S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf

PDF 19 MB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades
Solicitation number
36C77626R0025
Issued by

About this file

This file is a collection of 100 construction drawings (Part 7 of 24) for the EHRM Infrastructure Upgrades project at the Hershel "Woody" Williams Veterans Affairs Medical Center in Huntington, West Virginia. The drawings include mechanical systems details (HVAC, plumbing, controls), electrical plans and schematics, fire protection systems, telecommunications bonding diagrams, and associated schedules across multiple buildings and levels. The mechanical drawings (M-series sheets) detail ductwork layouts, refrigerant piping, condensate drainage, chilled water systems, fan coil units, and control sequences for various buildings. The electrical drawings (E-series sheets) provide lighting plans, power distribution, panel locations, receptacle locations, and conduit routing for buildings throughout the facility. The documents are dated September 3, 2025, prepared at 100% Construction Documents phase by SPEES Design Build, and include comprehensive legends, general notes, abbreviations, and typical details for construction implementation. These are design and specification documents, not procurement or contractual documents.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHOWN AREA

PROJECT

NORTH

X Y Z

M-301-2B

M-302-2B

T

H

R

M

H

T M R

T

H

T

H

R

M

GC115-1-CRAC-01

GC115-1-ERV-01

BMS

GC114

ELECTRICAL 2

GC114a

CORRIDOR

MECH / FIRE

5ELECTRICAL 1

ENTRANCE #1

CORRIDOR

DATA CENTER

GC115-1

ENTRANCE #2

GC115-1-CRAC-02

24"x18" 24"x18"

48"x30"

H

TR

M

T H

R

M

R

M

(TYPICAL)

"ø

"ø

10"ø

12"ø

CONTRACTOR TO

BALANCE AT 75

CFM

FSD

SDS, 8X8

50 CFM

SDS, 8X8

60 CFM

RGS, 8ø

60 CFM

RGS, 8ø

155 CFM

SDS, 8X8

145 CFM

RGS (8"Ø)

160 CFM

SDS, 8X8

145 CFM

RGS, 8ø

50 CFM

SDS, 8X8

50 CFM

12"ø

8"ø

8"ø

8"ø

12"ø

8"ø

10"ø

8"ø

10"ø

8"ø

8"ø

8"ø

8"ø

M-302-2B

GC115-EDH-01-5 8

8"ø

GC115-H-01-5

10"ø

10"ø

GC115-1-DH-01-5

GC115-1-DH-02-5

TELE

GC118

BATTERY

GC119

STAIR 1

MEN

GB174

WOMEN

GB175

LINEN

GB169

TR TOWER 1

T1-00G

PUBLIC LOBBY

CG19

CORRIDOR

CG-43

OXYGEN STOR

GC112

IRM MECH.

SUPPORT

GC103

WOMEN

GC109

MEN

GC108

STAIR 9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:3

P M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

MH421-2B

PHASE 2B - LVL 00 - DATA CENTER - HVAC

DUCT - FLOOR PLAN

GC115-1

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

PROJECT

NORTH

3/16" = 1'-0"1

PHASE 2B - DATA CENTER -FLOOR PLAN - HVAC DUCT

SEE DETAIL 26 ON SHEET M-503 AND CONTROLS DIAGRAM 6

ON SHEET M-702 FOR SENSOR LAYOUT IN MONITORED

RACKS AND NUMBER OF MONITORED RACKS.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE

THAN 1FT. ABOVE FINISHED FLOOR.

PROVIDE WALL OPENING AND DUCT SLEEVE. SEE DETAIL

NUMBER 23 ON SHEET M-503.

PROVIDE WALL OPENING AND DUCT SLEEVE. SEE DETAIL

NUMBER 25 ON SHEET M-503. FURNISH AND INSTALL

FIRE/SMOKE DAMPER.

TIE IN NEW DUCTWORK TO DUCTWORK INSTALLED IN

PREVIOUS PHASE.

SEE EXHAUST CONTINUATION ON SHEET MH422-2B.

SEE OUTSIDE AIR DUCT CONTINUATION ON SHEET

MH422-2B.

FURNISH AND INSTALL ELECTRIC DUCT HEATER.

