A22_Rehab_Tables_Amendment_2.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- HARLEM BADEN PHASE 8 Federal contract opportunity
- Solicitation number
- W912P919R0023
About this file
REHAB TABLES EXCEL SHEET - AMENDMENT 2
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REHAB Quantities
| REHABILITATION TABLE - PIPE | ||||||||
| HARLEM BADEN RELIEF PHASE IV TRUNK SEWER REHABILITATION (HEBERT) | ||||||||
| MSD PROJECT NUMBER: 11800-015.1 | ||||||||
| NO. | UPSTREAM STRUCTURE | DOWNSTREAM STRUCTURE | ADDRESS NEAREST UPSTREAM MANHOLE | LENGTH (FT) | SIZE (IN) | MATERIAL | COMMENTS | RECOMMENDATION |
| 1 | 16H3-008C (APPROX. STA 93+82) | 16H3-009C | 1907 KIENLEN AVE | 87 | 48X48 | RCB | SLUDGE/SAND/GRIT, MODERATE CORROSION, EVIDENCE OF I/I, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 2 | 16H3-077C (APPROX. STA 88+20) | 16G4-0248C | 1900 KIENLEN AVE | 137 | 72 | RCP | EVIDENCE OF I/I, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 3 | 16H3-076C (APPROX. STA 90+82) | 16H3-077C | 1900 KIENLEN AVE | 262 | 72 | RCP | EVIDENCE OF I/I, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 4 | 16H3-009C (APPROX. STA 92+95) | 16H3-076C | 1907 KIENLEN AVE | 213 | 60 | RCP | SLUDGE/SAND/GRIT, MODERATE CORROSION | GEOPOLYMER LINER |
| 5 | 16H3-007C (APPROX. STA 95+27) | 16H3-008C | 1907 KIENLEN AVE | 145 | 60X60 | RCB | SLUDGE/SAND/GRIT, EVIDENCE OF I/I, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 6 | 16H3-006C (APPROX. STA 96+20) | 16H3-007C | 1907 KIENLEN AVE | 93 | 60X60 | RCB | SLUDGE/SAND/GRIT, MODERATE CORROSION, EVIDENCE OF I/I, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 7 | 16H3-004C (APPROX. STA 98+77) | 16H3-006C | 1905 KIENLEN AVE | 257 | 60X60 | RCB | EVIDENCE OF I/I, MODERATE CORROSION, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 8 | 16H2-100C (APPROX. STA 103+54) | 16H3-004C | 6264 ST LOUIS AVE | 477 | 60X60 | RCB | EVIDENCE OF I/I, MODERATE CORROSION, MINERAL DEPOSITS | GEOPOLYMER LINER |
| 9 | 16H2-030C (APPROX. STA 109+91) | 16H2-100C | 6300 ST LOUIS AVE | 637 | 48X48 | RCP | SLUDGE/SAND/GRIT, SEVERE CORROSION, EVIDENCE OF I/I, MULTIPLE LEAKS, MINERAL DEPOSITS | GEOPOLYMER LINER |
| TOTAL LENGTH | 2307 |
| STRUCTURE RECOMMENDATION TABLE | |||||||
| HARLEM BADEN RELIEF PHASE IV (HEBERT) | |||||||
| MSD PROJECT NUMBER: 11800-015.1 | |||||||
| NO. | PROJECT AREA | MSD STRUCTURE | TYPE OF STRUCTURE (MSD GIS) | NEAREST ADDRESS | DEPTH OF OUTLET (FT) | INSTALL GEOPOLYMER LINER | COMMENTS |
| 1 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-319C | MANHOLE | 2835 HAMILTON AVE | 20.0* | X | |
| 2 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H2-030C | MANHOLE | 6300 ST LOUIS AVE | 20.0* | X | |
| 3 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H2-100C | MANHOLE | 6264 ST LOUIS AVE | 20.0* | X | |
| 4 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-076C | MANHOLE | 1900 KIENLEN AVE | 21.6 | X | |
| 5 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-004C | INLET | 1905 KIENLEN AVE | 20.0* | X | |
| 6 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-006C | INLET | 1905 KIENLEN AVE | 20.0* | X | |
| 7 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-007C | INLET | 1905 KIENLEN AVE | 20.0* | X | |
| 8 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-008C | INLET | 1905 KIENLEN AVE | 20.0* | X | |
| 9 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-009C | INLET | 1905 KIENLEN AVE | 20.0* | X | |
| 10 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-077C | INLET | 1900 KIENLEN AVE | 17.8 | X | |
| 11 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G3-232C | MANHOLE | 5730-4 GOODFELLOW PL | 26.8 | X | |
| 12 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-234C | MANHOLE | 3100 GOODFELLOW PL | 23.1 | X | |
| 13 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-237C | MANHOLE | 2901 GOODFELLOW PL | 28.5 | X | |
| 14 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-250C | MANHOLE | 3100 GOODFELLOW PL | 32.0 | X | |
| 15 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-280C | MANHOLE | 2901 GOODFELLOW PL | 34.4 | X | |
| 16 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-284C | MANHOLE | 2835 HAMILTON AVE | 26.4 | X | |
| 17 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-282CA | MANHOLE | 2835 HAMILTON AVE | 20.0 | X | |
| 18 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-289C | MANHOLE | 2835 HAMILTON AVE | 20.0 | X | |
| 19 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16G4-293C | MANHOLE | 5730-4 GOODFELLOW PL | 27.5 | X | |
| 20 | HARLEM BADEN RELIEF PHASE IV (HEBERT) | 16H3-009CA | MANHOLE | 1907 KIENLEN AVE | 20.0 | X | |
| TOTAL | 458.1 | ||||||
| NOTES: | |||||||
| * A FIELD INSPECTION WAS NOT PERFORMED ON THE STRUCTURE. THE STRUCTURE DEPTH IS AN ESTIMATE AND THE CONTRACTOR MUST VERIFY THE ACTUAL DEPTH. |
&"Arial,Bold"&24TABLE 1 - REHABILIATION
File details come from the government source that posted it.