SOLICITATION W912P919R0023

View the file

Other files for this federal contract opportunity

Other files attached to HARLEM BADEN PHASE 8, newest first.
File Type Posted
D03_SF30_Amendment_3.pdf PDF
A22_Rehab_Tables_Amendment_2.xlsx XLSX spreadsheet
A22_Drawing_10722-S2.pdf PDF
A22_Amendment_2.pdf PDF
A22_Revised_Bid_Schedule_Amendment_2.pdf PDF
A22_Amendment_1.pdf PDF
16G4-237C_TO_16G4-234C_TVI_436894.pdf PDF
GIS_Map_Name_to_ADS_CCTV_Log.pdf PDF
16H3-004C_TO_16H3-011C_TVI_908427.pdf PDF
16H3-076C_TO_16H3-077C_TVI_437431.pdf PDF
16H3-007C_TO_16H3-008C_TVI_437265.pdf PDF
Harlem_Baden_PIV_Dry_Weather.xlsm XLSM spreadsheet
16G4-282CA_TO_16G4-289C_TVI_908419.pdf PDF
16H3-006C_TO_16H3-007C_TVI_437264.pdf PDF
16H3-077CBS_TO_16H3-077CDS_TVI_908434.pdf PDF
16H2-030C_TO_16H2-100C_TVI_437014.pdf PDF
16G4-293C_TO_16G3-232C_TVI_908634.pdf PDF
16H3-077CA_TO_16H3-077CC_TVI_908440.pdf PDF
XP-SWMM_Modeling_Summary.pdf PDF
16H3-008C_TO_16H3-009C_TVI_437266.pdf PDF
16H3-077CC_TO_16G4-319CA_TVI_908441.pdf PDF
16G4-319CA_TO_16G4-319C_TVI_908437.pdf PDF
16G4-234C_TO_16G4-250C_TVI_436891.pdf PDF
16G4-280C_TO_16G4-237C_TVI_908421.pdf PDF
16H3-011C_TO_16H3-006C_TVI_908426.pdf PDF
16H3-077CDN_TO_16G4-319CBN_TVI_908433.pdf PDF
16H3-077C_TO_16H3-077CA_TVI_908422.pdf PDF
16H2-100C_TO_16H3-004C_TVI_437486.pdf PDF
16H2-031C_TO_16H2-030C_TVI_437018.pdf PDF
16H3-077CDS_TO_16G4-319CBS_TVI_908435.pdf PDF
16G4-319C_TO_16G4-284CA_TVI_908438.pdf PDF
16H3-009CA_TO_16H3-076C_TVI_908424.pdf PDF
16G4-250C_TO_16G4-258C_TVI_459472.pdf PDF
16H3-077CBN_TO_16H3-077CDN_TVI_908432.pdf PDF
16G4-258C_TO_16G4-260C_TVI_908418.pdf PDF
16G4-289C_TO_16G4-280C_TVI_908420.pdf PDF
16G4-284CA_TO_16G4-282CA_TVI_908439.pdf PDF
16H2-029C_TO_16H2-030C_TVI_437012.pdf PDF
16H3-009C_TO_16H3-009CA_TVI_908425.pdf PDF
16H3-077CA_TO_16H3-077CB_TVI_908423.pdf PDF
A22_Amendment_1.pdf PDF
Rehab_Map_West.pdf PDF
Rehab_Map_East.pdf PDF
Harlem_Baden_1-200_West_NoAerial.png PNG image
GIS_Map_Name_to_ADS_CCTV_Log_(sorted_by_GIS).pdf PDF
Pre-bid_Sign-in_Sheet.pdf PDF
Harlem_Baden_1-200_East_NoAerial.png PNG image
Table_A-1_-_Reach_Recommendation_excerpt_from_TM.pdf PDF
A02_19R0023_Plans_Harlem_Baden.pdf PDF
A02_19R0023_SOW_Harlem_Baden.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81C8X83485832

HARLEM BADEN PACKAGE 8, ST. LOUIS, MISSOURI

Project Scope: Indefinite Quantity contract, (Tw o-Year IDIQ w ith multiple task orders). Work consists of furnishing all material, labor, tools, equipment and supervision necessary for the rehabilitation of combined sew ers and related appurtenances; the rehabilitation of manholes and service connections; the cleaning and lining of pipe sew ers and point repairs; and the removal and replacement of pavements and roadw ays.

