L.12 TECHNICAL ACCEPTABLE - UNACCEPTABLE EVALUATION OF KEY PERSONNEL.pdf

PDF 77 KB Posted

Attached to
Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
Solicitation number
6973GH-26-R-00082
Issued by

About this file

This document is a Technical Acceptable/Unacceptable Evaluation Provision (L.12) for key personnel qualifications on an FAA construction project, revised November 24, 2026.

Offerors must demonstrate that their proposed Construction Project Manager and Construction Superintendent meet specific minimum qualifications. The Construction Project Manager must have a minimum of seven years of experience serving in that role on multi-discipline construction projects of similar scope and complexity, and must have managed or supervised at least two multi-discipline construction projects of similar scope and complexity completed within the past seven years. The Construction Superintendent must similarly have a minimum of seven years of experience serving as Construction Superintendent on multi-discipline construction projects of similar scope and complexity, with experience on at least two multi-discipline construction projects completed within the past seven years. Both positions must be employed by the offeror at the time of proposal submission, though past project experience does not need to have been completed while employed by the current offeror. Offerors must submit documentation demonstrating compliance using SIR Attachment 17, Resume of Key Personnel, with a maximum of 25 pages permitted. The evaluation caution notes that the FAA may use other sources of information to verify key personnel experience and will provide offerors opportunity to rebut negative findings, though offerors bear the burden of providing thorough and complete past performance documentation.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
Amendment 0008 Attachment 1 Section B.xlsx XLSX spreadsheet
Attachment 17 Resume for Key Personnel.pdf PDF
Amendment 0008 Attachment 14 Major Cost Element Breakdown.xlsx XLSX spreadsheet
Amendment 0007.pdf PDF
Addendum 03.pdf PDF
Amendment 0006.pdf PDF
Updated QA Log 6-5-26.pdf PDF
Amendment 0005.pdf PDF
Solicitation Offeror and Award Construction.pdf PDF
Amendment 0004.pdf PDF
Questions Answer Log 6-2-26.pdf PDF
Amendment 0003 Attachment 2 - Addendum 02 COMPLETE.pdf PDF
Amendment 0003 Attachment 3 - Asbestos Abatement Information.pdf PDF
Amendment 0003 Attachment 1 - QA Log.pdf PDF
Amendment 0003 Attachment 4 - HQB Furniture Information.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 Attachment 5 - HQB Requested Photos.pdf PDF
Amendment 0002.pdf PDF
HQ BUILDING MECHANICAL AND ELECTRICAL UPGRADES SITE VISIT SIGN IN.pdf PDF
Addendum 01 Full Document.pdf PDF
Amendment 0001 with Updated Clauses.pdf PDF
Attachment 5 Chapter 33 Construction Safety.pdf PDF
Attachment 16 OCAT 00310 Anti Non-Collusion Affidavit.pdf PDF
Attachment 15 OCAT 00320 Business Relationship Affidavit _002_.pdf PDF
Attachment 7 Payment Bond.pdf PDF
Attachment 9 Operational Control Docs.pdf PDF
Attachment 11 Past Performance Survey.docx DOCX document
Attachment 12 Client Authorization Letter.pdf PDF
ATTACHMENT 3 2025.02.20_FAA_HQB MEP UPGRADES_100 CD_PROJECT MANUAL.pdf PDF
Attachment 8 Performance Bond.pdf PDF
Attachment 14 Major Cost Element Breakdown.xlsx XLSX spreadsheet
6973GH-26-R-00082.pdf PDF
Attachment 10 Past Performance Experience Form.docx DOCX document
ATTACHMENT 2 HQB MEP UPGRADES_100 CD_DESIGN ANALYSIS.pdf PDF
ATTACHMENT 6 WAGE DETERMINATION.pdf PDF
Attachment 13 Contractor Release.pdf PDF
Attachment 1 Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
ATTACHMENT 4 FAA_HQB MEP UPGRADES_100 CD_DRAWINGS (1).pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L.12 TECHNICAL ACCEPTABLE/UNACCEPTABLE EVALUATION OF KEY PERSONNEL

(REVISED NOV 24, 2026)

Offerors must complete and provide documentation to demonstrate that the proposed Construction Project Manager and the Construction Superintendent that will be employed on this project meet the following qualifications and experience as identified in the following table:

Construction Project Manager

-Must have a minimum of seven (7) years of experience in serving as Construction Project Manager on multi-discipline construction projects of similar scope and complexity

-Must have a minimum of managing or supervising at least two (2) multi-discipline construction projects completed within the past 7 years of similar scope and complexity

- Must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror

Construction Superintendent

-Must have a minimum of seven (7) years of experience in serving as a Construction Superintendent on multi-discipline construction projects of similar scope and complexity -Must have experience serving as a Construction Superintendent of at least two (2) multi-discipline construction projects completed within the past 7 years of similar scope and magnitude

- Must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror

Offerors are required to complete and submit their documentation to demonstrate how Construction Project Manager and Construction Superintendent key personnel meet these requirements by completing SIR Attachment 17, Resume of Key Personnel. Offerors are allowed but are not required to provide a maximum of 25 pages, consistent with the information provided in Provision L.3 INSTRUCTIONS FOR PREPARATION AND SUBMISSION OF PROPOSALS, to complete SIR attachment 17, Resume of Key Personnel.

CAUTION: Offerors are cautioned that the FAA may use other sources of information in evaluating experience of key personnel. Offerors will be given an opportunity to rebut information considered negative and relevant to the evaluation. While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror.

File details come from the government source that posted it. Updated .