Amendment 10 - Civil dwgs.pdf
PDF 18 MB Posted
- Solicitation number
- N4008520R0021
About this file
This federal solicitation is for the design and construction of a partitioned addition to Dry Dock #1 at Portsmouth Naval Shipyard in Kittery, Maine. The Navy seeks to construct two new dry dock bays, labeled Dry Dock #1 North and Dry Dock #1 West, of sufficient size and depth to support maintenance and overhaul of Virginia Class submarines. The project scope includes new concrete floors, walls and center wall; new pump well systems and pump station building; portal crane rails, mooring hardware, and mechanical and electrical utilities. Modifications will also be made to the existing dry dock closure wall and adjacent berths. Offerors must have experience designing and building similar naval dry dock facilities. Proposals are due by the date specified in the solicitation, with award expected within 90 days thereafter.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I L E
N
M
E
U s h a r e d b i m c i v i l d c i v i l C
S
C
I V
I L
N
O T
E S
A
B B
R E
V I A
T I O
S
G E
N D d w g
Y O
U T
M
E
C
C
I V
I L
N
O T
P
O
T T
E D
F r i d a y
D e c e m b e r p m
E
R b c u l l i n a n
D E
P A
R T
M E
O
F
T
H
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
M
I D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
P
M
U L T
I M
I S
S I O
N
D
R Y
C
K
LBT / LBL
EJA
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
1. ELEVATION CONTOURS, SPOT GRADES, INVERTS AND DIMENSIONS ON CIVIL
DRAWINGS ARE IN DECIMAL FEET UNLESS NOTED OTHERWISE.
2. WORK FROM GIVEN DIMENSIONS AND LARGE SCALE DETAILS ONLY. DO NOT
SCALE DRAWINGS.
3. EXISTING CONDITIONS ARE BASED ON FIELD SURVEY BY DOUCET SURVEY,
INC., PERFORMED IN OCT. TO NOV. 2017 AND SEPT. 2018 AND PORTSMOUTH
NAVAL SHIPYARD (PNSY) YARD RECORD DRAWINGS. HORIZONTAL CONTROL
IS BASED UPON MAINE STATE PLANE COORDINATES NAD83 /96 MAINE WEST
ZONE 1802. VERTICAL DATUM IS BASED ON NAVD 1988 VERTICAL DATUM PER
PNSY CONTROL SURVEY OF 2002. CONTROL POINTS H1, (PUBLISHED ELEV. =
15.751). EXISTING CONDITIONS ARE ALSO BASED ON RECORD DRAWINGS
AND OBSERVATION. HORIZONTAL DATUM IS MAINE STATE COORDINATES,
WEST ZONE NAD 83.
4. EXERCISE CARE TO PROTECT EXISTING BENCHMARKS, SYSTEMS, AND
SURFACES TO REMAIN. ALL DAMAGED SYSTEMS AND SURFACES MUST BE
REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER AT
NO ADDITIONAL COST TO THE GOVERNMENT.
5. YELLOW PLASTIC - CONTRACTORS MUST NOT USE YELLOW OR
ORANGE-YELLOW COLORED MATERIALS FOR THE FOLLOWING PURPOSES;
PROTECTIVE CLOTHING, HOODS, SHEETING, TARPS, POLYETHYLENE
BOTTLES OR OTHER CONTAINERS, TAPES, BAGS, BANDING, IDENTIFICATION
MARKS ON TOOLS, BOUNDARY MARKERS, RIBBONS, VENT DUCTS, ETC.
CONTRACTOR GENERATED YELLOW COLORED WASTE MUST BE DISPOSED
OF BY THE CONTRACTOR OFF-YARD, SHIPYARD REFUSE CONTAINERS MUST
NOT BE USED FOR THE DISPOSAL OF YELLOW COLORED WASTE MATERIALS.
YELLOW COLORED ITEMS SUCH AS DESCRIBED ABOVE ARE OF SPECIAL
SIGNIFICANCE WITHIN THE SHIPYARD AND ARE SUBJECT TO STRICT
CONTROLS. YELLOW COLORED CONTRACT GENERATED DEBRIS MUST BE
BAGGED IN NON-TRANSLUCENT CONTAINERS AND PROMPTLY REMOVED
FROM PORTSMOUTH NAVAL SHIPYARD.
6. REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER HAZARDOUS
SUBSTANCES (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING DURING
THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY,
REGARDLESS OF THE QUANTITY. CALL THE FIRE DEPARTMENT AT
207.438.2333 TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE
RIGHT TO CLEAN UP, PACKAGE AND DISPOSE OF CONTRACTOR SPILLS
OCCURRING ON THE SHIPYARD, AND BILL SUCH COSTS TO THE
CONTRACTOR.
7. NOTIFY CONTRACTING OFFICER AND STOP WORK IMMEDIATELY IF
HAZARDOUS MATERIAL SUCH AS PCB, LEAD PAINT, AND FRIABLE AND
NON-FRIABLE ASBESTOS AND ANY OTHER MATERIAL THAT MAY BE
HAZARDOUS TO HUMAN HEALTH IS ENCOUNTERED DURING CONSTRUCTION
OPERATIONS.
8. IN ARCHAEOLOGICALLY SENSITIVE AREAS IDENTIFIED ON SHEETS G-131 AND
G-132, PROVIDE ARCHAEOLOGICAL MONITORING FOR ALL GROUND
DISTURBING ACTIVITIES. WORK WITHIN EXISTING DUCT BANKS OR DIRECTLY
ABOVE ARE EXEMPT FROM THIS REQUIREMENT.
GENERAL NOTES:
CONSTRUCTION NOTES:
1. FIELD VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES BEFORE
COMMENCING WORK. UNDERGROUND UTILITY LOCATIONS ARE
APPROXIMATE. LOCATIONS SHOWN ARE A COMPILATION OF FIELD
INVESTIGATIONS AND EXISTING RECORD DRAWINGS. THE EXACT LOCATION
OF ALL UTILITIES MUST BE CONFIRMED IN THE FIELD BY THE CONTRACTOR
BY DIRECT OR INDIRECT (ELECTRONIC, MAGNETIC, GROUND PENETRATING
RADAR) MEANS. THE RESULTS OF THE INVESTIGATIONS MUST BE
RECORDED ON CIVIL DRAWINGS HIGHLIGHTING ANY CHANGES OR
CONFLICTS WITH DESIGN DRAWINGS. ANY DISCREPANCIES MUST BE
REPORTED TO THE CONTRACTING OFFICER. UTILITY MAPPING MUST BE
PERFORMED IN COORDINATION WITH THE PNS "DIG SAFE" PROGRAM.
SECURE A "DIGGING" PERMIT AND CONTACT "DIG SAFE" AT 1-888-344-7233
TO OBTAIN A "DIG SAFE" PERMIT AT LEAST 14 WORKING DAYS PRIOR TO
ANY EXCAVATION OR POST DRIVING (3" DEEP OR MORE). THE CONTRACTOR
MUST STAKE OR PAINT THE LIMITS OF CONSTRUCTION PRIOR TO NOTIFYING
DIG SAFE.
2. PREPARE A "PWD MAINE DIG SAFE UTILITY LOCATE REQUEST FORM" AT
LEAST 14 CALENDAR DAYS PRIOR TO THE COMMENCEMENT OF
EXCAVATION OR GROUND PENETRATING ACTIVITY AND SUBMIT THE FORM
TO THE CONTRACTING OFFICER.
3. THE GOVERNMENT WILL LOCATE AND MARK THE UNDERGROUND UTILITIES
WITHIN 14 CALENDAR DAYS OF RECEIVING THE DIG SAFE NOTIFICATION.
4. EXCAVATION OR GROUND PENETRATION ACTIVITIES CANNOT COMMENCE
UNTIL THE UTILITIES HAVE BEEN MARKED IN THE FIELD AND THE PWD MAINE
DIG SAFE UTILITY LOCATE REQUEST FORM HAS BEEN RETURNED
INDICATING THE PWD MAINE DIG SAFE REVIEW PROCESS HAS BEEN
COMPLETED AND EXCAVATION HAS BEEN APPROVED BY THE CONTRACTING
OFFICER.
1. PROVIDE STEEL TRAFFIC ROAD PLATES AT ALL EXCAVATIONS IN PAVED
AREAS THROUGHOUT CONSTRUCTION TO ALLOW VEHICLE ACCESS.
2. ALL PAVEMENT MARKINGS MUST CONFORM TO THE LATEST EDITION OF THE
"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES", STANDARD
ALPHABETS, AND THE AMERICANS WITH DISABILITIES ACT REQUIREMENTS,
LATEST EDITION.
3. GIVEN DIMENSIONS ARE FROM FACE OF CURB, FACE OF WALL, FACE OF
BUILDING, EDGE OF PAVEMENT, AND CENTERLINE OF MARKINGS UNLESS
OTHERWISE NOTED.
4. WHERE ITEMS SUCH AS UTILITY STRUCTURES AND EARTHWORK MATERIALS
ARE INDICATED BY TYPE, SEE THE MEDOT STANDARD SPECIFICATIONS,
HIGHWAY AND BRIDGES, LATEST REVISION, AND SUPPLEMENTARY
STANDARD CONSTRUCTION DETAILS FOR CONSTRUCTION, LATEST
REVISION.
5. WHEELED OR TRACKED VEHICLES MUST NOT OPERATE IN THE WATER.
EQUIPMENT MAY OPERATE ON SHORE AND REACH INTO THE WATER WITH A
BUCKET OR SIMILAR EXTENSION.
6. STORAGE AND LAYDOWN AREAS ARE LIMITED TO THE WORK AREAS SHOWN
ON DRAWINGS G-101 THROUGH G-123. ADDITIONAL SPACE IS NOT
AVAILABLE FOR CONTRACTOR USE ON THE SHIPYARD.
7. TRANSPORT ALL CONSTRUCTION MATERIALS TO AND FROM THE SITE IN
COVERED VEHICLES. ON A DAILY BASIS, PROVIDE A VACUUM ASSISTED
STREET SWEEPER, AT THE SITE, TO KEEP PAVED AREAS CLEAN.
8. COORDINATE WITH PORTSMOUTH SHIPYARD OPERATIONS DURING THE LIFE
OF THE WORK.
9. SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN FOR REVIEW AND
APPROVAL PRIOR TO BEGINNING CONSTRUCTION OPERATIONS.
10. THE CONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING SECURITY OF
HIS/HER EQUIPMENT.
11. COMPLY WITH ALL APPLICABLE OSHA REGULATIONS AND ARMY CORPS OF
ENGINEERS EM 385 SAFETY REQUIREMENTS.
12. ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50 MPH
WIND VELOCITY AND ARE TO BE PREPARED BY A PROFESSIONAL SIGN
COMPANY WITH A MINIMUM OF THREE (3) YEARS EXPERIENCE.
13. WHERE CONTRACTOR REMOVES EXISTING SITE FEATURES THAT ARE TO
REMAIN, TO FACILITATE INSTALLATION OF NEW WORK FOR THIS PROJECT,
THE CONTRACTOR MUST REPLACE THE EXISTING FEATURES AT HIS/HER
EXPENSE.
14. THE LIMIT OF CONSTRUCTION LINE INDICATED ON THE DRAWINGS IS AN
APPROXIMATION ONLY. COORDINATE CLOSELY WITH THE CONTRACTING
OFFICER. THE CONTRACTING OFFICER MAY MODIFY THIS LINE TO
ACCOMMODATE THE EFFICIENCY OF THE CONSTRUCTION PROJECT.
15. ALL CONSTRUCTION DETAILS AND SPECIFICATIONS ARE REQUIRED TO
MEET THE STANDARDS OF THE NAVFAC MID ATLANTIC PUBLIC WORKS
DEPARTMENT MAINE, PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE.
16. EXCAVATION WORK WILL BE TIDAL, OFF-HOURS/WEEKEND CONSTRUCTION
MAY BE REQUIRED.
UTILITY NOTES:
C I V
T
E S
AS-BUILT NOTES:
1. REVISE TWO (2) SETS OF PAPER DRAWINGS BY RED-LINE PROCESS TO
SHOW THE AS-BUILT CONDITIONS DURING THE PROSECUTION OF THE
PROJECT. KEEP THE AS-BUILT DRAWINGS CURRENT ON A WEEKLY BASIS
AND KEEP AT LEAST ONE SET AVAILABLE ON THE SITE AT ALL TIMES.
2. CHANGES FROM THE CONTRACT PLANS WHICH ARE MADE IN THE WORK OR
ADDITIONAL INFORMATION WHICH MIGHT BE UNCOVERED IN THE COURSE
OF CONSTRUCTION MUST BE ACCURATELY AND NEATLY RECORDED AS
THEY OCCUR BY MEANS OF DETAILS AND NOTES. PREPARE AND PROVIDE
TO THE CONTRACTING OFFICER WORKING RECORD (AS-BUILT) DRAWINGS
AFTER THE COMPLETION OF EACH DEFINABLE FEATURE OF WORK AS LISTED
IN THE CONTRACTOR QUALITY CONTROL PLAN (FOUNDATIONS,
UNDERGROUND UTILITIES, STRUCTURAL STEEL, ETC., AS APPROPRIATE FOR
THE PROJECT). IF WORKING AND FINAL RECORD DRAWINGS ARE NOT
MAINTAINED AS SPECIFIED HEREIN, THE CONTRACTING OFFICER WILL
DEDUCT FROM THE MONTHLY PROGRESS PAYMENT AN AMOUNT
REPRESENTING THE ESTIMATED COST OF MAINTAINING THE RECORD
DRAWINGS. THIS MONTHLY DEDUCTION WILL CONTINUE UNTIL AN
AGREEMENT CAN BE REACHED BETWEEN THE CONTRACTING OFFICER AND
THE CONTRACTOR REGARDING THE ACCURACY AND COMPLETENESS OF
UPDATED DRAWINGS. INFORMATION SHOWN ON THE WORKING AND FINAL
RECORD DRAWINGS MUST INCLUDE, BUT IS NOT LIMITED TO, THE
FOLLOWING:
A. THE ACTUAL LOCATION (DEPTH AND HORIZONTAL COORDINATES) AND
SIZES OF ALL SUBSURFACE UTILITY LINES. IN ORDER THAT THE
LOCATION OF THESE LINES AND APPURTENANCES MAY BE
DETERMINED IN THE EVENT THE SURFACE OPENINGS OR INDICATORS
BECOME COVERED OVER OR OBSCURED, SHOW BY OFFSET
DIMENSIONS TO TWO PERMANENTLY FIXED SURFACE FEATURES AT
THE END OF EACH RUN INCLUDING EACH CHANGE IN DIRECTION ON
THE RECORD DRAWINGS OR HORIZONTAL COORDINATES BASED ON
THE SHIPYARD DATUM. LOCATE VALVES, SPLICE BOXES AND SIMILAR
APPURTENANCES BY DIMENSIONING ALONG THE UTILITY RUN FROM A
REFERENCE POINT. ALSO, RECORD THE DEPTH BELOW THE SURFACE
OF EACH RUN OF PIPE, FITTINGS, VALVES, ETC.
B. CHANGES IN GRADE, ELEVATIONS, CROSS SECTION, OR
ALIGNMENT OF PAVEMENTS, EARTHWORK, STRUCTURES OR
EXISTING AND NEW UTILITIES.
C. THE TOPOGRAPHY, INVERT ELEVATIONS AND GRADES OF DRAINAGE
SYSTEMS INSTALLED OR AFFECTED AS PART OF THE PROJECT
CONSTRUCTION.
D. CHANGES IN DETAILS OF DESIGN OR ADDITIONAL INFORMATION
OBTAINED FROM WORKING DRAWINGS SPECIFIED TO BE PREPARED
AND/OR FURNISHED BY THE CONTRACTOR; INCLUDING BUT NOT
LIMITED TO FABRICATION, ERECTION, INSTALLATION PLANS, DETAILS,
PIPE SIZES, INSULATION MATERIAL, DIMENSIONS OF EQUIPMENT
FOUNDATIONS, ETC.
E. WHERE CONTRACT DRAWINGS OR SPECIFICATIONS PRESENT
OPTIONS, SHOW ONLY THE OPTION SELECTED FOR CONSTRUCTION
ON THE FINAL AS-BUILT PRINTS.
F. WHERE UTILITY LOCATIONS DIFFER FROM THOSE IDENTIFIED ON THE
PLANS.
G. MODIFICATIONS (INCLUDE WITHIN MODIFICATION PRICING THE COST
TO CHANGE WORKING AND FINAL RECORD DRAWINGS TO REFLECT
MODIFICATIONS).
H. CHANGES OR MODIFICATIONS WHICH RESULT FROM THE FINAL
INSPECTION.
5. IF THE EXCAVATION OR GROUND PENETRATING ACTIVITIES DO NOT
COMMENCE WITHIN 27 DAYS OF DIG SAFE NOTIFICATION OR THE
EXCAVATION WORK IS EXPANDED OUTSIDE THE LOCATION ORIGINALLY
SPECIFIED IN THE NOTIFICATION, THE EXCAVATOR MUST RE-NOTIFY DIG
SAFE, THE CONTRACTING OFFICER AND THE PWD MAINE DIG SAFE
COORDINATOR.
6. ADJUST ALL SEWER, DRAINAGE, AND ELECTRICAL FRAMES AND COVERS TO
MATCH FINISH GRADE. REMOVE EXISTING FRAMES AND COVERS AND
PROVIDE NEW FRAMES AND COVERS WHEN DAMAGED DURING THE
COURSE OF WORK.
7. SURVEY ALL UTILITY MANHOLES, STRUCTURES, GATE VALVES, VALVE
BOXES AND OTHER SURFACE FEATURES PRIOR TO PAVING AND VERIFY TO
THE CONTRACTING OFFICER THAT THESE FEATURES ARE ACCESSIBLE
AFTER FINAL PAVING HAS BEEN COMPLETED.
8. ADJUST ALL ITEMS NOTED IN NOTE 7 ABOVE TO FINISH GRADE. REMOVE
EXISTING GATE VALVE BOXES AND CURB STOP BOXES AND PROVIDE NEW
GATE VALVE BOXES AND CURB STOP BOXES WHEN DAMAGED DURING THE
COURSE OF WORK.
9. MAINTAIN THE UTILITY MARKING THROUGH OUT THE CONTRACT PERIOD. IF
ADDITIONAL MARKINGS ARE REQUIRED, THE EXCAVATOR MUST NOTIFY DIG
SAFE AND THE CONTRACTING OFFICER.
10. SHORING SYSTEMS: MECHANICAL MEANS OF EXCAVATION MUST NOT BE
USED WHEN EXCAVATING WITHIN TWO (2) FEET OF ANY MARKED
UNDERGROUND UTILITY UNTIL THE UNDERGROUND UTILITY HAS BEEN
EXPOSED. MECHANICAL MEANS MAY BE USED, AS NECESSARY, FOR INITIAL
PENETRATION AND REMOVAL OF PAVEMENT, ROCK, OR OTHER MATERIALS
REQUIRING USE OF MECHANICAL MEANS OF EXCAVATION. ONCE THE
UTILITY HAS BEEN EXPOSED, FURTHER EXCAVATION MUST BE PERFORMED
EMPLOYING REASONABLE PRECAUTIONS TO AVOID DAMAGE TO THE
UTILITY INCLUDING BUT NOT LIMITED TO ANY SUBSTANTIAL WEAKENING OF
STRUCTURAL OR LATERAL SUPPORT OF UTILITY OR PENETRATION OR
DESTRUCTION OF THE UTILITY OR THEIR PROTECTING COATINGS.
11. ASSUME THAT EXCAVATIONS WILL BE IMPACTED BY TIDAL CONDITIONS AND
MUST COORDINATE WORK ACCORDINGLY WHICH MAY INCLUDE WORK
DURING LOW TIDE PERIODS AS WELL AS DEWATERING.
12. SUBMIT A DEWATERING PLAN SEALED BY A MAINE LICENSED
PROFESSIONAL ENGINEER FOR APPROVAL PRIOR TO ANY EXCAVATION.
COORDINATE LOCATION OF DEWATERING SEDIMENT FILTERS WITH
CONTRACTING OFFICER AND PORTSMOUTH NAVAL SHIPYARD
ENVIRONMENTAL DEPARTMENT.
13. UTILITIES LOCATED WITHIN AND UNDER CONCRETE SLABS OR PIER
STRUCTURES, BRIDGES, AND SIMILAR AREAS ARE EXTREMELY DIFFICULT
TO IDENTIFY. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW
CUTTING, OR CORE DRILLING THROUGH CONCRETE, BITUMINOUS
PAVEMENT, OR OTHER IMPERVIOUS SURFACES, THE CONTRACTOR MUST
PROVIDE THE SERVICES OF A THIRD PARTY, INDEPENDENT, PRIVATE
LOCATING COMPANY TO LOCATE ANY UTILITIES WITHIN THE LIMITS OF
WORK. THE THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY
MUST LOCATE UTILITY DEPTH BY USE OF GPR, X-RAY, BORE SCORE,
ULTRASOUND OR OTHER MEANS PRIOR TO THE START OF
DEMOLITION/CONSTRUCTION. OUTAGES TO ISOLATE UTILITY SYSTEMS
MUST BE USED IN CIRCUMSTANCES WHERE UTILITIES ARE UNABLE TO BE
POSITIVELY IDENTIFIED. THE USE OF HISTORICAL DRAWINGS DOES NOT
ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT.
14. SEE GENERAL DRAWINGS FOR PROJECT PHASING, MILESTONES,
TEMPORARY SERVICES, COMPOSITE UTILITY PLANS, APPROXIMATE
HISTORIC QUAY WALLS, APPROXIMATE ABANDONED FOUNDATIONS, CRANE
RAIL/RAILROAD AND GENERAL SECTIONS.
15. ALL UTILITY STRUCTURES REQUIRE THE STRUCTURE NUMBERS TO BE
WELDED ON TOP. COORDINATE WITH THE CONTRACTING OFFICER TO
VERIFY NUMBERING PRIOR TO INSTALLATION.
UTILITY NOTES CONT:
C-001
ENVIRONMENTAL NOTES:
1. EXCAVATION WITHIN ARCHAEOLOGICALLY SENSITIVE AREAS MUST BE
MONITORED BY AN ARCHAEOLOGIST. REFER TO G-131 AND G-132 FOR
ARCHAEOLOGICALLY SENSITIVE AREAS.
TRAFFIC NOTES:
1. COORDINATE WITH THE CONTRACTING OFFICER AND MAINTAIN TRAFFIC
FLOW TO THE EXTENT PRACTICABLE DURING CONSTRUCTION AS DIRECTED
BY THE CONTRACTING OFFICER.
2. PREPARE A DETAILED TRAFFIC CONTROL PLAN, SUBMIT TO CONTRACTING
OFFICER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE
TRAFFIC CONTROL PLAN MUST CONSIDER ALL AFFECTED PORTSMOUTH
NAVAL SHIPYARD OPERATIONS. UPDATE THE TRAFFIC CONTROL PLAN AS
REQUIRED AND DIRECTED BY THE CONTRACTING OFFICER DURING THE
PROJECT.
3. MAINTAIN EXISTING TRAFFIC CONTROL AND INFORMATIONAL SIGNAGE
DURING THE PROCESS OF WORK.
4. PROVIDE ALL TEMPORARY CONSTRUCTION TRAFFIC CONTROL DEVICES.
5. PROVIDE POST MOUNTED AND WALL MOUNTED TRAFFIC CONTROL AND
INFORMATIONAL SIGNS IN ACCORDANCE WITH THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, AS PUBLISHED
BY THE U.S. DEPARTMENT OF TRANSPORTATION.
6. MAINTAIN A 24 FT WIDE FIRE LANE TO THE MOST WESTERN END OF BERTH 1
AND 2, AROUND DRY DOCK NO. 1 AND BERTH 11 AT ALL TIMES.
12823115
A
M E
N D
M E
V
M G
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
NO PARKING
IR ZONE
EX. HISTORIC QUAY WALL
SEE STRUCTURAL PLANS
CD104-CD106 FOR
STRUCTURAL DEMOLITION
1 SAW CUT, REMOVE AND DISPOSE BITUMINOUS CONCRETE
PAVEMENT. PAVEMENT DEPTH VARIES. SEE BORING
LOGS FOR PAVEMENT THICKNESS AT EACH LOCATION.
2 LIMIT OF RAIL REMOVAL. SEE GENERAL NOTE 3.
3 EXISTING AIR INTAKE MUST REMAIN AND BE PROTECTED
4 REMOVE EXISTING CONTAINERS AND TRAILERS. SEE
GENERAL NOTE 6.
5 REMOVE EXISTING CONCRETE STEPS
6 REMOVE CRANE RAIL AND ASSOCIATED STRUCTURE. SEE
SHEET CD501
7 REMOVE EXISTING CAPSTAN. SEE NOTE 9
8 EXISTING EQUIPMENT AND LOUVER SERVICING THE
PUMPWELL MUST REMAIN OPERATIONAL UNTIL
TEMPORARY OR PERMANENT SYSTEM ARE IN PLACE.
EQUIPMENT AND LOUVER MAY BE REMOVED WHEN
DEWATERING, DRAINAGE AND ASW PUMPS HAVE BEEN
DECOMMISSIONED. REMOVAL MUST BE COORDINATED
WITH PNSY.
9 REMOVE EXISTING CONCRETE TRENCH
10 CONTRACTOR MUST INCLUDE COST TO RELOCATE
EXISTING ELECTRICAL PANEL AND BOX TO
ACCOMMODATE DEMOLITION AND CONSTRUCTION
11 REMOVE EXISTING PUMPWELL HEAD HOUSE
GENERAL NOTES:
1. THE LIMITS OF SAWCUTTING, PAVEMENT REMOVAL, AND
RAIL REMOVAL SHOWN ARE APPROXIMATE. DETERMINE
THE EXACT LIMITS OF THIS WORK REQUIRED TO SUPPORT
THE DEMOLITION EFFORT.
2. SEE SURVEY DRAWINGS FOR EXISTING UTILITIES.
PROTECT UTILITIES TO REMAIN.
3. RAILS ARE IN 39 FT LENGTHS. REMOVE FULL SEGMENT OF
RAIL AT NEAREST RAIL JOINT, OR SAWCUT RAIL TO ALLOW
FOR UTILITY WORK . DETERMINE LOCATION OF RAIL
JOINTS AND LIMITS OF RAIL REMOVAL. ALL SPLICE PLATES
AND BOLTS AT THE REMOVAL LIMIT MUST BE REPLACED.
REUSE OF THE HARDWARE WILL NOT BE ALLOWED.
4. REQUEST ALL RAIL AND UTILITY OUTAGES PRIOR TO
PERFORMING ANY WORK IN ACCORDANCE WITH
CONTRACT DOCUMENTS.
5. GOVERNMENT WILL REMOVE AND RELOCATE ABOVE
GROUND FACILITIES, TRAILERS, TANKS AND CONTAINERS.
CONTRACTOR MUST PROVIDE REQUEST TO CONTRACTING
OFFICER A MINIMUM OF 30 DAY PRIOR TO WORK.
DEMOLITION KEYNOTES
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
D
D
E M
O L I T
I O
N
P
L A
N d
Y O
M
E
C
D
D
E M
O L I T
I O
N
P
L A
N
T
U R
N O
X I S
T I N
G
P
U M
P
W
E L L
A
R
O
T T
E D
S u n d a y
D e c e m b e r a
E
R
S e F o s t e r
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L A
N T
I C
DRAWFORM REVISION: 07 AUG 2018
CHECK GRAPHIC SCALE BEFORE USING
P
U L
T I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
KEY PLAN
GRAPHIC SCALE
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
1" = 20'
20' 0 20' 40'
PLAN
NORTH
DEMOLITION PLAN - TURNOUT & EXISTING PUMP WELL AREA
SCALE: 1" = 20'
M A
T C
H
L I N
E
S
E
C
M A
T C
H
L I N
E
S
E
CD103
D E
M O
L I T
I O
N
P
L A
N
T
U R
N O
I S
T I N
G
P
U M
P
W
E L L
A
R E
A
12823122
GENERAL NOTES (CONTINUED):
7. ACCESS HATCHES FOR PUMPWELL
OPERATION MUST BE PROTECTED
8. AREAS TO BE DEMOLISHED ONLY AFTER
SUPPORT OF EXCAVATION IS COMPLETE.
9. ALL EXISTING EQUIPMENT USED FOR DD1E
DOCKING/UNDOCKING EVOLUTIONS,
INCLUDING CLEATS, BOLLARDS, CHOKES,
RINGS, WINCHES AND GATES SHALL BE
PRESENT AND FUNCTIONING. REMOVAL OF
ANY OF THESE ITEMS SHALL BE
COORDINATED WITH AND APPROVED BY THE
CONTRACTING OFFICER PRIOR TO REMOVAL.
10. SEE SHEET CD104 FOR REMOVAL OF
SUBSURFACE UTILITIES WITHIN THE
TURNOUT AREA
A
M E
N D
M E
V M
G
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
2"FW(R)
AutoCAD SHX Text
4"ST
AutoCAD SHX Text
4"ST
AutoCAD SHX Text
6"ST
AutoCAD SHX Text
6"ST
AutoCAD SHX Text
4"ST
AutoCAD SHX Text
1 1/2"COND
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SYL
AutoCAD SHX Text S
AutoCAD SHX Text
SYL
AutoCAD SHX Text
ST
AutoCAD SHX Text
CA
AutoCAD SHX Text
CA
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SWL
AutoCAD SHX Text 378A
AutoCAD SHX Text
GUARD HOUSE
AutoCAD SHX Text
PUMP WELL ENTRANCE
AutoCAD SHX Text
45A UNABLE TO ACCESS
AutoCAD SHX Text
EOI
AutoCAD SHX Text
6" A QL-B
AutoCAD SHX Text
5-3" DC E QL-C COULD NOT BE DESIGNATED.
AutoCAD SHX Text 6" STEAM 6" AIR 1.5" CONDENSATE 0.5" HIGH PRESSURE COMPRESSED AIR 6" AUXILIARY SALT WATER 6" FIRE WATER 8" FIRE PROTECTION IN UTILITY TUNNEL QL-B
AutoCAD SHX Text
16-4" E QL-B
AutoCAD SHX Text
SHELF IN MH
AutoCAD SHX Text
TMH/EMH DC-D-4 RIM=9.8', CH=8.3' SUMP=0.6'
AutoCAD SHX Text
4-4" E QL-C (R)
AutoCAD SHX Text
18-4" E QL-B
AutoCAD SHX Text
2" STEAM IN UTILITY TUNNEL QL-B
AutoCAD SHX Text
3" STEAM IN UTILITY TUNNEL QL-B
AutoCAD SHX Text
4" CUT STEAM PIPE IN UTILITY TUNNEL
AutoCAD SHX Text
5" E QL-B
AutoCAD SHX Text
24-4" T/DC E QL-B
AutoCAD SHX Text
TMH/EMH DC-D-9 RIM=9.5', CH=8.9' SUMP=2.5'
AutoCAD SHX Text
9-4" T/DC E QL-C NO ELECTRONIC SIGNALS DETECTED
AutoCAD SHX Text
HPCA MH RIM=9.5', CH=8.9' SUMP=7.1'
AutoCAD SHX Text
2-4" T/DC E QL-D (EMPTY)
AutoCAD SHX Text
24-4" T/DC E QL-B
AutoCAD SHX Text
20-4" E QL-B
AutoCAD SHX Text
HIGH PRESSURE COMPRESSED AIR DUCT QL-B
AutoCAD SHX Text
HPCA MH RIM=9.5' COULD NOT OPEN
AutoCAD SHX Text
HPCA MH RIM=9.7' COULD NOT OPEN
AutoCAD SHX Text
6" STEAM 6" AIR IN THE UTILITY TUNNEL QL-B
AutoCAD SHX Text
HIGH PRESSURE COMPRESSED AIR DUCT QL-B
AutoCAD SHX Text
HPCA MH RIM=9.6' COULD NOT OPEN
AutoCAD SHX Text
TMH/EMH DC RIM=9.6', CH=7.4' SUMP=0.6'
AutoCAD SHX Text
1.5" HPCA QL-B
AutoCAD SHX Text
6" FW QL-C
AutoCAD SHX Text
3" STEAM IN UTILITY TUNNEL QL-B
AutoCAD SHX Text
6" STEAM 6" AIR IN THE UTILITY TUNNEL QL-B
AutoCAD SHX Text
24-4" T/DC E QL-B
AutoCAD SHX Text
ELECTRIC SUB STATION VAULT
AutoCAD SHX Text
24-4" T/DC E QL-B
AutoCAD SHX Text
9-4" E QL-C
AutoCAD SHX Text 20-4" E
AutoCAD SHX Text
QL-B
AutoCAD SHX Text
QL-C
AutoCAD SHX Text
24-4" E QL-C
AutoCAD SHX Text
E QL-B
AutoCAD SHX Text
15-4" E QL-B
AutoCAD SHX Text
16-4" E QL-B
AutoCAD SHX Text
15-4" E QL-B
AutoCAD SHX Text
4" EMPTY CONDUITS
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
6" FW QL-B
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
6" FW QL-B
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
EOI
AutoCAD SHX Text
24-4" T/DC E QL-B
AutoCAD SHX Text
6" STEAM 6" AIR IN THE UTILITY TUNNEL QL-B
AutoCAD SHX Text
20-4" E QL-B
AutoCAD SHX Text
SOFT WALL STORAGE BUILDING
AutoCAD SHX Text
ELECTRIC PANEL & METER BOX
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
24-4" T/DC E QL-B
AutoCAD SHX Text
21-4" E QL-C (R)
AutoCAD SHX Text
EOC
AutoCAD SHX Text
EOC
AutoCAD SHX Text
EOC
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
EOC
AutoCAD SHX Text
OFFICE TRAILER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text
OFFICE TRAILER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
OFFICE TRAILER
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text
ELECTRIC PANEL & METER BOX
AutoCAD SHX Text
1-4" E QL-B 1-4" T QL-B 1-2" T QL-B
AutoCAD SHX Text
9-4" E QL-B
AutoCAD SHX Text
AC-39 UNABLE TO OPEN LOCATION UNDER STORAGE CONTAINER
AutoCAD SHX Text
OFL 16A(R)
AutoCAD SHX Text
OFL 17A(R)
AutoCAD SHX Text
OFL 17(R)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
WOODEN DECK
AutoCAD SHX Text
DIESEL FUEL
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
SWL
AutoCAD SHX Text
(2)ES
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
1" HPA QL-B
AutoCAD SHX Text
1" HPA QL-B
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
MLLW EL -4.62
MHW EL -3.81
EXISTING
COMPACTED
GRANULAR FILL
EXISTING ROCK ANCHOR. SEE NOTE 2.
SEE GEOTECHNICAL DWGS FOR DEMO
SEQUENCE
TOP OF ROCK
ELEVATION VARIES
EXISTING ROCK SOCKET
EXIST GROUT HOLE
DEMOLISH EXISTING KING
PILE
DEMOLISH EXISTING
CONCRETE BULKHEAD CAP
DEMOLISH EXISTING CONCRETE
SHUTTER PANEL WALL
EXISTING GROUT AT PANEL BASE
EL VARIES
EXISTING PEASTONE FILL
DEMOLISH EXISTING
PRECAST CONC UTILITY
TUNNEL
DEMOLISH EXISTING
W14 WALES
DEMOLISH EXISTING CAST IN PLACE
UTILITY TUNNEL ROOF
38'-0"± EXIST BERTH 11 WHARF14'-11"±
NOTES:
1. FOR CONSTRUCTION DETAILS OF THE
PRECAST CONC TUNNEL AND CAST IN
PLACE TUNNEL ROOF SEE THE P371
REFERENCE DRAWINGS LOCATED IN
APPENDIX F .
2. FOR THE CONSTRUCTION DETAILS OF
THE KING PILE BULKEAD SEE THE
BERTH 11 REPAIR DRAWINGS LOCATED
IN APPENDIX F.
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E u s f s h a r e d p r o j e c t s s h a r e d b i m c i v i l d c i v i l D
T
D
E T
A I
M
B I N
E D d
Y O
M
E
C
D
D
E M
O L I T
I O
N
D
E T
A I
O
T T
E D
W e d n e s d a y
D e c e m b e r
E
R m c a r a m a g n o
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
P
M
U L T
I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
CD501 -
D E
M O
L I T
I O
N
D
E T
A I L
S
NOTES:
1. FOR LIMITS OF RAIL REMOVAL, SEE DEMOLITION PLANS.
2. FOR RAILS WITH WELDED JOINTS, SAWCUT RAIL AT JOINT.
3. CUTTING OF RAILS, EXCEPT AT WELDED JOINTS, IS NOT ALLOWED.
REMOVE BASE PLATE, NUT, RAIL
CLIPS AND LEVELING NUTS TYP
C CRANE RAIL
L
SAWCUT AT EDGES OF
RAIL POCKET, TYP.
RETAIN THREADED ROD, TYP.
C RAIL
L
REMOVE CONCRETE
FILL, TYP.
REMOVE RAIL
CD105
A5
SCALE: 1/2" = 1'-0"
CRANE RAIL REMOVALA2
SCALE: 1/2" = 1'-0"
TRAIN RAIL REMOVAL - BERTH 11
REMOVE EXISTING RAILS REMOVE EXISTING TIMBER TIES
2'-0"±
EXISTING ASPHALT
CONCRETE PAVEMENT
EXISTING 2'± HIGH X 3'± WIDE
X 4'± LONG GRANITE BLOCK
A3EXISTING QUAY WALL SECTION
NOT TO SCALE
12823133
B5
SCALE: 1/8" = 1'-0"
BERTH 11 WEST END DEMOLITION LIMIT
DEMOLISH EXIST CONC
TUNNEL ROOF, RETAIN REINF.
SEE REFERENCE DRAWINGS
FOR EXISTING REINF IN APPENDIX F
REMOVE EXIST
WALL REINF AT DUCTBANK
SECANT PILES
REMOVE EXIST
CONC FILL
B2
SCALE: 1/2" = 1'-0"
BERTH 1 TUNNEL DEMOLITION
A
M E
N D
M E
V
G
FRESH WATER KEYNOTES
1 PROVIDE MECHANICALLY RESTRAINED 12" CEMENT-LINED
DUCTILE IRON FRESH WATER PIPE BURIED.
2 PROVIDE 12' X 10" X 12" MECHANICAL JOINT TEE BURIED
WITH THRUST BLOCKS, SEE DETAIL A2 ON DRAWING CF501
3 PROVIDE MECHANICALLY RESTRAINED 10" CEMENT-LINED
DUCTILE IRON FRESH WATER PIPE BURIED.
4 PROVIDE 10" 45° MECHANICAL JOINT BENDS BURIED WITH
THRUST BLOCKS, SEE DETAIL A2 ON DRAWING CF501
5 PROVIDE 12" 45° MECHANICAL JOINT BENDS BURIED WITH
THRUST BLOCKS, SEE DETAIL A2 ON DRAWING CF501
6 PROVIDE 12" X 12" X 12" MECHANICAL JOINT TEE BURIED
WITH THRUST BLOCKS, SEE DETAIL A2 ON DRAWING CF501
7 CONNECT TO EXISTING GATE VALVE FRESH WATER
8 CONTINUE INTO UTILITY ENCLOSURE, SEE DRAWING UP101
9 CUT AND CONNECT TO 8" EXISTING FRESH WATER
10 PROVIDE 10" X 8" MECHANICAL JOINT TEE BURIED WITH
THRUST BLOCKS, SEE DETAIL A2 ON DRAWING CF501
11 PROVIDE NEW HYDRANT, SEE DETAIL A5 ON DRAWING CF501
12 PROVIDE 12" GATE VALVE, SEE DETAIL C4 ON DRAWING
CF501, REFER TO GENERAL NOTE 10
13 PROVIDE 10" GATE VALVE, SEE DETAIL C4 ON DRAWING
CF501, REFER TO GENERAL NOTE 10
14 PROVIDE CORE THROUGH EXISTING PUMP SIDE WALL
15 PROVIDE 12" 22.5° MECHANICAL JOINT BENDS BURIED
WITH THRUST BLOCKS, SEE DETAIL A2 ON DRAWING CF501
16 PROVIDE CORE HOLE THROUGH ROOF OF EXISTING PUMP
WELL AND DOUBLE MECHANICAL SEAL, REFER TO DETAIL
C4 ON SHEET CF502
17 PROVIDE CORPORATION STOP
18 PROVIDE PIPE SUPPORTS FOR 8" CEMENT LINED DUCTILE
IRON PIPE WITHIN PUMP WELL
19 PROVIDE MECHANICALLY RESTRAINED 8" CEMENT-LINED
DUCTILE IRON PIPE BURIED, ENCASED IN 12" STEEL PIPE
BENEATH NITROGEN PAD.
20 PROVIDE 1" COPPER FRESH WATER PIPE BURIED. SEE
GENERAL NOTE 9
21 CONNECT TO EXISTING WITH CORPORATION STOP
1+22
0+00
1+00
3+70
0+59
0+00
REFER TO PROFILE
A3 ON SHEET CF201
REFER TO PROFILE
C5 ON SHEET CF201
REFER TO PROFILE
C3 ON SHEET CF201
14 18
0+29
0+00
REFER TO PROFILE
C4 ON SHEET CF201
SEE ENLARGEMENT DETAIL
A5 ON SHEET CF502
KEYNOTES CONTINUED:
22 CONNECT TO EXISTING WATER SERVICE AT BUILDING
FOUNDATION, CONTRACTOR MUST CONFIRM INVERT
PRIOR TO CONDUCTING THE WORK
23 PROVIDE 8" GATE VALVE, SEE DETAIL C4 ON DRAWING
CF501, REFER TO GENERAL NOTE 10
24 CUT AND CONNECT TO 12" EXISTING FRESH WATER
25 COVER FOR GATE VALVE MUST BE LOCATED OUTSIDE
OF NITROGEN PAD
GENERAL NOTES:
1. ALL BURIED FRESH WATER PIPE JOINTS MUST BE
MECHANICALLY RESTRAINED.
2. NOT ALL EXISTING AND NEW UTILITIES HAVE BEEN
SHOWN FOR CLARITY. REFER TO THE COMPOSITE
UTILITY DRAWINGS, DISCIPLINE SPECIFIC DRAWINGS
AND EXISTING CONDITION DRAWINGS FOR UTILITIES
LOCATED ADJACENT TO THE WORK BEING PERFORMED.
3. COMPLETE WATERLINE RELOCATION PRIOR TO
DEMOLITION OF EXISTING WATER LINE.
4. SEE SURVEY DRAWINGS AND COMPOSITE DRAWINGS
FOR EXISTING UTILITIES. PROTECT UTILITIES TO
REMAIN.
5. REQUEST UTILITY OUTAGE PRIOR TO PERFORMING ANY
WORK IN ACCORDANCE WITH CONTRACT DOCUMENTS.
6. CONCRETE ENCASE NEW FRESH WATER LINE WITHIN 10'
VERTICALLY OR HORIZONTALLY OF SEWER.
7. PROVIDE WATER CONNECTION TO FIRE PUMP REFER TO
FIRE PROTECTION PLANS.
8. CONTRACTOR MUST CONFIRM INVERT LOCATIONS OF
CONNECTION POINTS TO EXISTING WATER PRIOR TO
COMMENCEMENT OF WORK
9. CONTRACTOR MUST PROVIDE FREEZE PROTECTION
FOR SECTIONS OF PIPING LESS THAN 5FT OF COVER
10. GATE VALVES MUST BE INSTALLED AS CLOSE TO THE
TEE FITTINGS AS POSSIBLE. FLANGE OF GATE VALVE
INSTALLED TO TEE FLANGE
11. REFER TO PHASING SHEET G106 FOR FRESH WATER
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
F
F
R E
W
T
A
N d
Y O
M
E
C
F
F
R E
T
A
N
O
O
T T
E D
F r i d a y
D e c e m b e r
E
R b c u l l i n a n
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
CHECK GRAPHIC SCALE BEFORE USING
P
M
U L T
I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
KEY PLAN
GRAPHIC SCALE
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
1" = 20'
20' 0 20' 40'
PLAN
NORTH
FRESH WATER PLAN - SHEET 2 OF 2 - TURNOUT & EXISTING PUMP WELL AREA
SCALE: 1" = 20'
CF102
F R
E S
H
W
A T
A
N
S
H E
12823164
A
M E
N D
M E
V
M G
A
M E
N D
M E
V
M G
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
2"FW(R)
AutoCAD SHX Text
ST
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GUARD HOUSE
AutoCAD SHX Text
PUMP WELL ENTRANCE
AutoCAD SHX Text
45A UNABLE TO ACCESS
AutoCAD SHX Text (A)
AutoCAD SHX Text
GATE
AutoCAD SHX Text (A)
AutoCAD SHX Text
GATE
AutoCAD SHX Text
UNKNOWN TRENCH NO ELECTRONIC SIGNALS DETECTED
AutoCAD SHX Text
6" FW QL-C
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
6" FW QL-B
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
6" FW QL-B
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
12" FW QL-B
AutoCAD SHX Text
EOI
AutoCAD SHX Text
SOFT WALL STORAGE BUILDING
AutoCAD SHX Text
8" FW QL-B
AutoCAD SHX Text
6-1/2' CHAIN LINK (HIGH VOLTAGE AREA)
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CRANE RAIL
AutoCAD SHX Text
OFFICE TRAILER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
OFFICE TRAILER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
OFFICE TRAILER
AutoCAD SHX Text
TURNTABLE FROG
AutoCAD SHX Text
RAIL SWITCH
AutoCAD SHX Text
CRANE RAIL STOP
AutoCAD SHX Text
CRANE RAIL STOP
AutoCAD SHX Text
CRANE RAILS
AutoCAD SHX Text
CRANE RAILS
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
CRANE RAIL
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
1-1/2" PVC
AutoCAD SHX Text
8" COND.
AutoCAD SHX Text
WOODEN DECK
AutoCAD SHX Text
VSP (SEWER VALVE CONN.)
AutoCAD SHX Text
DIESEL FUEL
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
E V
A T
I O
N
F
T
E L
E V
A T
I O
N
F
T
-5
-5
0+00
1+00
1+21.93
FINISHED GRADE
EX DC ELECTRIC
TO BE REMOVED
E L E
V A
T I O
N
F
T
E L E
V A
T I O
N
F
T
-5
-5
UTILITY ENCLOSURE
P381 24" DRAIN
EX AC ELECTRIC
12" HPS
12" X 10" TEE TO RELOCATED
FRESH WATER
0+00
0+59.45
EX DC ELECTRIC
12" FW
12" X 12" TEE TO RELOCATED
FRESH WATER
FINISHED GRADE
EXISTING GRADE
CONNECTION TO
EXISTING 12" FW
H O
R
B
E N
D
H O
R
B
E N
D
V E
B
N
D
V E
N
D
V E
N
D
CRANE RAIL
GRADE BEAMS
10" FW
V E
N
D
V E
N
D
6" HPS
6" CA
EXISTING GRADE
10" X 8" TEE TO HYDRANT
P381 DC ELECTRIC
P381 DC ELECTRIC
V E
N
D
H O
R
B
E N
D
V
A L V
E
H O
R
B
E N
D
V
A L V
E
V
A L V
E
WHEELER UNIT
H O
R
B
E N
D
P381 AC ELECTRIC
E L E
V A
T I O
N
F
T
E L E
V A
T I O
N
F
T
-5
-5
0+00
1+00
2+00
3+00
3+70.14
EX DC ELECTRIC
EX DC ELECTRIC
12" FW
FINISHED GRADE
EXISTING GRADE
P381 24" DRAIN
EX AC ELECTRIC
12" X 10" TEE TO UTILITY ENCLOSURE
12" X 12" TEE TO RELOCATED FRESH WATER
V E
N
D
V E
N
D
V E
N
D
12" X 12" TEE TO EXISTING
FRESH WATER CONNECTION. SEE NOTE 1
H O
R
B
E N
D
H O
R
B
E N
D
H O
R
B
E N
D
H O
R
B
E N
D
V E
N
D
V E
N
D
EX AC ELECTRIC
6" HPS
V E
N
D
V E
N
D
EX 12" DRAIN (DEMO)
V E
N
D
P381 12" DRAIN
P381 6" DRAIN
45° FITTING TO EXISTING
FRESH WATER. SEE NOTE 1
V E
N
D
V E
N
D
V
A L
V E
V
A L
V E
V
A L
V E
V
A L
V E
V
A L
V E
6" HPS
EX 3" HPS
H O
R
B
E N
D
P381 12" DRAIN
EXISTING GATE VALVE
EXISTING GRADE
E L
E V
A T
I O
N
F
T
E L
E V
A T
I O
N
F
T
-5
-5
0+00
0+85.39
F
W
EX 12" FW
EXISTING GATE VALVE
E L
E V
A T
I O
N
F
T
E L
E V
A T
I O
N
F
T
-5
-5
0+00
0+29.12
8" FW
CF201
F R
E S
H
W
A T
O
F I L
E S
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
F
F
R E
T
A
N d
Y O
M
E
C
F
F
R E
T
O
F I L
O
T T
E D
F r i d a y
D e c e m b e r
E
R b c u l l i n a n
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
P
M
U L T
I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
FRESH WATER PROFILE - UTLITY ENCLOSURE TO 12" MAIN
SCALE: HOR - 1" = 20', VERT - 1" = 4'
C3
CF102
FRESH WATER PROFILE - CRANE RAIL TURNOUT - EAST OF SUBSTATION 3 EXPANSION
SCALE: HOR - 1" = 20', VERT - 1" = 4'
A3
CF102
1" = 20'
20' 0 20' 40'
FRESH WATER PROFILE - SOUTH
OF SUBSTATION 3 EXPANSION
SCALE: HOR - 1" = 20', VERT - 1" = 4'
C5
CF102
FRESH WATER PROFILE - HEAD END
SCALE: HOR - 1" = 20', VERT - 1" = 4'
A5
CF101
GENERAL NOTES:
1. CONTRACTOR MUST CONFIRM INVERT
LOCATIONS OF CONNECTION POINTS TO EXISTING
WATER PRIOR TO COMMENCEMENT OF WORK
12823165
FRESH WATER PROFILE - HYDRANT
SCALE: HOR - 1" = 5', VERT - 1" = 5'
C4
CF102
V
A L
V E
HYDRANT
FINISHED GRADE
EXISTING PUMPWELL SLAB
6" NITROGEN PAD
EXISTING GRADE
10" X 8" TEE
12" STEEL PIPE ENCASEMENT
A M
E N
D M
E N
T
V
M G
A
M E
N D
M E
V
M G
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
2+21
0+00
1+00
2+00
SMH-02
SMH-01
1+67
0+00
1+00
SMH-03
SMH-04
SMH-05
0+92
0+00
REFER TO PROFILE
C3 ON SHEET CR201
REFER TO PROFILE
A3 ON SHEET CR201
REFER TO PROFILE
C5 ON SHEET CR201
SANITARY SEWER KEYNOTES
1 PROVIDE NEW 8" DUCTILE IRON SEWER PIPE
2 PROVIDE NEW 4" SEWER FORCE MAIN. SEE MECHANICAL
DRAWINGS FOR CONTINUATION.
3 PROVIDE NEW 10" DUCTILE IRON SEWER PIPE
4 PROVIDE NEW PRECAST CONCRETE SEWER MANHOLE
5 CONNECT TO EXISTING BUILDING 175 SERVICE. SEE
GENERAL NOTE 4
6 INSTALL SEWER CLEANOUT
7 PROVIDE NEW 6" DUCTILE IRON SEWER PIPE
8 TIE EXISTING 12" SEWER TO NEW SEWER MANHOLE
GENERAL NOTES:
1. NOT ALL EXISTING AND NEW UTILITIES HAVE BEEN SHOWN
FOR CLARITY. REFER TO THE COMPOSITE UTILITY
DRAWINGS, DISCIPLINE SPECIFIC DRAWINGS AND
EXISTING CONDITIONS DRAWINGS FOR UTILITIES LOCATED
ADJACENT TO THE WORK BEING PERFORMED.
2. SEE SURVEY DRAWINGS FOR EXISTING UTILITIES.
PROTECT UTILITIES TO REMAIN.
3. REQUEST UTILITY OUTAGE PRIOR TO PERFORMING ANY
WORK IN ACCORDANCE WITH CONTRACT DOCUMENTS.
4. CONTRACTOR MUST VERIFY EXISTING INVERTS OF
SANITARY SEWER AT CONNECTION POINTS AT THE
BUILDING PRIOR TO CONDUCTING WORK
SEWER STRUCTURE INFORMATION
SMH-01
N: 90942.9366
E: 2798916.3751
RIM: 9.82
INV IN 6" X 16 LF: 5.20 (ENCLOSURE)
INV IN 4" X 16 LF: 5.33 (FORCEMAIN)
INV OUT 8" X 47 LF: 5.10 (SMH-02)
SMH-02
N: 90988.9577
E: 2798937.7565
RIM: 9.46
INV IN 8" X 47 LF: 4.64 (SMH-01)
INV OUT 8" X 132 LF: 4.25 (SMH-05)
SMH-03
N: 91143.5886
E: 2798929.5750
RIM: 9.57
INV IN 10" X 49 LF: 0.95 (SMH-05)
INV OUT 10" X 97 LF: 0.95 (SMH-04)
SMH-04
N: 91242.3263
E: 2798906.8350
RIM: 9.75
INV IN 10" X 97 LF: 0.45 (SMH-03)
INV IN 10" X 68 LF: 0.45 (BUILDING)
INV OUT 12" X 3 LF: 0.45 (EX SMH 3568)
SMH-05
N: 91114.1904
E: 2798885.0817
RIM: 9.54
INV IN 8" X 132 LF: 1.80 (SMH-02)
INV IN 8" X 4 LF: 1.30 (EX SMH 45C1)
INV OUT 10" X 49 LF: 1.30 (SMH-03)
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
R
S
A N
I T
A R
Y
S
E W
A
N d
Y O
M
E
C
R
S
A N
I T
A R
Y
S
E W
O
T T
E D
F r i d a y
D e c e m b e r
E
R b c u l l i n a n
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
CHECK GRAPHIC SCALE BEFORE USING
P
M
U L T
I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
KEY PLAN
GRAPHIC SCALE
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
1" = 20'
20' 0 20' 40'
PLAN
NORTH
SANITARY SEWER PLAN
SCALE: 1" = 20'
CR101 -
S A
N I T
A R
Y
S
E W
A
N
12823168
A
M E
N D
M E
V
M G
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
2"FW(R)
AutoCAD SHX Text
SYL
AutoCAD SHX Text S
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
TRENCH DRAIN SUMP 7.0'
AutoCAD SHX Text
GATE
AutoCAD SHX Text
45A UNABLE TO ACCESS
AutoCAD SHX Text (A)
AutoCAD SHX Text
GATE
AutoCAD SHX Text (A)
AutoCAD SHX Text
GATE
AutoCAD SHX Text
TRENCH DRAIN
AutoCAD SHX Text
6-1/2' CHAIN LINK (HIGH VOLTAGE AREA)
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
TRENCH DRAIN
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
OFL 16A(R)
AutoCAD SHX Text
OFL 17A(R)
AutoCAD SHX Text
OFL 17(R)
AutoCAD SHX Text
TURNTABLE FROG
AutoCAD SHX Text
CRANE RAILS
AutoCAD SHX Text
CRANE RAILS
AutoCAD SHX Text
CRANE RAILS
AutoCAD SHX Text
RAILS
AutoCAD SHX Text
RAILS
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text
RD
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (C)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text
VSP (SEWER VALVE CONN.)
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
E V
A T
I O
N
F
T
E L
E V
A T
I O
N
F
T
-15
-10
-15
-10
0+00
1+00
2+00
2+20.80
8" SSWR S=0.009
S M
H
R I M
I N
V
I N
I N
V
O
U T
S M
H
R I M
I N
V
I N
I N
V
I N
I N
V
O
U T
E L
E V
A T
I O
N
F
T
E L
E V
A T
I O
N
F
T
-10
-10
6" SSWR S=0.017
P381 DC ELECTRIC
P381 DC ELECTRIC
P381 AC ELECTRIC
P381 DC ELECTRIC
P381 30" DRAINAGE
" S
S W
R S
.0
EX 6" HPS
EX 8" FW
S M
H
R I M
I N
V
I N
I N
V
I N
I N
V
O
U T
UTILITY ENCLOSURE
EXISTING GRADE
FINISHED GRADE
EX 6" CA
EX ELECTRIC (DEMO)
EX ELECTRIC (DEMO)
0+00 0+96
BUILDING 175
P381 6" HPA
EX ELECTRIC
P381 12" DRAINAGE
10" SSWR S=0.005
EXISTING GRADE
FINISHED GRADE
SUBSTATION WALL
EX CA
EX HPS
EX 12" FW (DEMO)
INV: 5.50
INV: 0.95
S M
H
R I M
I N
V
I N
I N
V
I N
I N
V
O
U T
CRANE RAIL
GRADE BEAMS
ENCASE IN CONCRETE
P381 DC ELECTRIC
E L E
V A
T I O
N
F
T
E L E
V A
T I O
N
F
T
-10
-10
0+00
1+00
1+66.53
10" SSWR S=0.005
10" SSWR S=0.007
S M
H
R I M
I N
V
I N
I N
V
O
U T
P381 AC ELECTRIC
P381 DC ELECTRIC
EX ELECTRIC
EX ELECTRIC
EX 12" FW
EX ELECTRIC
P381 DC ELECTRIC
S M
H
R I M
I N
V
I N
I N
V
I N
I N
V
O
U T
EXISTING GRADE
FINISHED GRADE
EX HPS
(DEMO)
EX 12" FW (DEMO)
EX 12" STRM (DEMO)
S M
H
R I M
I N
V
I N
I N
V
I N
I N
V
O
U T
P381 3" CA
P381 6" HPS
P381 12" DRAINAGE
CR201
S A
N I T
A R
Y
S
E W
O
F I L
E
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
R
S
A N
I T
A R
Y
S
E W
A
N d
Y O
M
E
C
R
S
A N
I T
A R
Y
S
E W
O
F I
O
T T
E D
F r i d a y
D e c e m b e r
E
R b c u l l i n a n
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
P
M
U L T
I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
SANITARY SEWER PROFILE - ENCLOSURE TO SMH-05
SCALE: HOR - 1" = 20', VERT - 1" = 4'
C3
CR101
SANITARY SEWER PROFILE - SMH-05 TO SMH-04
SCALE: HOR - 1" = 20', VERT - 1" = 4'
A3
CR101
1" = 20'
20' 0 20' 40'
SANITARY SEWER PROFILE - BUILDING 175 SERVICE
SCALE: HOR - 1" = 20', VERT - 1" = 4'
C5
CR101
12823169
A
M E
N D
M E
V
M G
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
E
E
W H
E E
L E
R
NITROGEN
HYD
KEYNOTES
1 PROVIDE AND COMPACT AGGREGATE SUBBASE AND BASE
AS REQUIRED TO MEET GRADING. GRADE AND COMPACT
EXISTING AGGREGATE SUBBASE AND BASE. PROVIDE
BITUMINOUS CONCRETE BINDER AND WEARING COURSE.
SEE DETAIL A2 ON DRAWING CS503.
2 PROVIDE PAINTED YELLOW STRIPING LINES AT CRANE
RAIL. TYP. SEE DRAWING CS107 AND CS504
3 INSTALL CHAIN LINK FENCE. SEE DETAILS A2 AND C2 ON
DRAWING CS502.
4 INSTALL ELECTRICAL ENCLOSURE LOW RETAINING WALL
PER DETAIL C5 ON DRAWING CS507.
5 RAISE CASTING, TYP. SEE SHEET CS 107 FOR GRADING.
6 INSTALL AASHTO #57 STONE BASE PER SECTION B2 ON
DRAWING CS301.
7 INSTALL CAST IN PLACE STAIRS, REFER TO DETAIL C4 ON
SHEET CS507.
8 INSTALL SINGLE LEAF CHAIN LINK GATE AT STAIRS PER
DETAILS A3 AND C5 ON DRAWING CS501.
9 INSTALL DOUBLE SWING CHAIN LINK GATE PER DETAIL A2
ON DRAWING CS502.
10 REINSTALL CRANE RAILS. SEE DRAWINGS CS401 AND
CS510
11 PROVIDE REINFORCED STRUCTURAL SLAB, REFER TO
DETAILS C2/C3/C5 ON DRAWING CS507.
12 PROVIDE REINFORCED CONCRETE SLAB, REFER DETAIL C2
ON DRAWING CS510
13 REINFORCED CONCRETE DUCTBANK SECTION. SEE DETAIL
B4 ON CS507
14 PROVIDE AT-GRADE TRENCH SECTION FOR HPA, REFER
TO DETAILS B3/B4 ON DRAWING CS110
15 PROVIDE AT GRADE TRENCH FOR WHEELER, REFER TO
DETAILS ON SHEET CS509
16 REPLACE SWITCH 55 AND 56. SEE CRANE RAIL DRAWINGS
17 PROVIDE HYDRANT. SEE DETAIL A5 ON DRAWING CF501
18 REFER TO STRUCTURAL PLANS FOR NITROGEN PAD.
19 INSTALL RAMP WITH CHEEK WALLS IN EITHER SIDE, REFER
TO SHEET CS110
20 ELECTRICAL EQUIPMENT PAD, REFER TO DETAIL CS ON
SHEET CS507
21 EXISTING CONCRETE TRENCH TO REMAIN
GENERAL NOTES:
1. NOT ALL EXISTING AND NEW UTILITIES HAVE BEEN SHOWN
FOR CLARITY. THE CONTRACTOR MUST REFER TO THE
COMPOSITE UTILITY DRAWINGS, DISCIPLINE SPECIFIC
DRAWINGS, AND EXISTING CONDITIONS DRAWINGS FOR
UTILITIES LOCATED ADJACENT TO THE WORK BEING
PERFORMED.
2. SEE SHEET CS401 FOR SUBSTATION AND PIDC PART
PLANS.
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
S
C
I V
I L
S
I T
E
P
L A
N d
Y O
M
E
C
S
C
I V
I L
S
I T
E
P
L A
N
T
U R
N O
I S
T I N
G
P
U M
P
W
E L L
A
R
O
T T
E D
S u n d a y
D e c e m b e r
E
R
S e F o s t e r
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L A
N T
I C
DRAWFORM REVISION: 07 AUG 2018
CHECK GRAPHIC SCALE BEFORE USING
P
U L
T I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
KEY PLAN
GRAPHIC SCALE
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
1" = 20'
20' 0 20' 40'
PLAN
NORTH
CIVIL SITE PLAN - TURNOUT & EXISTING PUMP WELL AREA
SCALE: 1" = 20'
M A
T C
H
L
I N
E
S
E
M A
T C
H
L
I N
E
S
E
CS103
C I V
I L
S
I T
E
P
L A
N
T
U R
N O
I S
T I N
G
P
U M
P
W
E L L
A
R E
A
12823136
A
M E
N D
M E
V M
G
22 CONCRETE FILLED STEEL PIPES, SEE DETAIL A5 ON
SHEET CS502
23 REFER TO SHEET US403 FOR STRUCTURAL SLAB
EAST OF UTILITY ENCLOSURE
KEYNOTES CONTINUED:
A
M E
N D
M E
V M
G
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
ST
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
GUARD HOUSE
AutoCAD SHX Text
PUMP WELL ENTRANCE
AutoCAD SHX Text
SOFT WALL STORAGE BUILDING
AutoCAD SHX Text
STEEL PLATFORM
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
OFL 16A(R)
AutoCAD SHX Text
OFL 17A(R)
AutoCAD SHX Text
OFL 17(R)
AutoCAD SHX Text
ALTAR
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
OUTLET
AutoCAD SHX Text
1-1/2" PVC
AutoCAD SHX Text
8" COND.
AutoCAD SHX Text
WOODEN DECK
AutoCAD SHX Text
DIESEL FUEL
AutoCAD SHX Text
(2)ES
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text C-1
AutoCAD SHX Text C-2
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
11+00 12+00 13+00
LOW POINT AT NEW CB
RIM: 9.08
LOW POINT AT NEW CB
RIM: 9.30
M
A
T
I
S
T
I
N
G
LOW POINT AT NEW CB
RIM: 9.60
LOW POINT
AT NEW CB
RIM: 9.53
ELEV: 9.55
ADJUSTED RIM: 9.17
EXISTING RIM: 9.08
ADJUSTED RIM: 9.25
EXISTING RIM: 9.13
10.19
9.91
10.05
9.83
9.96 9.87
9.95
9.88
9.80
9.84
LOW POINT
AT NEW CB
RIM: 9.32
9.73
9.53
9.96
TOP SLAB: 10.03
9.66
9.59
9.51
9.58
9.53 9.45
9.53
9.50
9.59
9.70
9.40
9.55
ADJUSTED RIM: 9.38
TOW: 12.00
BOW: 9.55
TOW: 12.00
BOW: 9.56
TOW: 12.00
BOW: 9.84
TOW: 12.00
BOW: 9.55
9.38
TOP SLAB: 9.95
TOW: 12.00
BOW: 9.86
TOP SLAB: 10.37
LOW POINT AT NEW CB
RIM: 9.68
TOP SLAB: 10.00
TOW: 12.00
BOW: 9.50
TOW: 12.00
BOW: 9.65
TOW: 12.00
BOW: 9.50
EXISTING RIM: 9.08
9.85
9.73
9.75
9.52
9.61
9.33
9.44
9.48
9.36
MATCH GRADE AT EXIST MH
RIM: 9.46
MATCH GRADE AT EX MH
RIM: 9.33
MATCH GRADE AT EX MH
RIM: 9.38
9.33
9.57
9.33
9.48
9.73
9.48
9.84
9.89
HIGH POINT: 9.66
9.78
TOP OF STONE: 11.50
9.54
9.36
G
R
A
D
E
9.43
TOP OF STONE: 11.50
9.40
9.91
9.95
9.73
9.77
9.80
MATCH GRADE AT EXIST TRENCH
HIGH POINT AT DOOR: 10.07
VERIFY IN FIELD
BOTTOM OF CURB AT DOOR: 9.60
VERIFY IN FIELD
BOTTOM OF CURB AT VENT: 9.55
VERIFY IN FIELD
BOTTOM OF CURB AT VENT: 9.60
VERIFY IN FIELD
9.67
9.55
TOW: 12.00
BOW: 9.62
9.68
ADJUSTED RIM: 9.12
EXISTING RIM: 9.12
GENERAL NOTES:
1. CONCRETE EQUIPMENT PAD LOCATIONS AND SIZE ARE
APPROXIMATE. ADJUST TO SUIT ELECTRICAL EQUIPMENT
PROVIDED. IF ELECTRICAL EQUIPMENT SELECTED BY
CONTRACTOR REQUIRES A PAD LARGER THAN IS SHOWN
ON THIS DRAWING, THE CONTRACTOR MUST REVISE
LAYOUT OF PADS ENSURING THAT ALL CLEARANCE
SHOWN BETWEEN PADS ARE MAINTAINED. SEE
ELECTRICAL DRAWINGS.
2. PRECAST GRADE RINGS OR RISERS MUST BE USED FOR
ELECTRIC MANHOLE CASTING ADJUSTMENTS INSIDE
SUBSTATION.
KEYNOTES
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l C
S
G
R A
D I N
G
P
L A
N d
Y O
M
E
C
S
S
I T
E
G
R A
D I N
G
P
L A
N
T
U R
N O
O
T T
E D
S u n d a y
D e c e m b e r
E
R
S e F o s t e r
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L A
N T
I C
DRAWFORM REVISION: 07 AUG 2018
CHECK GRAPHIC SCALE BEFORE USING
P
U L
T I M
I S
S I O
N
D
C
K
LBT / LBL
EJA
KEY PLAN
GRAPHIC SCALE
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
A L
S
H I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
1" = 20'
20' 0 20' 40'
PLAN
NORTH
SITE GRADING PLAN - TURNOUT
SCALE: 1" = 20'
CS107
S I T
E
G
R A
D I N
G
P
L A
N
T
U R
N O
U T
CASTINGS ADJUSTMENT TABLE
CASTING NO TYPE
EXISTING ELEVATION (FT) NEW ELEVATION (FT)
C-1 DC ELECTRIC MH 9.47 11.50
C-2 AC ELECTRIC MH 9.59 11.50
CASTING C-2
CASTING C-1
12823140
A
M E
N D
M E
V M
G
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
CA
AutoCAD SHX Text
CA
AutoCAD SHX Text F
AutoCAD SHX Text
TRENCH DRAIN SUMP 7.0'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 308A
AutoCAD SHX Text
AutoCAD SHX Text
AC-36(R)
AutoCAD SHX Text
45A UNABLE TO ACCESS
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text
TRENCH DRAIN
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
TRENCH DRAIN
AutoCAD SHX Text
TRENCH DRAIN
AutoCAD SHX Text
OFL 16A(R)
AutoCAD SHX Text
OFL 17A(R)
AutoCAD SHX Text
OFL 17(R)
AutoCAD SHX Text
AC-309
AutoCAD SHX Text
MP
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
VAULT
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text
RD
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (A)
AutoCAD SHX Text (B)
AutoCAD SHX Text (C)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text (A)
AutoCAD SHX Text
ACCESS HATCH
AutoCAD SHX Text
VSP (SEWER VALVE CONN.)
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.9
AutoCAD SHX Text 9.8
AutoCAD SHX Text 8.8
AutoCAD SHX Text 8.9
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.8
AutoCAD SHX Text 10.3
AutoCAD SHX Text 9.5
AutoCAD SHX Text 10.4
AutoCAD SHX Text 9.4
AutoCAD SHX Text 9.4
AutoCAD SHX Text 9.9
AutoCAD SHX Text 12.0tw
AutoCAD SHX Text 12.0tw
AutoCAD SHX Text 8.8
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.5
AutoCAD SHX Text 8.8
AutoCAD SHX Text 8.9
AutoCAD SHX Text 9.3
AutoCAD SHX Text 9.2
AutoCAD SHX Text 9.7
AutoCAD SHX Text 9.4
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.3
AutoCAD SHX Text 9.8
AutoCAD SHX Text 9.3
AutoCAD SHX Text 9.7
AutoCAD SHX Text 10.4
AutoCAD SHX Text 8.8
AutoCAD SHX Text 9.1
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.7
AutoCAD SHX Text 9.8
AutoCAD SHX Text 10.3
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.3
AutoCAD SHX Text 10.4
AutoCAD SHX Text 9.7
AutoCAD SHX Text 10.6
AutoCAD SHX Text 9.8
AutoCAD SHX Text 9.4
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.3
AutoCAD SHX Text 9.4
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.3
AutoCAD SHX Text 9.4
AutoCAD SHX Text 9.8
AutoCAD SHX Text 9.7
AutoCAD SHX Text 9.8
AutoCAD SHX Text 9.9
AutoCAD SHX Text 9.9
AutoCAD SHX Text 9.9
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.6
AutoCAD SHX Text 10.4
AutoCAD SHX Text 9.9
AutoCAD SHX Text 9.5
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.6
AutoCAD SHX Text 9.3
AutoCAD SHX Text 8.8
AutoCAD SHX Text 10.5
AutoCAD SHX Text 10.7
AutoCAD SHX Text 10.8
AutoCAD SHX Text 10.8
AutoCAD SHX Text
(2)ES
AutoCAD SHX Text
1" HPA QL-B
AutoCAD SHX Text
1" HPA QL-B
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
SOIL ZONE 1
AutoCAD SHX Text
SOIL ZONE 2
AutoCAD SHX Text
UNCLASSIFIED
AutoCAD SHX Text
UNCLASSIFIED
DRAIN STRUCTURE INFORMATION
CB-01
48 DIA CONCENTRIC STRUCTURE
N: 90976.0747
E: 2798948.8017
RIM: 9.30
INV OUT 12" CONC X 3 LF: 5.37 (DMH-04)
CB-02
48 DIA CONCENTRIC STRUCTURE
N: 90951.4813
E: 2798936.6660
RIM: 9.60
INV IN 6" PVC X 16 LF: 5.51 (DMH-04)
INV OUT 6" PVC X 12 LF: 5.51 (DMH-16)
CB-04
48 DIA CONCENTRIC STRUCTURE
N: 90981.5575
E: 2798874.2580
RIM: 9.67
INV IN 6" PVC X 18 LF: 5.38 (RD 2)
INV OUT 6" PVC X 41 LF: 5.38 (DMH-05)
CB-05
48 DIA CONCENTRIC STRUCTURE
N: 91054.6612
E: 2798890.9523
RIM: 9.08
INV OUT 12" CONC X 15 LF: 5.03 (DMH-06)