The Guaranteed Minimum for this contract is $5000.00.

Estimated Range (in accordance w ith FAR 36.204) - betw een $5,000,000.00 and $10,000,000.00.

Solicitation Type - Low est Price, Technically Acceptable, Request for Proposal (LPTA-RFP) - UNRESTRICTED.

RFP Opening Date - 8 April 2019 @ 1:00 p.m., Central Standard Time.

LISA M WHITE 314 331-8518

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

06-Mar-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10 Alt1

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

314 331-8746FAX:TEL: TEL: FAX:

W912P919R0023 89

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912P919R0023

Section 00 10 00 - Solicitation

SCHEDULE AND NOTES

SCR-203-11

Enclosure 1

(S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS- BACON ACT CERTIFIED LABOR PAYROLLS (April2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3

HARLEM BADEN PACKAGE 8

BID SCHEDULE

ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED PRICE

ABANDONMENT OF LATERALS (TYPE "LA" REPAIR) EA 24

BYPASS PUMPING JB 1

CLEAN AND PREPARE SEWER LF 700

HEAVY CLEANING HR 30

MOBILIZATION JB 1

REMOBILIZATION JB 1

DEMOBILIZATION JB 1

PROTECTION AND RESTORATION OF SITE LS 1

REINFORCED CONCRETE INVERT CY 50

REPAIR OF LATERAL SEWER CONNECTION ( TYPE "LC"

REPAIR)

EA 10

SPALLED CONCRETE & EXPOSED REBAR REPAIR (TYPE

"SC" REPAIR)

SF 1650

MANHOLE REHABILITATION/GEOPOLYMER LINING 01

INCH THICK

LF 500

GEOPOLYMER LINING 1-1/2 INCH THICK SF 42000

GEOPOLYMER LINING 02 INCH THICK SF 76350

GEOPOLYMER LINING 2-1/2 INCH THICK SF 37200

VOID REPAIR (TYPE "VR" REPAIR) SF 25

TOTAL AMOUNT $

years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

HARLEM BADEN PH 8

FFP

In accordance with Plans and Scope of Work. --- PROJECT NO.: 114522

*Two Year IDIQ with multiple task orders.

FOB: Destination

MILSTRIP: W81C8X83485832

PURCHASE REQUEST NUMBER: W81C8X83485832

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-APR-2019 TO

31-MAR-2021

N/A CONSTRUCTION BRANCH

TONY JONES

1222 SPRUCE STREET

ST. LOUIS MO 63103-2833

314-331-8130 FOB: Destination

966402

CLAUSES INCORPORATED BY REFERENCE

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.236-28 Preparation of Proposals--Construction OCT 1997 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.247-7022 Representation Of Extent Of Transportation Of Supplies By

Sea

AUG 1992

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm-fixed price contract resulting from this solicitation.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

March 21, 2019 at 10:00 a.m.

(c) Participants will meet at-- Barrett Brothers Park (Ballfield Parking Lot near the intersection of St. Louis Avenue & Hamilton Avenue)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

(End of clause)

PART I - PROPOSAL SUBMISSION INSTRUCTIONS, CONDITIONS, NOTICE TO OFFERORS

SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

FULL AND OPEN LOWEST PRICED TECHNICALLY

ACCEPTABLE (LPTA)

1. GENERAL INFORMATION

This solicitation is for a lowest price technically acceptable, firm-fixed price contract for construction of Harlem Baden Package 8 located in the City of St. Louis and the Village of Hillsdale, Missouri. The magnitude of construction for this project is between $5M and $10M.

Work consists of rehabilitation of approximately 6,800 lineal feet of combined sewers, varying in size from 48” x 48” to 122” x 144”, utilizing trenchless methods, and the rehabilitation of approximately 500 lineal feet of manhole utilizing geopolymer liner methods in an area south of Natural Bridge Avenue between Kienlen and Clara Avenues within the City of St. Louis and the Village of Hillsdale. The work consists of furnishing all material, labor, tools, equipment and supervision necessary for the rehabilitation of combined sewers and related appurtenances utilizing trenchless methods; the rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods; the cleaning and lining of pipe sewers and point repairs; and the removal and replacement of pavements and roadways.

Coordination with the Metropolitan St. Louis Sewer District may be required throughout the duration of construction, with approval of the St. Louis District.

2. REQUIRED REGISTRATIONS

Offerors must have and must maintain an active registration in the following databases:

System for Award Management (SAM): Offerors must have and must maintain an active registration in the SAM database at https://www.sam.gov/portal/public/SAM/ to be eligible for a Government contract award. If the offeror is a Joint Venture (JV), the JV entity must have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an offeror is not actively and successfully registered in the SAM data base, the Government reserves the right to award to the next prospective offeror.

On-Line Representations and Certifications. Prospective Contractors shall complete electronic representations and certifications at https://www.sam.gov/portal/public/SAM/ in conjunction with required registration in the SAM.

3. DEFINITIONS

When the word ‘offeror’ is encountered throughout this Section 00100, it is intended to mean a company, teaming arrangement, or Joint Venture seeking to do business with the Government that submits a proposal in response to this solicitation.

A ‘proposal’ is documentation prepared by the offeror and submitted to the Government for evaluation purposes in response to this solicitation.

When the word ‘Government’ is encountered throughout this Section 00100, it is intended to mean the U.S.

Army Corps of Engineers St. Louis District (MVS).

4. SUBMISSION OF INQUIRIES:

Proposals for this solicitation will be accepted until the date and time indicated on Standard Form 1442.

Prospective offerors should submit inquiries related to this solicitation only by e-mail to:

E-MAIL ADDRESS: lisa.white@usace.army.mil

Include the solicitation number, and project title with any questions/clarifications. Written questions must be received by this office not later than 7 calendar days after the site visit. TELEPHONE INQUIRIES WILL

NOT BE ACCEPTED.

5. DIRECTIONS FOR SUBMITTING PROPOSALS

Offers must be placed in envelopes/packages, sealed and marked and addressed as follows:

MARK PACKAGES:

Solicitation Number: W912P919R0023 Offer Closing Date: 4/08/2019 Offer Closing Time: 1:00 pm Local St. Louis time

ADDRESS PACKAGES TO:

U.S. Army Corps of Engineers (USACE) St. Louis District, CEMVS-CT-X Lisa White 1222 Spruce St – Room 4.207 St. Louis, MO 63103-2833

Additional Instructions Pertaining to Hand Carried Offers: Hand-carried offers must be delivered to 1222 Spruce St., Room 4.207, St. Louis, MO 63103-2833. Proposals must be properly marked package(s) and given to a member of the Contracting Division no later than the time specified above.

PROPOSALS SUBMITTED AFTER THE DATE AND TIME ESTABLISHED FOR SUBMISSION OF

PROPOSALS WILL NOT BE EVALUATED.

6. SITE VISIT

There is a site visit scheduled for 10:00 a.m. local time on March 21, 2019 at the Barrett Brothers Park ballfield parking lot near the intersection of St. Louis Avenue and Hamilton Avenue.

7. ELECTRONIC OFFERS

Electronic proposals, and their applicable modifications or cancellations, will not be accepted. However, proposals may be withdrawn in writing by letter or e-mail. Any written notice to withdraw an offer sent to this office must be received in the office designated in the Request for Proposal (RFP) for receipt of offers not later than the exact date and time set for receipt of proposals.

8. PROPOSALS SHALL BE SUBMITTED IN THE FOLLOWING FORMAT:

VOLUME 1 – Technical Proposal Submission Proposal Package Original Copies CD

1 4 1

FACTOR 1– Technical Approach:

Subfactor (a) – Key Personnel Qualifications Subfactor (b) – Prime Contractor Similar Experience Subfactor (c) – Management Plan Subfactor (d) – Safety

FACTOR 2 – Past Performance

Volume 1 shall also include the following:

• Letters of Commitment from Sub-Contractors (if applicable)

• Teaming Arrangements (if applicable)

• Joint Venture Agreements (if applicable)

VOLUME 2 – Price Proposal and Administrative Submission

Volume 2 shall also include the following:

Original Copies CD

1 0 1

• Signed Standard Form 1442 and all Amendments, signed and dated

• Section 00010 Bid Schedule

• SAM Representations and Certification

• Offeror’s e-mail address and cell phone number

• Name, Address, DUNS, CAGE Code, and TAX Identification Numbers of the

Contractor submitting the proposal

9. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

a. REQUIREMENT FOR SEPARATE T ECHNICAL AND PRICE PROPOSALS.

DO NOT MIX CONTENTS OF VOLUME 1 (Technical) AND VOLUME 2 (Price) IN THE SAME

BINDER.

(1) Each Offeror must submit a Technical Proposal and a Price Proposal. The Technical Proposal and the Price Proposal must be submitted as separate volumes. Both the Technical and Price Proposal shall be paginated (contain consecutive page numbers on each page).

(2) The outside cover of each separate volume (Vol 1 – Technical; Vol 2 – Price) must be clearly marked to indicate its contents and the identity of the Offeror. Additionally, identify the “original” Technical proposal and the “original” cost/price proposal on the outside cover.

(3) Both the Technical Proposal and the Price Proposal must be received by the closing date and time set for receipt of proposals.

(4) Pricing Schedule, Vol 2, shall be completed in full.

(5) Do not include any dollar amounts in the Technical Proposal that are taken from the Price Proposal.

(6) All information intended to be evaluated as part of the Technical Proposal MUST BE submitted within the Technical Proposal. Do not cross-reference material in the Price Proposal, or vice versa. Also, do not include links to websites in your proposal. Technical Proposals will not be provided to the price team and Price Proposals will not be provided to the technical team. Therefore, information submitted in the wrong volume could lead to the proposal being determined “unacceptable” if materially incomplete in any aspect.

(7) Do not attempt to modify the terms and conditions of the solicitation in either the technical or price proposal or add conditions or qualifications to your offer. Should the offeror include terms and conditions that conflict with the terms and conditions of the Solicitation, the offer may be determined "unacceptable" and thus ineligible for award. ANY QUESTIONS RELATED TO SPECIFIC TERMS AND CONDITIONS

CONTAINED WITHIN THE SOLICITATION SHOULD BE RESOLVED PRIOR TO SUBMISSION OF

THE OFFER. Notwithstanding the above, the offeror must clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any modifications to the contractual and/or technical terms and conditions of the solicitation contained in the Offer.

(8) FAILURE to submit required documents or FAILURE to properly complete documents may result in rejection of the offer without further evaluation. Therefore, offerors are urged to follow instructions carefully and to speak with the Contracting Officer if the offeror does not understand any part of the Solicitation.

b. DISCUSSIONS.

The Government intends to evaluate proposals and award a contract without discussions with offerors.

Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary

c. GENERAL INSTRUCTIONS.

(1) Submit only the documents specifically required in this section. Do not submit excess information; do not include audio-visual materials, electronic media, etc.

(2) Use only 8 ½ by 11 inch paper or A4 paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least one inch wide, but may include headers and footers. All pages must be numbered.

(3) The preferred method for assembling your proposal is to use three-ring binders; however, the use of pressboard or other report covers with compression or other type fasteners is acceptable. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages. Do not include loose papers.

(4) References to “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark their proposals in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors— Competitive Acquisition,” paragraph (e), “Restriction on disclosure and use of data.”

(5) In the case of an offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

(6) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

10. INSTRUCTIONS FOR SUBMISSION OF JOINT VENTURE AGREEMENTS

a. A Joint Venture offeror must submit with its technical proposal a copy of the joint venture agreement upon which the Joint Venture organization has been formed. The joint venture agreement must indicate that the joint venture is in existence as of the date and time that proposals are due to be submitted; or, alternatively, that the joint venture will automatically take legal effect immediately upon notification to the joint venture of contract award.

b. The joint venture agreement must be signed by a representative of each joint venture partner who has the requisite authority to bind the partner to the agreement, with the chief executive of each entity identified.

c. To be acceptable to the Government, the joint venture agreement must clearly state within its terms that each member of the joint venture is jointly and severally liable for all of the obligations of the joint venture itself with respect to completion of all work and services under the contract expected to result from the Solicitation.

d. The terms of the joint venture must detail, in terms of percentages, where appropriate, the relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.

e. Additionally, the joint venture agreement must specify who among the joint venture partners is authorized to sign the Solicitation, acknowledge the amendments to the Solicitation, if any, and bind the entire joint venture to its obligations under any contract which may result from the Solicitation.

11. SUB-CONTRACTOR CONTRACTORS

a. If an offeror wishes to receive credit for the experience or past performance of a Sub-Contractor, including a firm that is a proposed Sub-Contractor to the prime Contractor or a joint venture partner, the offeror must submit a letter of commitment to subcontract under the proposed project, signed both by the Sub-Contractor and the offeror.

b. For purposes of this Solicitation, such a Sub-Contractor shall be considered to be a “qualified Sub- Contractor.”

c. The commitment letter must be submitted even if the Sub-Contractor is in some way affiliated with a joint venture partner (for example, the Sub-Contractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary).

