This is a solicitation for a design-bid-build construction project to build a partitioned addition to Dry Dock 1 located at Portsmouth Naval Shipyard in Kittery, Maine. The addition will include two new dry dock bays labeled Dry Dock 1 North and Dry Dock 1 West separated by a new center wall. Both new bays will be large enough to support maintenance and overhaul of Virginia Class submarines. Scope of work includes new concrete floors, walls and center wall; pumpwell systems; a new pump station building; portal crane rails; mooring hardware; mechanical, electrical and utility systems including tunnels; and all other appurtenances to make the dry docks operational. Modifications will also be made to the existing basin closure wall and Berths 1 and 11. The existing Dry Dock 1 pumpwell will be connected to the new system and interior modifications made. The Navy is the contracting agency. Proposals are due by February 26, 2021 with award anticipated in July 2021.

View the file

Other files

File Type Posted
AMENDMENT 0015.pdf PDF
Amendment 14 - 25 00 00.00 22.pdf PDF
Amendment 14 - Electrical dwgs.pdf PDF
AMENDMENT 0014.pdf PDF
Amendment 14 - Mechanical Dwgs.pdf PDF
Amendment 14 - Electrical One Line.pdf PDF
Amendment 14 - Fire Protection One Line.pdf PDF
Amendment 14 - Henderson Point Dwgs.pdf PDF
Amendment 14 - Nitrogren Overall Plan.pdf PDF
Amendment 14 - Panelboards.pdf PDF
Amendment 14 - 32 31 13.53.pdf PDF
Amendment 14 - Raychem RHW 2-hour fire-rated power cable.pdf PDF
Amendment 14 - Civil Site Dwgs.pdf PDF
Amendment 14 - 25 00 00.00 22_ASW_Control.pdf PDF
Amendment 14 - General Dwgs.pdf PDF
Amendment 13 - Hendersen Pt Site Dwgs.pdf PDF
Amendment 13 - General Dwgs.pdf PDF
Amendment 13 - Electrical Dwgs.pdf PDF
Amendment 13 - Mechanical Dwgs.pdf PDF
Amendment 13 - Structural Dwgs.pdf PDF
Amendment 13 - Geotech dwgs.pdf PDF
Amendment 0013 - Price Proposal Form (rev).pdf PDF
Amendment 13 - Civil Dwgs.pdf PDF
Amendment 13 - 40 95 00 App B - IO List.pdf PDF
Amendment 13 - Process dwgs.pdf PDF
AMENDMENT 0012.pdf PDF
Amendment 12 - Structural Drawings.pdf PDF
Amendment 12 - General Drawings.pdf PDF
Amendment 12 - 40 95 00 App B - IO List.pdf PDF
Amendment 12 - LightFixt_BOD_1_5_2021.pdf PDF
Amendment 12 - Pump Station and Utility Enclosure.pdf PDF
Amendment 12 - Electrical drawings.pdf PDF
Amendment 0011.pdf PDF
Amendment 10 - General dwgs.pdf PDF
Amendment 10 - Drydock 1 existing pumpwell valve arrangements drawings.pdf PDF
Amendment 10 - Geotech- Structural dwgs.pdf PDF
Amendment 10 - Architectural dwgs.pdf PDF
Amendment 10 - Electrical dwgs.pdf PDF
Amendment 10 - Mechanical.dwgs.pdf PDF
AMENDMENT 0010.pdf PDF
Amendment 10 - Civil dwgs.pdf PDF
Amendment 0009.pdf PDF
Amendment 8 - Structural.pdf PDF
Amendment 8 -mechanical.pdf PDF
01 50 00.00 22.pdf PDF
Amendment 8 - Geotech.pdf PDF
23 81 23.00 20.pdf PDF
Amendment 8 -Civil.pdf PDF
Amendment 8 -Structural Bld.pdf PDF
21 13 13.00 20.pdf PDF
Show 40 more

Latest 50 of 123 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-20-R-0021, DESIGN-BID-BUILD (DBB), P-381, MULTI MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME

The purpose of this amendment is to provide responses to PPI's and updates to draw ings and specifications.

The Step 2 proposal due date of 26 February 2021 NTL 2:00 P.M. EST remains unchanged.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 41

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0021

X 9B. DATED (SEE ITEM 11)

31-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Feb-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0013

CONTINUATION SHEET

SECTION 01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS (PWD ME)

Paragraph 2.2.4, Temporary Wiring

Change the first sentence to read “Provide temporary wiring in accordance with NFPA 241 and NFPA 70, Article 590.6(B)(2), Assured Equipment Grounding Conductor Program”.

Paragraph 2.3.1, Drydock 1 Temporary Dewatering Pumping System

Emergency Dewatering Pumps, delete the second paragraph in its entirety and replace with the following:

“The Contractor shall design and provide a system that ensures that all of the requirements of this specification are met. Provide a complete system inclusive of pumps, piping, valves, controls, and all appurtenances. The system designed shall physically fit within the spaces designated. The basis of the P381 conceptual design is based on the following:

1. Number of pumps = 3 (2 primary, 1 standby)

2. Pump design point = 12,000 gpm at 36.6 feet

3. Flygt model number = CP 3531/806 3 1240”

Paragraph 2.3.1, Temporary Dewatering Pumping Systems

Primary Temporary Dewatering Pumps, delete the second paragraph in its entirety and replace with the following:

“The Contractor shall design and provide a system that ensures that all of the requirements of this specification are met. Provide a complete system inclusive of pumps, piping, valves, controls, and all appurtenances. The system designed shall physically fit within the spaces designated. The basis of the P381 conceptual design is based on the

1. Number of pumps = 4 (3 primary, 1 standby)

2. Pump design point = 20,000 gpm at 36.6 feet

3. Flygt model number = CP 3800/905 3 1440”

Paragraph 2.3.2, Drydock 1 Temporary Drainage Pumping System

Primary Temporary Dewatering Pumps, delete the last paragraph in its entirety and replace with the following:

“The Contractor shall design and provide a system that ensures that all of the requirements of this specification are met. Provide a complete system inclusive of pumps, piping, valves, controls, and all appurtenances. The system designed shall physically fit within the spaces designated. The basis of the P381 conceptual design is based on the

1. Number of pumps = 4 primary, 1 standby, 1 backup

2. Pump design point = 3,750 gpm at 74.3 feet

3. Flygt model number = NS 3315 MT 3 633”

SECTION 05 30 00.01 MOORING

Paragraph 2.1.3 Fairlead Tie Down Rings

Delete paragraph in its’ entirety and replace with:

“Fairlead tie down ring assembly shall consist of a u-shaped anchor in accordance with ASME B30.26. The anchor assembly shall have a single pull working load limit of at least 100,000 lbs. Anchor shall conform to ASTM F1554 Gr 105. Top 8" of anchor must be coated with epoxy polyamide in accordance with Section 09 97 13.00 40 STEEL COATINGS. Top coating to be Safety Yellow.”

SECTION 31 41 16 METAL SHEET PILING

Paragraph 3.4.1 Pulling, delete the sixth sentence in its entirety and replace with:

“Pull pilings one sheet at a time or in pairs.”

SECTION 31 68 13 ROCK ANCHORS

Paragraph 3.2.3 Cement Grouted Rock Anchors, delete paragraph in its entirety and replace with:

“Grouting equipment shall be of type and capacity required for successful installation of the rock anchors. Perform single stage grouting in the field. Grouting shall be performed by a method in accordance with PTI DC35.1, paragraph 7.8. Grouting shall commence at the bottom of the grout zone and proceed to the top of the zone.

Grouting shall be gravity flow. The casing shall be withdrawn as the grouting proceeds.”

SECTION 35 20 16.53 FABRICATED STAINLESS STEEL SLIDE GATES

Paragraph 1.4 Design Data

Slide Gate Design Data Table

SG-9 Valve Clear Opening Size (in): delete 48”x72” and replace with “72”x 72”

Paragraph 2.3.4, delete the first paragraph in its entirety and replace with:

“Slide gate frame and bonnet shall be shop fabricated. Guiding and seal surfaces of slide gate frame shall be in a true vertical plane. Fabrication tolerances shall be in accordance with AWWA C561- Fabricated Stainless Steel Gates.

Gate frame and bonnet shall be stress relieved prior to the attachment of seats and seals. Design bonnets to be embedded in concrete. Design bonnet cover seals to resist slide gate seating head water pressure.”

Paragraph 2.3.4, delete the first sentence of the second paragraph in its entirety and replace with:

“The frame assembly and bonnet, including the guide members, invert member, shall be constructed of stainless steel plate with a minimum thickness of 1/4-inch.”

Paragraph 3.1.1, add the following sentence at the end of paragraph 3.1.1:

“Install bonnet covers to be accessible and removable for gate maintenance after installation.”

SECTION 35 45 02.00 10 SUBMERSIBLE PUMP, AXIAL FLOW AND MIXED-FLOW TYPE FOR

DRAINAGE

Paragraph 1.1, delete the first sentence of the first paragraph in its entirety and replace with:

“Design, furnish, and install three identical pumping units for the Dry Dock Drainage System and two identical pumping units for the sumps located in the east and west drainage valve pits.”

Paragraph 2.1.6, delete the first paragraph in its entirety and replace with:

“a. Pumping units for drainage system cannot be less than 5000 gpm against total design head of 66.8 ft with water surface in the intake sump at elevation minus 49.2 ft.

b. Pumping units for drainage valve pit sumps cannot be less than 25 gpm against total design head of 15.0 ft with water surface in the valve pit at elevation minus 51.43 ft.”

SECTION 14 21 13 MATERIAL LIFT

Paragraph 2.2.d, change the first sentence to read “The material lift carriage shall be a minimum of 53 inches wide x 84 inches deep …..”

SECTION 10 44 16 FIRE EXTINGUISHERS

Paragraph 1.2 Submittals. Add “Identification Signage; G” to SD-03 Product Data

Insert new paragraph:

“2.3 IDENTIFICATION SIGNAGE

2.3.1 General

Provide identification signage complying with NFPA 10 and authorities having jurisdiction for letter style, size, spacing, and location. Provide one sign at each fire extinguisher location.

Identify fire extinguisher with the words "FIRE EXTINGUISHER" and an arrow pointing toward the fire extinguisher.

2.3.2 Material and Composition

Sign Material: .040" aluminum.

Text Orientation: Vertical or horizontal.

Lettering Color: Red lettering on white background, non-reflective.

Protective Coating: Clear film laminate.

2.3.3 Placement

Place sign so it can be seen well from the normal path of travel, up close, at a distance, from different angles, and free from obstructions (such as stored materiel, machinery, or an open door). Signs may be flush-mounted to wall, or bracket-mounted at an angle to the wall, with text on multiple sides of sign for multi-directional visibility.

Mechanically fasten identification sign to wall above, or in close proximity to the fire extinguisher at mounting height to suit visibility described in preceding paragraph.”

SECTION 40 95 00 PROCESS CONTROL

Delete Appendix B in its’ entirety and replace with the updated list attached. The amendment 13 change is highlighted in green.

SECTION 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

Add section 3.11 Wire and Cable a follows:

Provide complete electrical wiring for the Control System, including wiring to transformer primaries. Wire and Cable must be installed without splices between control devices and in accordance with NFPA 70 and NFPA 90A.

Instrumentation grounding must be installed per the device manufacturer's instructions and as necessary to prevent ground loops, noise, and surges from adversely affecting operation of the system. Test installed ground rods as specified in IEEE 142. Cables and conductor wires must be tagged at both ends, with the identifier indicated on the shop drawings. Electrical work must be as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM and as indicated.

Install control circuit wiring in conduit or raceways. Where conduit or raceways are required, control circuit wiring must not run in the same conduit/raceway as power wiring over 50 volts.

Run all circuits over 50 volts in conduit, metallic tubing, covered metal raceways, or armored cable. Install wiring in exposed areas, including low voltage wiring, in conduit as specified in Section 26 20 00 INTERIOR

DISTRIBUTION SYSTEM.

SECTION 23 09 00 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

Update section 3.1.13 Wire and Cable as follows:

Provide complete electrical wiring for the Control System, including wiring to transformer primaries. Wire and Cable must be installed without splices between control devices and in accordance with NFPA 70 and NFPA 90A.

Instrumentation grounding must be installed per the device manufacturer's instructions and as necessary to prevent ground loops, noise, and surges from adversely affecting operation of the system. Test installed ground rods as specified in IEEE 142. Cables and conductor wires must be tagged at both ends, with the identifier indicated on the shop drawings. Electrical work must be as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM and as indicated.

Install control circuit wiring in conduit or raceways. Where conduit or raceways are required, control circuit wiring must not run in the same conduit/raceway as power wiring over 50 volts.

Run all circuits over 50 volts in conduit, metallic tubing, covered metal raceways, or armored cable. Install wiring in exposed areas, including low voltage wiring, in conduit as specified in Section 26 20 00 INTERIOR

DISTRIBUTION SYSTEM.

On NAVFAC Dwg. No. 12823087

CHANGE BJ104 BERTH 11 EXCAVATION SUPPORT – TANGENT PILE WALL – PLAN – SHEET 2 OF

2 as follows:

Add note related to tangent pile and closure pile placement to avoid existing master piles.

On NAVFAC Dwg. No. 12822979

CHANGE G103 MILESTONE PLANE as follows:

Removed Vessel 4 Docking at DD1N on 9/1/2025.

Renumbered milestones 7, 8 and 9.

On NAVFAC Dwg. No. 12822991

CHANGE G115 CONSTRUCTION SEQUENCING & PHASING PLAN - PHASE 4 as follows:

Removed Vessel 4 from DD1N.

Removed contractor mobilization requirement for Vessel 4.

Revised hatch area for waterside areas available for staging and construction.

Renamed Phase 4 “Open Construction”.

On NAVFAC Dwg. No. 12822992

CHANGE G116 CONSTRUCTION SEQUENCING & PHASING PLAN - PHASE 5 as follows:

Removed hatch indicating waterside areas available for staging and construction from DD1W and added to

DD1N.

Barge mounted batch plant showed moored along Berth 2.

Added hatch of waterside area available for staging and construction along Berth 2.

On NAVFAC Dwg. No. 12822993

CHANGE G117 CONSTRUCTION SEQUENCING & PHASING PLAN - PHASE 6 as follows:

On NAVFAC Dwg. No. 12822994

CHANGE G118 CONSTRUCTION SEQUENCING & PHASING PLAN - PHASE 6A as follows:

Moved Vessel 3 critical shipyard operations to Phase 6B.

Revised phase for Vessel 4 docking.

Duration dates were revised for April 2026 to May 2026.

Contractor mobilization dates for Vessel 4 were added.

On NAVFAC Dwg. No. 12822995

CHANGE G119 CONSTRUCTION SEQUENCING & PHASING PLAN - PHASE 6B as follows:

Revised to indicate Vessel 3 critical shipyard operations.

Barged mounted batch plant is shown moored at Berth 11C.

On NAVFAC Dwg. No. 12823000

CHANGE G124 COMPOSITE UTILITY PLAN – BERTH 11A AND 11B as follows:

Revised western end of drainage layout along Berth 11.

Revised existing and proposed electric layout on western end of Berth 11.

Removed portion of existing electric along Berth 11 that was not installed.

On NAVFAC Dwg. No. 12823001

CHANGE G125 COMPOSITE UTILITY PLAN –TURNOUT as follows:

Removed portion of existing electric along Berth 11 that was not installed.

Revised portion layout of drainage trunk line.

On NAVFAC Dwg. No. 12823100

CHANGE BK502 BERTH 1 ANCHOR DETAILS – SHEET 1 OF 2 as follows:

Add Waler splice detail.

On NAVFAC Dwg. No. 12823114

CHANGE BP501 PUMPWELL AND UTILITY ENCLOSURE – DETAILS as follows:

Add note for required jet grout column diameter in rock.

On NAVFAC Dwg. No. 12823120

CHANGE CD101 DEMOLITION PLAN – BERTH 11A AND 11B as follows:

Revised limit of removal and disposal of bituminous concrete pavement along western end of Berth 11.

On NAVFAC Dwg. No. 12823121

CHANGE CD102 DEMOLITION PLAN – TURNOUT as follows:

Revised limit of removal and disposal of bituminous concrete pavement.

Added removal of existing trench drain between existing train rails.

Added removal of existing high pressure steam structure.

Added additional keynotes for removal of drainage infrastructure.

On NAVFAC Dwg. No. 12823122

CHANGE CD103 DEMOLITION PLAN – TURNOUT & EXISTING PUMP WELL AREA as follows:

Extended and revised limit of removal and disposal of bituminous concrete pavement along eastern edge of work area north the crane rail.

Reduced and revised limited of removal and disposal of bituminous concrete pavement north of proposed substation.

On NAVFAC Dwg. No. 12823123

CHANGE CD104 – UTILITY DEMOLITION PLAN - TURNOUT as follows:

Updated northern limit of view to show extents of drainage demolition.

Modified the extents of existing fresh water demolition east of substation.

EX CB 17-3B, and connecting pipe, included for demolition.

Extent of existing quay wall removal north of DD1 at the turnout was revised.

On NAVFAC Dwg. No. 12823136

CHANGE CS103 CIVIL SITE PLAN – TURNOUT & EXISTING PUMP WELL AREA as follows:

Updated Keynote 11 to reference sheet CS510 Reinforced structural slab near MH AC-501 adjusted Reinforced structural slab for revised AC and DC ductbank layouts to the east of the PIDC area were added.

Limit of new pavement adjusted to be coordinated with new limits of grading along east edge of pavement.

Limit of new pavement adjusted to be coordinated with demolition plans along east edge of pavement.

Limit of pavement north of substation was revised.

On NAVFAC Dwg. No. 12823140

CHANGE CS107 SITE GRADING PLAN-TURNOUT as follows:

Extended and revised limit of grading along the limit of work on east side of turnout.

Revised limit of grading to match existing edge of wharf structure to remain on west side of turnout.

Revised grading between new crane rail to move low point for CB-09.

Revised grading to eliminate low point at north of DD1.

On NAVFAC Dwg. No. 12823141

CHANGE CS108 DRAINAGE NOTES as follows:

Revised drainage structure table to reflect updates to the drainage layout.

On NAVFAC Dwg. No. 12823142

CHANGE CS109 OVERALL DRAINAGE PLAN as follows:

Revised layout of drainage on western end of trunk line along Berth 11.

Revised layout of drainage truck line on eastern end at crane rail turnout.

On NAVFAC Dwg. No. 12823143

CHANGE CS110 DRAINAGE PLAN – BERTH 11A AND 11B as follows:

Revised DMH-13 to a precast rectangular structure.

Reconfigured layout between DMH-12 to DMH-13.

Removed DMH-14.

On NAVFAC Dwg. No. 12823144

CHANGE CS111 DRAINAGE PLAN - TURNOUT as follows:

Relocated DMH 07 to fix conflict with connecting pipes DMH-08 was removed.

Removed CB symbols that were displaying in error Relocated DMH 10 to fix conflict with connecting pipes Added additional connection to existing pipe at DMH 10 Revised layout of drainage trunk line between DMH-05 and connection to existing drainage system at CB

15-6.

CB16-6 was removed

CB-09 was relocated.

On NAVFAC Dwg. No. 12823145

CHANGE CS201 DRAINAGE PROFILES 1 OF 2 as follows:

Drainage profile between DMH-05 and CB-15-16 was revised to show revised layout and revised crossings with other utilities.

CB 16-16 was removed.

On NAVFAC Dwg. No. 12823150

CHANGE CS402 DRAINAGE OUTLET PART PLAN as follows:

Revised DMH-13 to a precast rectangular structure with a weir. Revised Keynote 9.

Reconfigured layout between DMH-13 to DMH-12.

Removed DMH-14.

Added keynote 12 to “Provide 30” dia frame and cover for DMH-13”.

On NAVFAC Dwg. No. 12823157

CHANGE CS 505 DRAINAGE DETAILS – SHEET 1 OF 2 as follows:

Added new detail A5 for plan and section review of DMH-13.

Moved switch drain detail C5 to sheet CS506.

On NAVFAC Dwg. No. 12823158

CHANGE CS 506 DRAINAGE DETAILS – SHEET 2 OF 2 as follows:

Revised section detail from outlet to DMH-13 to reflect revised layout north of the Berth 11 wharf structure.

Deleted DMH-14 detail A1.

Added switch drain detail A5.

Revised detail C5.

On NAVFAC Dwg. No. 12823164

CHANGE CF102 FRESH WATER PLAN – SHEET 2 OF 2 as follows:

Shifted portion of north/south 12” main east, added additional 45-degree mechanical joint bends.

Shifted 10” fresh water service for utility enclosure connection to 12” main east.

On NAVFAC Dwg. No. 12823165

CHANGE CF201 FRESH WATER PROFILES as follows:

Added missing 6” CA crossing to profile C3.

Added 2 vertical bends and raised 8’ of fresh water piping on profile C5.

Removed 2 vertical bends and raised 129’ of fresh water piping on profile A3.

On NAVFAC Dwg. No. 12823194

CHANGE Y-002 – STRUCTURAL NOTES – SHEET 2 OF 3 as follows:

Under Concrete, revise Note 10

On NAVFAC Dwg. No. 12823195

CHANGE Y-003 – STRUCTURAL NOTES – SHEET 3 OF 3 as follows:

Under Miscellaneous Metals, add the following to the end of Note 7: “DIELECTRIC ISOLATION SHALL

CONSIST OF A CONTINUOUS 1/16" THICK NEOPRENE RUBBER PAD (70A DUROMETER) ADHERED

TO THE BEARING FACE OF THE EMBEDDED SUPPORT ANGLES; AND PLASTIC SLEEVES AND

WASHERS AT THE FASTENER LOCATIONS.”

On NAVFAC Dwg. No. 12823196

CHANGE Y-004 – STRUCTURAL DESIGN CRITERIA DATA– SHEET 1 OF 5 as follows:

Under Design criteria, revised Note 11.B.

On NAVFAC Dwg. No. 12823197

CHANGE Y-005 – STRUCTURAL DESIGN CRITERIA DATA– SHEET 2 OF 5 as follows:

In CASE II, revised geometry of north dock wall.

On NAVFAC Dwg. No. 12823198

CHANGE Y-006 – STRUCTURAL DESIGN CRITERIA DATA– SHEET 3 OF 5 as follows:

In CASE III, revised geometry of north dock wall.

In CASE IV, revised geometry of north dock wall.

On NAVFAC Dwg. No. 12823199

CHANGE Y-007 – STRUCTURAL DESIGN CRITERIA DATA– SHEET 4 OF 5 as follows:

In CASE V, revised geometry of north dock wall.

In CASE VI, revised geometry of north dock wall.

On NAVFAC Dwg. No. 12823202

CHANGE Y-010 – CONSTRUCTION SEQUENCE SECTIONS – SHEET 1 OF 4 as follows:

In SECTION A3, revised geometry of north dock wall.

On NAVFAC Dwg. No. 12823203

CHANGE Y-011 – CONSTRUCTION SEQUENCE SECTIONS – SHEET 2 OF 4 as follows:

On NAVFAC Dwg. No. 12823204

CHANGE Y-012 – CONSTRUCTION SEQUENCE SECTIONS – SHEET 3 OF 4 as follows:

On NAVFAC Dwg. No. 12823205

CHANGE Y-013 – CONSTRUCTION SEQUENCE SECTIONS – SHEET 4 OF 4 as follows:

On NAVFAC Dwg. No. 12823211

CHANGE Y-019 – CONSTRUCTION SEQUENCE DD1N FLOOR SLAB AND WALLS – SHEET 4 OF 5 as follows:

Revised geometry of north dock wall.

On NAVFAC Dwg. No. 12823212

CHANGE Y-020 – CONSTRUCTION SEQUENCE DD1N FLOOR SLAB AND WALLS – SHEET 5 OF 5 as

On NAVFAC Dwg. No. 12823213

CHANGE Y-021 – CONSTRUCTION SEQUENCE DD1W FLOOR SLAB AND WALLS – SHEET 1 OF 5

as follows:

On NAVFAC Dwg. No. 12823214

CHANGE Y-022 – CONSTRUCTION SEQUENCE DD1W FLOOR SLAB AND WALLS – SHEET 2 OF 5

On NAVFAC Dwg. No. 12823215

CHANGE Y-023 – CONSTRUCTION SEQUENCE DD1W FLOOR SLAB AND WALLS – SHEET 3 OF 5

On NAVFAC Dwg. No. 12823216

CHANGE Y-024 – CONSTRUCTION SEQUENCE DD1W FLOOR SLAB AND WALLS – SHEET 4 OF 5

On NAVFAC Dwg. No. 12823217

CHANGE Y-025 – CONSTRUCTION SEQUENCE DD1W FLOOR SLAB AND WALLS – SHEET 5 OF 5

On NAVFAC Dwg. No. 12823195

CHANGE YS103 – CENTER WALL – CONCRETE – PLANS – SHEET 1 OF 14 as follows:

Added elevation callouts: EL 12.00, HP EL 9.70, LP EL 9.65 and EL 9.68.

Revised top of curb elevation to “T/CURB EL 11.92 (TYP)”.

On NAVFAC Dwg. No. 12823196

CHANGE YS104 – CENTER WALL – CONCRETE – PLANS – SHEET 2 OF 14 as follows:

Added elevation callouts: EL 9.70, HP EL 9.70 and LP EL 9.65

Added “SLOPE TO DRAIN” callouts

On NAVFAC Dwg. No. 12823197

CHANGE YS105 – CENTER WALL – CONCRETE – PLANS – SHEET 3 OF 14 as follows:

Added “SLOPE TO DRAIN” callouts

On NAVFAC Dwg. No. 12823198

CHANGE YS106 – CENTER WALL – CONCRETE – PLANS – SHEET 4 OF 14 as follows:

Added “SLOPE TO DRAIN” callouts

Added “FILLING CULVERT TRASHRACK SLOT (FILL WITH MARINE CONCRETE” callout.

Added “(FILL WITH MARINE CONCRETE)” to “FILLING CULVERT GATE SLOT” callout.

Added dimensions for new concrete at filling culvert trash rack slot and filling culvert gate slot.

On NAVFAC Dwg. No. 12823202

CHANGE YS110 – CENTER WALL – CONCRETE – PLANS – SHEET 8 OF 14 as follows:

Added “FILLING CULVERT TRASHRACK SLOT (FILL WITH MARINE CONCRETE” callout.

Added “(FILL WITH MARINE CONCRETE)” to “FILLING CULVERT GATE SLOT” callout.

Added dimension for new concrete at filling culvert trash rack slot and filling culvert gate slot.

On NAVFAC Dwg. No. 12823204

CHANGE YS112 – CENTER WALL – CONCRETE – PLANS – SHEET 10 OF 14 as follows:

Revised callout for 4’-0” x 6’-0” filling culvert.

Replaced Note 2 with “AFTER THE EXISTING DD1E PUMPWELL CEASES TO DISCHARGE THROUGH

THE DISCHARGE CULVERT, REMOVE FLAP VALVE AND FILL DISCHARGE CULVERT WITH 1-FT OF

MARINE CONCRETE AT THE FACE OF THE CENTER WALL AND NON-MARINE BACKFILL

CONCRETE IN THE REMAINDER OF THE DISCHARGE CULVERT UP TO THE DEWATERING PUMP

COVER PLATES”.

On NAVFAC Dwg. No. 12823205

CHANGE YS113 – CENTER WALL – CONCRETE – PLANS – SHEET 11 OF 14 as follows:

Added note for 3’-0” x 3’-0” sump pit, INV EL -51.93

Added note for 3’-0” x 4’-0” sump pit, INV EL -51.93

On NAVFAC Dwg. No. 12823209

CHANGE YS117 – DD1N HEAD END WALL – CONCRETE – PLANS as follows:

In PLAN EL 12.00, added “FILLING CULVERT TRASHRACK SLOT (FILL WITH MARINE CONCRETE” callout.

In PLAN EL 12.00, added “FILLING CULVERT GATE SLOT (FILL WITH MARINE CONCRETE” callout.

In PLAN EL 2.09, added “FILLING CULVERT TRASHRACK SLOT (FILL WITH MARINE CONCRETE” callout.

In PLAN EL 2.09, added “FILLING CULVERT GATE SLOT (FILL WITH MARINE CONCRETE” callout.

In PLAN EL 2.09, revised geometry of north dock wall and head end wall.

On NAVFAC Dwg. No. 12823210

CHANGE YS118 – CONNECTION TO EXISTING PUMPWELL AND UTILITY ENCLOSURE

CONCRETE - PLANS - SHEET 1 OF 4 as follows:

Added “FILLING CULVERT TRASH RACK SLOT (FILL WITH MARINE CONCRETE” callout.

Revised “DRAINAGE FILLING CULVERT SLUICE GATE SLOT” to “FILLING CULVERT SLUICE GATE

SLOT (FILL WITH MARINE CONCRETE)”.

Added dimensions for new concrete at filling culvert trash rack slot.

On NAVFAC Dwg. No. 12823211

CHANGE YS119 – CONNECTION TO EXISTING PUMPWELL AND UTILITY ENCLOSURE

CONCRETE - PLANS - SHEET 2 OF 4 as follows:

Added “FILLING CULVERT GATE SLOT (FILL WITH MARINE CONCRETE” callout.

On NAVFAC Dwg. No. 12823216

CHANGE YS124 – NORTH DOCKWALL - CONCRETE - PLANS - SHEET 2 OF 4 as follows:

In PLAN EL 12.00 (bottom viewport), corrected stationing.

On NAVFAC Dwg. No. 12823217

CHANGE YS125 – NORTH DOCKWALL - CONCRETE - PLANS - SHEET 3 OF 4 as follows:

Added Note 2: “SEE DRAWINGS ES407 AND ES408 FOR SIZES OF ELECTRICAL MANHOLES”.

On NAVFAC Dwg. No. 12823218

CHANGE YS126 – NORTH DOCKWALL - CONCRETE - PLANS - SHEET 4 OF 4 as follows:

Added Note 2: “SEE DRAWINGS ES407 AND ES408 FOR SIZES OF ELECTRICAL MANHOLES”.

In PLAN EL 2.09 (bottom viewport), corrected stationing.

On NAVFAC Dwg. No. 12823220

CHANGE YS128 – SOUTH DOCKWALL - CONCRETE - PLANS - SHEET 2 OF 2 as follows:

In PLAN EL 12.00 (bottom viewport), corrected stationing.

On NAVFAC Dwg. No. 12823260

CHANGE YS301 – FLOAT-IN CONSTRUCTION - GENERAL SECTIONS SHEET 1 OF 6 as follows:

In SECTION – DD1W, B3, added “NOTE 1” callout.

In SECTION – DD1W, B3, revised “NOTE 1 AND 2” callout.

Added note 2: “AFTER THE EXISTING DD1E PUMPWELL CEASES TO DISCHARGE THROUGH THE

DISCHARGE CULVERT, REMOVE FLAP VALVE AND FILL DISCHARGE CULVERT WITH 1-FT OF

MARINE CONCRETE AT THE FACE OF THE CENTER WALL AND NON-MARINE BACKFILL

COVER PLATES.”

On NAVFAC Dwg. No. 12823261

CHANGE YS302 – FLOAT-IN CONSTRUCTION - GENERAL SECTIONS SHEET 2 OF 6 as follows:

In SECTION B3, added marine concrete at filling culvert trash rack slot and filling culvert gate slot.

On NAVFAC Dwg. No. 12823264

CHANGE YS305 – FLOAT-IN CONSTRUCTION - GENERAL SECTIONS SHEET 5 OF 6 as follows:

In SECTION A3, revised geometry and reinforcement of north dock wall.

On NAVFAC Dwg. No. 12823265

CHANGE YS306 – FLOAT-IN CONSTRUCTION - GENERAL SECTIONS SHEET 6 OF 6 as follows:

On NAVFAC Dwg. No. 12823275

CHANGE YS316 – PRECAST TYPE 16 - CONCRETE as follows:

In PLAN AT TOP OF WALLS, added 3’-0” x 3’-0” sump pit.

In PLAN THRU WALLS, added 3’-0” x 3’-0” sump pit, with dimensions.

In SECTION A2, added 3’-0” x 3’-0” sump pit, INV EL -51.93.

On NAVFAC Dwg. No. 12823285

CHANGE YS326 - CENTER WALL - CONCRETE - SECTIONS - SHEET 5 OF 14 as follows:

In SECTION A3, added callout bubble for DETAIL B5.

Added DETAIL B5.

On NAVFAC Dwg. No. 12823286

CHANGE YS327 - CENTER WALL - CONCRETE - SECTIONS - SHEET 6 OF 14 as follows:

In SECTION A3, added 3’-0” x 3’-0” sump pit, INV EL -51.93

On NAVFAC Dwg. No. 12823293

CHANGE YS334 - CENTER WALL - CONCRETE - SECTIONS - SHEET 13 OF 14 as follows:

In SECTION A3, revised filling culvert callout.

Replaced Note 2 with: “AFTER THE EXISTING DD1E PUMPWELL CEASES TO DISCHARGE THROUGH

THE DISCHARGE CULVERT, REMOVE FLAP VALVE AND FILL DISCHARGE CULVERT WITH 1-FT OF

MARINE CONCRETE AT THE FACE OF THE CENTER WALL AND NON-MARINE BACKFILL

On NAVFAC Dwg. No. 12823294

CHANGE YS335 - CENTER WALL - CONCRETE - SECTIONS - SHEET 14 OF 14 as follows:

Replaced Note 2 with: “AFTER THE EXISTING DD1E PUMPWELL CEASES TO DISCHARGE THROUGH

THE DISCHARGE CULVERT, REMOVE FLAP VALVE AND FILL DISCHARGE CULVERT WITH 1-FT OF

MARINE CONCRETE AT THE FACE OF THE CENTER WALL AND NON-MARINE BACKFILL

On NAVFAC Dwg. No. 12823295

CHANGE YS336 - DD1N HEAD END WALL - CONCRETE - SECTIONS as follows:

Replaced Note 2 with: “AFTER THE EXISTING DD1E PUMPWELL CEASES TO DISCHARGE THROUGH

THE DISCHARGE CULVERT, REMOVE FLAP VALVE AND FILL DISCHARGE CULVERT WITH 1-FT OF

MARINE CONCRETE AT THE FACE OF THE CENTER WALL AND NON-MARINE BACKFILL

On NAVFAC Dwg. No. 12823297

CHANGE YS338 - CONNECTION TO EXISTING PUMPWELL AND UTILITY ENCLOSURE

CONCRETE - SECTIONS - SHEET 1 OF 5 as follows:

In SECTION A3, revised fairlead tie down ring.

On NAVFAC Dwg. No. 12823299

CHANGE YS340 - CONNECTION TO EXISTING PUMPWELL AND UTILITY ENCLOSURE

CONCRETE - SECTIONS - SHEET 3 OF 5 as follows:

In SECTION A3, revised fairlead tie down ring.

On NAVFAC Dwg. No. 12823305

CHANGE YS346 - NORTH DOCKWALL - CONCRETE – SECTIONS as follows:

In SECTION A2, revised geometry of north dock wall.

In SECTION A3, revised geometry of north dock wall.

In SECTION A4, revised geometry of north dock wall.

In SECTION A5, revised geometry of north dock wall.

On NAVFAC Dwg. No. 12823310

CHANGE YS503 – PEDESTAL AND GUARDRAIL DETAILS as follows:

Revised DETAIL C2

Revised DETAIL C3

On NAVFAC Dwg. No. 12823311

CHANGE YS504 – WINCH AND FAIRLEAD SYSTEM DETAILS as follows:

Revised DETAIL A2

Revised DETAIL A4

Revised DETAIL A5

Revised DETAIL C5

On NAVFAC Dwg. No. 12823313

CHANGE YS506 – DRILLED SHAFT DETAILS – SHEET 1 OF 3 as follows:

Revised DETAIL B5

On NAVFAC Dwg. No. 12823314

CHANGE YS507 – DRILLED SHAFT DETAILS – SHEET 2 OF 3 as follows:

Revised view title on detail A5 to “6-FT DIA LEVELING/ BEARING DRILLED SHAFT CONNECTION UNDER

CENTER WALL – DETAIL”

On NAVFAC Dwg. No. 12823327

CHANGE YS520 - CENTER WALL - DEWATERING INLET TRASH RACK DETAILS as follows:

Added the hinged door type trash rack panel geometry and embedded angle requirements for the filling culvert inlet.

On NAVFAC Dwg. No. 12823336

CHANGE YS529 – DD1N PRECAST FLOOR SLAB AND NORTH DOCK WALL - REINFORCEMENT as

In DETAIL B3, revise geometry and reinforcement of north dock wall.

On NAVFAC Dwg. No. 12823337

CHANGE YS530 – DD1N PRECAST FLOOR SLAB AND NORTH DOCK WALL - REINFORCEMENT as

On NAVFAC Dwg. No. 12823338

CHANGE YS531 – DD1N PRECAST FLOOR SLAB AND NORTH DOCK WALL - REINFORCEMENT as

In SECTION A3, revised geometry and reinforcement of north dock wall.

Added detail “DETAIL AT TC TYPE MANHOLE”.

Added detail “DETAIL AT AC TYPE MANHOLE”.

On NAVFAC Dwg. No. 12823347

CHANGE YS540 – DD1N PRECAST FLOOR SLAB 9’-0” DIA AND 6’-6” DIA DRILLED SHAFTS

CONNECTION - REINFORCEMENT as follows:

In SECTION B2, revised to “3 MIN COVER”

In SECTION B4, revised to “6 MIN COVER”

Add Note 1: “THE STEEL BEAMS IN THE DRILLED SHAFTS SHALL BE UNCOATED. HOWEVER, IF THE

STEEL BEAMS WILL BE EXPOSED IN WATER FOR LONGER THAN ONE MONTH, THE EXPOSED

LENGTHS OF THE STEEL BEAMS SHALL BE COATED WITH PRIMER.”

On NAVFAC Dwg. No. 12823361

CHANGE YS554 – CENTER WALL - REINFORCEMENT – SHEET 9 as follows:

In SECTION A3, revised geometry and reinforcement of the DD1N head end wall.

On NAVFAC Dwg. No. 12823363

CHANGE YS556 – CENTER WALL - REINFORCEMENT – SHEET 11 as follows:

Added DETAIL B5

On NAVFAC Dwg. No. 12823366

CHANGE YS559 – CENTER WALL - REINFORCEMENT – SHEET 14 as follows:

In SECTION A3, added callouts for details A1 and A2.

Added DETAIL A1

Added DETAIL A2

On NAVFAC Dwg. No. 12823382

CHANGE YS575 – DD1W PRECAST FLOOR SLAB 9’-0” DIA AND 6’-6” DIA DRILLED SHAFTS

CONNECTION - REINFORCEMENT as follows:

In SECTION B2, revised to “3 MIN COVER”

In SECTION B4, revised to “6 MIN COVER”

Added Note 1: “THE STEEL BEAMS IN THE DRILLED SHAFTS SHALL BE UNCOATED. HOWEVER, IF

THE STEEL BEAMS WILL BE EXPOSED IN WATER FOR LONGER THAN ONE MONTH, THE EXPOSED

LENGTHS OF THE STEEL BEAMS SHALL BE COATED WITH PRIMER.”

On NAVFAC Dwg. No. 12823384

CHANGE YS577 – DD1N NORTH AND DD1W SOUTH DOCK WALL – STAIRWELL

REINFORCEMENT – SHEET 2 OF 2 as follows:

In SECTION A1, revised geometry and reinforcement of north dock wall.

In SECTION A5, revised geometry and reinforcement of north dock wall.

On NAVFAC Dwg. No. 12823480

CHANGE PD504 PUMP WELL DEWATERING DETAILS – SHEET 4 OF 6 as follows:

Call out note for the 72” X 60” slide gate has been clarified to be a bonneted slide gate encased in concrete.

On NAVFAC Dwg. No. 12823483

CHANGE PD504 PUMP WELL SCHEDULES as follows:

Added sump pump schedule.

On NAVFAC Dwg. No. 12823818

CHANGE MT108 HIGH PRESSURE STEAM PLAN – TURNOUT as follows:

Revised portion of horizontal layout of 6” HPS from MH378A to connection to DD1 utility tunnel.

Added pipe bends to the 6” HPS between MH378A and MH380A Location and size of MH380A was revised.

On NAVFAC Dwg. No. 12823819

CHANGE MT201 HIGH PRESSURE STEAM PROFILE as follows:

Revised rim elevations on structures MH 378B and MH 3563.

Revised profile C5 of 6” HPS from MH378A to connection to DD1 utility tunnel.

On NAVFAC Dwg. No. 12823737

CHANGE MC106 COMPRESSED AIR PLAN as follows:

Revised portion of horizontal layout of 6” CA from MH378A to connection to DD1 utility tunnel.

Added pipe bends to the 6” CA between MH378A and MH380A Location and size of MH380A was revised.

On NAVFAC Dwg. No. 12823739

CHANGE MC201 COMPRESSED AIR PROFILE as follows:

Revised profile C3 of 6” CA from MH378A to connection to DD1 utility tunnel.

On NAVFAC Dwg. No. 12823725

CHANGE MA105 HIGH PRESSURE AIR PLAN as follows:

Revised a portion of the layout between MH-2 and connection to existing near crane rail.

On NAVFAC Dwg. No. 12823726

CHANGE MA201 HIGH PRESSURE AIR PROFILE as follows:

Revised a portion of the profile between MH-2 and connection to existing near crane rail.

On NAVFAC Dwg. No. 12823896

CHANGE ED603 DEMOLITION – CONDUIT AND WIRE SCHEDULE as follows:

The “Conduit and Wire Schedule-Duct Bank Replacement” has changed to increase wire sizes and manhole routing for P1, P2, P3, P4, P5, P6, P8 & P9. Title of the notes under “Conduit and Wire Schedule-Demolition” has been changed to clarify these notes are for this schedule.

On NAVFAC Dwg. No. 12823897

CHANGE ED604 DEMOLITION – CONDUIT AND WIRE SCHEDULE as follows:

The “Conduit and Wire Schedule-Duct Bank Replacement” has changed to increase wire sizes and manhole routing for P10, P11, P13, P14 7 P15. P12 Manhole routing for C1 to C10 have been changed.

On NAVFAC Dwg. No. 12823898

CHANGE ED605 DEMOLITION – CONDUIT AND WIRE SCHEDULE as follows:

The “Conduit and Wire Schedule-Duct Bank Replacement” has changed to correct manhole routing for C11 to C38.

On NAVFAC Dwg. No. 12823909

CHANGE ES102 DD1N POWER AND TELCOM PLAN-EAST as follows:

Routing of Replacement duct banks have been changed as shown. Telecommunications feeder tags have been corrected.

On NAVFAC Dwg. No. 12823910

CHANGE ES103 DD1N POWER AND TELCOM PLAN-NORTH as follows:

Routing of Replacement duct banks have been changed as shown. Telecommunications feeder tags have been corrected.

On NAVFAC Dwg. No. 12823928

CHANGE ES206 ELECTRIC PROFILES 6 OF 10 as follows:

Revised alignment of AC Relocation Ductbank from electric manhole AC-515 to EX AC-308.

Revised ductbank dimensions Revised ductbank dimensions for at grade reinforced sections Electric manhole AC-528 renamed AC-514 Electric manhole AC-501 was resized.

Crossings of existing and new utilities were revised.

On NAVFAC Dwg. No. 12823929

CHANGE ES207 ELECTRIC PROFILES 7 OF 10 as follows:

Revised alignment of DC relocation ductbank from electric manhole DC-D85 TO EX DC-D8.

Revised ductbank dimensions Added an at grade reinforced section of ductbank.

Removed connection to AC-501.

Crossings of existing and new utilities were revised.

On NAVFAC Dwg. No. 12823977

CHANGE ES517 MANHOLE FOLDOUTS as follows:

Manhole foldouts for DC-D7, DC-D8, AC-308, AC-501 and AC-508 have been updated per the new replacement duct bank layout.

On NAVFAC Dwg. No. 12823978

CHANGE ES517 MANHOLE FOLDOUTS as follows:

Manhole foldout for DC-D4 has been updated.

On NAVFAC Dwg. No. 12823981

CHANGE ES601 CONDUIT AND WIRE SCHEDULES as follows:

Increased feeder sizes and added Note 4 for feeder 2 & 3.

On NAVFAC Dwg. No. 12823985

CHANGE ES605 ELECTRICAL SCHEDULES as follows:

Updated manhole types for AC-501 & AC-508.

On NAVFAC Dwg. No. 12823664

CHANGE UE001 ELECTRICAL SCHEDULES as follows:

Added symbol for VFD.

On NAVFAC Dwg. No. 12823666

CHANGE UE001 UTILITY ENCLOSURE – SECOND FLOOR POWER PLAN as follows:

Replaced disconnect symbol with VFD symbol at UE-EF-1 and UE-EF-2.

On NAVFAC Dwg. No. 12823667

CHANGE UE001 UTILITY ENCLOSURE – THIRD FLOOR POWER PLAN as follows:

Replaced disconnect symbol with VFD symbol at PWP-1-VFD and PWP-2-VFD.

On NAVFAC Dwg. No. TBD

CHANGE UE609 UTILITY ENCLOSURE – SCHEDULES as follows:

Added note 11 to “Mechanical equipment Connection Schedule-Utility Enclosure and to UE-EF1 & UE-EF-2 within schedule.

On NAVFAC Dwg. No. 12823509

CHANGE PE602 PUMP STATION – SINGLE LINE DIAGRAM as follows:

Changed KAIC rating on PS-SWBD1, PS-SWBD2, PS-SWBD1-S and PS-HV1.

On NAVFAC Dwg. No. 12823512

CHANGE PE605 PUMP STATION – PANELBOARD SCHEDULES as follows:

Changed KAIC rating on PS-HV1.

On NAVFAC Dwg. No. 12823798

CHANGE MS704 CHEMICAL FEED SCHEMATIC:

Changed Process control panel (PCP) to Dewatering pumping station control panel (DCP).

On NAVFAC Dwg. No. 12823799

CHANGE MS705 ASW CONTROL POINTS LIST – DD1E:

On NAVFAC Dwg. No. 12823800

CHANGE MS706 ASW CONTROL POINTS LIST – DD1N:

On NAVFAC Dwg. No. 12823801

CHANGE MS707 ASW CONTROL POINTS LIST – DD1W:

On NAVFAC Dwg. No. 12823646

CHANGE UM712 PURE WATER GENERATION SCHEMATIC:

On NAVFAC Dwg. No. 12823462

CHANGE PM704 PUMP STATION – HYDROBURST AIR COMPRESSOR SCHEMATIC:

On NAVFAC Dwg. No. 12823644

CHANGE UM710 – UTILITY ENCLOSURE – FRESH WATER SCHEMATIC:

Re-number flow transmitter to 3.

Remove LPS valve position control point from sheet.

Add general alarm point (GA/01) to heat exchanger control panel.

Add temperature transmitter point (TT/01) to heat exchanger control panel.

On NAVFAC Dwg. No. 12823630

CHANGE UM602 UTILITY ENCLOSURE – SCHEDULES – SHEET 2 OF 5:

Remove “VFD” from note 6 on fan schedule.

Add Note 9 to fan schedule stating “VFD is provided by electrical contractor”.

Notes reference for UE-EF-1 and UE-EF-2 shall be 9 instead of 6.

On NAVFAC Dwg. No. 12823633

CHANGE UM605 UTILITY ENCLOSURE – SCHEDULES – SHEET 5 OF 5:

Add flow transmitter (FT-03) to flow meter schedule. Meter shall serve utility enclosure fresh water main service with 4” size, 120VAC. Basis of design shall be Krohne model 3400 with all wetted parts 316 SS similar to all other flow meters used on the project.

On NAVFAC Dwg. No. 12823634

CHANGE UM606 UTILITY ENCLOSURE – PURE WATER SCHEDULES:

Change UE-PW-FE-04 to UE-PW-FE-01 on pure water flow meter schedule.

Change duplicate UE-PW-LIT-01 to UE-PW-LIT-02 on pure water pressure transmitter schedule.

On NAVFAC Dwg. No. 12823645

CHANGE UM711 UTILITY ENCLOSURE – LOW PRESSURE STEAM AND CONDENSATE

SCHEMATIC:

Add control point for UE-FT-1. Flow transmitter FT/01.

On CRU-1, rename level transmitter to level switch with level switch high level alarm.

On NAVFAC Dwg. No. 12823995

CHANGE R101 – HENDERSON POINT NOTES AND LEGEND as follows:

Added hatches for “Equipment Removal”, “Rip Rap Removal”. “Clear and Grub Existing Vegetation”, “Erosion Control Blanket”, “Crushed Stone”, “Grass Swale and Soil Filter”, “Loam and Seed”, and “Loam and Seed, Submerged” to the civil legend.

Added notes on seeding to general notes.

On NAVFAC Dwg. No. 12823996

CHANGE R102 EROSION CONTROL PLAN – HENDERSON POINT 1 OF 2 as follows:

Existing Conditions Sheet was removed and replaced with erosion and sediment control plan for northern portion of Henderson Point.

Added volume references to general notes.

On NAVFAC Dwg. No. 12823997

CHANGE R103 EROSION CONTROL PLAN – HENDERSON POINT 2 OF 2 as follows:

Existing Conditions Sheet was removed and replaced with erosion and sediment control plan for southern portion of Henderson Point.

Added volume references to general notes.

On NAVFAC Dwg. No. 12823998

CHANGE R104 HENDERSON POINT – LAND USE RESTRICTION AND BERTH AVAILAIBLITY

PLAN as follows:

Area of high archaeological sensitivity and area of archaeological sensitive have been revised.

On NAVFAC Dwg. No. 12823999

CHANGE R105 – DEMOLITION PLAN – HENDERSON POINT 1 OF 2 as follows:

Revised/coordinated hatches for demolition and removal for the project area.

On NAVFAC Dwg. No. 12824000

CHANGE R106 – DEMOLITION PLAN – HENDERSON POINT 2 OF 2 as follows:

Revised/coordinated hatches for demolition and removal for the project area.

On NAVFAC Dwg. No. 12824001

CHANGE R107 – OPERATIONS SITE PLAN – HENDERSON POINT 1 OF 2 as follows:

Revised pavement limits.

On NAVFAC Dwg. No. 12824002

CHANGE R108 – OPERATIONS SITE PLAN – HENDERSON POINT 2 OF 2 as follows:

Revised south swale/adjacent pavement limits.

On NAVFAC Dwg. No. 12824003

CHANGE R109 – GRADING PLAN – HENDERSON POINT 1 OF 2 as follows:

Revised grading around north swale.

On NAVFAC Dwg. No. 12824004

CHANGE R110 – GRADING PLAN – HENDERSON POINT 2 OF 2 as follows:

Adjusted contours 14 and 15 to eliminate low point to the east of the site.

Adjusted embankment contours to better meet existing grade at the eastern potion of the top bank.

On NAVFAC Dwg. No. 12824005

CHANGE R111 – OPERATIONS SECTIONS – HENDERSON POINT as follows:

Added section A5 – “Typical Section: South Swale” to sheet as detail A5.

On NAVFAC Dwg. No. 12824008

CHANGE R114 –HENDERSON POINT – RESTORATION SITE PLAN as follows:

Added new sheet for general site work for restoration of the Henderson Point.

Added hatch for loam and seed for disturbed areas.

Added hatch for submerged seed for soil filters. Added note indicating submerged seed must be a grass species that is tolerant of frequent inundation and well drain soil.

Added notes for limits of concrete curb and edge of pavement.

Added hatch for new pavement on south side of project site.

Revised limits of guardrail Indicated revised limits of soil filters with rip rap overflows.

On NAVFAC Dwg. No. 12824009

CHANGE R115 - HENDERSON POINT GRADING AND DRAINAGE PLAN 1 OF `as follows:

Revised drainage layout including structure layouts and pipe sizes.

Size and grading of BMP1 and sediment forebay have been revised.

Rip rap overflow to BMP1 have been added to the plan.

Pipe material changed from RCP to DI in Keynote 1 Removed Keynote 4 regarding headwall installation. Replaced with keynote on swale conversion.

Added Keynote regarding installation of erosion control matting at embankment slopes as indicated.

On NAVFAC Dwg. No. 12824010

CHANGE R116 –HENDERSON POINT GRADING AND DRAINAGE PLAN 2 OF 2 as follows:

Revised drainage layout including structure layouts and pipe sizes.

Size and grading of BMP2 and sediment forebay have been revised.

Portions of operations swale will be filled and graded.

Outlet locations from OS2, OS3 and D100 were revised.

Rip rap overflows to BMP2 have been added to the plan.

Restoration grading of portions of south area of the site ha Pipe material changed from RCP to DI in Keynote 1 Removed Keynote 4 regarding headwall installation. Replaced with keynote on swale conversion.

On NAVFAC Dwg. No. 12824011

CHANGE R-117 RESTORATION SECCTION – HENDERSON POINT as follows:

Moved utility structure information to sheet to R118.

Added restoration cross sections of BMP from sheet R116.

Revised sections B5 and C5 to relocate setback lines, include a “top bank” line, modify the location where grade is tied into existing, and coordinate width of embankments Added detailed typical cross sections for BMP-2 and BMP-3.

On NAVFAC Dwg. No. 12824012

CHANGE R-118 UTILITY INFO – HENDERSON POINT as follows:

Moved detail sheet to R122.

Add drainage structure tables from sheet R117.

Updated structure information.

On NAVFAC Dwg. No. 12824013

CHANGE R-119 EROSION CONTROL PLAN -PRISON POINT as follows:

Moved Henderson Point erosion control plan to sheet R102.

Sheets becomes Prison Point erosion control previously R121.

Removed legend from sheet.

Added construction entrance and keynote to plan.

On NAVFAC Dwg. No. 12824014

CHANGE R-120 PRISON SITE –SITE PLAN as follows:

Moved Henderson Point erosion control plan to sheet R103.

Sheets becomes Prison Point site layout previously R122.

Added embankment and seeding hatches.

On NAVFAC Dwg. No. 12824015

CHANGE R-121 PRISON SITE – OVERALL GRADING AND DRAINAGE PLAN as follows:

Moved Prison Point erosion control plan to sheet R119.

Revised drainage outlet from BMP-3.

Revised keynotes 1, 4, 5, and 7.

Added emergency rip rap overflow to BMP-3.

On NAVFAC Dwg. No. 12824016

CHANGE R-122 DETAILS HENDERSON POINT 1 OF 2 as follows:

Moved Prison Point drainage site plan to sheet R120.

Added site and drainage detail previously on sheet R118.

Added typical BMP-3 section.

On NAVFAC Dwg. No. 12824017

CHANGE R-123 DETAILS HENDERSON POINT 2 OF 2 as follows:

Moved Prison Point drainage layout plan to sheet R121.

Added drainage details, manhole, concrete headwall and catch basin to sheet.

Added typical BMP-3 section.

---END OF AMENDMENT---

Contractor

PPI#

Section of RFP or Page Number

Question RESPONSE

54 NA Reference sheet no. MD302 Keynote No. 01 regarding removal and disposal of the existing dewatering, drainage, sump and asw pump systems at the pump well. Please provide PID for each system which clearly shows the water flow path (source, suction, discharge) and how it is regulated/controlled (i.e.

valves, slide gates, etc.).

PID drawings have been provided.

120 Document 00 41 00 Bid Schedules

The explanation of this bid item states to include the cabling and duct banks "To/From" the substation. Does this include the duct bank and cabling to the PIDC and beyond? Also, should SP-7 and SP-8 be included within this pay item?

PENDING RESPONSE

151 33 20 00 Pure Water; spec section 2.1.1 requires a vendor supplied pretreatment system to treat a fresh water supply for use in the pure water system. What are the deionized quality requirements for the output of this system?

Water Quality requirements are detailed on UM606 Water Quality Schedule. Vendor selection by

NAVFAC

152 33 20 00 Pure Water; Attachment A; section

5.2.6 states that PNSY will be providing a pure water source for hydrostatic testing. Since PNSY will be providing a source of pure water, what is the need for a pretreatment system required in spec section 2.1.1?

PNSY has the ability to provide DI/Pure Water for needed procedures during construction including flushing and hydrostatic testing, but these are temporary measures to support construction. The pretreatment system is a permanent fixture of the Pure Water generation train for long term operation of the system.

153 33 20 00 Reference Spec. 33 20 00 - 3.3.1 regarding hydrostatic testing of pure water tanks using deionized water.

Reference Spec 01 50 00.00 22 - 3.2.2 which states that NAVFAC is to make available to the Contractor at no cost various utilities that do not include deionized water. Please confirm that Contractor is to provide deionized water required for the project. Please confirm that the hydrostatic testing of pure water tanks with deionized water cited in Spec. 33 20 00 - 3.3.1 is to be performed after the tanks have been set in place and is not to be performed in the factory prior to shipment.

PNSY will provide deionized water per 33 20 00 Technical supplement Section 6.10. Hydrostatic testing for the tanks is to be part of fabrication acceptance, but piping hydrostatic testing will require similar water quality and procedures.

163 31 23 00.00 Per Specification 31 23 00.00 part 3.3.4 Excavated Materials Unsuitable for Backfill, need to be disposed of at a licensed facility. Does this apply to the stone fill to be removed from inside of the West Closure Wall Cells?

The fill inside the west closure wall is considered clean fill, all the fill except the bottom 2 feet of material can be removed and trucked or barged directly off yard. Elevations of fill and bedrock interface are provided on the drawings. The bottom 2 feet of material is required to be brought through Bldg 357 and disposed of a at licensed landfill in accordance with the specifications.

164 31 23 00.00 Will the Stone fill from the West Closure Wall Cells need to be offloaded inside the shipyard and brought through building 357 regardless of if it to be disposed of at a licensed facility or other approved location?

The fill inside the west closure wall is considered clean fill, all the fill except the bottom 2 feet of material can be removed and trucked or barged directly off yard. Elevations of fill and bedrock interface are provided on the drawings. The bottom 2 feet of material is required to be brought through Bldg 357 and disposed of a at licensed landfill in accordance with the specifications.

180 33 20 00 Reference Spec. 33 20 00 - 2.1 and sheet nos. UM207 and UM712 regarding pure water System. Sheet no.

UM207, General Note No. 3 states that pure water pretreatment components to be furnished and maintained by third party vendor. Spec. 33 20 00 - 2.1.1 states that vendor is to replace deionization media as needed to maintain water quality. Please advise as to the length of time said replacement of deionization media is required.

Please confirm that other than media replacement NAVFAC is to perform all other pure water system component maintenance.

Procurement of the pretreatment system is by NAVFAC contract with 3rd party vendor. The pretreatment system will be a permanent feature of the pure water system as part of the generation train. Servicing of this equipment is expected to occur via an extension of existing contracts for similar treatment equipment on site.

181 33 20 00 Reference Spec. 33 20 00 - 2.2.1.2 and sheet no. UM601 regarding pure water system insulation. Spec. 33 20 00 -

2.2.1.2 states that pure water piping is to receive 1-inch thick cellular glass insulation. Sheet no. UM601 Mechanical Piping Schedule indicates that the pure water system receives no insulation.