This is Addendum No. 3 to a federal contract solicitation (SIR 6973GH-26-R-00082) dated June 5, 2026, for HQB Mechanical and Electrical Upgrades. The addendum modifies specifications across four mechanical and electrical categories. For hydronic piping (Specification 232113), contractors must implement a system drain and refill procedure that includes scheduling outages with the AMP-400 project manager, cleaning and flushing the hydronic piping system, removing and replacing all strainers mesh, and refilling with chemical treatment coordinated through the project manager. Hydronic testing requirements are added to both Air Terminal Units (Specification 233600) and Indoor Custom Air Handling Units (Specification 237313.16), mandating hydrostatic testing at 1.5 times design pressure (minimum 100 psi) for 15 minutes in accordance with the 2018 International Mechanical Code Section 1208.1.

The addendum also includes architectural and environmental modifications: the Seismic Design Category on sheet AS101 is revised from Category C to Category B, and the Equipment and Piping Support Tables (Seismic Restraint Detail) on sheet M503 are omitted from the plans. Additionally, the addendum clarifies asbestos abatement and carpet removal procedures per Addendum 2, specifying that blue-shaded areas indicating asbestos presence shall not be disturbed and shall not have carpet demolished, while non-ACM areas on sheets AD107, AD108, AD110, and AD111 shall have carpet removed and replaced as indicated in the plans.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Updated QA Log 6-5-26.pdf PDF
Amendment 0005.pdf PDF
Solicitation Offeror and Award Construction.pdf PDF
Questions Answer Log 6-2-26.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003 Attachment 2 - Addendum 02 COMPLETE.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 Attachment 4 - HQB Furniture Information.pdf PDF
Amendment 0003 Attachment 1 - QA Log.pdf PDF
Amendment 0003 Attachment 5 - HQB Requested Photos.pdf PDF
Amendment 0003 Attachment 3 - Asbestos Abatement Information.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 with Updated Clauses.pdf PDF
Addendum 01 Full Document.pdf PDF
HQ BUILDING MECHANICAL AND ELECTRICAL UPGRADES SITE VISIT SIGN IN.pdf PDF
Attachment 15 OCAT 00320 Business Relationship Affidavit _002_.pdf PDF
Attachment 9 Operational Control Docs.pdf PDF
ATTACHMENT 3 2025.02.20_FAA_HQB MEP UPGRADES_100 CD_PROJECT MANUAL.pdf PDF
Attachment 14 Major Cost Element Breakdown.xlsx XLSX spreadsheet
Attachment 10 Past Performance Experience Form.docx DOCX document
Attachment 8 Performance Bond.pdf PDF
Attachment 7 Payment Bond.pdf PDF
Attachment 5 Chapter 33 Construction Safety.pdf PDF
6973GH-26-R-00082.pdf PDF
Attachment 16 OCAT 00310 Anti Non-Collusion Affidavit.pdf PDF
Attachment 12 Client Authorization Letter.pdf PDF
Attachment 11 Past Performance Survey.docx DOCX document
Attachment 13 Contractor Release.pdf PDF
ATTACHMENT 6 WAGE DETERMINATION.pdf PDF
ATTACHMENT 4 FAA_HQB MEP UPGRADES_100 CD_DRAWINGS (1).pdf PDF
ATTACHMENT 2 HQB MEP UPGRADES_100 CD_DESIGN ANALYSIS.pdf PDF
Attachment 1 Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 3 HQB Mechanical and Electrical Upgrades – SIR - 6973GH-26-R-00082 6/5/2026

1) Add the following to specification 232113 Hydronic Piping.

3.8 SYSTEM DRAIN AND REFILL

A. Prior to removal and installation of hydronic components, drain the system.

Schedule outage with AMP-400 project manager.

B. Clean and flush the system the hydronic piping system for removal of debris.

C. Remove all strainers mesh in the system (all existing to remain and new equipment), clean and replace.

D. Refill the system. Contact AMP-400 project manager for providing chemical treatment.

2) Add the following to specification 233600 Air Terminal Units.

3.9 Hydronic Testing

A. Provide hydronic testing in accordance with 2018 International Mechanical Code 1208.1. Hydronic piping and coils added to the heating water system shall be hydrostatically tested at 1.5 times design pressure but not less than 100 psi. Test duration shall be 15 minutes.

3) Add the following to specification 237313.16 Indoor Custom Air Handling Units.

3.9 Hydronic Testing

A. Provide hydronic testing in accordance with 2018 International Mechanical Code 1208.1. Hydronic piping and coils added to the heating water and chilled water system shall be hydrostatically tested at 1.5 times design pressure but not less than 100 psi. Test duration shall be 15 minutes.

4) For Seismic Design Category on sheet AS101, Revise Seismic Design Category from C to B. On sheet M503, Omit 4/M503 Equipment and Piping Support Tables (Seismic Restraint Detail) from the plans.

5) Per Addendum 2 “Asbestos Abatement Information” All blue shaded areas indicated presence of asbestos which will not be disturbed. Sheets AD107, AD108, AD110 and AD111 indicate areas where carpet will be removed. Areas shaded blue in the Asbestos Abatement Information plan previously provided shall not have carpet demolished as these areas will not be abated. Carpet tile in areas shown abated will already have existing carpet and ACM (asbestos containing material) abated

Addendum No. 3 HQB Mechanical and Electrical Upgrades – SIR - 6973GH-26-R-00082 6/5/2026 from the spaces. All other spaces indicated which do not have ACM will require carpet removal and installation as indicated in the plans.