12. TEAMING ARRANGEMENT

If a contractor wishes to receive credit for the experience or past-performance from a teaming arrangement with another small business, provide the complete information on the arrangement, to include any relevant and recent past/present performance information on previous teaming arrangements with same partner.

13. SPECIFIC INSTRUCTIONS FOR VOLUME 1 – TECHNICAL PROPOSAL

(1) Number of Sets of the Technical Proposal. Submit an ORIGINAL and Four (4) additional sets of the Technical Proposal, with each set in a separate binder along with a CD containing the entire Technical and Price Proposal.

(2) Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the technical proposal will be appropriately labeled as such. Each technical proposal shall be organized using the tabs specified in the following chart. Note: The main tabs directly correlate to the evaluation factors identified in Section 00100 of the RFP.

TAB

CONTENTS OF THE TECHNICAL

PROPOSAL

PAGE

LIMITS

TAB 1

Factor 1

TECHNICAL APPROACH

Subfactor a – Key Personnel Qualifications Subfactor b – Prime Contractor Similar Experience Subfactor c – Management Plan Subfactor d - Safety

TAB 2

Factor 2

PAST PERFORMANCE 10

Pages submitted which exceed limitations listed above will not be evaluated. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

14. SPECIFIC INSTRUCTIONS FOR VOLUME 2 – PRICE PROPOSAL

(1) Number of Sets of the Price Proposal. Submit an ORIGINAL set of the Price Proposal in a binder. Also furnish price proposal on CD.

(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” or A4 pages. There are no page limits set for the price proposal. However, please provide only the information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

(3) Format and Contents of the Price Proposal and List of T abs. The Price Proposal shall be appropriately labeled and shall be organized and tabbed as indicated in the following chart.

CONTENTS OF THE PRICE PROPOSAL

TAB 1

The Proposal Cover Sheet, to include the offeror’s e-mail address, cell phone number, Name, Address, DUNS, CAGE Code and Tax Identification Numbers

TAB 2 Signed Standard Form 1442 and all Amendments (signed and dated)

TAB 3 Section 00010, Bidding Schedule

TAB 4 SAM Representations, Certifications, and Other Statements of the Offeror

(4) Detailed Sub mission Instructions for the Price Proposal

TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet are furnished at the end of this section.

TAB 2: The SF 1442, Solicitation, Offer, and Award is to be completed by the offeror and duly executed with an original signature by an official authorized to bind the offeror in accordance with FAR 4.102. Any and all amendments must be acknowledged by the offeror in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.

TAB 3: Section 00010 is to be completed in its entirety by the offeror. See Section 00010 with attached notes, for further instructions.

TAB 4: The offeror must complete the Online Representations and Certifications on the System for Award Management (SAM) website, and furnish under this tab.

If the offeror is a joint venture, each joint venture partner or entity must complete and attach the Online Representations and Certifications for its own organization, in addition to the “Reps and Certs” completed and submitted on behalf of the joint venture offeror.

15. PROPOSAL FORMAT - VOLUME 1

The Government will not make assumptions concerning intent, capabilities, or experience. Clear identification of proposal details shall be the sole responsibility of the offeror. The Government may reject incomplete proposals after initial evaluation without further consideration. Complete proposals shall meet the basic requirements identified in the RFP.

TAB 1: FACTOR 1 – TECHNICAL APPROACH

There are four (4) subfactors associated with this evaluation factor.

The Government will evaluate an offeror’s submitted information and experience under these Subfactors to determine if the contractors indicate technical capability to meet the requirements as specified within the contract specifications to accomplish work. To be considered ACCEPTABLE the contractor shall submit all required information under each Subfactor and such information shall meet the minimum technically acceptable requirements as defined in Section 00100, Part II, Paragraph 5 – Evaluation of Technical Proposal.

For submission of technical evaluation information or experience based on a Subcontractor, please refer to Section 00100, Part I, Paragraph 11-Subcontractor Technical Capability

For each Subfactor identified below the Government will evaluate the extent of designated subcontractor involvement as well as the integration of subcontracting efforts into the offeror’s management and technical approaches for successful performance of the project. Contractors should refer to FAR Clause 52.219-14 Limitations on Subcontracting for additional guidance.

The Offeror shall identify the subcontractors that are to be employed in the performance of project work that involves on- site management and/or construction work efforts. The types of work that each subcontractor would perform shall be identified.

Subfactor a – Key Personnel Qualifications:

(1) The offeror shall submit key personnel to be utilized on this requirement to ensure work is completed in accordance with the contract specifications. Offeror shall submit for each Key Personnel identified below the following minimum documentation:

a) Site Superintendent: Minimum requirements for this item to be rated Technically Acceptable include:

i. Submitted documentation indicates that the individual has 3 technical experiences supervising or performing all of the following items: rehabilitation of combined sewers and related appurtenances utilizing trenchless methods; rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods; the cleaning and lining of pipe sewers and point repairs; and the removal and replacement of pavements and roadways.

ii. Submitted documentation indicates that the individual has performed as a Superintendent for

5 years on projects involving rehabilitation of combined sewers and related appurtenances utilizing trenchless methods; rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods; the cleaning and lining of pipe sewers and point repairs; and the removal and replacement of pavements and roadways similar in magnitude that will be completed on this contract.

b) Contract Quality Control (CQC) System Manager: Minimum requirements for this item to be rated Technically Acceptable include:

i. Submitted documentation indicates that the individual has 3 similar experiences with performing quality control on all of the following items: rehabilitation of combined sewers and related appurtenances utilizing trenchless methods rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods; cleaning and lining of pipe sewers and point repairs; and removal and replacement of pavements and roadways.

ii. Submitted documentation indicates that the individual has performed a minimum of 5 years as a Quality Control System Manager on projects involving rehabilitation of combined sewers and related appurtenances utilizing trenchless methods; rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods; cleaning and lining of pipe sewers and point repairs; and removal and replacement of pavements and roadways similar in magnitude that will be completed on this contract.

Subfactor b – Prime Contractor Similar Experience:

(1) The offeror shall submit past experience for project requirements similar in magnitude and specific to this solicitation to demonstrate that the contractor has sufficient technical capability and resources to ensure work is completed in accordance with the contract specifications:

a) Rehabilitation of combined sewers and related appurtenances utilizing trenchless methods.

Minimum requirements for this item to be rated Technically Acceptable include:

i. Submitted documentation demonstrates that the contractor has previous experience performing rehabilitation of combined sewers and related appurtenances utilizing trenchless methods on a minimum of 3 projects similar in magnitude.

ii. Submitted documentation demonstrates that the contractor has an adequate technical approach and understanding for ensuring rehabilitation of combined sewers and related appurtenances utilizing trenchless methods as specified within the contract specifications, and the contractor indicates reasonable actions and methods to ensure that tolerances as specified in the contract are met.

b) Rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods. Minimum requirements for this item to be rated Technically Acceptable include:

i. Submitted documentation demonstrates that the contractor is licensed by approved geopolymer lining manufacturers and has previous experience performing rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods on a minimum of 3 projects similar in magnitude.

ii. Submitted documentation demonstrates that the contractor has an adequate technical approach and understanding for ensuring rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods as specified within the contract specifications, and the contractor indicates reasonable actions and methods to ensure that tolerances as specified in the contract are met on a minimum of 3 projects similar in magnitude.

c) Cleaning and lining of pipe sewers and point repairs. Minimum requirements for this item to be rated Technically Acceptable include:

i. Submission of a narrative demonstrating how past experience submitted provides technical knowledge and capability to perform the specific work item of this solicitation and the general planned approach for completion of such work item as identified in the contract requirements of this solicitation.

ii. Submitted documentation demonstrates that the contractor has previous experience performing and an adequate technical approach and understanding for ensuring cleaning and lining of pipe sewers and point repairs as specified within the contract specifications, specified in the contract are met on a minimum of 3 projects similar in magnitude.

d) Removal and replacement of pavements and roadways. Minimum requirements for this item to be rated Technically Acceptable include:

i. Submission of a narrative demonstrating how past experience submitted provides technical knowledge and capability to perform the specific work item of this solicitation and the general planned approach for completion of such work item as identified in the contract requirements of this solicitation.

ii. Submitted documentation demonstrates that the contractor has previous experience performing, and an adequate technical approach and understanding for ensuring removal and replacement of pavements and roadways as specified within the contract specifications, Subfactor c – Management Plan:

