Amendment 0003 Attachment 2 - Addendum 02 COMPLETE.pdf
PDF 4 MB Posted
- Solicitation number
- 6973GH-26-R-00082
About this file
This file is an Addendum (Addendum 02, dated May 21, 2026) to the original bidding documents for a federal construction contract related to mechanical and electrical upgrades at the FAA Mike Monroney Aeronautical Center (MMAC) Headquarters Building in Oklahoma City.
The addendum modifies the original bidding documents dated February 20, 2025, and consists of one revised specification section and eleven modified drawing sheets. The primary change involves Specification Section 017419 (Construction Waste Management and Disposal), which was entirely revised to eliminate project phasing per client request. Key waste management requirements include establishing a program to minimize waste generation and divert at least 55 percent by weight of total non-hazardous solid waste from landfills and incinerators. The contractor must submit a Waste Management Plan within 15 days of contract award, provide monthly Waste Reduction Progress Reports by the 15th of each month, and submit calculated end-of-project waste diversion rates before requesting Substantial Completion. The specification covers salvaging, recycling, and disposal procedures for demolition and construction waste, including specific material categories. Additionally, the addendum modifies ten mechanical HVAC plan drawings (sheets MH101A, MH101B, MH102A, MH102B, MH103A, MH103B, M-501, M-701, M-702, M-703, and M-705) to clarify valve types used in heating and cooling water piping systems, add VAV box size schedule columns, and modify schedule notes related to valve specifications. Bidders must acknowledge receipt of this addendum on the Bid Form to avoid disqualification.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 02
May 21, 2026
NOTICE TO BIDDERS
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated February 20, 2025, Addendum Number 02 dated May 21, 2026. Items not specifically revised remain in effect.
Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the
Bidder to disqualification.
This Addendum consists of seventeen (17) pages. See attached (1) Specification Section and (11) Drawing Sheet.
REFERENCE THE SPECIFICATIONS
ITEM 1-1 SPECIFICATION SECTION 017419 – CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
The attached Specification Section, dated May 21, 2026, is hereby revised to reflect the project modification eliminating project phasing per client request. Entire specification section has been revised, Client provided.
REFERENCE THE DRAWINGS
ITEM 1-2 DRAWING SHEET MH101A – MECHANICAL HVAC PLAN – FIRST FLOOR – SECTOR A
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the clarification of valve type used in heating and cooling water piping.
DRAWING SHEET MH101B – MECHANICAL HVAC PLAN – FIRST FLOOR – SECTOR B
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the change of valve type used in heating and cooling water piping.
DRAWING SHEET MH102A – MECHANICAL HVAC PLAN – SECOND FLOOR – SECTOR A
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the change of valve type used in heating and cooling water piping.
DRAWING SHEET MH102B – MECHANICAL HVAC PLAN – SECOND FLOOR – SECTOR B
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the change of valve type used in heating and cooling water piping.
DRAWING SHEET MH103A – MECHANICAL HVAC PLAN – THIRD FLOOR – SECTOR A
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the change of valve type used in heating and cooling water piping.
DRAWING SHEET MH103B – MECHANICAL HVAC PLAN – THIRD FLOOR – SECTOR B
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the change of valve type used in heating and cooling water piping.
DRAWING SHEET M-501 – MECHANICAL DETAILS
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the clarification in valve type and position in the system of the valves used in heating and cooling water piping.
FAA MIKE MONRONEY AERONAUTICAL CENTER
MECHANICAL AND ELECTRICAL UPGRADES –
HEADQUARTERS BUILDING
Project Number: 2021-675-00
FRANKFURT-SHORT-BRUZA ASSOCIATES, P.C.
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118
6973GH-26-R-00081 HQB Mechanical and Electrical Upgrades
AMENDMENT 0003,ATTACHMENT 2
DRAWING SHEET M-701 – MECHANICAL SCHEDULES
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the addition of a schedule column to clarify the size of VAV boxes as well as modified schedule notes to clarify valve type used in piping to the VAVs.
DRAWING SHEET M-702 – MECHANICAL SCHEDULES
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect the addition of a schedule column to clarify the size of VAV boxes as well as modified schedule notes to clarify valve type used in piping to the VAVs.
DRAWING SHEET M-703 – MECHANICAL SCHEDULES
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect clarification in schedule notes and valve type used in piping to the VAVs.
DRAWING SHEET M-705 – MECHANICAL SCHEDULES
The attached Drawing Sheet indicated and dated May 21, 2026 is hereby modified to reflect clarification in schedule notes and notes pertaining to scheduled valves.
END OF ADDENDUM
FSB
| DefineDesignDeliver
Technical Specification
01 7419 - 1 CONST. WASTE MGMT. & DISP.
11/13/2024
SECTION 01 7419
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 - GENERAL
1.01 SUMMARY
A. Section includes administrative and procedural requirements for the following:
1. Salvaging nonhazardous demolition and construction waste.
2. Recycling nonhazardous demolition and construction waste.
3. Recycling demolition and construction universal waste.
4. Disposing of nonhazardous demolition and construction waste.
B. Related Sections:
1. Section 01 5000 Temporary Construction Facilities and Controls
2. Section 015723 Stormwater Pollution Prevention
3. Section 02 4100 Demolition.
4. Section 04 2000 Unit Masonry.
5. Section 31 2000 Earth Moving
C. Related Documents: Refer to the FAA Construction Waste Management Requirements for Contracts (AMS Clause 3.6.3-22 Dated October 2024)
1.02 DEFINITIONS
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.
C. Universal Waste: As regulated in Title 40 of the Code of Federal Regulations (CFR) in Part 273, includes batteries, pesticides, mercury-containing equipment, lamps, and aerosol cans.
D. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
E. Mike Monroney Aeronautical Center (MMAC) – FAA Facility
F. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
G. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
H. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.
1.03 PERFORMANCE REQUIREMENTS
A. In performance of this contract, the Contractor must establish a program to minimize waste generation, as well as recycle, reuse, and salvage construction and demolition (C&D) debris generated to the maximum extent possible. The Contractor must divert at least 55 percent weight of the total non-hazardous solid waste generated by the work from landfills and incinerators.
Addendum 02 - 05/21/20266973GH-26-R-00081 HQB Mechanical and Electrical Upgrades
01 7419 - 2 CONST. WASTE MGMT. & DISP.
B. Practice efficient waste management in the use of materials in the course of the Work.
Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials, including the following:
1. Demolition Waste:
• Concrete
• Brick
• Carpet
• Ceiling Tiles
• Metal structural elements
• Asphalt
• Soil
• Equipment
• Metal Ductwork
• Metal Piping
• Electrical conduit
• Copper wiring
• Switchgear and panelboards
• Transformers
• Universal Waste
• Wood / Pallets
2. Construction Waste:
• Metal scraps
• Packaging: Regardless of salvage/recycle goal indicated in “General” Paragraph above, salvage or recycle 100 percent of the following uncontaminated packaging materials:
• Paper
• Cardboard
• Boxes
• Plastic sheet and film
• Polystyrene packaging
• Wood crates / Pallets
• Plastic pails
1.04 ACTION SUBMITTALS
A. Waste Management Plan: Submit plan within 15 days after contract award / Notice to Proceed (NTP) prior to the start of construction activities. The plan must be found acceptable by the Contracting Officer's Representative (COR) or the COR's designated representative prior to the Contractor starting work.
B. Surplus Soil Analysis: Submit surplus soil analysis within 10 days of receiving results.
The analysis must meet EPA requirements for the disposal specified. If results are not approved for the disposal specified, a modification to the contract will be required.
1.05 INFORMATIONAL SUBMITTALS
A. Waste Reduction Progress Reports: Submit report by the 15th day of each month.
Include the following monthly information for all construction and demolition (C&D) waste:
1. FAA facility name and address, report date and reporting period, contract number and project name.
2. Date waste is removed from the facility.
3. Material Category
4. Generation-point of waste
01 7419 - 3 CONST. WASTE MGMT. & DISP.
5. Total quantity of waste in tons (including disposed, salvaged, recycled & reused)
6. The quantity of waste disposed in tons, method of waste material disposal, and reason why waste was not diverted.
7. Quantity of waste salvaged, both estimated and actual in tons
8. Quantity of waste recycled, both estimated and actual in tons
9. Quantity of waste reused, both estimated and actual in tons
10. Total quantity of waste recovered (salvaged plus recycled) in tons.
11. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.
B. Waste Reduction Calculations: Before request for Substantial Completion, submit calculated end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.
C. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.
D. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.
E. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
F. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
G. Qualification Data: For waste management coordinator.
1.06 QUALITY ASSURANCE
A. Project Pre-Construction Meeting: Coordinate Waste Management Plan submittal and monthly reporting requirements.
1.07 WASTE MANAGEMENT PLAN
A. General: Develop a waste management plan. Provide an overall strategy for managing C&D debris associated with the project. Plan shall consist of waste identification, waste reduction work plan, handling and transportation procedures and cost/revenue analysis.
B. Waste Identification: Indicate anticipated types and quantities of demolition, site clearing, and construction waste generated by the Work. Include estimated quantities by weight and assumptions for estimates.
C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, reused or disposed of in landfill or incinerator. Include points of waste generation, estimated total weight of each type of waste, final disposition for each waste type, and handling and transportation procedures.
1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project (including relocating soil elsewhere on FAA property), describe methods for preparing salvaged materials before incorporation into the Work.
2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.
3. Salvaged Materials for Donation: For materials that will be donated to individuals
01 7419 - 4 CONST. WASTE MGMT. & DISP.
and organizations, include list of their names, addresses, and telephone numbers.
4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.
6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location where materials separation will be performed.
PART 2 – PRODUCTS – Not Used
PART 3 – EXECUTION
3.01 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan.
C. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site.
1. Distribute waste management plan to everyone concerned within three days of submittal return.
2. Distribute waste management plan to entities when they first begin work on-site.
Review plan procedures and locations established for salvage, recycling, and disposal.
D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.
2. Comply with Section 015000 "Temporary Facilities and Controls" for controlling dust and dirt, environmental protection, and noise control.
3. Comply with Section 015723 “Stormwater Pollution Prevention” for controlling stormwater run-off.
3.02 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until installation.
4. Protect items from damage during transport and storage.
5. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.
01 7419 - 5 CONST. WASTE MGMT. & DISP.
B. Salvaged Items for Owner's Use:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
3.03 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL
A. General: Recycle paper and beverage containers used by on-site workers.
B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall accrue to Owner.
C. Procedures: Separate recyclable waste from other waste materials, trash, and debris.
Separate recyclable waste by type at Project site to the maximum extent practical.
1. Provide appropriately marked containers or bins for controlling recyclable waste until they are removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.
a. Inspect containers and bins for contamination and remove contaminated materials if found.
2. Stockpile processed materials on-site without intermixing with other materials.
Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
3. Stockpile materials away from construction area. Do not store within drip line of remaining trees or structures.
4. Store components off the ground and protect from the weather.
5. Remove recyclable waste from Owner's property and transport to recycling receiver or processor.
3.04 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn waste materials.
C. Disposal: Remove waste materials from Owner's property and legally dispose of them.
3.05 SURPLUS SOIL:
A. Soil Sampling and Testing: All soil must be sampled and tested prior to disposal or relocation on the MMAC. If designated elsewhere in the contract documents, the contractor will be responsible for sampling and testing the soil.
1. If contract documents indicate that soil will be tested by the contractor:
a. The contractor shall collect one (1) composite sample (composed of five (5) to
01 7419 - 6 CONST. WASTE MGMT. & DISP.
seven (7) discrete subsamples) per 500 cubic yards of soil that will be removed from the construction site. Based on this, the contractor shall determine the number and frequency of samples that need to be collected from the soil excavations and generated stockpiles. The soil samples will be analyzed by USEPA SW-846 methods for TPH, VOCs, SVOCs, RCRA metals, PCBs, and Pesticides. In the unlikely event during excavation that a waste release is encountered, such as odor, etc., then VOC samples shall be collected as discrete, not composite, samples for analysis. Contractor shall assume up to ten (10) additional discrete VOC samples may be required.
b. Soil analysis must be submitted to and approved by the FAA prior to moving soil from the site.
B. Soil Reuse, Relocation or Disposal: The contract documents will specify what will be done with the surplus soil, based on our current understanding of the soil’s properties. If the soil analysis is not acceptable for the specified action a contract modification will be required.
1. Surplus Soil Removed for Sale or Reuse Off Owner’s Property: If designated elsewhere in the contract documents, the contractor will remove and transport the surplus soil from the MMAC and legally dispose of it. Removed soil will be sold or reused to meet waste diversion requirements.
2. Surplus Soil Relocated on the MMAC: If designated elsewhere in the contract documents, the contractor will transport the surplus soil to a designated area on the Owner’s property. The area will be designated prior to the start of construction.
a. The Contractor’s Oklahoma City Land Disturbance Permit, the Oklahoma
Department of Environmental Quality (ODEQ) General Permit (OKR-10), and the Storm Water Pollution Prevention Plan (SWPPP) must include the designated soil relocation area. Refer to Section 015723.
b. The Contractor is responsible for the installation and maintenance of erosion control devices at the designated soil relocation area. The Contractor is responsible for the repair and replacement of damaged erosion control devices at the designated soil disposal area.
c. No foreign / inorganic materials or rocks larger than 2 inches shall be mixed in with the relocated soil.
d. Spread soil 3” thick while maintaining the existing contours of the land. No soil will be relocated into wetland areas or stormwater run-off features.
3. Soil Disposal as Special Waste: If designated elsewhere in the contract documents, soil determined to be unsuitable for use as backfill shall be considered special waste.
The contractor will transport and legally dispose the unsuitable soil to a Non- Hazardous Industrial Waste (NHIW) Landfill located in Oklahoma County and certified by Oklahoma Department of Environmental Quality (ODEQ). The contractor will coordinate with the FAA to profile and manifest the waste for transport to the landfill. Contractor shall transport unsuitable soil in a lined container.
C. Remove waste materials, including trash and debris, from surplus soil to the extent practicable prior to removing surplus soil from the construction site. Recycle waste materials if possible. Otherwise, remove waste materials and legally dispose at a construction debris landfill.
END OF SECTION
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T T
T
T
T
T
T T T T
T
T
T TT
T
TT
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T T
T
T
T
T
T T
T T
T
T
T
C
E
F
G
K
M
P
W
Y
AA
AC
AD
232424a 23a25a2930 29a3234 3135363738394041424344
I
V
X
Xa
Z
AB
AE
AG
L
N
VAV#5-1-3
VAV#5-1-5
VAV#5-1-1
VAV#5-1-4
VAV#5-1-9
VAV#5-1-19
VAV#5-1-18
VAV#5-1-12
VAV#5-1-10
VAV#5-1-39
VAV#5-1-13
VAV#5-1-14
VAV#5-1-15
VAV#5-1-40
VAV#5-1-11
VAV#5-1-22 VAV#5-1-41
VAV#5-1-42
VAV#5-1-20
VAV#5-1-26
VA
V#
3- 1-
VAV#5-1-23
VAV#5-1-29
VAV#5-1-30
VAV#5-1-31
VA
V#
5- 1-
VA
V#
5- 1-
VA
V#
5- 1-
VA
V#
5- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VAV#4-1-5
VAV#4-1-10
VAV#4-1-4
VAV#4-1-9
VAV#4-1-6
VAV#4-1-3
VAV#4-1-7
FCU-REF.
VAV#5-1-7
VAV#5-1-8
VAV#5-1-6
VAV#5-1-17
VAV#5-1-16
VAV#5-1-21
VAV#5-1-27
VAV#5-1-28
VAV#5-1-33
VA
V#
3- 1-
VAV#5-1-24
VAV#5-1-32
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
5- 1-
VA
V#
4- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VA
V#
3- 1-
VAV#4-1-2
1 1 1 1 1 1 1 1 1 1 1 1 21 1
1 1 1 1 1
1 4
EXISTING
U.H. #4
EXISTING
U.H. #3
EXISTING
UNIT HEATER
3EXISTING
FAN COIL
UNIT
2 1
EVAP-1-1
EVAP-1-2
190D
190A 190B 190C 191
192B
192A
155A 155B
153Z
153C
153B
153A
176B 176A
184A
168B
192C
100S
100D
161 160
160A
149 150
100Q
100A
100C
100U
145E
148A
145A
100R
172A
149A
148B
100E
100F
100G
188A
100H
139 1 1/2" G
1 1/2" G
EXISTING GAS
SERVICE TO BUILDING
EXISTING
AIR
CURTAIN
14 14
3/4" CD
3/4" CD
AHU-1
AHU-1
15 10
CO2
CO2
VAV#5-1-2
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
SECTOR KEY PLAN
BA
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:5
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL HVAC PLAN - FIRST FLOORMECHANICAL HVAC PLAN - FIRST FLOOR
- SECTOR A- SECTOR A
KMSKMS
APCAPC
KMSKMS
MH101AMH101A
CLFCLF
MH101AMH101A
02/20/202502/20/2025
SCALE: 3/32" = 1'-0"
MECHANICAL HVAC PLAN - FIRST FLOOR - SECTOR A1
GENERAL NOTES SHEET KEYNOTES
8' 24'16'0
3/32" = 1'-0"
N
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
REFER TO GENERAL NOTE L. ON M-001 FOR SPECIFIC
PHASING REQUIREMENTS OF THE PROJECT.
REFER TO GENERAL NOTE M. ON M-001 FOR SPECIFIC
COOLING REQUIREMENTS OF THE PROJECT.
ALL MATERIALS WITHIN RETURN AIR PLENUM MUST
BE PLENUM RATED.
REUSE EXISTING DUCTWORK AND SUPPLY
DIFFUSERS. LED LIGHT FIXTURES WITH VENTING TO
BE USED FOR RETURN AIR PATHWAY TO PLENUM.
CONTRACTOR SHALL ENSURE ALL EQUIPMENT
CLEARANCES ARE MET FOR MAINTENANCE ACCESS
AND CLEAR AREAS PER NATIONAL ELECTRICAL
CODE. INSTALL PER MANUFACTURER INSTRUCTIONS
AND LOCAL AHJ.
CONTRACTOR TO FIELD VERIFY PREVIOUS EXACT
LOCATION OF THERMOSTAT AND REPLACE IN PLACE.
PROVIDE THERMALLY ISOLATED MOUNT IF LOCATING
ON AN EXTERIOR WALL.
INSULATE MINI-SPLIT CONDENSATE RETURN AND
CONDENSATE SUCTION LINES WITH PLENUM RATED
EPDM INSULATION.
SIZE AND INSTALL REFRIGERANT LINES IN
ACCORDANCE WITH MFR. RECOMMENDATIONS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVE FOR UNIT. FIELD
VERIFY PIPING CONFIGURATION FOR VALVE TYPE.
REPLACE VAV TERMINAL BOX. INSTALL TWO
ELECTRIC DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVES FOR UNIT. FIELD
VERIFY PIPING SIZE AND CONFIGURATION FOR
VALVE TYPE.
INSTALL NEW ELECTRIC DDC COMPATIBLE TWO-WAY
VALVE FOR UNIT. FIELD VERIFY PIPING
CONFIGURATION FOR VALVE.
VAV UNITS IN THIS AREA EXISTING TO REMAIN.
SURFACE MOUNT GAS PIPING LOW ALONG WALL TO
NEW GENERATOR LOCATION, 3,345 MBH DEMAND.
PHASE 2: MOUNT NEW INDOOR VRF MINI SPLIT UNIT
TO WALL ABOVE DOORWAY HEIGHT. INSTALL NEW
THERMOSTAT. WIRE TO NEW ASSOCIATED UNIT.
MOUNT ON WALL AT 48" A.F.F. ROUTE REFRIGERANT
LINES THROUGH RETURN AIR PLENUM AND CHASE
UP TO CORRESPONDING CONDENSER ON ROOF.
PHASE 2: ROUTE REFRIGERANT LINES UP TO FLOOR
ABOVE.
PHASE 2: ROUTE REFRIGERANT LINES TIGHT TO
BOTTOM CHORD OF STRUCTURE ABOVE CEILING.
APPROXIMATE LOCATION OF NEW EMERGENCY
POWER GENERATOR. COORDINATE WITH
ELECTRICAL.
PHASE 2: INSTALL NEW CONTROL DAMPER CLASS 1
AT 8 CFM/SF 4" W.G. IN BRANCH DUCTWORK SERVING
THIS FLOOR. THIS WORK SHALL BE EXECUTED
DURING PHASE 2 WHOLE-BUILDING SHUTDOWN.
CONNECT NEW 1-1/2" NATURAL GAS TO EXISTING
GAS SERVICE TO BUILDING. LOCATE CONNECTION
POINT DIRECTLY UPSTREAM OF BUILDING SERVICE
REGULATOR. INSTALL ON NEW LINE A SHUT OFF
VALVE WITH ADDITIONAL REGULATOR TO REDUCE
PRESSURE FROM TRANSMISSION LEVEL TO SUPPLY
3,345 CFH AT 2 PSI FOR NEW GENERATOR SERVICE.
MAINTAIN 2 PSI PRESSURE TO GENERATOR POINT OF
CONNECTION BEFORE REDUCING FURTHER FOR
USE. REFERENCE M-601 FOR GAS PIPE RISER
DIAGRAM.
ROUTE PIPE BELOW GRADE AND THROUGH
BASEMENT WALL ALONGSIDE EXISTING BUILDING
GAS LINE.
ROUTE PIPE THROUGH BASEMENT WALL AND
BELOW GRADE TO STUB UP NEXT TO NEW
GENERATOR CONNECTION LOCATION. REGULATE
GAS PRESSURE DOWN AND CONNECT TO
GENERATOR FOR USE ACCORDING TO EQUIPMENT
MANUFACTURER RECOMMENDATIONS. EXACT
LOCATION AND CONNECTION SIZE PER
MANUFACTURER RECOMMENDATIONS.
ROUTE INSULATED PUMPED CONDENSATE UP
ABOVE CEILING AND TRANSITION TO GRAVITY FLOW.
THEN ROUTE CONDENSATE ABOVE CEILING OVER TO
MOP SINK AND DOWN WALL. TERMINATE WITH AIR
GAP ABOVE THE FLOOD RIM LEVEL OF THE MOP SINK
BASIN.
DUCTWORK SHOWN FOR REFERENCE.
1 5/21/26 ADDENDUM 02
T T
T
T T
T
T T
T
T
T
T
T T
T
T
T
T
T
TTTT
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T T
T
T T
T
T
C
E
F
G
K
M
P
W
Y
AA
AC
AD
123457810121315161820 192324 1724a 20a23a
I
V
X
Xa
Z
AB
AE
12a
AG
L
N
VA
V#
3- 1-
VAV#2-1-2
VAV#2-1-3
VAV#2-1-1
VAV#2-1-4
VAV#2-1-5
VAV#2-1-8
VAV#2-1-9
VAV#2-1-10 VAV#2-1-55
VAV#2-1-12
VAV#2-1-11
VAV#2-1-14
VAV#2-1-13
VAV#2-1-15
VAV#2-1-17
VAV#2-1-18
VAV#2-1-54
VAV#2-1-19
VAV#2-1-20
VAV#2-1-56
VAV#2-1-58
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VA
V#
2- 1-
VAV#2-1-16
VAV#2-1-7
1 4 4
1 1 11 1 1 1 1 1 1 11 1 1
4 4 4 4 4 4 4 4 4 44 4 4 4 4
EXISTING
U.H. #1
EXISTING
U.H. #2
EVAP-5-1
100A
145A
100F 106
139A
110A
135A 134
100M
117B
117C
131B
131A
117A130A
120E120F
120G
120D 120H
120Z 120C
120B
120A
121 122
130AZ
128127B
127A
126D126B
126A
126C
100N
100B
100P
145B 145C
145G
145F
145H
145K
145L
145J
145D
145M145N
145P
145Q
145R
194 133
3/4" CD
AHU-1
AHU-1
AHU-1
CO2
CO2
CO2
NO WORK THIS AREA
VAV#2-1-57
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
SECTOR KEY PLAN
BA
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:0
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL HVAC PLAN - FIRST FLOORMECHANICAL HVAC PLAN - FIRST FLOOR
- SECTOR B- SECTOR B
KMSKMS
APCAPC
KMSKMS
MH101BMH101B
CLFCLF
MH101BMH101B
02/20/202502/20/2025
SCALE: 3/32" = 1'-0"
MECHANICAL HVAC PLAN - FIRST FLOOR - SECTOR-B1
GENERAL NOTES
SHEET KEYNOTES
8' 24'16'0
3/32" = 1'-0"
N
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
REFER TO GENERAL NOTE L. ON M-001 FOR SPECIFIC
PHASING REQUIREMENTS OF THE PROJECT.
REFER TO GENERAL NOTE M. ON M-001 FOR SPECIFIC
COOLING REQUIREMENTS OF THE PROJECT.
ALL MATERIALS WITHIN RETURN AIR PLENUM MUST
BE PLENUM RATED.
REUSE EXISTING DUCTWORK AND SUPPLY
DIFFUSERS. LED LIGHT FIXTURES WITH VENTING TO
BE USED FOR RETURN AIR PATHWAY TO PLENUM.
CONTRACTOR SHALL ENSURE ALL EQUIPMENT
CLEARANCES ARE MET FOR MAINTENANCE ACCESS
AND CLEAR AREAS PER NATIONAL ELECTRICAL
CODE. INSTALL PER MANUFACTURER INSTRUCTIONS
AND LOCAL AHJ.
CONTRACTOR TO FIELD VERIFY PREVIOUS EXACT
LOCATION OF THERMOSTAT AND REPLACE IN PLACE.
PROVIDE THERMALLY ISOLATED MOUNT IF LOCATING
ON AN EXTERIOR WALL.
INSULATE MINI-SPLIT CONDENSATE RETURN AND
CONDENSATE SUCTION LINEA WITH PLENUM RATED
EPDM INSULATION.
SIZE AND INSTALL REFRIGERANT LINES IN
ACCORDANCE WITH MFR. RECOMMENDATIONS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVE FOR UNIT. FIELD
VERIFY PIPING CONFIGURATION FOR VALVE TYPE.
REPLACE VAV TERMINAL BOX. INSTALL TWO
ELECTRIC DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVES FOR UNIT. FIELD
VERIFY PIPING SIZE AND CONFIGURATION FOR
VALVE TYPE.
INSTALL NEW ELECTRIC DDC COMPATIBLE TWO-WAY
VALVE FOR UNIT. FIELD VERIFY PIPING
CONFIGURATION FOR VALVE.
VAV UNITS IN THIS AREA EXISTING TO REMAIN.
PHASE 2: MOUNT NEW INDOOR VRF MINI SPLIT UNIT
TO WALL ABOVE DOORWAY. INSTALL NEW
THERMOSTAT. WIRE TO NEW ASSOCIATED UNIT.
MOUNT ON WALL AT 48" A.F.F. ROUTE REFRIGERANT
LINES THROUGH RETURN AIR PLENUM AND CHASE
UP TO CORRESPONDING CONDENSER ON ROOF.
PHASE 2: ROUTE REFRIGERANT LINES UP TO FLOOR
ABOVE.
PHASE 2: INSTALL NEW CONTROL DAMPER CLASS 1
AT 8 CFM/SF 4" W.G. IN BRANCH DUCTWORK SERVING
THIS FLOOR. THIS WORK SHALL BE EXECUTED
DURING PHASE 2 WHOLE-BUILDING SHUTDOWN.
DUCTWORK SHOWN FORR REFERENCE.
ROUTE INSULATED PUMPED CONDENSATE UP ABOVE
CEILING AND TRANSITION TO GRAVITY FLOW. THEN
ROUTE CONDENSATE ABOVE CEILING OVER TO MOP
SINK AND DOWN WALL. TERMINATE WITH AIR GAP
ABOVE THE FLOOD RIM LEVEL OF THE MOP SINK
BASIN.
1 5/21/26 ADDENDUM 02
T
T
T
T
T
T
T
T
T
T T
T T
T
T T
T T T
T T
T
T
T
T
T
T
T T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T T T T
T
T
T T
T
T
T
T T
T T
T
T T
T
T
T
T
T
C
E
G
K
M
P
W
Y
AA
AC
AD
232424a 23a25a2930 29a3234 3135363738394041424344
I
V
X
Xa
Z
AB
AE
AG
L
N
EXISTING UNIT
HEATER
VAV#5-2-1
VAV#5-2-3
VAV#5-2-5
VAV#5-2-6
VAV#5-2-7
VAV#5-2-8
VAV#5-2-9
VAV#5-2-37
VAV#5-2-15
VAV#5-2-20
VAV#5-2-21
VAV#5-2-26
VAV#5-2-27
VAV#5-2-24
VAV#5-2-17
VAV#5-2-12
VAV#5-2-14
VAV#5-2-11
VAV#5-2-29
VAV#5-2-31
VA
V#
3- 2-
VA
V#
5- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
5- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VAV#4-2-7
VAV#4-2-4
VAV#4-2-1
VAV#4-2-5
VAV#5-2-38
VAV#5-2-2
VAV#5-2-13
VAV#5-2-16
VAV#5-2-22
VAV#5-2-28
VAV#5-2-19
VAV#5-2-10
VAV#5-2-18
VAV#5-2-30
VA
V#
5- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
U.H.
#3
1 1 1 1 1 1 1 1 2 1
1 1 1 1 1 1 1
VAV#4-2-6 1
VAV#5-2-4
VAV#5-2-23
VAV#5-2-25
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
5- 2-
VAV#5-2-32
VA
V#
3- 2-
VAV#4-2-12
VAV#4-2-11
VAV#4-2-10
VAV#4-2-13
VAV#4-2-9
VAV#4-2-8
VAV#4-2-3
VAV#4-2-2
VAV#4-2-14
1 11 1 1
1 1
1 1
EVAP-3-2
6 6
268A
254 255
272K
272H
272F
272E
272C
272B
284A 289
291A
291B291C
200B
267 266
251G251F
251D
251L 251K
251E
251C
251B
251J 251H
251A
253A
200C
257A
260A
261B
261A261
205B
272G
272D
272A
200F
271A
205D
262A
252A
290A
263A
3/4" CD
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
SECTOR KEY PLAN
BA
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:0
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL HVAC PLAN - SECONDMECHANICAL HVAC PLAN - SECOND
FLOOR - SECTOR AFLOOR - SECTOR A
KMSKMS
APCAPC
KMSKMS
MH102AMH102A
CLFCLF
MH102AMH102A
02/20/202502/20/2025
SCALE: 3/32" = 1'-0"
MECHANICAL HVAC PLAN - SECOND FLOOR - SECTOR-A1
GENERAL NOTES
SHEET KEYNOTES
8' 24'16'0
3/32" = 1'-0"
N
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
REFER TO GENERAL NOTE L. ON M-001 FOR SPECIFIC
PHASING REQUIREMENTS OF THE PROJECT.
REFER TO GENERAL NOTE M. ON M-001 FOR SPECIFIC
COOLING REQUIREMENTS OF THE PROJECT.
ALL MATERIALS WITHIN RETURN AIR PLENUM MUST
BE PLENUM RATED.
REUSE EXISTING DUCTWORK AND SUPPLY
DIFFUSERS. LED LIGHT FIXTURES WITH VENTING TO
BE USED FOR RETURN AIR PATHWAY TO PLENUM.
CONTRACTOR SHALL ENSURE ALL EQUIPMENT
CLEARANCES ARE MET FOR MAINTENANCE ACCESS
AND CLEAR AREAS PER NATIONAL ELECTRICAL
CODE. INSTALL PER MANUFACTURER INSTRUCTIONS
AND LOCAL AHJ.
CONTRACTOR TO FIELD VERIFY PREVIOUS EXACT
LOCATION OF THERMOSTAT AND REPLACE IN PLACE.
PROVIDE THERMALLY ISOLATED MOUNT IF LOCATING
ON AN EXTERIOR WALL.
INSULATE MINI-SPLIT CONDENSATE RETURN AND
CONDENSATE SUCTION LINES WITH PLENUM RATED
EPDM INSULATION.
SIZE AND INSTALL REFRIGERANT LINES IN
ACCORDANCE WITH MFR. RECOMMENDATIONS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVE FOR UNIT. FIELD
VERIFY PIPING CONFIGURATION FOR VALVE TYPE.
REPLACE VAV TERMINAL BOX. INSTALL TWO
ELECTRIC DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVES FOR UNIT. FIELD
VERIFY PIPING SIZE AND CONFIGURATION FOR
VALVE TYPE.
INSTALL NEW ELECTRIC DDC COMPATIBLE TWO-WAY
VALVE FOR UNIT. FIELD VERIFY PIPING
CONFIGURATION FOR VALVE.
PHASE 2: ROUTE REFRIGERANT LINES UP TO FLOOR
ABOVE.
PHASE 2: ROUTE REFRIGERANT LINES TIGHT TO
BOTTOM CHORD OF STRUCTURE ABOVE CEILING.
PHASE 2: INSTALL NEW CONTROL DAMPER CLASS 1
AT 8 CFM/SF 4" W.G. IN BRANCH DUCTWORK SERVING
THIS FLOOR. THIS WORK SHALL BE EXECUTED
DURING PHASE 2 WHOLE-BUILDING SHUTDOWN. THIS
WORK SHALL BE EXECUTED DURING PHASE 2
WHOLE-BUILDING SHUTDOWN.
DUCTWORK SHOWN FOR REFERENCE
PHASE 2: MOUNT NEW INDOOR VRF MINI SPLIT UNIT
TO WALL ABOVE DOORWAY. INSTALL NEW
THERMOSTAT. WIRE TO NEW ASSOCIATED UNIT.
MOUNT ON WALL AT 48" A.F.F. ROUTE REFRIGERANT
LINES THROUGH RETURN AIR PLENUM AND CHASE
UP TO CORRESPONDING CONDENSER ON ROOF.
ROUTE INSULATED PUMPED CONDENSATE UP ABOVE
CEILING AND TRANSITION TO GRAVITY FLOW. THEN
ROUTE CONDENSATE ABOVE CEILING OVER TO MOP
SINK AND DOWN WALL. TERMINATE WITH AIR GAP
ABOVE THE FLOOD RIM LEVEL OF THE MOP SINK
BASIN.
1 5/21/26 ADDENDUM 02
T
T
T
T
T T
T
T T
T T
T
T
T T
T
T
T
T
T
T
T
T
T
T T
T
T T
T T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T T
T
T
T
T C
E
F
G
K
M
P
W
Y
AA
AC
AD
123457810121315161820 192324 1724a 20a23a
I
V
Xa
Z
AB
AE
12a
AG
L
N
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
3- 2-
VA
V#
3- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VAV#2-2-29
VAV#2-2-24
VAV#2-2-14
VAV#2-2-15
VAV#2-2-10
VAV#2-2-11
VAV#2-2-17
VAV#2-2-13
VAV#2-2-7
VAV#2-2-3
VAV#2-2-1
VAV#2-2-37
VAV#2-2-39
VAV#2-2-38
VAV#2-2-40
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V# 2-
2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VAV#2-2-34
VAV#2-2-26
VAV#2-2-25
VAV#2-2-22
VAV#2-2-21
VAV#2-2-18
VAV#2-2-16
VAV#2-2-5
VAV#2-2-4
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
11111
1 1 1 1 1 1 1 1
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VAV#2-2-47
VAV#2-2-33
VAV#2-2-36
VAV#2-2-32
VAV#2-2-23
VAV#2-2-12
VAV#2-2-8
VAV#2-2-19
VAV#2-2-20
VAV#2-2-28
VAV#2-2-6
VAV#2-2-2
VA
V#
2- 2-
VA
V#
2- 2-
VA
V#
2- 2-
VAV#2-2-35
VAV#2-2-31
VAV#2-2-9
VAV#2-2-27
VAV#2-2-30
1111111
2 1 1 1 1 1 1 1 1 1 1
1 4
EV
AP
-6 -2
205B 205C
200A
205D
240A247
205A
208B
208A206
210A
212209
216A 216B
220B
220A
227226
230231
246A
294 2376
3/4" CD
7 6
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
SECTOR KEY PLAN
BA
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:1
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL HVAC PLAN - SECONDMECHANICAL HVAC PLAN - SECOND
FLOOR - SECTOR BFLOOR - SECTOR B
KMSKMS
APCAPC
KMSKMS
MH102BMH102B
CLFCLF
MH102BMH102B
02/20/202502/20/2025
SCALE: 3/32" = 1'-0"
MECHANICAL HVAC PLAN - SECOND FLOOR - SECTOR-B1
GENERAL NOTES
SHEET KEYNOTES
8' 24'16'0
3/32" = 1'-0"
N
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
REFER TO GENERAL NOTE L. ON M-001 FOR SPECIFIC
PHASING REQUIREMENTS OF THE PROJECT.
REFER TO GENERAL NOTE M. ON M-001 FOR SPECIFIC
COOLING REQUIREMENTS OF THE PROJECT.
ALL MATERIALS WITHIN RETURN AIR PLENUM MUST
BE PLENUM RATED.
REUSE EXISTING DUCTWORK AND SUPPLY
DIFFUSERS. LED LIGHT FIXTURES WITH VENTING TO
BE USED FOR RETURN AIR PATHWAY TO PLENUM.
CONTRACTOR SHALL ENSURE ALL EQUIPMENT
CLEARANCES ARE MET FOR MAINTENANCE ACCESS
AND CLEAR AREAS PER NATIONAL ELECTRICAL
CODE. INSTALL PER MANUFACTURER INSTRUCTIONS
AND LOCAL AHJ.
CONTRACTOR TO FIELD VERIFY PREVIOUS EXACT
LOCATION OF THERMOSTAT AND REPLACE IN PLACE.
PROVIDE THERMALLY ISOLATED MOUNT IF LOCATING
ON AN EXTERIOR WALL.
INSULATE MINI-SPLIT CONDENSATE RETURN AND
CONDENSATE SUCTION LINES WITH PLENUM RATED
EPDM INSULATION.
SIZE AND INSTALL REFRIGERANT LINES IN
ACCORDANCE WITH MFR. RECOMMENDATIONS.
1.
2.
3.
4.
5.
6.
7.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE TWO-WAY MODULATING VALVE
WITH NEW AUTOMATIC BALANCING VALVE FOR UNIT.
FIELD VERIFY PIPING CONFIGURATION FOR VALVE
TYPE.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE THREE-WAY WATER VALVE FOR
UNIT. FIELD VERIFY PIPING SIZE AND
CONFIGURATION FOR VALVE TYPE.
ROUTE INSULATED PUMPED CONDENSATE UP ABOVE
CEILING AND TRANSITION TO GRAVITY FLOW. THEN
ROUTE CONDENSATE ABOVE CEILING OVER TO MOP
SINK AND DOWN WALL. TERMINATE WITH AIR GAP
ABOVE THE FLOOD RIM LEVEL OF THE MOP SINK
BASIN.
PHASE 2: MOUNT NEW INDOOR VRF MINI SPLIT UNIT
TO WALL ABOVE DOORWAY. INSTALL NEW
THERMOSTAT. WIRE TO NEW ASSOCIATED UNIT.
MOUNT ON WALL AT 48" A.F.F. ROUTE REFRIGERANT
LINES THROUGH RETURN AIR PLENUM AND CHASE
UP TO CORRESPONDING CONDENSER ON ROOF.
PHASE 2: ROUTE REFRIGERANT LINES UP TO FLOOR
ABOVE.
PHASE 2: INSTALL NEW CONTROL DAMPER CLASS 1
AT 8 CFM/SF 4" W.G. IN BRANCH DUCTWORK SERVING
THIS FLOOR. THIS WORK SHALL BE EXECUTED
DURING PHASE 2 WHOLE-BUILDING SHUTDOWN.
DUCTWORK SHOWN FOR REFERENCE.
1 5/21/26 ADDENDUM 02
T
T
T
T
T
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
T T
T
T
TT
T T
TT
T T
T
T
T
T
T
T
T
T
T TT
T T
T
T
T
T
T
T
TT
T T
TT
C
E
F
G
K
M
P
W
Y
AA
AC
AD
232424a25a2930 29a3234 3135363738394041424344
I
V
X
Xa
Z
AB
AE
AG
L
N
VAV#9-3-1
VAV#9-3-2
VAV#9-3-3
VAV#9-3-5
VAV#9-3-4
VAV#9-3-6
VAV#9-3-7
VAV#9-3-29
VAV#9-3-9 VAV#9-3-10
VAV#9-3-17
VAV#9-3-18
VAV#9-3-19
VA
V#
9- 3-
VA
V#
9- 3-
VA
V#
9- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
9- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
9- 3-
VAV#9-3-20
VA
V#
9- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
1 1
1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 11
1 1 1 1 1 1 1 1
1 1
1 1 1
VAV#9-3-12
VAV#9-3-11
VAV#9-3-14
VAV#9-3-131
VAV#9-3-151
VAV#9-3-16 1
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
1 1
VA
V# 3-
3-
EV
AP
-2 -3
340A340
303J
303H303G
303S303A
300C
3XX
300F
341B
303T
366E
368367
366C
366B
366A
364A
366R
365B
360 359
303F
303E
303B303C
303D
351352B
300D
361 359A
379A
378377
366H
366G
352A
346 347
344A
341D
341C
341G
341G1
341E2
341E
367A
345A
300E
343A
376A
7 7
3/4" CD
NO WORK THIS AREA
NO WORK THIS AREA
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
SECTOR KEY PLAN
BA
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:2
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL HVAC PLAN - THIRD FLOORMECHANICAL HVAC PLAN - THIRD FLOOR
- SECTOR A- SECTOR A
KMSKMS
APCAPC
KMSKMS
MH103AMH103A
CLFCLF
MH103AMH103A
02/20/202502/20/2025
SCALE: 3/32" = 1'-0"
MECHANICAL HVAC PLAN - THIRD FLOOR - SECTOR A1
GENERAL NOTES
SHEET KEYNOTES
8' 24'16'0
3/32" = 1'-0"
N
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
REFER TO GENERAL NOTE L. ON M-001 FOR SPECIFIC
PHASING REQUIREMENTS OF THE PROJECT.
REFER TO GENERAL NOTE M. ON M-001 FOR SPECIFIC
COOLING REQUIREMENTS OF THE PROJECT.
ALL MATERIALS WITHIN RETURN AIR PLENUM MUST
BE PLENUM RATED.
REUSE EXISTING DUCTWORK AND SUPPLY
DIFFUSERS. LED LIGHT FIXTURES WITH VENTING TO
BE USED FOR RETURN AIR PATHWAY TO PLENUM.
CONTRACTOR SHALL ENSURE ALL EQUIPMENT
CLEARANCES ARE MET FOR MAINTENANCE ACCESS
AND CLEAR AREAS PER NATIONAL ELECTRICAL
CODE. INSTALL PER MANUFACTURER INSTRUCTIONS
AND LOCAL AHJ.
CONTRACTOR TO FIELD VERIFY PREVIOUS EXACT
LOCATION OF THERMOSTAT AND REPLACE IN PLACE.
PROVIDE THERMALLY ISOLATED MOUNT IF LOCATING
ON AN EXTERIOR WALL.
INSULATE MINI-SPLIT CONDENSATE RETURN AND
CONDENSATE SUCTION LINES WITH PLENUM RATED
EPDM INSULATION.
SIZE AND INSTALL REFRIGERANT LINES IN
ACCORDANCE WITH MFR. RECOMMENDATIONS.
1.
2.
3.
4.
5.
6.
7.
8.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVE FOR UNIT. FIELD
VERIFY PIPING CONFIGURATION FOR VALVE TYPE.
REPLACE VAV TERMINAL BOX. INSTALL TWO
ELECTRIC DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVES FOR UNIT. FIELD
VERIFY PIPING SIZE AND CONFIGURATION FOR
VALVE TYPE.
PHASE 2: MOUNT NEW INDOOR VRF MINI SPLIT
UNIT TO WALL ABOVE DOORWAY. INSTALL NEW
THERMOSTAT. WIRE TO NEW ASSOCIATED UNIT.
MOUNT ON WALL AT 48" A.F.F. ROUTE
REFRIGERANT LINES THROUGH RETURN AIR
PLENUM AND CHASE UP TO CORRESPONDING
CONDENSER ON ROOF.
PHASE 2: ROUTE REFRIGERANT LINES WITHIN
RETURN AIR PLENUM AND STRUCTURE OVER TO
PENETRATE THROUGH ROOF DECK NEAR
ASSOCIATED CONDENSER ON ROOF.
DUCT SHOWN FOR REFERENCE.
PROVIDE NEW DUCT MOUNTED DAMPERS, SOUND
ATTENUATORS, AND ELECTRIC DDC COMPATIBLE
SENSORS SUCH AS STATIC PRESSURE SENSORS,
DISCHARGE AIR SENSORS, SMOKE DETECTORS,
AND CO2 SENSORS IN PREVIOUS LOCATIONS.
ROUTE ALL CONTROL WIRING TO
CORRESPONDING AHU.
PHASE 2: INSTALL NEW CONTROL DAMPER CLASS
1 AT 8 CFM/SF 4" W.G. IN BRANCH DUCTWORK
SERVING THIS FLOOR. THIS WORK SHALL BE
EXECUTED DURING PHASE 2 WHOLE-BUILDING
SHUTDOWN.
ROUTE INSULATED PUMPED CONDENSATE UP
ABOVE CEILING AND TRANSITION TO GRAVITY
FLOW. THEN ROUTE CONDENSATE ABOVE CEILING
OVER TO MOP SINK AND DOWN WALL. TERMINATE
WITH AIR GAP ABOVE THE FLOOD RIM LEVEL OF
THE MOP SINK BASIN.
1 5/21/26 ADDENDUM 02
T
T T
T
T
T
T
T
TT
T
T
T
T
T T
T
T
T
T
T T T
T T
T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T T
C
E
F
G
K
M
P
W
Y
AA
AC
AD
1234578101213161820 192324 1724a 20a23a
I
AE
AG
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VAV#7-3-19
VAV#7-3-17
VAV#7-3-18
VAV#7-3-15
VAV#7-3-16
VAV#7-3-14
VAV#7-3-13
VAV#7-3-11
VAV#7-3-8
VAV#7-3-7
VAV#7-3-4
VAV#7-3-2
VAV#7-3-3
VAV#7-3-1
VAV#7-3-12
VA
V#
3- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VAV#7-3-5
VA
V#
7- 3-
VA
V#
7- 3-
VAV#7-3-20
VAV#7-3-6
VAV#7-3-9
VAV#7-3-10
VA
V#
3- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VAV#7-3-21
2 1 1 1 1
1 1 11
1 11 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
VA
V#
3- 3-
VA
V# 3-
3-
VA
V#
3- 3-
VA
V#
7- 3-
VA
V#
7- 3-
VA
V#
7- 3-
1 1
VA
V#
7- 3-
1 1 1 1
VAV#7-3-481
335F
335E
335D335C
335B
321X
321W 321Y
321VZ
321S
321R
323322
321K
321I
321H
321G
321F
321E
321J
321V
321A
320B
320A
316H
316G
316F
316J
316E
316D
300B
300A
340A340
331A
316A
303P
303N 303M
303K 303J
303H
303R303S
300N
303T 303Q 306
316B
321U
322A
VA
V#
3- 3-
VA
V#
3- 3-
VA
V#
3- 3-
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
SECTOR KEY PLAN
BA
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:2
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL HVAC PLAN - THIRD FLOORMECHANICAL HVAC PLAN - THIRD FLOOR
- SECTOR B- SECTOR B
KMSKMS
APCAPC
KMSKMS
MH103BMH103B
CLFCLF
MH103BMH103B
02/20/202502/20/2025
SCALE: 3/32" = 1'-0"
MECHANICAL HVAC PLAN - THIRD FLOOR - SECTOR B1
GENERAL NOTES
SHEET KEYNOTES
1.
2.
3.
4.
5.
6.
REPLACE VAV TERMINAL BOX. INSTALL ELECTRIC
DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVE FOR UNIT. FIELD
VERIFY PIPING CONFIGURATION FOR VALVE TYPE.
REPLACE VAV TERMINAL BOX. INSTALL TWO
ELECTRIC DDC COMPATIBLE TWO-WAY PRESSURE
INDEPENDENT CONTROL VALVES FOR UNIT. FIELD
VERIFY PIPING SIZE AND CONFIGURATION FOR
VALVE TYPE.
PHASE 2: ROUTE REFRIGERANT LINES WITHIN
RETURN AIR PLENUM AND STRUCTURE OVER TO
PENETRATE THROUGH ROOF DECK NEAR
ASSOCIATED CONDENSER ON ROOF.
PROVIDE NEW DUCT MOUNTED DAMPERS, SOUND
ATTENUATORS, AND ELECTRIC DDC COMPATIBLE
SENSORS SUCH AS STATIC PRESSURE SENSORS,
DISCHARGE AIR SENSORS, SMOKE DETECTORS, AND
CO2 SENSORS IN PREVIOUS LOCATIONS. ROUTE ALL
CONTROL WIRING TO CORRESPONDING AHU.
PHASE 2: INSTALL NEW CONTROL DAMPER CLASS 1
AT 8 CFM/SF 4" W.G. IN BRANCH DUCTWORK SERVING
THIS FLOOR. THIS WORK SHALL BE EXECUTED
DURING PHASE 2 WHOLE-BUILDING SHUTDOWN.
DUCTWORK SHOWN FOR REFERENCE.
8' 24'16'0
3/32" = 1'-0"
N
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
REFER TO GENERAL NOTE L. ON M-001 FOR SPECIFIC
PHASING REQUIREMENTS OF THE PROJECT.
REFER TO GENERAL NOTE M. ON M-001 FOR SPECIFIC
COOLING REQUIREMENTS OF THE PROJECT.
ALL MATERIALS WITHIN RETURN AIR PLENUM MUST
BE PLENUM RATED.
REUSE EXISTING DUCTWORK AND SUPPLY
DIFFUSERS. LED LIGHT FIXTURES WITH VENTING TO
BE USED FOR RETURN AIR PATHWAY TO PLENUM.
CONTRACTOR SHALL ENSURE ALL EQUIPMENT
CLEARANCES ARE MET FOR MAINTENANCE ACCESS
AND CLEAR AREAS PER NATIONAL ELECTRICAL
CODE. INSTALL PER MANUFACTURER INSTRUCTIONS
AND LOCAL AHJ.
CONTRACTOR TO FIELD VERIFY PREVIOUS EXACT
LOCATION OF THERMOSTAT AND REPLACE IN PLACE.
PROVIDE THERMALLY ISOLATED MOUNT IF LOCATING
ON AN EXTERIOR WALL.
INSULATE MINI-SPLIT CONDENSATE RETURN AND
CONDENSATE SUCTION LINES WITH PLENUM RATED
EPDM INSULATION.
SIZE AND INSTALL REFRIGERANT LINES IN
ACCORDANCE WITH MFR. RECOMMENDATIONS.
1 5/21/26 ADDENDUM 02
1"x22 GA.
1"x22 GA.
(2)3/8" (2)3/8"
12' 12' 12' 12' 12' 12'
1"x22 GA.
1"x20 GA.
(2)1"x20 GA.
(2)1"x18 GA.
(2)1"x16 GA.
1/4" 1/4" 1/4"
3/8" (2)3/8"
(1) 12 GA.
(2)12 GA. OR (1)8 GA.
(2) 10 GA.
(2) 8 GA.
12'
61-84" 51-60" 37-50" 25-36" 19-24" 11-18"
10" DN
STRAPRODWIRE DIAMETERMAX. SPACINGDIA.
MINIMUM HANGER SIZES FOR ROUND DUCT
LOAD RATED
FASTENERS
10" DIA.
MAX.
SECURE
WIRE
HANGER
BAND OF SAME SIZE
AS HANGER STRAP
50" DIA. MAX.
LOAD RATED
FASTENERS
24" DIA.
MAX. BAND
OVER 50" DIA.
HANGER RODS,
WIRES, OR
STRAPS
1.
2.
3.
NOTES:
STRAPS ARE GALV. STEEL; RODS ARE UNCOATED OR GALV. STEEL; WIRE IS BLACK
ANNEALED, BRIGHT BASIC OR GALV. STEEL; ALL ARE ALTERNATIVES.
TABULATED DATA FROM 1985 SMACNA STANDARDS ALLOWS FOR DUCT
REINFORCING AND INSULATION, BUT NO EXTERNAL LOAD.
HANGER MUST NOT DEFORM DUCT SHAPE.
WATER
COIL
RETURN
SUPPLY
P1
T1
T1
TWO-WAY PRESSURE
INDEPENDENT CONTROL
VALVE
STRAINER
BALL VALVE
TEST PLUG
BALL VALVE
WATER
COIL
RETURN
SUPPLY
P1
T1
T1
UNION
TEMPERATURE
GAUGE
PRESSURE
GAUGE
TEST PLUG
TWO-WAY PRESSURE
INDEPENDENT
CONTROL VALVE
BALL VALVE
STRAINER
TWO-WAY PRESSURE
INDEPENDENT
CONTROL VALVE
ELECTRIC VALVE
OPERATOR
BALL VALVE
ELECTRIC VALVE
OPERATOR
NOTE:
1. BOTH PRESSURE INDEPENDENT CONTROL VALVES TO OPERATE IN
TANDEM WITH INVERSELY PROPORTIONAL POSITIONING. SUCH THAT ONE VALVE
CLOSES WHILE THE OTHER OPENS TO KEEP WATER FLOW CONSTANT THROUGH
THE BRANCH.
REMOVABLE CAP
ROUTE W/ 1%
SLOPE AS SHOWN
ON PLANS.
EQUIPMENT
GREATER OF 3" OR 1"
PLUS SYSTEM TOTAL
PRESSURE IN INCHES
W.C.
MINIMUM ONE HALF
SYSTEM TOTAL PRESSURE
IN INCHES W.C.
LEAVE OPEN
FOR VENTING
NEW
DUCTWORK
AND
FITTINGS NEW
DUCTWORK
AND
FITTINGS
OA
RA
SA
DYNAMIC AIR V8
FILTER SYSTEM
STERILE-AIRE
UV LIGHTS
TWO FAN
ARRAY
POWER
CONNECTION
CHANNELBLENDER
MIXING SECTION
AIRFLOW
MEASUREMENT
STATION
NEW
DUCTWORK
AND
FITTINGS
MAXIMUM PIPE/TUBING SUPPORT SPACING, FEET
HANGER ROD
ADJUSTABLE CLEVIS HANGER
HANGER
ROD
INSULATION
WELD
SADDLE
ADJUSTABLE ROLLER HANGER
BAND
SIDE VIEW
TRAPEZE HANGER FOR UP
TO 1000 LB. UNIFORM LOAD
15FP PIPING
STEEL PIPE
7 FT.
NOM. SIZE THRU 3/4"
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION INSERT
UNDER INSULATION SHIELD
INSULATION SHIELD
AT HANGER
1/2" DIA. HANGER RODS
WITH 36" MAX. SPACING
ON EACH CHANNEL.
1.
2.
3.
4.
NOTES:
FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE OR
MAXIMUM HANGER LOAD (700 LB.).
REFER TO NFPA 13 FOR ADDITONAL FIRE PROTECTION PIPING HANGING
REQUIREMENTS.
CAST IRON PIPING SHALL HAVE 10FT MAXIMUM SPACING WITH A MINIMUM OF
ONE HANGER PER SECTION CLOST TO THE JOINT ON THE BARREL.
INCLUDE SUPPORT FOR ALL CHANGE OF DIRECTION AND BRANCH
CONNECTIONS.
PROVIDE INSULATION
SHIELD & INSERT FOR
ALL PIPING
1 5/8" 12 GA.
CHANNEL
24201816141210865432
3028272523221917161412
------1515151515
2 1/2
1 1/2
1 1/41
DOUBLE NUT &
WASHER AT
TOP & BOTTOM
9CU TUBING 5 FT. -------16141312108876
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:4
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL DETAILSMECHANICAL DETAILS
KMSKMS
APCAPC
KMSKMS
M-501M-501
CLFCLF
M-501M-501
02/20/202502/20/2025
SCALE: NTS
TYPICAL ROUND DUCT HANGER DETAIL5
SCALE: NTS
TWO-WAY COIL PIPING DETAIL2 SCALE: NTS
THREE-WAY COIL UNIT PIPING DETAIL3
SCALE: NTS
TYPICAL DRAW THRU HVAC EQUIPMENT DRAIN PIPING DETAIL6
PRESSURE
GAUGE
UNION
TEMPERATURE
GAUGE
ELECTRIC VALVE
OPERATOR
SCALE: NTS
AHU-1 COMPONENTS1
SCALE: NTS
TYPICAL PIPE HANGER DETAIL4
1 5/21/26 ADDENDUM 02
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
DESIGNED BY:
DRAWN BY:
WORK ORDER NO. 21-002533 AMP-400-E-
DRAWING NO.
DATE
PREPARED BY
FSB
REVIEWED BY
REV DATE
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
MECHANICAL AND ELECTRICAL UPGRADES
OF
XX
Work Request Construction No: 21-002533
HEADQUARTERS BUILDING
ISSUED BY
OFFICE OF
FACILITY MANAGEMENT
5/ /2 3:
:4
PM
C :\U se rs \jg or do n\ D oc um en ts \1 0_ M ec h_ jg or do nV Q H N W .rv t
MECHANICAL SCHEDULESMECHANICAL SCHEDULES
KMSKMS
APCAPC
KMSKMS
M-701M-701
CLFCLF
M-701M-701
02/20/202502/20/2025
SERIES FAN POWERED VAV TERMINAL SCHEDULE
MARK
NECK
SIZE
(IN)
COOLING
AIRFLOW
MAX
INLET
S.P.
(INCHES
W.C.)
HEATING ELECTRICAL DATA BASIS OF DESIGN
NOTES
MAX
(CFM)
AIRFLOW
(CFM)
CAPACITY
(BTUH)
FLOW RATE
(GPM)
MOTOR
HP V / PH / HZ
FLA
(AMPS)
MCA
(AMPS)
MOCP
(AMPS)
MANUFA
CTURER MODEL
VAV#2-1-1 12 750 1.5 750 10349 0.69 1/4 120 / 1 / 60 4.0 5.0 15 TITUS DTFS C 1-14,16
VAV#2-1-2 6 155 1.5 155 3301 0.22 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15
VAV#2-1-3 7 470 1.5 470 5524 0.37 1/6 120 / 1 / 60 2.3 2.88 15 TITUS DTFS B 1-15
VAV#2-1-4 4 145 1.5 145 803 0.05 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15
VAV#2-1-5 6 275 1.5 275 6628 0.44 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15
VAV#2-1-7 10 850 1.5 850 6902 0.46 1/4 120 / 1 / 60 4.0 5.0 15 TITUS DTFS C 1-15
VAV#2-1-8 5 160 1.5 160 3762 0.25 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15
VAV#2-1-9 4 70 1.5 70 401 0.03 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15
VAV#2-1-10 5 165 1.5 165 4323 0.29 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15 VAV#2-1-11 9 245 1.5 245 5404 0.36 1/10 120 / 1 / 60 1.6 2.0 15 TITUS DTFS A 1-15
VAV#2-1-12 9 850…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .