UTILITY TUNNEL UH'S 10
7 TRAP PRIMERS - 3RD FLR SOUTH 20 A 1 0.09 0.54 1 20 A CONVINIENCE RECEPT 3RD FL 8
5 CONVINIENCE RECEPT 3RD FL 20 A 1 0.36 0.87 1 20 A UE-UH-06 6
3 ACTUATOR 20 A 1 0.30 1.20 1 20 A PWP CONTROL PANEL 4
1 ROOF CONVINIENCE RECEPT 20 A 1 0.18 0.72 1 20 A CONVINIENCE RECEPT 3RD FL 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: 225 A
Mounting: SURFACE Wires: 4 Mains Rating: 225 A
Supply From: T UE-LV1 Phases: 3 Mains Type: MCB
Location: UE SECOND FLOOR Volts: 208/120V K.A.I.C. Rating: 10K
Branch Panel: UE-LV1
Total... 177 A 182 A 182 A Total Load: 48.97 kVA 50.36 kVA 50.17 kVA
41 -- -- -- 0.00 0.00 -- -- Space 42 39 -- -- -- 0.00 0.00 -- -- Space 40 37 Spare 20 A 3 0.00 0.00 -- -- Space 38 35 -- -- -- 0.00 0.00 -- -- Space 36 33 -- -- -- 0.00 0.00 -- -- Space 34 31 Spare 20 A 3 0.00 0.00 -- -- Space 32 29 -- -- -- 0.00 0.00 -- -- Space 30 27 -- -- -- 0.00 0.00 -- -- Space 28 25 Spare 20 A 3 0.00 0.00 -- -- Space 26 23 -- -- -- 0.00 0.00 -- -- Space 24 21 -- -- -- 0.00 0.00 -- -- Space 22 19 Spare 20 A 3 0.00 0.00 -- -- Space 20 17 -- -- -- 3.00 0.00 -- -- Space 18 15 -- -- -- 3.19 0.00 -- -- Space 16 13 UE T-HTCP 50 A 3 2.60 0.00 -- -- Space 14 11 -- -- -- 36.67 0.00 -- -- -- 12 9 -- -- -- 36.67 0.00 -- -- -- 10 7 CRANE HOTEL POWER CP-2 200 A 3 36.67 0.00 3 30 A Spare 8 5 -- -- -- 5.70 4.80 -- -- -- 6 3 -- -- -- 5.70 4.80 -- -- -- 4
1 MPZ 1NSE 45 A 3 5.70 4.00 3 45 A MPZ 1NN 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: N/A
Mounting: Surface Wires: 3 Mains Rating: 400 A
Supply From: LC19 WEST Phases: 3 Mains Type: MCB
Location: GROUND FLOOR Volts: 480V K.A.I.C. Rating: 65K
Branch Panel: UE-HV3
Total... 325 A 329 A 335 A Total Load: 90.20 kVA 91.15 kVA 92.61 kVA
41 -- -- -- 0.00 0.00 -- -- Space 42 39 -- -- -- 0.00 0.00 -- -- Space 40 37 Spare 20 A 3 0.00 0.00 -- -- Space 38 35 -- -- -- 12.19 0.00 -- -- Space 36 33 -- -- -- 12.19 0.00 -- -- Space 34 31 UE-JP-DIST-BLOCK 60 A 3 12.19 0.00 -- -- Space 32 29 -- -- -- 0.33 14.24 -- -- -- 30 27 -- -- -- 0.33 12.78 -- -- -- 28
25 UE-CRAC-1 15 A 3 0.33 11.83 3 125 A T UE-LV 26
23 -- -- -- 2.11 2.11 -- -- -- 24 21 -- -- -- 2.11 2.11 -- -- -- 22
19 UE-EF-1 15 A 3 2.11 2.11 3 15 A UE-EF-2 20
17 -- -- -- 24.68 24.68 -- -- -- 18 15 -- -- -- 24.68 24.68 -- -- -- 16
13 HPA COMPRESSOR #2 150 A 3 24.68 24.68 3 150 A HPA COMPRESSOR #1 14
11 -- -- -- 2.27 1.33 -- -- -- 12 9 -- -- -- 2.27 1.33 -- -- -- 10
7 UE-AHU-02-SUPPLY 15 A 3 2.27 1.33 3 15 A UE-AHU-02-RETURN 8
5 -- -- -- 3.81 4.85 -- -- -- 6 3 -- -- -- 3.81 4.85 -- -- -- 4
1 UE-AHU-01-RETURN 20 A 3 3.81 4.85 3 30 A UE-AHU-01-SUPPLY 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: NA
Mounting: Surface Wires: 3 Mains Rating: 400 A
Supply From: LC21-EAST Phases: 3 Mains Type: MCB
Location: SECOND FLOOR Volts: 480V K.A.I.C. Rating: 65K
Branch Panel: UE-HV1
Total... 107 A 112 A 111 A Total Load: 12.78 kVA 13.40 kVA 13.27 kVA
41 -- -- -- 3.12 0.00 1 20 A Spare 42 39 -- -- -- 2.17 0.00 1 20 A Spare 40 37 UE-LVIT-S 100 A 3 3.12 0.00 1 20 A Spare 38 35 Work Station Rec 20 A 1 0.36 0.00 1 20 A Spare 36 33 Lighting - Utility Tunnel 20 A 1 1.61 2.94 -- -- -- 34 31 Lighting - Utility Tunnel 20 A 1 1.41 2.12 -- -- -- 32 29 Lighting - DD1W 20 A 1 0.30 2.19 3 100 A UE-LV-S2 30 27 Lighting - DD1W 20 A 1 0.24 0.24 1 20 A Lighting - DD1N 28 25 Lighting - DD1N 20 A 1 0.30 0.36 1 20 A Lighting - Centerwall 26 23 Lighting - Exterior 20 A 1 0.07 1.04 1 20 A Lighting - DD1N Tunnel 24 21 UE-CHP-1 20 A 1 1.20 1.04 1 20 A Lighting - DD1N Tunnel 22 19 CONDUCTIVITY METER 20 A 1 1.00 0.36 1 20 A Lighting - Centerwall 20 17 UE-EF-4 15 A 1 0.60 0.70 1 20 A Lighting - Exterior 18
15 UE-BAS-CT4 20 A 1 1.20 1.20 1 20 A UE-BAS-CT2 16
13 UE-BAS-CT1 20 A 1 1.20 1.20 1 20 A UE-BAS-CT3 14
11 UE-BAS-HPA1 20 A 1 1.20 1.20 1 20 A UE-BAS-HPA2 12
9 Lighting - UE Tunnel 20 A 1 0.30 1.20 1 20 A RADIO TRANSMITTER 10 7 Spare 20 A 1 0.00 0.60 1 20 A Lighting - UE Tunnel 8 5 Lighting - UE Ground Floor 20 A 1 1.30 1.34 1 20 A Lighting - UE Second Floor 6 3 Receptacle-ASW ctrl Station 20 A 1 0.18 0.00 1 20 A Spare 4 1 FACP 20 A 1 1.20 0.00 1 20 A Spare 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: 225A
Mounting: Surface Wires: 4 Mains Rating: 225 A
Supply From: UE-MCC Phases: 3 Mains Type: MCB
Location: THIRD FLOOR Volts: 208/120V K.A.I.C. Rating: 10K
Branch Panel: UE-LV-S
Total... 27 A 32 A 11 A Total Load: 3.04 kVA 3.61 kVA 1.38 kVA
41 Spare 20 A 1 0.00 0.00 -- -- Space 42 39 Spare 20 A 1 0.00 0.00 -- -- Space 40 37 Spare 20 A 1 0.00 0.00 -- -- Space 38 35 Spare 20 A 1 0.00 0.00 -- -- Space 36 33 Spare 20 A 1 0.00 0.00 -- -- Space 34 31 Spare 20 A 1 0.00 0.00 -- -- Space 32 29 Spare 20 A 1 0.00 0.00 -- -- Space 30 27 Spare 20 A 1 0.00 0.00 -- -- Space 28 25 Spare 20 A 1 0.00 0.00 -- -- Space 26 23 Spare 20 A 1 0.00 0.00 -- -- Space 24 21 Spare 20 A 1 0.00 0.00 -- -- Space 22 19 Spare 20 A 1 0.00 0.00 -- -- Space 20 17 Spare 20 A 1 0.00 0.00 -- -- Space 18 15 Spare 20 A 1 0.00 0.00 -- -- Space 16 13 CONVINIENCE RECPT GROUND... 20 A 1 0.54 0.72 1 20 A OUTDOOR CONVINIENCE RECEPT 14
11 -- -- -- 0.67 0.50 1 15 A UE-EF-3 12
9 -- -- -- 0.67 0.54 1 20 A CONVENIENCE RECEPT 2ND FL 10
7 UE-CUH-2 20 A 3 0.67 1.00 1 20 A UE-CHP-3 8
5 MOTORIZED DAMPERS SECOND... 20 A 1 0.03 0.18 1 20 A RECEPT - SECOND FL 6
3 UE-UH-04 & UE-UH-05 20 A 1 1.50 0.90 1 20 A CONVINIENCE RECEPT RM 25, 10 4
1 MOTORIZED DAMPERS SECOND... 20 A 1 0.05 0.06 1 20 A MOTORIZED DAMPERS SECOND... 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: 225 A
Mounting: SURFACE Wires: 4 Mains Rating: 225 A
Supply From: UE-LV1 Phases: 3 Mains Type: MLO
Location: UE SECOND FLOOR Volts: 208/120V K.A.I.C. Rating: 10K
Branch Panel: UE-LV2
A m en dm en t 1
-2
0-
C S
A
A m en dm en t 1
-1
6-
C S
A
MLO MLO
MLO
MCB
T E
R Y
M
A
IN
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
C A
P
IT
A L
IIM
P
R O
V E
M E
N T
C O
R E
N A
V A
L S
T A
T
IO
N N
O R
F O
LK
, V
IR
G
IN
IA
P -3
M
U L
T I-
M
IS
S
IO
N D
R Y
D O
C K
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C L A S S
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
JDM
CONSTR. CONTR. NO.
DRW CHKCSADES
SCALE: AS SHOWN
EPROJECT NO.: 1604959
JRC
C
U se rs
P u b lic
D o c u m e n ts
L o c a l_ R e v it F i le s\ D
R Y
D S
W
TR
-1
-E C
A ss in i.
rv t
/1
/2
:1
:5
A
M
U T
IL
IT
Y E
N C
L O
S U
R E
P
A N
E L B
O A
R D
S C
H E
D U
L E
S
UE607
12823692
Total... 27 A 18 A 27 A Total Load: 3.12 kVA 2 kVA 3 kVA
29 Spare 20 A 1 0.00 0.00 -- -- Space 30 27 Spare 20 A 1 0.00 0.00 -- -- Space 28 25 Spare 20 A 1 0.00 0.00 -- -- Space 26 23 Spare 20 A 1 0.00 0.00 -- -- Space 24 21 Spare 20 A 1 0.00 0.00 -- -- Space 22 19 Spare 20 A 1 0.00 0.00 -- -- Space 20 17 Spare 20 A 1 0.00 0.00 -- -- Space 18 15 Spare 20 A 1 0.00 0.00 -- -- Space 16 13 Spare 20 A 1 0.00 0.00 -- -- Space 14 11 UE-BAS-AHU1 20 A 1 1.20 0.00 -- -- Space 12
9 UE-BAS-AHU2 20 A 1 1.20 0.25 1 20 A ACCESS CONTROL PANEL 10
7 UE-BAS-CRAC 20 A 1 1.20 1.20 1 20 A UE-BAS-MSTR 8
5 IT ROOM RECEPT 20 A 1 0.72 1.20 1 20 A UE-BAS-VAV 6
3 Receptacle Space 26 20 A 1 0.36 0.36 1 20 A Receptacle Space 26 4 1 Receptacle Space 26 20 A 1 0.36 0.36 1 20 A Receptacle Space 26 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: 100 A
Mounting: SURFACE Wires: 4 Mains Rating: 100 A
Supply From: UE-LV-S Phases: 3 Mains Type: MLO
Location: TELCOM ROOM Volts: 208/120V K.A.I.C. Rating: 10
Branch Panel: UE-LVIT-S
A m en dm en t 1
-2
0-
C S
A
A m en dm en t 1
-1
6-
C S
A
Total... 18 A 18 A 25 A Total Load: 2.19 kVA 2.12 kVA 2.94 kVA
41 Spare 20 A 1 0.00 0.00 -- -- Space 42 39 Spare 20 A 1 0.00 0.00 -- -- Space 40 37 Spare 20 A 1 0.00 0.00 -- -- Space 38 35 Spare 20 A 1 0.00 0.00 -- -- Space 36 33 Spare 20 A 1 0.00 0.00 -- -- Space 34 31 Spare 20 A 1 0.00 0.00 -- -- Space 32 29 Spare 20 A 1 0.00 0.00 -- -- Space 30 27 Spare 20 A 1 0.00 0.00 -- -- Space 28 25 Spare 20 A 1 0.00 0.00 -- -- Space 26 23 Spare 20 A 1 0.00 0.00 -- -- Space 24 21 Spare 20 A 1 0.00 0.00 -- -- Space 22 19 FLOW METER FT-02N 20 A 1 0.10 0.00 -- -- Space 20 17 FLOW METER FT-02W 20 A 1 0.10 0.00 -- -- Space 18
15 FLOW METERS - THIRD FLR 20 A 1 0.20 0.20 1 20 A PW FLOW METERS - THIRD FLR 16
13 CONTROL VALVES - THIRD FLR 20 A 1 0.20 0.40 1 20 A CONTROL VALVES - THIRD FLR 14 11 CONTROL VALVES - THIRD FLR 20 A 1 0.40 0.20 1 20 A CONTROL VALVES - THIRD FLR 12
9 LIGHTING - THIRD FLR 20 A 1 0.51 0.40 1 20 A CONTROL VALVES - ROOF 10
7 CONTROL VALVES - ROOF 20 A 1 0.40 0.40 1 20 A CONTROL VALVES - THIRD FLR 8
5 LIGHTING - THIRD FLR HIGH BAY 20 A 1 1.84 0.40 1 20 A CONTROL VALVES - ROOF 6
3 CONTROL VALVES - THIRD FLR 20 A 1 0.40 0.43 1 20 A LIGHTING - SOUTH STAIRS 4
1 LIGHTING - NORTH STAIRS 20 A 1 0.30 0.40 1 20 A CONTROL VALVES - ROOF 2
CKT Circuit Description Trip Poles A-KVA B-KVA C-KVA Poles Trip Circuit Description CKT
Enclosure: NEMA 3RX MCB Rating: NA
Mounting: Surface Wires: 4 Mains Rating: 100 A
Supply From: UE-LV-S Phases: 3 Mains Type: MCB
Location: THIRD FLOOR Volts: 208/120V K.A.I.C. Rating: 10K
Branch Panel: UE-LV-S2
MLO
| PE606 - PUMP STATION - PANELBOARD SCHEDULES |
| Sheets |
| PE606 - PUMP STATION - PANELBOARD SCHEDULES |
| UE606 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| UE607 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| UE606 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| Sheets |
| PE606 - PUMP STATION - PANELBOARD SCHEDULES |
| UE606 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| UE607 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| UE607 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| Sheets |
| PE606 - PUMP STATION - PANELBOARD SCHEDULES |
| UE606 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
| UE607 - UTILITY ENCLOSURE - PANELBOARD SCHEDULES |
File details come from the government source that posted it. Updated .