16H2-029C_TO_16H2-030C_TVI_437012.pdf
PDF 25 KB Posted
- Attached to
- HARLEM BADEN PHASE 8
- Solicitation number
- W912P919R0023
About this file
Additional Information for Amendment 1.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNAL INSPECTION LOG
FLow Measurement
Date: 3/3/2010
Technician: ADS
ADS Environmental Services
16H2-029C 16H2-030C
Downstream Line Depth 9 8
Sewer Plug Locations
None
Dyed-Water Flood Sketch None
Upstream Line Depth 8 8
ADDITIONAL INFORMATION
Type Of Sewer Combination
Harlem Baden Hebert
LOCATION: Cherry Avenue
PROJECT:
Total Line Length 16
Type Of Pipe RCP
Joint Spacing 4
Pipe Diameter 36
Avg. Depth 9.2
Uncapped SC's
Comments:
TAPE NO. 29
Start Counter 00812
End Counter 01014 ft.
ft. in.
in.
l.f.
l.f.
in.
ft.TV Line Length 16 l.f.
Time: 9:40 AM
Precleaning N
Upstream Structure Downstream Structure
Start Inspection End Inspection
Capped SC's
Distance Defect Description Clock Ref.
GPM Photo No.
Defect
0 MH 16H2-029C 1BUMH
2-14 Less Than 1/8-Pipe Water Depth W 1
ALIGN
2-14 Minimal to No Debris in Pipe
SGR
DEBRIS
6 General Condition Photo 2GCP
16 MH 16H2-030C 3EDMH
Page 1 of 2 From MH 16H2-029C To 16H2-030C
LS 16H2-029C to 16H2-030C
Harlem Baden Hebert TV PHOTOS
FLow Measurement
0 l.f.PHOTO 1 MH 16H2-029C 6 l.f.PHOTO 2 General Condition Photo
16 l.f.PHOTO 3 MH 16H2-030C
Page 2 of 2 From MH 16H2-029C To 16H2-030C
File details come from the government source that posted it.