Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
Open Solicitation Posted
- Solicitation number
- 6973GH-26-R-00082
- Agency
-
Franchise Acquisition Servies
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Oklahoma City, Oklahoma 73145, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration's Facilities & Aviation Safety Acquisition office (AAQ-730) seeks mechanical and electrical upgrades to the Headquarters Building at the Mike Monroney Aeronautical Center under Solicitation 6973GH-26-R-00082, with key personnel volumes due by 5:00 p.m. Central Time on December 4, 2026. The Set Aside line reads No Set-Aside Used. The NAICS code is 236220 and the PSC is Y1AA.
Work is performed at Tinker Air Force Base, Oklahoma 73145. The single fixed-price construction contract covers HVAC, electrical, lighting controls, fire alarm, and ERRCS work, plus concrete slab demolition and window replacement. Base line item 0001 carries six optional items, and the government may exercise none, some, or all of them at established prices. Performance runs 887 calendar days from Notice to Proceed. The building will not be fully vacated, and the contractor must maintain service to the Cafe, conference room 148A/B, Stem Lab 102, telecom room BC04B, and room 338, a mission-critical SCIF requiring security escort. Work hours are 6:00 a.m. to 6:00 p.m. on normal government workdays, with after-hours work permitted on seven days' advance notice. Johnson Controls must perform modifications to existing fire alarm and HVAC control systems. The government performs asbestos abatement from February 11 to March 10, 2027, before contractor mobilization.
Key personnel are a Construction Project Manager and a Construction Superintendent. Each requires a minimum of seven years in that role on multi-discipline projects of similar scope and complexity, plus at least two such projects completed within the past seven years. Both must be employed by the offeror at proposal submission. Documentation uses Attachment 17, limited to 25 pages, and key personnel are rated Technical Acceptable or Unacceptable under Provision L.12. Price is evaluated in Volume IV. Past performance and relevant experience are evaluated for General Contractors, mechanical subcontractors, and electrical subcontractors under Provision M.3. Teaming agreements are mandatory for subcontractors exceeding $750,000. Offerors must provide performance and payment bonds and an offer guarantee, and the major MEP equipment must comply with the Buy American Act.
Attachment 14 totals the base proposal at $22.1 million, split between $11.7 million in FAA F18 funding and $10.4 million in OCAT Sr. Lien funds, and the six optional items total $8.7 million. OCAT is the building's partial funding partner.
Amendment 0008, posted November 25, 2026, replaces Provision L.4 with L.12 and requires new Volume II key personnel submissions by December 4, 2026. Revised Volume IV cost/price submissions, including Attachment 1 Section B and Attachment 14 regardless of cost changes, are due by 5:00 p.m. Central Time on December 18, 2026. These dates follow the June 10, 2026 proposal receipt date set by Amendment 0007. Addendum 03 adds hydronic testing to air terminal units and indoor custom air handling units. Contracting Officer Cynthia L. Cooper is reachable at 405-954-2601.
Notice text
8 versions
Update #8 · Latest ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos.
Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached. In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL.
Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026.
Amendment 0006 is hereby issued to provide Questions and Answers 1 through 192, including new Questions and Answers 166 through 192. The proposal due date remains June 10, 2026.
Amendment 0007 is hereby issued to incorporate Addendum 03, HQB Mechanical and Electrical Upgrades – SIR - 6973GH-26-R-00082, dated June 5, 2026.
Amendment 0008 is hereby issued to revise Provision L.3 INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF PROPOSALS, add new Provision L.12 TECHNICAL ACCEPTABLE/UNACCEPTABLE EVALUATION OF KEY PERSONNEL and request revised Cost Price Proposals. NOTE: New Volume II Technical Proposals are due on December 4, 2026 and Revise Cost/Price Proposals are due on December 18, 2026.
Update #7 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos.
Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached. In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL.
Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026.
Amendment 0006 is hereby issued to provide Questions and Answers 1 through 192, including new Questions and Answers 166 through 192. The proposal due date remains June 10, 2026.
Amendment 0007 is hereby issued to incorporate Addendum 03, HQB Mechanical and Electrical Upgrades – SIR - 6973GH-26-R-00082, dated June 5, 2026.
Update #6 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos.
Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached. In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL.
Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026.
Amendment 0006 is hereby issued to provide Questions and Answers 1 through 192, including new Questions and Answers 166 through 192. The proposal due date remains June 10, 2026.
Update #5 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos.
Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached. In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL.
Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026.
Update #4 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos.
Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached. In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026. NOTE: OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL.
Update #3 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).
Update #2 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.
Update #1 ·
SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors
Files
Show all 40
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK. | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Electrical Construction Services IDIQ - MMAC | Franchise Acquisition Servies | Total Small Business | |
| Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK | Franchise Acquisition Servies | No set-aside | |
| General Construction Services IDIQ - MMAC | Franchise Acquisition Servies | Total Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| WWYK250063 - install react VII facility, B9001, post V19 | Air Force Sustainment Center | Woman-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity