16G4-258C_TO_16G4-260C_TVI_908418.pdf
PDF 26 KB Posted
- Attached to
- HARLEM BADEN PHASE 8
- Solicitation number
- W912P919R0023
About this file
Additional Information for Amendment 1.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNAL INSPECTION LOG
FLow Measurement
Date: 2/11/2010
Technician: ADS
ADS Environmental Services
16G4-258C 16G4-260C
Downstream Line Depth NA
Sewer Plug Locations
None
Dyed-Water Flood Sketch None
Upstream Line Depth NA
ADDITIONAL INFORMATION
Type Of Sewer Combined
Harlem Baden Hebert
LOCATION: Easement Clara Avenue
PROJECT:
Total Line Length 83
Type Of Pipe RCP
Joint Spacing 0
Pipe Diameter 78x92
Avg. Depth
Uncapped SC's
Comments:
TAPE NO. 14
Start Counter 01740
End Counter 02520 ft.
ft. in.
in.
l.f.
l.f.
in.
ft.TV Line Length 83 l.f.
Time: 9:15 AM
Precleaning N
Upstream Structure Downstream Structure
Start Inspection End Inspection
Capped SC's
Distance Defect Description Clock Ref.
GPM Photo No.
Defect
0 MH 16G4-258C 1BUMH
2-81 Less Than 1/8-Pipe Water Depth W 1
ALIGN
2-81 Minimal to No Debris in Pipe
SGR
DEBRIS
2-81 Evidence of Leakage -- Slight -- Deposits 2
EL 1
LEAK
33 General Condition Photo 3GCP
47 12Leak in Brickwork/Masonry (See I/I Severity Value)
LB
LEAK
47 Leak - GW Infiltration (Seepage) .1 4
IGW 1
LEAK
83 SNP 16G4-260C 5EAND
Page 1 of 2 From MH 16G4-258C To 16G4-260C
LS 16G4-258C to 16G4-260C
Harlem Baden Hebert TV PHOTOS
FLow Measurement
0 l.f.PHOTO 1 MH 16G4-258C 2-81 l.f.PHOTO 2 Evidence of Leakage -- Slight -- Deposits
33 l.f.PHOTO 3 General Condition Photo 47 l.f.PHOTO 4 Leak - GW Infiltration (Seepage)
83 l.f.PHOTO 5 Inspection Ends at Connection/Node --
SNP 16G4-260C
Page 2 of 2 From MH 16G4-258C To 16G4-260C
File details come from the government source that posted it.