Amendment 14 - General Dwgs.pdf

PDF 3 MB Posted

Attached to
P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY MAINE
Solicitation number
N4008520R0021
Issued by

About this file

This document package includes construction drawings and specifications for a federal contract opportunity to expand Dry Dock 1 at Portsmouth Naval Shipyard in Kittery, Maine. The project involves constructing two new dry dock bays labeled DD1N and DD1W within the superflood basin area to support maintenance and overhaul of Virginia-class submarines. Work includes new concrete floors, walls and center wall; pumpwell systems; a pump station building; portal crane rails; mechanical and electrical utilities; utility tunnels; and all necessary appurtenances. Modifications will be made to the existing basin closure wall and Berths 1 and 11. The existing DD1 pumpwell will be connected to the new system and interior modified. The solicitation is available through the Navy's Naval Facilities Engineering Command for design-bid-build project delivery.

View the file

Other files

File Type Posted
AMENDMENT 0015.pdf PDF
Amendment 14 - 25 00 00.00 22.pdf PDF
Amendment 14 - Electrical dwgs.pdf PDF
AMENDMENT 0014.pdf PDF
Amendment 14 - Mechanical Dwgs.pdf PDF
Amendment 14 - Electrical One Line.pdf PDF
Amendment 14 - Fire Protection One Line.pdf PDF
Amendment 14 - Henderson Point Dwgs.pdf PDF
Amendment 14 - Nitrogren Overall Plan.pdf PDF
Amendment 14 - Panelboards.pdf PDF
Amendment 14 - 32 31 13.53.pdf PDF
Amendment 14 - Raychem RHW 2-hour fire-rated power cable.pdf PDF
Amendment 14 - Civil Site Dwgs.pdf PDF
Amendment 14 - 25 00 00.00 22_ASW_Control.pdf PDF
Amendment 13 - Hendersen Pt Site Dwgs.pdf PDF
Amendment 13 - General Dwgs.pdf PDF
Amendment 13 - Electrical Dwgs.pdf PDF
Amendment 13 - Mechanical Dwgs.pdf PDF
Amendment 13 - Structural Dwgs.pdf PDF
Amendment 13 - Geotech dwgs.pdf PDF
AMENDMENT 0013.pdf PDF
Amendment 0013 - Price Proposal Form (rev).pdf PDF
Amendment 13 - Civil Dwgs.pdf PDF
Amendment 13 - 40 95 00 App B - IO List.pdf PDF
Amendment 13 - Process dwgs.pdf PDF
AMENDMENT 0012.pdf PDF
Amendment 12 - Structural Drawings.pdf PDF
Amendment 12 - General Drawings.pdf PDF
Amendment 12 - 40 95 00 App B - IO List.pdf PDF
Amendment 12 - LightFixt_BOD_1_5_2021.pdf PDF
Amendment 12 - Pump Station and Utility Enclosure.pdf PDF
Amendment 12 - Electrical drawings.pdf PDF
Amendment 0011.pdf PDF
Amendment 10 - General dwgs.pdf PDF
Amendment 10 - Drydock 1 existing pumpwell valve arrangements drawings.pdf PDF
Amendment 10 - Geotech- Structural dwgs.pdf PDF
Amendment 10 - Architectural dwgs.pdf PDF
Amendment 10 - Electrical dwgs.pdf PDF
Amendment 10 - Mechanical.dwgs.pdf PDF
AMENDMENT 0010.pdf PDF
Amendment 10 - Civil dwgs.pdf PDF
Amendment 0009.pdf PDF
Amendment 8 - Structural.pdf PDF
Amendment 8 -mechanical.pdf PDF
01 50 00.00 22.pdf PDF
Amendment 8 - Geotech.pdf PDF
23 81 23.00 20.pdf PDF
Amendment 8 -Civil.pdf PDF
Amendment 8 -Structural Bld.pdf PDF
21 13 13.00 20.pdf PDF
Show 40 more

Latest 50 of 123 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPERFLOOD BASIN

B

E

R

T

H

B

P-310 - NOSSA IBD

FRAGMENTATION

EXISTING WEST CLOSURE WALL

EXISTING DD1W

ENTRANCE STRUCTURE

EXISTING SOUTH

CLOSURE WALLPISCATAQUA RIVER

FEDERAL CHANNEL

TEMPORARY

ASW ENCLOSURE

P-310 - BLASTING SUPPORT BARGES

BARGED MOUNTED BATCH PLANT

AND SUPPORT BARGES

BUOYANCY CANS

(SEE NOTE 10)

TRAILERS ONLY

(SEE NOTE 12)

RELOCATION

OF FACILITIES

(SEE NOTE 11)

B

E

R

A

SEE SHEET G106 FOR PHASING

AT CRANE RAIL TURNOUT

CRANE RAIL TURNOUT

SEE SHEET G106 FOR

TEMPORARY

DEWATERING/DRAINAGE

REQUIREMENTS FOR DD1E

DD1E

BERTH 11A

BERTH 1

2-30" TEMPORARY

DEWATERING DISCHARGES

2 TEMPORARY EMERGENCY DEWATERING

PUMPS WITHIN DD1 NORTH SUMP

5 TEMPORARY DRAINAGE PUMPS, 4 PRIMARY

AND 1 STANDBY LOCATED WITHIN THE

EXISTING DRY DOCK 1 WET WELL

SINGLE COMMON 24" TEMPORARY

DISCHARGE PIPE FROM DRAINAGE

PUMPS. INSTALL PIPING THROUGH NORTH

SUMP GRATING AND UP ALONG WALL

BERTH 11

CIA FENCE SHALL EXTEND A

MINIMUM OF 5 FEET INTO

THE BASIN OR RIVER SIDE

(TYP 4 LOCATIONS)

10'-0" (M

IN)

10FT CLEAR ZONE ON BOTH SIDES

OF FENCE TO BE MAINTAINED AT

ALL TIMES

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

F I L E

N

M

E u s f s h a r e d p r o j e c t s s h a r e d b i m c i v i l d c i v i l

P h a s i n g

P l a n s G

C

O N

S T

R U

C T

I O

N

S

E Q

U E

N C

I N

G

P

A

S I N

G

P

L A

N

P

H A

S d w g

Y O

U

M

E

C

O N

S T

R U

C T

I O

N

S

E Q

U E

N C

I N

A

S I N

G

P

L A

N

P

H A

O

T T

E D

W e d n e s d a y

F e b r u a r y p m

E

R m c a r a m a g n o

D E

P A

R T

M E

O

F

T

V

Y

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

SEAL

OF

N A

V A

L

F

A C

I L

I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

D

M

I D

A

T L

A N

T I C

DRAWFORM REVISION: 07 AUG 2018

P

M

U L T

I M

I S

S I O

N

D

R Y

C

K

LBT / LBL

EJA

NBJ

DSN

1604959

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

PM / DM

BRANCH MANAGER

CHIEF ENG / ARCH

FIRE PROTECTION

DRWDES CHK

CONSTR. CONTR. NO.

SCALE:

A / E INFO

C A

P I T

A L

I M

P R

O V

E M

E N

T

C

O R

E N

A V

A L

S

T A

T I O

N

N

O R

F O

L K

V

I R

G I N

I A

P O

R T

S M

O U

V

I P

Y A

R D

K I T

T E

R Y

M

A I N

E

AS SHOWN

SBF MJC ASM

RICHARD POWERS,

C980 10/15/20

G105

12822981

C O

N S

T R

U C

T I O

N

S

E Q

U E

N C

I N

A

S I N

G

P

L A

N

P

H A

1. OPTION FOR CONTRACTOR ENCLAVE WILL REQUIRE THE FOLLOWING INSTALLATION:

A. INSTALL CIA FENCE ACROSS BERTH 1 AND 2

B. INSTALL CIA FENCE ALONG BERTH 11 AREA

C. INSTALL REVERSE TURNSTILES AT BERTH 11. AND BERTH 1 TO ALLOW ACCESS IN

AND OUT OF THE AREA

D. INSTALL FOUR TRUCK/CRANE OPENINGS IN THE FENCE AT BERTH 1, BERTH 2,

DRY DOCK 1 AND BERTH 11B

E. INSTALL NON CIA TURNSTILE AND FERRY LANDING AS SHOWN

2. COORDINATION WITH THE P-310 CONTRACTOR AND CONTRACTING OFFICER WILL BE REQUIRED FOR

INSTALLATION OF THE CIA FENCE AND FERRY LANDING. ACCESS TO CERTAIN AREAS DURING THIS TIMEFRAME

WILL BE PERMITTED.

3. REFER TO SHEET G106 FOR ENLARGEMENT OF CRANE RAIL TURNOUT AND DDIE FOR REQUIRED WORK

4. TEMPORARY BARGE MOUNTED CONCRETE BATCH PLANT AND SUPPORT BARGES AT BERTH 2A

5. DEMOLITION AND UTILITY INSTALLATION AT CRANE RAIL TURNOUT, REFER TO SHEET G-106 FOR MORE DETAILS

6. HENDERSON POINT SITE DEVELOPMENT AND OTHER NON-CIA AREAS.

PHASE 1 WORK ELEMENTS AND NOTES:

DURATION: CONTRACT NTP - FEB 2022

PLAN

NORTH

PHASE 1 CONSTRUCTION PHASING

DURING BLASTING OPERATIONS

SCALE: 1" = 70'

1. NO IN WATER NOISE GENERATING WORK UNTIL MARCH 2022. WORK THAT DOES NOT

PRODUCE NOISE MAYBE PREFORMED IN AREAS IDENTIFIED AS "WATERSIDE AREAS

AVAILABLE FOR STAGING AND CONSTRUCTION"

2. P-310 BLASTING WITHIN THE SUPERFLOOD BASIN; NOSSA RESTRICTIONS WILL BE IN PLACE.

NO WORK WITHIN ARCS SHOWN DURING BLASTING DAYS. BLASTING ANTICIPATED TO BE

COMPLETED IN DECEMBER 2021. BLASTING IS ANTICIPATED TO OCCUR 6 DAYS A WEEK.

CONTRACTOR WILL BE PROVIDED SCHEDULE OF BLASTING UPON AWARD.

RESTRICTIONS

USE BY OTHER CONTRACTS

WATERSIDE AREAS AVAILABLE

FOR STAGING

LEGEND:

FERRY LANDING

AREAS & ELEMENTS ACCESSIBLE

FOR CONSTRUCTION

CIA FENCE

CIA TURNSTILE

NON CIA TURNSTILE

GATE FOR TRUCK/

CRANE/TRAIN ACCESS

X

FIRE LANES

LIMITED OR NO ACCESS FOR

CONTRACTOR SUBJECT TO NOSSA

RESTRICTIONS

FULL SHIPYARD CRANE RAIL USE

A

M E

N D

M E

V

M G

A

M E

N D

M E

V

M

12+00 13+00

EX HIGH PRESSURE

STEAM, (TYP)

EX DC ELECTRIC, (TYP)

EX COMPRESSED

AIR, (TYP)

COMPRESSED AIR (TYP)

ELECTRIC (TYP)

SEE SHEET ES102

ELECTRIC (TYP)

SEE SHEET ES203

P381 ELECTRIC (TYP)

SEE SHEET ES204

SANITARY SEWER (TYP)

SEE SHEET CR101

HIGH PRESSURE STEAM (TYP)

SEE SHEETS MT108 & MT201

FRESH WATER (TYP)

SEE SHEETS CF102 & CF201

HIGH PRESSURE AIR

SEE SHEETS MA105 & MA201

COMPRESSED AIR (TYP)

SEE SHEETS MC106 & MC201

WHEELER TRENCH (TYP)

SEE SHEETS MW103 & MW201

12+00 13+00

EXISTING QUAY

WALL

REFER TO MECHANICAL

SHEETS FOR UTILITY WORK

INSIDE DD1 TUNNEL

STORM DRAINAGE SEE

SHEETS CS111 & CS 201

SUBSTATION 3 EXPANSION

SEE SHEETS ES411 & CS402

UNDERGROUND ELECTRIC

GENERAL NOTES:

1. THIS SHEET IS IN COLOR AND IS REQUIRED TO BE PRINTED IN

COLOR.

2. FOR LEGEND SEE SHEET G-124.

3. COMPOSITE UTILITY PLANS ARE SHOWN FOR GENERAL

COORDINATION. REFER TO INDIVIDUAL DISCIPLINE DRAWINGS

FOR THE WORK REQUIRED AND TAKE PRECEDENCE OVER

THE INFORMATION SOWN ON THESE COMPOSITE UTILITY

DRAWINGS.

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

F I

M

E

U s h a r e d b i m c i v i l d c i v i l G

C

O M

P O

S I T

E

U

T I L I T

Y

P

L A

N d w g

Y O

M

E

C

O M

P O

S I T

E

U

T I L I T

Y

P

L A

N

T

U R

N O

X I S

T I N

G

P

U M

P

W

E L L

A

R

O

T T

E D

W e d n e s d a y

F e b r u a r y a m

E

R

S e F o s t e r

D E

P A

R T

M E

F

T

V

Y

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

SEAL

OF

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

I D

A

T L A

N T

I C

DRAWFORM REVISION: 07 AUG 2018

CHECK GRAPHIC SCALE BEFORE USING

P

U L

T I M

I S

S I O

N

D

R Y

C

K

LBT / LBL

EJA

KEY PLAN

GRAPHIC SCALE

NBJ

DSN

1604959

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

PM / DM

BRANCH MANAGER

CHIEF ENG / ARCH

FIRE PROTECTION

DRWDES CHK

CONSTR. CONTR. NO.

SCALE:

A / E INFO

C A

P I T

A L

I M

P R

O V

E M

E N

T

C

O R

E N

A V

A L

S

T A

T I O

N

N

O R

F O

L K

V

I R

G I N

I A

P O

R T

S M

O U

V

A L

S

H I P

Y A

R D

K I T

T E

R Y

M

A I N

E

AS SHOWN

SBF MJC ASM

RICHARD POWERS,

C980 10/15/20

1" = 20'

20' 0 20' 40'

PLAN

NORTH

COMPOSITE UTILITY PLAN - TURNOUT & EXISTING PUMP WELL AREA

SCALE: 1" = 20'

M A

T C

H

L

I N

E

S

E

M A

T C

H

L I N

E

S

E

C O

M P

O S

I T

E

U

T I L I T

Y

P

L A

N

T

U R

N O

X I S

T I N

G

P

U M

P

W

E L L

A

R E

A

G-126

12823002

A

M E

N D

M E

V M

G

A

M E

N D

M E

V M

G

A

M E

N D

M E

V

M G

A

M E

N D

M E

AutoCAD SHX Text

ST

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

EP

AutoCAD SHX Text

HH

AutoCAD SHX Text

HH

AutoCAD SHX Text

GUARD HOUSE

AutoCAD SHX Text

PUMP WELL ENTRANCE

AutoCAD SHX Text

45A UNABLE TO ACCESS

AutoCAD SHX Text

SOFT WALL STORAGE BUILDING

AutoCAD SHX Text

EOC

AutoCAD SHX Text

EOC

AutoCAD SHX Text

EOC

AutoCAD SHX Text

EOC

AutoCAD SHX Text

STEEL PLATFORM

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text (A)

AutoCAD SHX Text

OFL 16A(R)

AutoCAD SHX Text

OFL 17A(R)

AutoCAD SHX Text

ALTAR

AutoCAD SHX Text

WOODEN DECK

AutoCAD SHX Text

DIESEL FUEL

AutoCAD SHX Text

OUTLET

AutoCAD SHX Text

2" COND.

AutoCAD SHX Text

1" COND.

AutoCAD SHX Text

3/4" COND.

AutoCAD SHX Text

1" HPA QL-B

AutoCAD SHX Text

1" HPA QL-B

AutoCAD SHX Text

SOIL ZONE 1

AutoCAD SHX Text

SOIL ZONE 2

AutoCAD SHX Text

SOIL ZONE 1

AutoCAD SHX Text

SOIL ZONE 2

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

G105 CONSTRUCTION SEQUENCING & PHASING PLAN PHASE 1-CONSTRUCTION SEQUENCING & PHASING PLAN PHASE 1
G-126 COMPOSITE UTILITY PLAN - TURNOUT & EXISTING PUMP WELL AREA
2021-02-19T12:50:02-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-02-19T12:50:18-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-02-19T12:50:31-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2021-02-19T12:50:44-0500
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .