Amendment 10 - Drydock 1 existing pumpwell valve arrangements drawings.pdf
PDF 6 MB Posted
- Solicitation number
- N4008520R0021
About this file
This document outlines a federal contract opportunity for construction services. The Department of the Navy Naval Facilities Engineering Command is soliciting bids for the construction of a partitioned addition to Dry Dock 1 at Portsmouth Naval Shipyard in Kittery, Maine. The addition will include two new dry dock bays, Dry Dock 1 North and Dry Dock 1 West, with concrete floors, walls, and a center wall separating the bays. New pump well systems and a pump station building will also be constructed. Existing Dry Dock 1 will be renamed Dry Dock 1 East. The scope of work includes modifications to the existing basin closure wall and Berths 1 and 11 to support fully dewatered conditions. The existing Dry Dock 1 pump well will be connected to the new pump well system and modified internally. Bids are due under Solicitation Number N4008520R0021 by the unspecified date provided in the solicitation document.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .