Amendment 8 -Henderson.pdf
PDF 2 MB Posted
- Solicitation number
- N4008520R0021
About this file
This package includes construction drawings and plans for the P-381 Multi-Mission Dry Dock #1 project at the Portsmouth Naval Shipyard in Kittery, Maine. The project constructs a partitioned addition to Dry Dock #1 within the superflood basin area, consisting of two bays (Dry Dock #1 North and Dry Dock #1 West) of sufficient size and depth to support maintenance and overhaul of Virginia Class submarines, Blocks I-IV. New construction includes concrete floors, walls and center wall, new pump well systems, pump station building, portal crane rails, mooring hardware, mechanical and electrical utilities, utility tunnels and all appurtenances. Modifications will be made to the existing basin closure wall and Berths 1 and 11. The existing Dry Dock #1 pump well will be connected to the new pump well system and interior modified. Sheet R-100 shows the site access plan and Sheet R-104 the land use plan for Henderson Point, including archaeological and flood zone information.
The related federal contract opportunity is solicitation number N4008520R0021 for the design-bid-build of the P-381 Multi-Mission Dry Dock #1 project at the Portsmouth Naval Shipyard in Kittery, Maine. The solicitation is issued by the Department of the Navy, Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN SITE ACCESS ROUTE
GATE 2 ACCESS ROUTE
PROJECT LIMITS
FLOATING BARRIER
GENERAL NOTES
P
IS
C A
T A
Q U
A
R
IV
E R
MAIN SITE ACCESS ROUTE
GATE 2 ACCESS ROUTE
PROJECT LIMITS
FLOATING BARRIER
B A C K
C H A N N E L
1. CONTRACTOR MUST COORDINATE ALL
BARGE ACCESS AND MOORING LOCATIONS
WITH THE CONTRACTING OFFICER.
2. CONTRACTOR MUST COORDINATE USE OF
GATES 1 AND 2 FOR WIDE LOAD
DELIVERIES WITH CONTRACTING OFFICER.
3. THE INTENT OF THIS PLAN IS TO SHOW
ACCESS ROUTES TO THE SITE FROM THE
GATES. FOR PHASING, FIRE LANE
REQUIREMENTS, LAYDOWN AREA
RESTRICTIONS AND INTERFACE WITH
OTHER ONGOING PROJECTS SEE THE
PHASING PLANS.
NOTES:
SITE ACCESS PLAN
LEGEND:
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I L E
N
A M
E
U s h a r e d b i m c i v i l d c i v i l
O n s i t e
L a n d
U s e
A l t e r n a t i v e s L a n d
U s e
A l t e r n a t i v e s S i t e
A c c e s s
P l a n d w g
Y O
U T
M
E
R
S
I T
E
A
C C
E S
S
P
L
P
O
T T
E D
M o n d a y
N o v e m b e r p m
S E
R m c a r a m a g n o
D E
P A
R T
M E
O
F
T
H
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
M
I D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
P
U L
T I M
I S
S I O
N
D
R Y
C
K
LBT / LBL
EJA
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
R-100
S I T
E
A
C C
E S
S
P
L A
N
12823994
MAIN GATE
GATE 2
B
E
R
B
E
R
HENDERSON POINT
PRISON SITE
BUILDING 191
PRISON ANNEX
MAIN SITE ACCESS ROUTE
CIA FENCE
PASS OFFICE
TRUCK INSPECTION AREA
PUBLIC WORKS MAIN OFFICE
BRIDGE 1
KITTERY
BRIDGE 2
GATE 2 ACCESS ROUTE
CIA FENCE
B
E
R
A
M E
N D
M E
V
G
D
E
R
C
A
N
N
E
L
P
IS
C A
T A
Q U
A
R
IV
E R
P
I
S
C
A
T
A
Q
V
E
R
100 YEAR FLOOD ZONE
ARCHAEOLOGICAL SENSITIVITY
HISTORIC FACILITY
LAND USE LEGEND
HIGH ARCHAEOLOGICAL SENSITIVITY
LAND USE CONTROLS - INSTALLATION RESTORATION (IR)
PROGRAM SITE
GENERAL NOTES:
1. SOILS LOCATED WITHIN THE INSTALLATION
RESTORATION AREA(IR) ARE CLASSIFIED AS ZONE 1
SOILS.
2. 100 YEAR FLOOD LINE BASED ON CURRENT FEMA
MAPPING 1986.
3. SOIL DISTURBING WORK WITHIN ARCHAEOLOGICALLY
SENSITIVE AREAS SHOULD BE AVOIDED TO THE
MAXIMUM EXTENT PRACTICABLE.
4. HIGH ARCHAEOLOGICALLY SENSITIVE AREA. SOIL
DISTURBANCE IN THIS AREA WILL REQUIRE MITIGATION
MEASURES, REFER TO SPECIFICATION SECTION 01 44
01.22.
5. ARCHAEOLOGICAL MONITORING MUST BE PROVIDED
DURING ANY SOIL DISTURBANCE IN THE
ARCHAEOLOGICALLY SENSITIVE AREAS. MONITORING
MUST BE COMPLETED IN ACCORDANCE WITH
SPECIFICATION SECTION 01 44 00.22.
SITE LOCUS
LIMIT OF WORK
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
F I
M
E
U s h a r e d b i m c i v i l d c i v i l
O n s i t e
L a n d
U s e
A l t e r n a t i v e s H e n d e r s o n
P o i n t L a n d u s e d
Y O
M
E
R
L A
A
N
H
E N
D E
R S
I
O
T T
E D
M o n d a y
N o v e m b e r
E
R m c a r a m a g n o
D E
P A
R T
M E
T
V
Y
EPROJECT NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
SEAL
OF
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
D
A
T L
A N
T I C
DRAWFORM REVISION: 07 AUG 2018
CHECK GRAPHIC SCALE BEFORE USING
P
M
U L T
I M
I S
S I O
N
D
Y
C
K
LBT / LBL
EJA
GRAPHIC SCALE
NBJ
DSN
1604959
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM / DM
BRANCH MANAGER
CHIEF ENG / ARCH
FIRE PROTECTION
DRWDES CHK
CONSTR. CONTR. NO.
SCALE:
A / E INFO
C A
P I T
A L
I M
P R
O V
E M
E N
T
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
I R
G I N
I A
P O
R T
S M
O U
V
I P
Y A
R D
K I T
T E
R Y
M
A I N
E
AS SHOWN
SBF MJC ASM
RICHARD POWERS,
C980 10/15/20
F I
M
E
U s h a r e d b i m c i v i l d c i v i l
O n s i t e
L a n d
U s e
A l t e r n a t i v e s H e n d e r s o n
P o i n t L a n d u s e d
Y O
M
E
R
L A
A
N
H
E N
D E
R S
I
O
T T
E D
M o n d a y
N o v e m b e r
E
R m c a r a m a g n o
N
W
S
T
N
A D
1" = 50'
50' 0 50' 100'
12823998
H E
N D
E R
S O
N
P
O I N
T
L
A N
D
U
S
T R
I C
T I O
N
A
R
T H
A V
A I L
A B
I L
I T
Y
P
L A
N
HENDERSON
POINT SITE
R-104
B
E
R
A
V
A
I
L
A
B
C
T
O
B
B
E
R
A
V
A
I
L
A
B
W
A
R
D
KEYNOTES:
BERTH 7B IS AVAILABLE FOR P381 CONTRACTOR USE
UPON CONTRACT AWARD AND THROUGHOUT
CONSTRUCTION. CONTRACTOR WILL HAVE 275FT OF
LANDSIDE ACCESS ALONG BERTH 7B AVAILABLE FOR
USE. REFER TO SHEET R-107
BERTH 7A MUST REMAIN ACCESSIBLE FOR
CONTINUOUS USE BY THE SHIPYARD AND COAST
GUARD THROUGH SEPTEMBER 30, 2022. BERTH 7B
WILL BE AVAILABLE FOR P381 CONTRACTOR ACCESS
STARTING OCTOBER 1, 2022. LANDSIDE ACCESS IS
NOT INCLUDED.
A
M E
N D
M E
V
G
| R-100 SITE ACCESS PLAN |
| Sheets and Views |
| R-100 SITE ACCESS PLAN |
| R-104 LAND USE PLAN - HENDERSON POINT |
| Sheets and Views |
| R-104 LAND USE PLAN - HENDERSON POINT |
| 2020-12-07T13:15:36-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:15:59-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:16:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:16:47-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .