This document is Attachment 17, a template for submitting resumes of key personnel for a federal construction contract. The attachment requires offerors to provide detailed information about two key positions: a Construction Project Manager and a Construction Superintendent, both of whom must be employed by the offeror at the time of contract performance.

The evaluation criteria for the Construction Project Manager require a minimum of seven years of experience serving in that role on multi-discipline construction projects of similar scope and complexity, with documented evidence of managing or supervising at least two multi-discipline construction projects completed within the past seven years of comparable scope and magnitude. Prior project experience need not have been completed while employed by the current offeror. Identical requirements apply to the Construction Superintendent position. The template consists of two parts: Part 1 requests general information including the person's name, company name and location, proposed role, and total experience in years and months; Part 2 requests project experience documentation with a minimum of two projects, with replication allowed as necessary. For each project, offerors must provide the project name and location, construction cost to the nearest thousand, specific role and duties performed, role start and end dates by month and year, and a brief project description including scope and types of construction disciplines involved.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
Amendment 0008 Attachment 1 Section B.xlsx XLSX spreadsheet
L.12 TECHNICAL ACCEPTABLE - UNACCEPTABLE EVALUATION OF KEY PERSONNEL.pdf PDF
Amendment 0008 Attachment 14 Major Cost Element Breakdown.xlsx XLSX spreadsheet
Amendment 0007.pdf PDF
Addendum 03.pdf PDF
Amendment 0006.pdf PDF
Updated QA Log 6-5-26.pdf PDF
Amendment 0005.pdf PDF
Solicitation Offeror and Award Construction.pdf PDF
Amendment 0004.pdf PDF
Questions Answer Log 6-2-26.pdf PDF
Amendment 0003 Attachment 2 - Addendum 02 COMPLETE.pdf PDF
Amendment 0003 Attachment 3 - Asbestos Abatement Information.pdf PDF
Amendment 0003 Attachment 1 - QA Log.pdf PDF
Amendment 0003 Attachment 4 - HQB Furniture Information.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 Attachment 5 - HQB Requested Photos.pdf PDF
Amendment 0002.pdf PDF
HQ BUILDING MECHANICAL AND ELECTRICAL UPGRADES SITE VISIT SIGN IN.pdf PDF
Addendum 01 Full Document.pdf PDF
Amendment 0001 with Updated Clauses.pdf PDF
Attachment 5 Chapter 33 Construction Safety.pdf PDF
Attachment 16 OCAT 00310 Anti Non-Collusion Affidavit.pdf PDF
Attachment 15 OCAT 00320 Business Relationship Affidavit _002_.pdf PDF
Attachment 7 Payment Bond.pdf PDF
Attachment 9 Operational Control Docs.pdf PDF
Attachment 11 Past Performance Survey.docx DOCX document
Attachment 12 Client Authorization Letter.pdf PDF
ATTACHMENT 3 2025.02.20_FAA_HQB MEP UPGRADES_100 CD_PROJECT MANUAL.pdf PDF
Attachment 8 Performance Bond.pdf PDF
Attachment 14 Major Cost Element Breakdown.xlsx XLSX spreadsheet
6973GH-26-R-00082.pdf PDF
Attachment 10 Past Performance Experience Form.docx DOCX document
ATTACHMENT 2 HQB MEP UPGRADES_100 CD_DESIGN ANALYSIS.pdf PDF
ATTACHMENT 6 WAGE DETERMINATION.pdf PDF
Attachment 13 Contractor Release.pdf PDF
Attachment 1 Section B - Supplies or Services-Prices.xlsx XLSX spreadsheet
ATTACHMENT 4 FAA_HQB MEP UPGRADES_100 CD_DRAWINGS (1).pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 17, RESUME OF KEY PERSONNEL

PART 1 – FACTOR AND GENERAL INFORMATION

Technical Proposals (Factor 1) will be evaluated, rated, and scored in accordance with the pre-established evaluation plan. Based upon the information contained in the Offeror’s technical proposal regarding their proposed Construction Project Manager AND the Construction Superintendent that will be employed on this project in comparison to the following pre-established criteria:

Construction Project Manager

- Evidence showing the Construction Project Manager has a minimum of seven (7) years of experience in serving as Construction Project Manager on multi-discipline construction projects of similar scope and complexity

- Evidence of managing or supervising at least two (2) multi-discipline construction projects completed within the past 7 years of similar scope and magnitude

- Construction Project Manager must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror

Construction Superintendent

- Evidence showing the Construction Superintendent has a minimum of seven (7) years of experience in serving as a Construction Superintendent on multi-discipline construction projects of similar scope and complexity

- Evidence as Construction Superintendent of at least two (2) multi-discipline construction projects completed within the past 7 years of similar scope and magnitude

- Construction Superintendent must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror

COMPLETE ALL SECTIONS BELOW

1. PERSON’S NAME:

2. COMPANY NAME AND LOCATION:

3. PROPOSED ROLE FOR THIS CONTRACT (Project Manager or Superintendent) :

4. TOTAL EXPERIENCE SHOWN ON THE ATTACHED PROJECT EXPERIENCE SHEETS

(in years and months):

RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT

PART 2 – PROJECT EXPERIENCE

INSTRUCTIONS: Provide project experience information to demonstrate the criteria listed for Construction Project Manager or Construction Superintendent. Include as many projects as needed to meet the Factor requirement, but no less than two projects. Replicate this sheet as necessary for each project.

PROJECT __________ (number each project)

a. PROJECT NAME AND LOCATION (include city and state):

b. CONSTRUCTION COST (to nearest thousand):

c. SPECIFIC ROLE ON PROJECT (Project Manager or Superintendent, describe duties & responsibilities):

d. ROLE START (month/year): ROLE END (month/year):

e. BRIEF PROJECT DESCRIPTION (Include scope & types of disciplines involved)

NAME:
COMPANY NAME LOCATION:
ROLE:
Text4:
project number:
project name location:
Cost:
Specific Role:
Role Start:
Role End:
Project Description: