AMENDMENT 0014.pdf
PDF 213 KB Posted
- Solicitation number
- N4008520R0021
About this file
This solicitation is for a design-build construction project to build additions to Dry Dock 1 located at Portsmouth Naval Shipyard in Kittery, Maine. The additions will include two bays labeled Dry Dock 1 North and Dry Dock 1 West of sufficient size and depth to support maintenance and overhaul of Virginia Class submarines. New construction will include concrete structures, pump wells, a pump station building, crane rails, mooring hardware, utilities, and tunnels. Modifications will be made to existing structures to support dewatered conditions. The Navy's Naval Facilities Engineering Command is the agency issuing this solicitation for offers due by February 26, 2021.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. N40085-20-R-0021, DESIGN-BID-BUILD (DBB), P-381, MULTI MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME
The purpose of this amendment is to provide responses to PPI's, updates to draw ings and specifications, and updates to the RFP and Factor 2 - Management Approach and Schedule.
The Step 2 proposal due date of 26 February 2021 NTL 2:00 P.M. EST remains unchanged.
See Continuation Page(s).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 39
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0021
X 9B. DATED (SEE ITEM 11)
31-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Feb-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0014
CONTINUATION SHEET
2. BASIS FOR AWARD
Delete:
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
Replace With:
The Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. EVALUATION FACTORS FOR AWARD
(2) Factor 2 – Management Approach and Schedule
(i) Solicitation Submittal Requirements:
2. Critical Path Schedule
Delete:
A schedule that proposes a contract duration longer than indicated in the RFP will be rated UNACCEPTABLE.
Replace With:
If unable to meet the milestone dates of the RFP, the Offeror shall submit the best possible schedule.
SECTION 01 44 00.22 ARCHAEOLOGICAL MONITORING (PWD ME)
Paragraph 3.1 INSPECTION AND MONITORING
Delete first and second paragraphs in their entirety.
SECTION 01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)
Paragraph 1.4.1 Henderson Point
Delete paragraph in its’ entirety.
SECTION 03 31 29 MARINE CONCRETE
Paragraph 1.8.3 Concrete Design Requirements
Add Paragraph 1.8.3.2 Fifty-Six (56) Day Compressive Strength as follows: “The concrete may meet the specified concrete compressive strength at 56 days instead of 28 days if the Contractor's means and methods of construction will not exert loading on the completed work requiring an earlier concrete strength for the completed work and if the longer strength gain will not adversely affect the construction schedule. Intermediate cylinders can be tested at 28 days to estimate if the 56 day strengths can be achieved for a given construction load. Otherwise, the concrete shall meet the specified concrete compressive strength at 28 days.”
Paragraph 1.8.7 Mass Concrete Temperature Control Plans
In the fifth sub-paragraph, revise “Within 3 inches…” to “Between 3 and 6 inches…” in the second, third and fourth bullets.
Add the following to the end of the sixth sub-paragraph: “Sensor installation and temperature recording is not required during construction of the drilled shafts, however all other thermal control requirements shall be provided.”
Add the following to the end of Paragraph 1.8.7:
“After the Contractor has established, to the satisfaction of the Government, that proper control can be maintained of the concrete mix properties, including curing temperatures, the Contractor shall have the option of submitting an alternative plan to use a performance-based criteria for a variable differential limit, based on the concrete strength as determined by the maturity at any given time. This will supersede the 35 degree F limit. The alternative plan shall include the methods used to determine the temperature and supporting data and design to support the accuracy of the method chosen. Provide complete calculations and basis for increasing the maximum differential temperature specification. The Mass Concrete Temperature Control Plan for the alternative performance-based temperature difference limit shall also provide the Government with tables that define ambient temperatures for acceptable concrete placement, the required temperature of the concrete for the ambient air temperature, the maximum predicted concrete temperature, the maximum predicted differential temperature, the time for removal of forms, the allowable air temperature for form removal, and the predicted maximum and differential temperature from placement to age of 28 days. The Government will consider all cracking of a mass concrete placement where the differential temperature exceeded 36 degrees F the responsibility of the Contractor. Upon the Government’s acceptance of the Mass Concrete Temperature Control Plan, continuously monitor all temperature sensors over the required age of the concrete. If the maximum limit or differential temperature limits are exceeded at any time, immediately take action to retard and reduce the out-of-specification temperatures. Failure to maintain proper temperature control under this plan will result in reversion to the 35 degree F limit for subsequent placements until such time that the Contractor demonstrates to the Government that causes for the loss of control have been identified and corrected. Temperature control will be considered to have failed, the mass concrete placement will be considered as defective and resulting delays will be considered as non-excusable if one of the following conditions occurs:
(1) The differential exceeds the variable value by more than 3 degrees F at any time during the first 40 hours after placement.
(2) The differential exceeds the variable value by more than 5 degrees F at any time after the first 40 hours after placement during temperature control.
(3) The differential exceeds the variable value by 2 degrees F or more for any period of 8 hours or more at any time during temperature control.
(4) Cracking of the placement determined to be the result of thermal issues will also be considered to be failure of the temperature control and will result in reversion to the 35 degree F limit, as well as triggering the provisions specified in Paragraph 3.9 REPAIR, REHABILITATION AND REMOVAL and in Specification Section 03 45 33.01, Paragraph 2.2.9 Acceptance/Rejection of Defects.
The Contractor shall determine the extent and effect of the damage and submit a proposed repair plan to the Government for approval to return the concrete to the specified requirements. The Government will determine if the proposed repair methods are acceptable or if concrete removal is required. No repairs shall begin until the Government has approved the repair plan.
Reversion to the 35 degree F requirement will be at no additional cost to the Government or be cause for an increase in schedule.”
Paragraph 1.8.8 Mass Concrete Mock-Up
In the second sub-paragraph, revise “…a minimum dimension of 3 feet per side…” to “…a minimum dimension of 5 feet per side…”.
Paragraph 3.2.3 Cover Add the following to the end of the first sentence: “ on the Contract Drawings.”
SECTION 03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
Change section name to: “PLANT-PRECAST AND CAST IN PLACE CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION”
Paragraph Part 1 GENERAL
Add: “Based on site conditions encountered the contractor shall provide cast-in-place concrete manholes where the placement of precast products is not possible. The interior dimension shown on the contract drawings shall be maintained. Cast in place floors, walls, and roof shall be 10" min. thick with #5 bars at 6" O.C. each way, top and bottom or each face as applicable. Concrete shall be f'c = 4,000 psi and in accordance with specification section 03 30 00 Non-marine concrete.”
SECTION 03 45 33.01 PRECAST CONCRETE DRY DOCK MONOLITHS
Paragraph 3.6 DRILLED SHAFT CONNECTIONS
In the last sentence of the first paragraph, revise “…and the Type 3 compression drilled shafts…” to “….and the Type 3 and Type 4 compression drilled shafts…”.
SECTION 09 96 00 HIGH PERFORMANCE COATINGS
Paragraph 3.1.1.1 Existing Cast Iron Suction Piping and Wrought Iron Lining Surface Preparation
Paragraph 3.1.4 Wood Substrates
Delete paragraph in its’ entirety.
Paragraph 3.4 Coating Systems
Item a, Table: delete “Division 6 Exterior Wood Paint Table”
Paragraph 3.7 COATING SYSTEM OR WOOD
Delete paragraph in its’ entirety
Paragraph 3.8 COATING SYSTEM FOR CAST IRON SUCTION PIPING AND WROUGHT IRON LINING IN
SUCTION CHAMBER
Paragraph 3.12.2. Interior Paint Tables
Delete Tables E and F
Paragraph 3.12.3 Division 6 Exterior Paint Table
Delete paragraph in its’ entirety
Paragraph 3.12.4 Interior Wood Paint Table
Delete paragraph in its’ entirety
SECTION 23 64 26 AUXILIARY SEA WATER AND TOWER WATER PIPING SYSTEMS
Paragraph 1.3 SUBMITTALS
Add “SD-01 Preconstruction Submittals
INTAKE SCREENS AND AIR BACKWASH SYSTEM; G”
Paragraph 2.15.1 General
Fourth paragraph: delete “…over 50” and replace with “…at least 5”
Fifth paragraph: Replace in its’ entirety with: “Manufacturer shall submit a complete and detailed pre-submittal package containing the below information:”
Item f. Replace in its’ entirety with: “Detailed list of all variations required from the original design if an alternate screen is used, referencing appropriate sections of the specifications and locations on the drawings.”
SECTION 25 00 00.00 22 ASW Control
Replace the specification in its’ entirety. The following sections were added to the ASW control specification.
2.19 Points
2.20 Building Telecommunications Cabling (BTC)
2.21 System Reliability
2.22 Sensors
2.23 Programmable Logic Controller (PLC)
2.24 PLC Software
2.25 Workstation Hardware
2.26 Touchscreen HMI
2.27 Monitoring and Control Software
2.28 Data Communication Requirements
3.1.11.5 Device Mounting
3.1.11.6 Sequence of Operations
3.1.11.7 Control Panels
3.1.11.8 Level Instruments
3.1.11.9 Pressure Instruments
3.1.11.10 Electrical Power Devices
3.7 Control Drawings
3.8 Field Training
3.9 Operation and Maintenance Data Requirements
Additionally, updates were made to section 2.11 clarifying control panel requirements for ASW system in the utility enclosure and pump station.
SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM
Paragraph 2.20 MOTOR CONTROL CENTERS
Item d. Change sentence to read “…..withstand and interrupting rating of 65,000 amperes rms symmetrical”.
SECTION 41 22 13.33 PORTAL CRANE TRACK INSTALLATION
Paragraph 1.1 References.
Delete “ASTM A1 - (2000; R2018) Standard Specification for Carbon Steel Tee Rails” and replace with “ASTM A759 - (2016) Standard Specification for Carbon Steel Rails”
Paragraph 2.1.1.1 Rail Section Weight and Hardness
First sentence. Delete “ASTM A1” and replace with “ASTM A759”.
SECTION 32 31 13.53 HIGH SECURITY CHAIN LINK FENCE
Replace specification in its entirety with the attached.
On NAVFAC Dwg. No. 12822981
CHANGE G105 CONSTRUCTION SEQUENCING & PHASING PLAN PHASE 1 as follows:
Revised layout of CIA fence, turnstiles, and gates.
Removed note 12.
Added note for 10ft clear zone on both sides of CIA fence to be maintained at all times.
On NAVFAC Dwg. No. 12823002
CHANGE G126 COMPOSITE UTILITY PLAN – TURNOUT & EXISTING PUMP WELL AREA as follows:
Revised composite sheet to incorporate updated utility layouts and sizes in the crane rail turnout area.
On NAVFAC Dwg. No. 12823122
CHANGE CD103 DEMOLITION PLAN – TURNOUT & EXISTING PUMP WELL AREA as follows:
Adjusted limit of pavement demolition south of Building 175.
Reworded Keynote 10.
Added demolition of existing HPA manhole and portion of adjacent concrete trench located northeast of
Building 175.
On NAVFAC Dwg. No. 12823123
CHANGE CD104 – UTILITY DEMOLITION PLAN - TURNOUT as follows:
Added demolition and flowable fill portions of existing drainage pipe east of Building 175.
Added existing catch basin and section of drainage pipe for demolition east of electric manhole AC-35.
Added demolition and relocation of existing electrical infrastructure servicing hull cut and seabox units east of electric manhole, AC-34.
Clarified demolition at east end of Berth 11.
Added Keynote 18 “Relocate existing remote-control shelter and equipment. See general note 4” for existing equipment southeast of Building 175.
Added Keynote 19 adjacent to existing manhole AC-35 to “Remove and reset existing electrical panel and meter box, See General Note 4”.
Added Keynote 20 adjacent to existing manhole AC-35 to “Remove and reset existing siren, pole and wiring, see general note 4”.
Added Keynote 21 “Demolish existing ductbank and install new ductbank ~1ft lower” Added Keynote 22 “Remove and relocated existing electrical equipment, see general note 4” Added Keynote 23 “Flowable fill portion of drainage below existing electrical infrastructure”.
Added General Note 4 “Coordinate relocation of existing equipment with contracting officer”.
On NAVFAC Dwg. No. 12823136
CHANGE CS103 CIVIL SITE PLAN – TURNOUT & EXISTING PUMP WELL AREA as follows:
Revised location of generator pad north of PIDC enclosure.
Added reinforced concrete pad and associated Keynote 11 for section of shallow high-pressure steam/compressed air north of MH 380A.
Revised limit of pavement south of Building 175 around existing fire hydrant and electrical manhole Limit of new pavement north of substation was revised.
On NAVFAC Dwg. No. 12823140
CHANGE CS107 SITE GRADING PLAN-TURNOUT as follows:
Revised grading north of PIDC enclosure to accommodate relocated generator.
Revised extend of grading in vicinity of existing CB 17-3A.
Revised low point northeast of PIDC enclosure.
Moved low point north of crane rail/south of PIDC area
On NAVFAC Dwg. No. 12823141
CHANGE CS108 DRAINAGE NOTES as follows:
Added CB-10 to structure table.
Added CB-17-3A to structure table.
Revised CB 17-3B to include existing pipe penetrations.
On NAVFAC Dwg. No. 12823143
CHANGE CS110 DRAINAGE PLAN – BERTH 11A AND 11B as follows:
Revised DMH-17 to have frame and grade in lieu of frame and cover, added keynote 13.
On NAVFAC Dwg. No. 12823144
CHANGE CS111 DRAINAGE PLAN - TURNOUT as follows:
Added new CB-17-3A northeast of PIDC enclosure.
Added Keynote 11 to “Cut and connect existing pipe to catch basin” Revised connection of existing pipes to CB 17-3B.
Revised inverts and labels for drainage from enclosure to main trunk line Revised location of CB-01 Revised layout of main truck line from DMH-04 to CB 15-6.
On NAVFAC Dwg. No. 12823154
CHANGE CS502 SITE DETAILS SHEET 1 OF 2 as follows:
Added pipe trench and bituminous concrete pavement detail.
On NAVFAC Dwg. No. 12823155
CHANGE CS503 SITE DETAILS SHEET 2 OF 2 as follows:
Revised CIA fence, turnstile, and gate details Added CIA double gate detail.
On NAVFAC Dwg. No. 12823462
CHANGE PM704 PUMP STATION HYDROBURST AIR COMPRESSOR SCHEMATIC as follows:
Replace P&ID number in control points list with “PM704”.
On NAVFAC Dwg. No. 12823615
CHANGE UM204 UTILITY ENCLOSURE - THIRD FLOOR PIPING PLAN as follows:
Add keynote 22 stating “ASW system control workstation. Provide workstation as outlined in specifications
25.00.00.00 25 asw control”.
Add keynote 23 stating “The four BAS panels shown shall house all cooling tower and ASW related controllers within the utility enclosure. The control workstation and HMI screen shall be located near column 4”.
On NAVFAC Dwg. No. 12823630
CHANGE UM602 UTILITY ENCLOSURE – SCHEDULES – SHEET 2 OF 5 as follows:
Updated note 5 on Air Handling Schedule stating “AHU fan VFDs shall be supplied and installed by the electrical contractor”.
On NAVFAC Dwg. No. 12823634
CHANGE UM606 UTILITY ENCLOSURE – SCHEDULES – PURE WATER SCHEDULES as follows:
Add note 4 on Pure Water Pump Schedule stating “Pump VFDs shall be supplied and installed by the electrical contractor”.
On NAVFAC Dwg. No. 12823725
CHANGE MA105 HIGH PRESSURE AIR PLAN as follows:
Adjusted location of new MH-2 and MH-5.
On NAVFAC Dwg. No. 12823818
CHANGE MT108 HIGH PRESSURE STEAM PLAN – TURNOUT as follows:
Revised expansion loop between MH3563 and MH378B to 6’x3’x6’ Revised expansion loop between MH378B and MH378A to 12’x6’x12’ Revised expansion loop between MH378A and EX MH378 to 6’x3’x6’ Added 8’x4’x8’ expansion loop between MH 380A and DD1 utility tunnel.
Dimensions of MH380A were revised.
Added General Note 5 to “Confirm invert elevation of HPS entering DD1 tunnel prior to installation of new connection”.
On NAVFAC Dwg. No. 12823819
CHANGE MT201 HIGH PRESSURE STEAM PROFILE as follows:
Revised rim elevations on structures MH 380A Added expansion loop between MH 380A and DD1 utility tunnel
Added utility crossings for relocated AC and DC ductbanks between MH 380A and DD1 utility tunnel.
Lowered 6”HPS between MH 380A and DD1 utility tunnel.
Revised anchor location south of MH 378A.
Adjusted other expansion loops on profiles C5 and C2.
Added 10” fresh water crossing to profile C5.
On NAVFAC Dwg. No. 12823739
CHANGE MC201 COMPRESSED AIR PROFILE as follows:
Added utility crossings for relocated AC and DC ductbanks between MH 380A and DD1 utility tunnel.
Lowered 6”CA between MH 380A and DD1 utility tunnel.
Updated crossing of 10” FW to Utility Enclosure.
On NAVFAC Dwg. No. 12823868
CHANGE M-514 MECHANICAL DETAILS – SHEET 2 0F 2 as follows:
Update manhole configuration 380A within the turn out area. Manhole updates are shown to accommodate updated site pipe routing.
On NAVFAC Dwg. No. 12823924
CHANGE ES202 ELECTRIC PROFILES 2 OF 10 as follows:
Revised ductbank dimensions on profiles C3 and A3.
Revised ductbank depth between AC-507 and AC-502.
Added utility crossings for revised AC and DC relocation ductbanks to profile A3.
On NAVFAC Dwg. No. 12823925
CHANGE ES203 ELECTRIC PROFILES 3 OF 10 as follows:
Revised ductbank dimensions on profiles B2 and B5.
Added utility crossings for revised AC and DC relocation ductbanks to profile B2 and B5.
On NAVFAC Dwg. No. 12823926
CHANGE ES204 ELECTRIC PROFILES 4 OF 10 as follows:
Revised ductbank dimensions on profiles B2 and B5.
Removed utility crossings for AC and DC relocation ductbanks to profile B2 and B5.
On NAVFAC Dwg. No. 12823927
CHANGE ES205 ELECTRIC PROFILES 5 OF 10 as follows:
Revised profile between AC-512 and connection to existing electrical conduits.
Added General Note 3 to “refer to sheet ES518 for conduit layout”.
Revised ductbank dimensions on profile B3.
Revised finish grade on profile B3 Adjusted rim elevations for manholes to revised finish grade.
On NAVFAC Dwg. No. 12823928
CHANGE ES206 ELECTRIC PROFILES 6 OF 10 as follows:
Revised ductbank dimensions on profile C3.
Lowered ductbank depth between AC-514 and AC-515.
On NAVFAC Dwg. No. 12823929
CHANGE ES207 ELECTRIC PROFILES 7 OF 10 as follows:
Revised ductbank dimensions on profile C3.
Lowered ductbank depth between DC-D87 and DC-D85.
On NAVFAC Dwg. No. 12823930
CHANGE ES208 ELECTRIC PROFILES 8 OF 10 as follows:
Revised ductbank dimensions on profile B4.
Added 4-way ductbank from DC-D89 to existing pump well to profile B4.
On NAVFAC Dwg. No. 12823931
CHANGE ES209 ELECTRIC PROFILES 9 OF 10 as follows:
Revised ductbank dimensions on profile C2.
Added 8-way ductbank from AC-526 to existing pump well to profile C2.
On NAVFAC Dwg. No. 12823932
CHANGE ES210 ELECTRIC PROFILES 10 OF 10 as follows:
Revised ductbank dimensions between AC-503 and AC-504.
On NAVFAC Dwg. No. 12823758
CHANGE MN100 NITROGEN OVERALL PLAN:
Insert drawing into contract documents.
On NAVFAC Dwg. No. 12823757
CHANGE MH701 FIRE PROTECTION SCHEMATIC:
Insert drawing into contract documents.
On NAVFAC Dwg. No. 12823983
CHANGE ES603 CONDUIT AND WIRE SCHEDULES as follows:
Added Note 4 to clarify requirements for the fire rated cable.
On NAVFAC Dwg. No. 12823986
CHANGE ES606 13.2 KV SINGLE LINE DIAGRAM as follows:
Added note 16 to require commissioning of existing unused 13.2 KV breaker 3-18A prior to circuit connection.
On NAVFAC Dwg. No. 12823486
CHANGE PE102 PUMP STATION-MAIN LEVEL POWER AND TELCOM PLAN as follows:
Added circuiting for air compressor. Corrected tags for air dryers.
On NAVFAC Dwg. No. 12823513
CHANGE PE606 PUMP STATION-PANELBOARD SCHEDULES as follows:
In panel PS-LV; Added circuiting for air compressor, corrected tags for air dryers. Corrected source for PS-HV-S1, S2 & S3 and rating of PS-HV-S1.
On NAVFAC Dwg. No. 12823666
CHANGE UE102 UTILITY ENCLOSURE-SECOND FLOOR POWER PLAN as follows:
Changed disconnects at PS-AHU-01 and PS-AHU-02 to VFDs.
On NAVFAC Dwg. No. 12823667
CHANGE UE103 UTILITY ENCLOSURE-THIRD FLOOR POWER PLAN as follows:
Added receptacle/circuit and data outlet for ASW system control station.
On NAVFAC Dwg. No. 12823691
CHANGE UE606 UTILITY ENCLOSURE-PANELBOARD SCHEDULES as follows:
Added circuit for ASW system control station in panel UE-LV-S. Corrected “Mains Type” designations on panels
UE-HV1, UE-HV2, UE-HV3 & UE-LV2.
On NAVFAC Dwg. No. 12823692
CHANGE UE607 UTILITY ENCLOSURE-PANELBOARD SCHEDULES as follows:
Corrected “Mains Type” designations on panels UE-LV-S2
On NAVFAC Dwg. No. xxxxxxxx
CHANGE UE609 UTILITY ENCLOSURE - SCHEDULES as follows:
Added VFD’s for UE-AHU-01, UE-AHU-02 supply and return fans. Note 6 has added verbiage to clarify that cooling tower VFDs are provided by the cooling tower manufacturer and installed by the electrical contractor.
On NAVFAC Dwg. No. 12823995
CHANGE R101 HENDERSON POINT NOTES & LEGEND as follows:
Updated legend.
On NAVFAC Dwg. No. 12823996
CHANGE R102 EROSION CONTROL PLAN – HENDERSON POINT 1 OF 2 as follows:
Revised layout between north and south casting areas to include maintaining Quarters S and Building 348.
Removed stabilized gravel construction entrance/exit east of Quarters S.
On NAVFAC Dwg. No. 12823997
CHANGE R103 EROSION CONTROL PLAN – HENDERSON POINT 2 OF 2 as follows:
Revised layout between north and south casting areas to include maintaining Quarters S and Building 348.
Removed stabilized gravel construction entrance/exit east of Quarters S.
On NAVFAC Dwg. No. 12823999
CHANGE R105 – DEMOLITION PLAN – HENDERSON POINT 1 OF 2 as follows:
Eliminated demolition work between north and south casting areas.
Added Keynote 13 “Contractor must maintain access to Building 348 at all times during construction.
Added Keynote 14 “Contractor must maintain access to Quarters S at all times during construction.
On NAVFAC Dwg. No. 12824000
CHANGE R106 – DEMOLITION PLAN – HENDERSON POINT 2 OF 2 as follows:
Eliminated demolition work between north and south casting areas.
Removed portion of removal, disposal of existing bituminous concrete pavement in south area.
Added Keynote 13 “Contractor must maintain access to Building 348 at all times during construction.
Added Keynote 14 “Contractor must maintain access to Quarters S at all times during construction.
Added General Note 13.
On NAVFAC Dwg. No. 12824001
CHANGE R107 – OPERATIONS SITE PLAN – HENDERSON POINT 1 OF 2 as follows:
Removed most new work between north and south casting areas to include maintaining Quarters S and Building 348.
Added Keynote 7 to “Provide fill and bituminous asphalt overlay withing the archaeological sensitive areas to match grades shown on sheet R-110. See general note 10.
Added General note 10.
On NAVFAC Dwg. No. 12824002
CHANGE R108 – OPERATIONS SITE PLAN – HENDERSON POINT 2 OF 2 as follows:
Removed most new work between north and south casting areas to include maintaining Quarters S and Building 348.
Removed 3 casting beds along south area.
Added Keynote 7 to “Provide fill and bituminous asphalt overlay withing the archaeological sensitive areas to match grades shown on sheet R-110. See general note 10.
Added General note 10.
On NAVFAC Dwg. No. 12824003
CHANGE R109 – GRADING PLAN – HENDERSON POINT 1 OF 2 as follows:
Removed grading between north and south casting areas.
On NAVFAC Dwg. No. 12824004
CHANGE R110 – GRADING PLAN – HENDERSON POINT 2 OF 2 as follows:
Removed grading between north and south casting areas.
Revised grading in archaeological sensitive area.
On NAVFAC Dwg. No. 12824008
CHANGE R114 –HENDERSON POINT – RESTORATION SITE PLAN as follows:
Revised layout between north and south casting areas to include maintaining Quarters S and Building 348.
On NAVFAC Dwg. No. 12824009
CHANGE R115 - HENDERSON POINT GRADING AND DRAINAGE PLAN 1 OF `as follows:
Revised drainage layout between drainage manhole D70 and D100.
On NAVFAC Dwg. No. 12824010
CHANGE R116 –HENDERSON POINT GRADING AND DRAINAGE PLAN 2 OF 2 as follows:
Revised drainage layout between drainage manhole D70 and D100.
On NAVFAC Dwg. No. 12824012
CHANGE R-118 UTILITY INFO – HENDERSON POINT as follows:
Revised drainage structure table to reflect changes on grading and structure layout.
PPI RESPONSES:
Contractor
PPI#
Section of RFP or Page Number
Question RESPONSE
120 Document 00 41 00 Bid Schedules
The explanation of this bid item states to include the cabling and duct banks "To/From" the substation. Does this include the duct bank and cabling to the PIDC and beyond? Also, should SP-7 and SP-8 be included within this pay item?
Yes, this should include the duct bank and cabling to the PIDC as well as SP-7 and SP-8.
390 03 30 00 Please confirm if the inside face of the B Monolith walls, that will be in direct contact with the Non-Marine infill concrete, requires surface preparation of roughing the precast surface to 1/4" amplitude and exposing the aggregate. The Notes on Y-002 and Paragraph 3.7.6 of 03 30 00 are unclear if applicable in these areas.
Confirmed. CJ surfaces against which marine concrete and non-marine structural concrete are placed shall be roughened to a 1/4" amplitude.
391 NA The DD1N North Wall lower tunnel is indicated on the referenced drawings to be filled with concrete after the installation of the electrical conduits. Is this the intent? If so, why is the lower utility tunnel even constructed - we could just embed the conduits in the wall pour, with significant savings? Are there rebar details for the tunnel infill concrete? Is this considered Mass Concrete? Is this considered marine Concrete?
The drawings are being revised to eliminate this lower tunnel and cast the electrical manholes and conduits directly into the concrete as the north dock wall is being constructed.
392 N/A "Details A5/PA401 and A5/UA604 show stainless steel numbers and a C-channel bracket.
Yes, stainless steel as those are the exterior building number signage and brackets. Also refer to specification section 101400
393 31 63 26 In amendment 0005, PPI#207, the note that CSL test pipes will be required per 1 foot of shaft diameter. Please clarify whether the stated "shaft diameter" refers to the rock socket diameter given in the drawings or the casing diameter.
The diameter referenced here is the rock socket diameter.
394 N/A Are these points being monitored by the Process Control Panel?
No, the HPA system is not monitored by the process control panel (PCP). Anything that is SCADA monitored will be monitored at the PCP. Also, In amendment 13 the PCP reference was changed to Dewatering Pumping Station (DCP)
395 N/A Please provide wiring requirements for all the Instruments/points shown on UM708 and listed on UM709.
Refer to spec section 23 09 13 and 23 09 00 for wire, cable, and conduit requirements for low voltage control wiring. The specifications were updated in Amendment 0013.
396 N/A Please provide wiring requirements for all the Instruments/points to be monitored by PCP.
Refer to spec section 23 09 13 and 23 09 00 for wire, cable, and conduit requirements for low voltage control wiring. The specifications were updated in Amendment 0013.
397 N/A Please provide control wiring requirements for OV-1,2,3,4,5,6, 8,9,10,11,12,13
The valves indicated are associated with the cooling tower which serves the boat similar to the ASW pumps in the pump station.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" for wire, cable, and conduit requirements for low voltage control wiring. Additionally refer to 26 20 00 Interior Distribution System as referenced in the ASW Control and cooling tower specification .
398 N/A Flow Transmitter FT-01 is listed on Section 40 95 00 Appendix B I/O list to be monitored from the Remote I/O Panel and is also listed on MS706, 707 to be monitored by the Process Control Panel. Are both of these correct? Please provide wiring requirements for this Flow Transmitter.
The remote I/O panel indicated in Section 40 95 00 Appendix B is for monitoring only and reports back to the Process Control Panel for monitoring, which then can be seen in building 72 via the scada system.
Please note, the PCP is now clarified as the Dewatering Pumping Station Control Panel (DCP) via amendment 0013.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" and "40 95 00 Process Control" for wire, cable, and conduit requirements for low voltage control wiring . Additionally refer to 26 20 00 Interior Distribution System as referenced in both specifications.
399 N/A Side Stream Filtration Skid General alarms are listed on Section 40 95 00 Appendix B I/O list to be monitored from the Remote I/O Panel and is also listed on MS706, 707 to be monitored by the Process Control Panel. Are both of these correct? Please provide wiring requirements for the General Alarms.
The remote I/O panel indicated in Section 40 95 00 Appendix B is for monitoring only and reports back to the Process Control Panel for monitoring, which then can be seen in building 72 via the scada system.
Please note, the PCP is now clarified as the Dewatering Pumping Station Control Panel (DCP) via amendment 0013.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" and "40 95 00 Process Control" for wire, cable, and conduit requirements for low voltage control wiring . Additionally refer to 26 20 00 Interior Distribution
System as referenced in both specifications.
400 N/A Sump Tank Level Switches LSLL and LSHH are listed on Section 40 95 00 Appendix B I/O list to be monitored from the Remote I/O Panel and is also listed on MS706, 707 to be monitored by the Process Control Panel. Are both of these correct? Please provide wiring requirements for the Level Switches
The remote I/O panel indicated in Section 40 95 00 Appendix B is for monitoring only and reports back to the Process Control Panel for monitoring, which then can be seen in building 72 via the scada system.
Please note, the PCP is now clarified as the Dewatering Pumping Station Control Panel (DCP) via amendment 0013.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" and "40 95 00 Process Control" for wire, cable, and conduit requirements for low voltage control wiring . Additionally refer to 26 20 00 Interior Distribution System as referenced in both specifications.
401 N/A ASW system Pumps Motor Status' are listed on Section 40 95 00 Appendix B I/O list to be monitored from the Remote I/O Panel and is also listed on MS706, 707 to be monitored by the Process Control Panel. Are both of these correct? Please provide wiring requirements for the Motor Status.
The remote I/O panel indicated in Section 40 95 00 Appendix B is for monitoring only and reports back to the Process Control Panel for monitoring, which then can be seen in building 72 via the scada system.
Please note, the PCP is now clarified as the Dewatering Pumping Station Control Panel (DCP) via amendment 0013.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" and "40 95 00 Process Control" for wire, cable, and conduit requirements for low voltage control wiring . Additionally refer to 26 20 00 Interior Distribution System as referenced in both specifications.
402 N/A ASW supply Pressure Transmitters PT-02 are listed on Section 40 95 00 Appendix B I/O list to be monitored from the Remote I/O Panel and is also listed on MS706, 707 to be monitored by the Process Control Panel. Are both of these correct? Please provide wiring requirements for the Pressure Transmitters
The remote I/O panel indicated in Section 40 95 00 Appendix B is for monitoring only and reports back to the Process Control Panel for monitoring, which then can be seen in building 72 via the scada system.
Please note, the PCP is now clarified as the Dewatering Pumping Station Control Panel (DCP) via amendment 0013.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" and "40 95 00 Process Control" for wire, cable, and conduit requirements for low voltage control wiring . Additionally refer to 26 20 00 Interior Distribution System as referenced in both specifications.
403 N/A Please provide wiring requirements between the Chemical Feed Controller and the Process Control Panel.
The chemical feed system indicated is associated with the cooling towers which serve the boat similar to the ASW pumps in the pump station.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" for wire, cable, and conduit requirements for low voltage control wiring. Additionally refer to 26 20 00 Interior Distribution System as referenced in the ASW Control and 23 25 00 Water Treatment specification .
404 N/A Air Handling Unit Schedule indicates VFD's for the supply and return fans with each unit.
There isn't any indication of VFD's on either the one-line diagram UE603, or in the notes on UE609 Equipment Connection Schedule.
Are there VFD cable requirements?
Provided by EC. See Amendment
405 N/A Pure Water Pump Schedule indicates VFD’s with each pump motor. There isn't any indication of VFD's on either the one-line diagram UE603, or in the notes on UE609 Equipment Connection Schedule. Are there VFD cable requirements?
Provided by EC. See Amendment
406 N/A Please provide wiring requirements for the Pulse Powered Water Treatment equipment.
The pulse powered water treatment equipment is associated with the cooling towers which serve the boat similar to the ASW pumps in the pump station.
Refer to spec section "25 00 00.00 22 ASW Control Specifications" for wire, cable, and conduit requirements. Additionally refer to 26 20 00 Interior Distribution System as referenced in the ASW Control and 23 25 00 Water Treatment specification .
120V GFCI outlet required for power to unit.
The signal cabel shall be provided by the equipment manufacturer shall be 2 core shielded marine shipboard cable.
407 N/A Please provide a specification for the 2-hour fire-rated cable listed on conduit and wire schedule circuits #299, #300.
See amendment 14 and attached "Raychem" Basis of Design fire rated cable cutsheet.
408 N/A Please provide wiring requirements for the High-Pressure Steam Control Valves
Refer to spec section 23 09 13 and 23 09 00 for wire, cable, and conduit requirements for low voltage control wiring. The specifications were updated in Amendment 0013. The valve selection is also outlined on detail C2 on MT503.
409 N/A Please provide wiring requirements for the High-Pressure Steam Heat Exchangers
Refer to spec section 23 09 13 and 23 09 00 for wire, cable, and conduit requirements for low voltage control wiring. The specifications were updated in Amendment 0013. The heat exchanger will have a control panel that is BACnet capable for interface with the niagara control system.
410 N/A Please provide a one-line diagram of the complete ASW Control System. Including quantity and location of the ASW Pump Control Panels, ASW Control Panel and ASW Tower System Control Panel in both the Utility Enclosure and Pump Station. Also indicating all interconnecting cabling requirements between the Control Panels.
The industrial process control system is outlined in the PI drawings and spec 40 95 00 process control. These diagrams are only required for the process control system. The ASW pumps in the pump station and cooling tower system in the utility enclosure will require wiring control documents for review by the EOR from the controls vendor.
This will be a stand alone system with an HMI interface. All points of operation and sequences are provided for the ASW systems in the drawings. The process control system will only monitor some of the control points via the SCADA system as outlined in the control points list. Cabling requirements are outlined in spec 25 00 00.00 22.
ASW control panel enclosure are called out in plans. quantity of controllers will be determined by the controls vendor. In the pump station drawing PM101 calls out panel PS-BAS-ASW for ASW controller locations. In the utility enclosure drawing UM204 and UM104 call out 4 control panels, UE-BAS-CT for each cooling tower system. these panels will house all cooling tower system controllers.
Amendment will identify the HMI interface location and specs will include HMI information.
411 01 50 00.00 22
The Henderson Point Specification states that the contractor shall provide new utilities for building 348 and shall assume that the required utilities are located within 200 ft. of the new building for connections. General note #8 on plan sheet R-105 states that utilities are located within 100 ft. of the relocated building. Please confirm the location of the tie ins.
The demolition and relocation of Bld 348 is being removed from the project
412 N/A General note #1 on sheet R-112 Utility Plan Henderson Point 1 of 2 states that the contractors shall include removal and disposal of bedrock at no additional cost to the government. Is rock removal anticipated for the installation of the new drainage system at Henderson point? If so, are borings available for the Henderson Point Site?
Limited subsurface information from subsurface investigation work in IR zone (OU-2) is available.
413 02 42 91 Per the specification, Granite Blocks removed from historic quay walls shall be intact and salvaged. Does this apply to the quay wall blocks from Berth 1 depicted to be removed on the basin side of the wall on
BK301?
No.
414 N/A If Berth 1 Quay Wall blocks are not to be salvaged, are they required to be disposed of at a licensed landfill?
No.
415 N/A Would offloading of dredge and rock excavation spoils from the basin be allowed at the NH State Pier rather than Berth 7?
If the contractor can make arrangements with owner of the NH State Pier it will be permitted.
All required submittals and reviews shall still be provided by the Government.
416 01 45 00.00 20
pg. 4
There is going to be extensive underwater work in this contract both for permanent installations, temporary construction installations and demolition work. Please clarify when the Underwater QC Team is required to be onsite. The specification is unclear as to if the QC Dive Team is required to be onsite during all underwater work for real time inspection or if they are to come in after the work is complete to complete a final inspection.
The underwater QC team shall be onsite and perform inspections as the work progresses and elements are installed to ensure any adjustments can be made as necessary.
417 Appendix C - Hazardous Material Survey Report
Per this report, access to certain areas and buildings was restricted because of Covid-19.
Please define what should be assumed for Asbestos, Lead, Chromium, Cadmium abatement at Henderson Point and in the Berth 11 / Berth 1 area for bidding purposes.
Berths 11 and 1 elements to be demolished have been installed in the last 5-10 years and shall be assumed not to have any hazardous materials present. The demolition of Quarters S has been removed from the project. If the contractor's means and methods require demolition or disturbance of existing utilities along berth 7 he shall assume that he pipes are covered with asbestos containing insulation.
418 Spec 31 63
26.01 Drilled
Shafts
Paragraph 3.3.d states "Sidewalls of drilled shaft rock sockets shall be cleaned by jetting or other means approved by the Contracting Officer". Will the "Contracting Officer" approve a cleaning method of airlifting the rock socket to remove solids and prove cleanliness of the tip with the use of a Shaft Inspection Device?
The intent of the jetting requirement is to clean the sidewalls for the purposes of obtaining the needed skin friction/adhesion for uplift/tensile resistance, and thus simply cleaning the tip would not be sufficient. Contractor will need to demonstrate that their means would be sufficient to provide proper skin friction/adhesion along the sidewalls.
419 Amendment
In amendment 0009, PPI#104 response said, "No additional permitting is required for water discharges within the basin resulting from monolith placements." To further clarify the purpose of the question was to determine if any permitting or treatment is required to direct discharge the water within DD1N and DD1W to the ocean after the monoliths are set and stitch pours completed.
This is a very large volume of water that will need to be discharge so any amount of treatment would be extremely expensive and time consuming.
Since the stich pours will be completed in the dry additional permitting is not required after the stitch pours are completed
420 03 31 29 Mass Concrete Specification 03 31 29, Paragraph 1.8.1 states the maximum temperature differential is 35 degrees Fahrenheit (Tdiff). Contractor proposes to utilize the Performance Based Temperature Difference Limit (PBTDL) procedure, based on testing and analysis of concrete properties as outlined in ACI and USACE Marine Concrete Specifications. The intent of this procedure would be to demonstrate the concrete’s ability to tolerate a higher Tdiff and to revise the specification requirement to higher than 35F. Would the owner consider specification changes based off of PBTDL procedural testing?
The use of a PBTDL procedure may be used as an alternative to the maximum temperature differential requirement of 35 degrees F. Specification Section 03 31 29 Paragraph 1.8.7 is being revised accordingly.
421 31 63 26.01 Specification 31 63 26.01 Drilled Shafts, Paragraph 2.1.1 states that the Concrete for drilled shafts shall meet the requirements of Tremie Concrete in Section 03 31 29 Marine Concrete, therefore subject to thermal control requirements. Contractor requests thermal control for drilled shafts be waived, similar to the current Super flood project. Please confirm that the drilled shaft concrete will not be required to follow thermal control requirements for the Marine Concrete Mass Concrete Specification.
Temperature control sensor installation and temperature monitoring is not required for the drilled shafts. The approved concrete mix that is used for the drilled shafts shall be based on mass concrete mock-ups that meet all of the thermal control requirements, including temperature monitoring through the installed temperature control sensors. The drilled shaft concrete placements shall meet all of the other thermal control requirements in Specification 03 31 29, Paragraph 1.8.7.
422 Amendment #9 As a follow-up to Amendment #9, PPI Question/Response 345 related to Marine/Non-Marine Infill Concrete Classification within the Centerwall units, please confirm that infill concrete within the Centerwall Units only are not subjected to thermal control requirements.
The infill concrete in the center wall monoliths shall meet all of the thermal control requirements in Specification 03 31 29, Paragraph 1.8.7.
423 03 31 29 Specification 03 31 29, Paragraph 1.8.8 Mass Concrete Mockup states to build a 3-foot cube mockup. Since the definition of Mass Concrete in Paragraph 1.2.r states that it is 4 feet or greater, please clarify if the mass concrete section thickness threshold is 3’ or 4’.
The second paragraph under 1.8.8 is being revised to require a cube with a minimum dimension of 5-ft per side. Thermal testing sensors or thermocouples should be set up in the same locations as specified during construction to perform correlation of mockup results with field results.
424 03 31 29 Specification 03 31 29, Paragraph 1.8.7 Mass Concrete states to place temperature sensors at the corners “Within 3” from the top corner at the intersection of the side forms.” These corner locations are not representative of the mass concrete thermal behavior risk and will create misleading thermal actions not in favor to the concrete thermal performance. Please confirm if this requirement can be waived.
This requirement is to remain.
425 03 31 29 Specification 03 31 29, Paragraph 1.8.7 Mass Concrete states to place temperature sensors within 3” of outside surface of concrete.
Since concrete cover is 6” at most locations where there’s mass concrete, it will present a challenge to properly secure and support the sensors at 3” of the surface as requested.
Please clarify if sensors can be placed at 6” in lieu of 3”.
The sensors can be placed between 3" and 6" of the concrete surface.
Paragraph 1.8.7 is being revised accordingly. For trial batch testing, place sensors in both offset locations and confirm the results.
This may lead to a temperature differential which is less than 35 degrees.
426 03 31 29 Specification 03 31 29, Paragraph 1.8.6.2a states that the minimum Compressive Strength results for Marine Concrete are to be tested at 28 days. With the significant quantity of mass concrete, and the higher volume use of fly ash, or slag, Contractor requests that the design strength testing be specified at 56 Days in lieu of 28 Days.
The concrete may meet the specified concrete compressive strength at 56 days if the Contractor's means and methods of construction will not exert loading on the completed work requiring an earlier concrete strength for the completed work and if the longer strength gain will not adversely affect the construction schedule. Intermediate cylinders can be tested at 28 days to estimate if the 56 day strengths can be achieved for a given construction load. Otherwise the concrete shall meet the specified concrete compressive strength at 28 days.
427 03 45 33.01 This paragraph states that mechanical rebar couplers shall be exposed between the precast and cast-in-place closure pours. It also states that "exposed reinforcement bars that will be submerged for more than one month shall be epoxy coated." Please confirm that these couplers are not considered "exposed reinforcement bars," and therefore it is acceptable to be black bars, similar to its corresponding reinforcing bar inside the monolith.
Confirmed.
Specification Section 03 20 00.00, Paragraph 3.1.2 requires the mechanical couplers to be countersunk in the concrete and plugged with a greased bolt. The remaining depression is to be caulked after the plug bolt is installed.
428 N/A This note states "Reinforcing bars installed in precast slabs and starter walls that are projecting outside the precast concrete shall be epoxy coated including the 12" into the precast concrete." Please confirm this note would not apply to any horizontal rebar that is coupled at the 9' tall vertical exterior face of monolith, that ultimately gets extended into the closure pours.