(1) The offeror shall submit a Management Plan to be utilized on this requirement to demonstrate technical capability to ensure work is completed in accordance with the contract specifications. Offeror shall submit for each item identified below all documentation requested within each item for a 30 month period of performance:

a) Sample Quality Control plan identifying all major phases of the work, Quality Control Staff, Quality Control Procedures, and specific layout and surveillance methods that will be utilized to assure technical compliance Minimum requirements for this item to be rated Technically Acceptable include:

i. Submission of Quality Control Plan

ii. Quality Control Plan specifies all major phases of the work to demonstrate that the contractor has a thorough understanding of the contract requirement.

iii. Quality Control Plan submitted demonstrates an adequate technical approach for ensuring rehabilitation of combined sewers and related appurtenances utilizing trenchless methods;

rehabilitation of main trunk sewers, manholes, and service connections utilizing geopolymer liner methods; cleaning and lining of pipe sewers and point repairs; and removal and replacement of pavements and roadways are performed as required by the contract specifications and an adequate technical approach is provided ensuring tolerances for such features are monitored and obtained.

b) Resources, equipment, and personnel required to accomplish work. Minimum requirements for this item to be rated Technically Acceptable include:

i. Offeror shall submit a list of resources, equipment, and personnel to be utilized to accomplish work, noting whether those resources are owned/employed by the contractor and/or how they are readily available to the contractor.

c) Anticipated schedule of work indicating critical path for accomplishment of all definable features of work within period of performance. Minimum requirements for this item to be rated Technically Acceptable include:

i. Submission of Schedule that identifies the following:

a) Critical path of all definable features of work within the solicitation.

b) Adequate plan for how resources will be mobilized to site.

c) Operations which shall take place at night.

d) Submission of narrative to explain the contractor’s assumptions to include number of workers, required shifts, schedule of activities, required equipment, critical path elements, anticipated risk, anticipated downtime, anticipated lead time for materials. Minimum requirements for this item to be rated Technically Acceptable include:

i. The offeror’s narrative shall demonstrate the offeror’s technical knowledge and understanding of the requirement and demonstrate that the offeror has accounted for all aspects of work to include risk to develop an adequate critical path schedule to complete all work in accordance with the sequence, flow, and time restraints as specified in the contract specifications.

Subfactor d – Safety:

(1) The offeror shall submit a Safety Plan to be utilized on this requirement to demonstrate safe practices and programs that will be implemented to ensure work is completed in accordance with the contract specifications in a safe and efficient manner. Offeror shall submit for each item identified below all documentation requested within each item:

a) General Safety Plan identifying the major phases of work associated with this solicitation and the anticipated risk and safety initiatives that shall be implemented against each major phase of work to ensure work is completed in a safe and efficient manner in accordance with OSHA and the EM385-1-1. Safety Plan shall address how the Prime Contractor shall ensure the safe practices of all subcontractors utilized on this requirement. Minimum requirements for this item to be rated Technically Acceptable include:

i. Submission of Safety Plan. All major phases of work identified with anticipated risk and safety initiatives to be implemented for each major phase of work.

ii. Safety Plan addresses Contractors approach for ensuring safe practices of all subcontractors.

iii. Safety Plan demonstrates that the contractor shall implement a Safety Program and Initiatives to ensure work is completed in a safe and efficient manner in accordance with OSHA and the

EM 385-1-1.

b) Corporate Statement of Safety and Health Policy. Minimum requirements for this item to be

i. Submission of Corporate Statement of Safety and Health Policy

ii. Submitted documentation indicates that the Contractor has implemented a safety program and all employees are required to adhere to safe practices.

c) Responsibilities and Lines of Authorities associated with the Offeror’s Safety Program to be utilized for administration of work in association with this solicitation. Designated Site Safety Officer shall be indicated for this requirements and shall submit experience indicating a minimum of 5 years in performing duties associated with Site Safety Supervisor. Minimum requirements for this item to be rated Technically Acceptable include:

i. Submission of Responsibilities and Lines of Authorities for all key personnel that will be utilized in performance of the Offeror’s Safety Program.

ii. Lines of Authorities and Responsibilities submitted demonstrate that the contractor has an adequate system in place to ensure safety on the jobsite and reporting and recording of incidents in accordance with the EM 385-1-1.

iii. Submission and designation of Site Safety Supervisor with experience demonstrating a minimum of 5 years’ experience performing duties associated with Site Safety Supervisor.

TAB 2: FACTOR 2 – PAST PERFORMANCE

The Proposal must include the attached Past Performance Questionnaire (PPQ) forms for all projects represented within the past experience. The Government shall evaluate offeror past performance either as acceptable/unacceptable considering the submitted Past Performance Questionnaire (PPQ) forms (which consist of five (5) pages) (do not include Adjective Ratings and Definitions) at the end of Section 00100, representing the offeror’s relevant Past Performance. Past Performance on projects shall be the same or similar in size, scope, complexity and dollar magnitude as the project described in the solicitation.

Submitted documentation shall demonstrate the past performance of the offeror and, if you wish, other members of the proposed team, if any, including Sub-Contractors, Teaming Partners and/or Joint Venture partners.

To be considered for evaluation, a submitted PPQ form must describe a project that is relevant to the project described in the solicitation, and has been completed within the last 6 years.

The offeror shall provide its System for Award Management (SAM) Commercial and Government Entity

(CAGE) Code and Data Universal Numbering System (DUNS) in Block 1 of the PPQ.

To receive credit for past performance by a Sub-Contractor, or work which the prime Contractor previously performed as a Sub-Contractor to another prime, the PPQ must state in detail the nature of the work performed as a Sub-Contractor, the total percentage of the overall contract performed as a Sub-Contractor and the total amount of work performed as a Sub-Contractor.

To receive credit for past performance as a Joint Venture, the PPQ form must state in detail the nature of the work performed by both of the Joint Venture partners, the total percentage of the work performed by both of the Joint Venture partners, and the total amount of work performed by both of the Joint Venture partners.

To receive credit for past performance as a Teaming Arrangement, the PPQ form must state in detail the nature of the work performed by both of the Teaming Partners, the total percentage of the work performed by each partner, and the total amount of the work performed by each partner.

16. PROPOSAL FORMAT - VOLUME 2: PRICE

The offeror’s prices shall contain all costs to complete the work contained in the Price Proposal Schedule that is part of this solicitation. The offeror’s prices shall contain all costs including profit, all overhead (to include office and field overhead), labor burden, insurance, adjustments to listed prices, general and administrative expenses, Sub-Contractor mark-up, mobilization and demobilization, and all other costs including, but not limited to, compliance with environmental laws, permits, preparation of reports, correspondence documentation required by law or these specifications, tax laws, protection and/or moving of Government property and engineering services. (Engineering services include those services that are incidental to construction, and completing submittals for construction work). The prices shall also include costs necessary to interface with Government representatives, and coordination with occupants and other Contractors, as necessary.

Information to be provided in Volume 2:

• Proposal Cover Sheet (see instructions below)

• Standard Form 1442 “Solicitation, Offer and Award” and all amendments to the solicitation signed and dated

• Section 00010 Bid Schedule

• Copy of SAM’s Representations and Certifications for offeror

Proposal Cover Sheet

1. Solicitation Number:

2. The offeror’s name, address, office and cell phone numbers and e-mail address.

3. A statement certifying that the enclosed proposal conforms to all terms, conditions, and provisions of the solicitation and a promise to furnish all items and services at the fixed price which the offeror has set opposite each item or service, or a statement specifying any exceptions contained in the offeror’s proposal to the technical standards and cost/price standards set forth in the solicitation, including any exceptions to the requirements of this solicitation inherent in the offeror’s standard terms and conditions.

4. Names, titles, land line and cell phone numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation.

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of the agent’s authority to bind the offeror, unless that evidence has been previously furnished to the issuing office.

6. Offeror’s DUNS, CAGE Code and TAX Identification Numbers.

EXPERIENCE INFORMATION

(To be completed by Offeror)

1. Contractor:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO/PO Status:

Active Complete

Percent (%) complete and scheduled completion date (if active):

Completion Date (if 100% complete): Prime Sub-Contractor

1. Project Title:

Client POC:

Client Telephone:

Client Email:

Location (City and Province):

2. Project Description:

Features of work that the Offeror completed, including a statement of the total dollar value of this work:

PAST PERFORMANCE QUESTIONNAIRE

Note: The past performance questionnaire consists of a total of five (5) pages.

CONTRACT INFORMATION (Offeror to complete Blocks 1-4)

1. Contractor Information

Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture (Explain)

Percent of project work performed:

If Sub-Contractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: THE GOVERNMENT REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.