16H3-077CDS_TO_16G4-319CBS_TVI_908435.pdf
PDF 26 KB Posted
- Attached to
- HARLEM BADEN PHASE 8
- Solicitation number
- W912P919R0023
About this file
Additional Information for Amendment 1.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNAL INSPECTION LOG
FLow Measurement
Date: 2/26/2010
Technician: ADS
ADS Environmental Services
16H3-077CDS 16G4-319CBS
Downstream Line Depth NA
Sewer Plug Locations
None
Dyed-Water Flood Sketch None
Upstream Line Depth NA
ADDITIONAL INFORMATION
Type Of Sewer Combined
Harlem Baden Hebert
LOCATION: Junk yard off Kienlen Ave.
PROJECT:
Total Line Length 88
Type Of Pipe RCP
Joint Spacing 3
Pipe Diameter 42
Avg. Depth
Uncapped SC's
Comments: Inspection of South line TAPE NO. 32
Start Counter 06
End Counter ft.
ft. in.
in.
l.f.
l.f.
in.
ft.TV Line Length 88 l.f.
Time: 11:45 AM
Precleaning N
Upstream Structure Downstream Structure
Start Inspection End Inspection
Capped SC's
Distance Defect Description Clock Ref.
GPM Photo No.
Defect
0 MH 16H3-077CDS 1BUMH
2-86 Minimal to No Water in Pipe W
ALIGN
2-86 Minimal to No Debris in Pipe
SGR
DEBRIS
7-86 Evidence of Leakage -- Slight -- MD's at most joints
EL 1
LEAK
44 General Condition Photo 2GCP
88 New Structure -- Not on Prints -- BuriedNEWB
88 MH 16G4-319CBS 3EDMH
Page 1 of 2 From MH16H3-077CDSTo 16G4-319CBS
LS 16H3-077CDS to 16G4-319CBS
Harlem Baden Hebert TV PHOTOS
FLow Measurement
0 l.f.PHOTO 1 MH 16H3-077CDS 44 l.f.PHOTO 2 General Condition Photo
88 l.f.PHOTO 3 MH 16G4-319CBS
Page 2 of 2 From MH16H3-077CDSTo 16G4-319CBS
File details come from the government source that posted it.