Revisions: Date:

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

KEYNOTES #

/0

3/

X Y Z

GC115-GV-01

GC115-GV-02

GC115-1-CU-08-1

GC115-1-CU-01-3

GC115-1-CU-03-3

GC115-1-CU-02-3

GC115-1-CU-06-6

GC115-1-CU-04-4

GC115-1-CU-05-6

GC115-1-CU-07-6

GC115-1-COND-01

GC115-1-COND-02

GC115-1-CU-10-GC114

GC115-1-CU-09-GC114a

3 5

3 5

3 5

3 5

GC115-GV-03

GC115-GV-04

GC115-1-RD-02

GC115-1-RD-01

GC115-1-CU-12-GC119

GC115-1-CU-11-GC118 2

3 5

3 5

R L /R

S R

L /R

S R

L /R

S

RL/RS

(E)RL/RS

(E)RL/RS

(E )R

L /R

S

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:3

P M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

MH422-2B

PHASE 2B - ROOF - DATA CENTER - ROOF

PLAN

GC115-1

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

SEE EXHAUST CONTINUATION ON SHEET MH421-2B.

SEE DETAIL NUMBER 12 ON SHEET M-502.

SEE DETAIL NUMBER 6 ON SHEET M-501.

SEE DETAIL NUMBER 7 ON SHEET M-501.

FROM BELOW, FOR CONTINUATION SEE SHEET MP420-2B.

PIPE INSTALLED IN PREVIOUS PHASE TO REMAIN.

CONDENSING UNIT INSTALLED IN PREVIOUS PHASE TO

REMAIN.

SEE OUTSIDE AIR DUCT CONTINUATION ON SHEET

MH421-2B.

GRAVITY VENTILATORS INSTALLED IN PREVIOUS PHASE TO

REMAIN.

PROJECT

NORTH

3/16" = 1'-0"1

PHASE 2B - DATA CENTER - ROOF PLAN

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING

CONCEALED IN WALLS, CHASES OR CEILING SPACES.

KEYNOTES #

Revisions: Date: 09 /0

3/

NORTH

X Y Z

DATA CENTER

GC115-1

ENTRANCE #2

ENTRANCE #1

ELECTRICAL 1

MECH / FIRE

CORRIDOR

ELECTRICAL 2

GC114a

BMS

GC114

TELE

GC118

BATTERY

GC119

3"Ø

3"Ø

SAN

S A

N4

GC115-1-FD-01

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:4

P M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

PP-423-2B

PHASE 2B - LVL 00 - DATA CENTER - PLUMBING

PIPING

GC115-1

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

PROJECT

NORTH

Revisions: Date:

3/16" = 1'-0"1

PHASE 2B - DATA CENTER -FOUNDATION PLAN - PLUMBING PIPING

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF ROOMS.

2. ALL SANITARY PIPING SHALL SLOPE AT 1/4" PER LINEAR

FOOT IN THE DIRECTION OF FLOW.

KEYNOTES

TIE IN TO SANITARY PIPING INSTALLED IN PREVIOUS PHASE.

SANITARY PIPING SHALL BE ROUTED UNDER THE FLOOR.

3" FLOOR CLEAN OUT.

FURNISH AND INSTALL NEW FLOOR DRAIN.

SEE SHEET 01S-M-401 FOR CONTINUATION.

/0

3/

A B D E F H I J K L MGC N O P Q R S T U V W X Y Z

A16 A15 A14

A7A6 A5

A4 A3

A8

A11 A10A9

A2 A1

02-M-402

02-M-402

PAINT SHOP

TOILET

BD102A

PAINT

BOOTH

BD102B

TLT

PAINT

VAULT

STORAGE

BD102D

M&O

FOREMAN

BD102C

DIAGNOST

TREATMENT

B20

FEED/

BEDDING

B21

ELEC.

B22

REFRIG

B23

QUARNTN

ROOM

B01

SIG./PH.

B27

T. SURG.

B19A

PRO LAB

B19

S. SURG.

B18A

ELEVATOR

SE-1

CORRIDOR

CB-6

CORRIDOR

CB-5

WORK/SUPP

B18

POST OP

B17

PREP/

SCRUB

B16

ANIMAL

B15

ANIMAL

B14

ANIMAL

B24

ANIMAL

B25

ANIMAL

B26

ANIMAL

B13

CLN CAGE

WASH

B08

SOILED

CAGE

WASH

B10

CAGE STO.

B08A

RECEIVING

B02

MEN

B03

WOMEN

B04

COLD RM

B05

H.A.C.

B06

NECROPSY

B07

TRASH

B32

MU FLAM

B31

VA FLAM

B28

VA GAS

B29

MU GAS

B30

EMERG.

GENERATOR

BB115

ELECTRICAL

SWITCH

BB116

VET OFF

B12

PRO LAB

B11

SUP. OFF

B12A

TR

B09

CORRIDOR

CB-2

CORRIDOR

CB-1

STAIR

ENGR.

CONTROL

BB117C

ELEC.

BB117A

TELE.

BB117B

MECHANICAL

ROOM

BB117

STAIR

S-1

CORRIDOR

CART LIFT

MACH RM

BB106E

H.A.C.

BB106D

BB102B

MEDIVATOR

BB106C

PREP. &

ASSEMBLY

STERILE

BB106A

STERIL

BB106B

H.A.C.

BB102A

M. LKR

BB103

DECON VEST

SOILED

MACH RM.

BB104

ADMIN

OFFICE

BB105

AUTO CART

WASH

BB102C

A CHIEF SPS

BB105B

CHIEF SPS

BB105A

STERILE

PROCESSING

SERVICE

CLEAN

SUPPLY

BB106 OFFICE

BB106F

CLEAN

RECEIVING

ANTEROOM

BB110C

WAREHOUSE

OFFICE

BB110A

TOILET

BB110B

CORRIDOR

CORRIDOR

RECEIVING &

SHIPPING

DOCK

BB109

WAREHOUSE

BB110

ELECTRICAL

SWITCH

GEAR

ELEVATOR

MACHINE

ROOM

MAINT.

ELEV

P9

ELEC

BD102

ELECTRIC

BD103

STORAGE

BD107

WATER

INTAKE

BD108

WATER

SOFTENER

BD106

BD105

BIOMEDICAL

ENGINEERING

BD104

BD100

MAS MAIL

ROOM

BD101

CORRIDOR

CORRIDOR

CB

ELEC

SHREDDING

MAS

STOR

TLT

ELEV

F8

ENG.

PLUMPING

SHOP

BD112

ENG. AIR

CONDITIONING

SHOP

BD110

HOT WATER

HEATERS

ENG

STORAGE

BD106A

ENG.

ELECTRICAL

SHOP

HVAC

BD104A

LOCKSMITH

BD104B

ENG. M&R

FOREMAN

CARPENTRY

SHOP

TOILET

BB108A

DECONTAMINATION

BB102

CORRIDOR

TR TOWER 3

T3-00B

T3-SA

T3-SB

BUILDING 02

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:1

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

02-M-101

BUILDING 02 - BASEMENT - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

SITE PLAN

1/16" = 1'-0"1

BASEMENT - OVERALL PLAN A

PROJECT

NORTH

Revisions: Date: 09 /0

3/

A B D E F H I J K L MGC N O P Q R T U V W X Y Z

A16 A15 A14

A7A6 A5A4

A3

A8

A11A10A9

A2 A1

02-M-403

02-M-403

TR TOWER 3

T3-00G

T3-SA

T3-SB

CORRIDOR

CG-43

LAUNDRY

PLANT

FOREMAN

GD114C

UNIFORM

STOR

GD114B

SEWING

GD114A

BOILER

ROOM

GD114G

SOILED

GD113

CPU ROOM

GD112

LOUNGE/BREAK

PT. CLOTH

GD111

LOCKERS

G112D

SHR

GD112B

MEN

GD112A

FPMS

GC155

GD110A

GD110

ELEV

F8

FREEZER

FREEZER

FRIDGE

FREEZER

SALAD PREP

GD109

MECH

GD105

GD104

GD106

IRM

GD108

IRM

GD100

GD103

GD102

GD101

GD107

MAINT. ELEV

P9

SERVICE

LOBBY

CG17

GB168g

BVA

GB168c

IRM

GB168a

EXAM

GB168k

FEE CLAIMS

GB168b

BOOTH

EXAMINER

GB168j

GB168l

GB168

GB168i

GB168h

MEDICAL

RECORDS

GB168d

GB168f

GB168e

STAIR 4

MECH RM

GB167

HEALTH

TECH

GB149c

HEALTH

TECH

GB149d

EXAM

GB149e

EXAM

GB149f

EXAM

GB149g

AUDIOLOGY

ROOM

GB149

RECEP

GB148

OFFICE

GB148a

OFFICE

GB148b

OFFICE

GB146

TLT

GB145

CERUMEN

MGMT

GB147b

TLT

GB144

GB143

HAC

GB142

GERI PACT

GB151

GERI PACT

GB152

GB140

GB141

STORAGE

GB141a

CLEAN

SUPPLY

GB139

AMCARE

ADMIN

GB150

AMCARE

GB150A

AMCARE

ADMIN

GB168rr

GERI PACT

GB155H

CORRIDOR

CG11

CORRIDOR

CG13

RECEIVING

ENTRY

EXAMINER

GB149h

EXAMINER

GB149i

BOOTH

BOOTH

BOOTH

ELEC.

GB166b

TEL

GB166a

EXAMINER

GB149j

POSTIOGRAPHY

& LAB

GA121

CORRIDOR

CG14

CORRIDOR

CG15

STAIR 3

GC160

MECH

GB166

ELEVATOR

EQUIP.

G01

LIFT EQUIP.

G06

CORRIDOR

G07

LOBBY

G05

CORRIDOR

C-G1

ELEC.

G03

STAIR

S-1

ELEVATOR

SE-1

SIGNAL/PH

SE-2

OPEN

MECHANICAL

SPACE

GO7

MECH.

G02

ELEVATOR

P-2

STAIR

S-2

BREAKROOM

GA107

RECEIVING

ENTRY

GC180

STORAGE

GC181

LAB

GC184

X-RAY

GC185

STAIR 6

GC186

CHAIR 5

GC189

CHAIR 6

GC190

CHAIR 4

GC197

CORRIDOR

GC198

CORRIDOR

T3-00M

CORRIDOR

T3-00N

LOUNGE

GD114E

TOILET

GD114D

LAUNDRY

GD114

STORAGE

GD114F

GC216

GC217

GC218

GC219

GC221

GC222

GC223

GC225

Room

XXX

Room

XXX

Room

XXX

AREA SHOWN

TRUE

NORTH

BUILDING 02

1/16" = 1'-0"1

LEVEL 00 - OVERALL PLAN A

SITE PLAN

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:2

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

02-M-102

BUILDING 02 - LEVEL 00 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

Revisions: Date: 09 /0

3/

NORTH

A7

A6

A5

A4

A3

A8

A11

A10

A9

A2

A1

PAINT SHOP

TOILET

BD102A

TLT

PAINT VAULT

STORAGE

BD102D

M&O FOREMAN

BD102C

ELEVATOR MACHINE ROOM

MAINT. ELEV

P9

ELEC

BD102

ELECTRIC

BD103

STORAGE

BD107

WATER INTAKE

BD108

WATER SOFTENER

BD106

BD105

BIOMEDICAL ENGINEERING

BD104

BD100

MAS MAIL ROOM

BD101

CORRIDOR

CORRIDOR

CB

ELEC

SHREDDING

MAS

STOR

TLT

ELEV

F8

ENG. PLUMPING SHOP

BD112

ENG. AIR CONDITIONING SHOP

BD110

HOT WATER HEATERS

ENG STORAGE

BD106A

ENG. ELECTRICAL SHOP

HVAC

BD104A

LOCKSMITH

BD104B

ENG. M&R FOREMAN

CARPENTRY SHOP

E(CHS) (E)CHR

E(CHS)

(E)CHR

E(CHS)

(E)CHR

E(CHS)

(E)CHR

HWS

HWR

CHS

C H

R

1 1/4" Ø1 1/4" Ø

1" Ø1" Ø

(E)FCU 6-2-B

(E)FCU 5-2-B

(E) FCU 2-2-B (E) FCU 3-2-B

(E) FCU 4-2-B

TR TOWER 3

T3-00B

02-ML-02

02-ML-014

T3-SAT3-SB

(E) FCU 1-2-B

(E)HWR

(E)HWS

(E)HWR

(E)HWS

(E)HWS

(E)HWR

(E)HWR

(E)HWS

EXISTING 4"

LINES

EXISTING 4"

LINES

2 2 2

2 2

HWS

HWR

CHS

CHR

PIPE ROUTING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:2

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

02-M-401

BASEMENT FLOOR PLAN - MECHANICAL

PIPING TO TR TOWER 3

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

FURNISH AND INSTALL NEW CHILLED WATER SUPPLY AND

RETURN PIPE. TIE-IN TO EXISTING CHILLED WATER LINES.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

FOR CONTINUATION SEE SHEET 02-M-402.

FURNISH AND INSTALL NEW METRAFLEX FLANGED LOOP.

SEE EQUIPMENT SCHEDULES ON SHEET M-602.

FURNISH AND INSTALL NEW HOT WATER SUPPLY AND

RETURN PIPE. TIE-IN TO EXISTING HOT WATER LINES.

PROJECT

NORTH

1" = 10'-0"1

BASEMENT FLOOR PLAN - MECHANICAL PIPING TO TR TOWER 3

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES OR

CEILING SPACES.

KEYNOTES #

Revisions: Date: 09 /0

3/

NORTH

T3-00B

A7 A6

A5

A4

A8 A9

TR TOWER 3

T3-00B

HWS

HWRCHS

CHR

M&O FOREMAN

BD102C

STORAGE

BD102D

PAINT

BOOTH

BD102B

TOILET

BD102A

CARPENTRY

SHOP

02-FCU-01-T3-00B

3/4" Ø

3/4" Ø

5/8" Ø

1 1/4" Ø 71

3/4" Ø 4

T

H

M

D

D

D

D

D

T3-SA

T3-SB

3/4" Ø

3/4" Ø

A7 A6

A8 A9

TR TOWER 3

T3-00B

EXPOSED

CARPENTRY

SHOP

T3-SA

T3-SB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:1

:4

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

02-M-402

BUILDING 02 - T3 - BASEMENT - FIRE

PROTECTION, PLUMBING, AND MECHANICAL -

FLOOR PLAN & RCP 02

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

PROJECT

NORTH

SEE PIPE RISER DIAGRAM NUMBER 3 ON SHEET M-505.

FOR CONTINUATION SEE SHEET 02-M-401.

INSTALL CHILLED WATER SUPPLY AND RETURN LINES.

PROVIDE PIPE INSULATION FOR ALL CHILLED WATER

LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION

SECTION 23 05 11.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION

23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION

SECTION 23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

CONDENSATE LINE TO BE ROUTED TO THE EXISTING

FLOOR SINK SANITARY LINE. SEE DETAIL NUMBER 2 ON

SHEET M-501.

TO FLOOR ABOVE, FOR CONTINUATION SEE SHEET

02-M-403.

SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED

AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR

IV SPRINKLER DESIGNER. SPRINKLER HAZARD

CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM

APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS

WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL

GUARD.

INSTALL HOT WATER SUPPLY AND RETURN LINES.

PROVIDE PIPE INSULATION FOR ALL CHILLED WATER

LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION

SECTION 23 05 11.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

02-M-403.

1/4" = 1'-0"1

RM T3-00B - FLOOR PLAN

1/4" = 1'-0"2

RM T3-00B - RCP

PROJECT

NORTH

Revisions: Date:

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. ROUTE ALL CONDENSATE PIPING CONCEALED IN WALLS,

CHASES OR CEILING SPACES.

KEYNOTES #

/0

3/

NORTH

T3-00G

A7 A6

A8 A9

D H

W S

H W

R C

H S

C H

R

TR TOWER 3

T3-00G

LAUNDRY

GD114

M

T

H

02-FCU-02-T3-00G

3/4" Ø

3/4" Ø

3/4" Ø

T3-SA

T3-SB

A7 A6

A8 A9

TR TOWER 3

T3-00G

LAUNDRY

GD114

EXPOSED

T3-SA

T3-SB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:3

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

02-M-403

BUILDING 02 - T3 - LEVEL 00 - FIRE

PROTECTION, PLUMBING, AND MECHANICAL -

FLOOR PLAN & RCP 02

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

RM T3-00G - FLOOR PLAN

1/4" = 1'-0"2

RM T3-00G - RCP

SEE PIPE RISER DIAGRAM NUMBER 3 ON SHEET M-505.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

02-M-402.

INSTALL CHILLED WATER SUPPLY AND RETURN LINES.

PROVIDE PIPE INSULATION FOR ALL CHILLED WATER

LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION

SECTION 23 05 11.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07

11. PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION

23 05 11.

SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED

AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR

IV SPRINKLER DESIGNER. SPRINKLER HAZARD

CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM

APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS

WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL

GUARD.

INSTALL HOT WATER SUPPLY AND RETURN LINES.

PROVIDE PIPE INSULATION FOR ALL CHILLED WATER

LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION

SECTION 23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

INSTALL MANUAL AIR VENT ON HYDRONIC HOT AND

CHILLED WATER PIPING AT HIGH POINT IN TELECOM

ROOM. SEE DETAIL 8 ON SHEET M-501.

PROJECT

NORTH

PROJECT

NORTH

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN

LIGHT.

3. ROUTE ALL CONDENSATE PIPING CONCEALED IN WALLS,

CHASES OR CEILING SPACES.

KEYNOTES #

Revisions: Date: 09 /0

3/

A B C D E F G

TANKS

SP3004-3

TANKS

SP30004A-3

GENERATOR

SP3000-3

PARTS

SP3001-3

KITCHEN

SP3000-3

PUMP

SP3011-3

CONTROL

SP3012-3

BOILER 1

SP3013-3

BOILER 2

SP3014-3

BOILER 3

SP3015-3

BOILER 4

SP3016-3

PIT

03-M-401

TE

SP3005-3A

STORAGE

SP3005-3

BUILDING 03

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032 NON SPRINKLERED

(206) 590-2118

RAY SPEES

/2

/2

:5

:0

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

03-M-101

BUILDING 03 - LEVEL 01 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

LEVEL 01 - OVERALL PLAN

PROJECT

NORTH

SITE PLAN

Revisions: Date: 09 /0

3/

SP3005-3

PROJECT

NORTH

E F

STORAGE

SP3005-3

TANKS

SP3004-3

TANKS

SP30004A-3

E F

D

D

3/4"Ø 2

345 1

(E)FD

03-RCU-01-SP3005-3

1/4" = 1'-0"1

RM SP3005-3 - FLOOR PLAN

PROJECT

NORTH

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.

PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION

23 05 11.

ROUTE CONDENSATE LINE DOWN TO 1'-0" ABOVE FINISH

FLOOR LEVEL AFTER PENETRATING WALL.

CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET

SHROUDING/CLADDING TO COVER CONDENSATE PIPING.

USE LOW PROFILE UNISTRUT FOR CONDENSATE PIPING.

PAINT SHROUD TO MATCH ADJACENT WALL AND

COORDINATE COLOR WITH COR.

CONDENSATE LINE TO BE ROUTED TO THE EXISTING

FLOOR DRAIN. SEE DETAIL NUMBER 2 ON SHEET M-501.

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. ROUTE ALL CONDENSATE PIPING CONCEALED IN WALLS,

CHASES OR CEILING SPACES.

KEYNOTES #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032 NON SPRINKLERED

(206) 590-2118

RAY SPEES

/2

/2

:5

:0

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

03-M-401

BUILDING 03 - LEVEL 01 - PLUMBING AND

MECHANICAL - FLOOR PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

Revisions: Date: 09 /0

3/

A B C D E F G H I J K L M N

04-M-401

04-M-401

04-M-401

04-M-401

CAN STORAGE

STAIRS

RECEIVING

RETAIL STORE

DINING ROOM

EXT SHELTER

MEN

WOMEN

TR

ELEVATOR

ELEV ROOM

STORAGE

SERVING AREA

REFRIGERATORS

SALAD ROOM

MECHANICAL

E-121

ELEC

E-122

SECURE STOR

STAFF TLT

DISHWASHING

KITCHEN

RETAIL STOCK

RETAIL STOCK

LOCKER

CORRIDOR

CHIEF VCS

NO ROOM NUMBER

NRN

AREA SHOWN

PROJECT

NORTH

BUILDING 04

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:4

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

04-M-101

BUILDING 04 - LEVEL 00 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/8" = 1'-0"1

LEVEL 00 - OVERALL PLAN

PROJECT

NORTH

SITE PLAN

Revisions: Date: 09 /0

3/

L M N

L M N

L M N

T

H

R

M

04-VRF-02-4001

3/4"Ø

D

R S

/R L

D

1/4"Ø RL, 1/2"Ø RS 5

04-VRF-01-4001

3/8"Ø RL, 5/8"Ø RS

WOMEN

TR

ELEVATOR

STORAGE

CORRIDOR

L M N

EXPOSED

WOMEN

TR

ELEVATOR

STORAGE

CORRIDOR

WOMEN

OFFICE

ELEVATOR

STORAGE

CORRIDOR

WOMEN

ELEVATOR

STORAGE

WOMEN

OFFICE

ELEVATOR

STORAGE

CORRIDOR

WOMEN

ELEVATOR

STORAGE

SHOWN AREA

PROJECT

NORTH

1/4" = 1'-0"1

RM 4001 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"2

RM 4001 - DEMOLITION RCP

1/4" = 1'-0"3

RM 4001 - FLOOR PLAN

1/4" = 1'-0"4

RM 4001 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH EXISTING DUCTLESS AC UNIT. DEMOLISH

REFRIGERANT PIPE SERVING DUCTLESS AC UNIT.

DEMOLISH EXISTING CONDENSATE PUMP. DEMOLISH

CONDENSATE PIPE.

DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.

EXISTING PIPING TO REMAIN.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT

MORE THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).

PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES

PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE

SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE

SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS

OF DESIGN MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.

PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION 23

05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

04-M-402.

SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED

AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR

IV SPRINKLER DESIGNER. SPRINKLER HAZARD

CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM

APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS

WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL

GUARD.

PROVIDE DRIP PAN WITH MOISTURE SENSOR FOR

EXISTING OVERHEAD PIPING. TIE MOISTURE SENSOR

INTO BMS FOR ALARM.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

04-M-401

BUILDING 04 - LEVEL 00 - FIRE PROTECTION,

PLUMBING, AND MECHANICAL - DEMOLITION,

FLOOR PLANS & RCPS 04

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING

CONCEALED IN WALLS, CHASES OR CEILING SPACES.

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,

EXISTING WORK TO REMAIN SHOWN LIGHT.

KEYNOTES #

Revisions: Date:

/0

3/

I J K L M N

104-CU-01-4001RS/RL

4 5 6 7

3/8"Ø RL, 5/8"Ø RS8

AUDITORIUM

VCS STOR

MEDIA

STAIR

LOBBY

ELEVATOR

VCS STORAGE

D

VCS

STORAGE

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

04-M-402

BUILDING 04 - LEVEL 01 - MECHANICAL PIPING

- FLOOR PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

LEVEL 01 - FLOOR PLAN

PROJECT

NORTH

SEE DETAIL NUMBER 11 ON SHEET M-502.

CONDENSATE TO BE DISCHARGED TO THE GROUND.

TERMINATE CONDENSATE PIPING WITH A DOWNTURNED

ELBOW 12" ABOVE FINISHED GRADE.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

ROUTE REFRIGERANT AND CONDENSATE LINE DOWN TO

1'-0" ABOVE FINISH FLOOR LEVEL BEFORE PENETRATING

WALL.

CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL

REFRIGERATION LINE - SET COVER TO CONCEAL

REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO

COORDINATE COLOR WITH VA COR.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

04-M-401.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).

PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES

PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE

SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE

SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS

OF DESIGN MANUFACTURER.

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING

CONCEALED IN WALLS, CHASES OR CEILING SPACES.

KEYNOTES #

Revisions: Date: 09 /0

3/

A B C D E F G H I J K L M N O P

3.5

COUNSEL

STOR

ELEC

CORRIDOR

5000B

CORRIDOR

5000A

WOMEN

MEN

STOR

ENTRANCE

LOBBY

ELEV.

5E1

SPKR

ELEV. EQUIP

GROUP ROOM 2

STAIR 2

EXAM

GROUP ROOM 3

COMMUNICATION

MEN

WOMEN

TR

PIT

MECHANICAL

GROUP ROOM 1

KITCHEN

COUNSEL

05-M-401

05-M-401

05-M-401

05-M-401

STAFF

LOUNGE

BUILDING 05

AREA SHOWN

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

05-M-101

BUILDING 05 - LEVEL 00 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/8" = 1'-0"1

LEVEL 00 - OVERALL PLAN

PROJECT

NORTH

SITE PLAN

Revisions: Date: 09 /0

3/

O P

10"x10" S.A (UP)

(E )F

P

(E)10"Ø

(E)FP

O P

O P

T

H

M

TR

ELEC

CORRIDOR

5000B

WOMEN

COMMUNICATION

R

05-VRF-01-5044

RL/RS

D

D

8 11

3/4"Ø

3/8"Ø RL, 5/8"Ø RS

05-VRF-02-5044

R L /R

S

10"x10" S.A (UP)

(E )F

P

(E)FP

1/4"Ø RL, 1/2"Ø RS 5

SHOWN AREA

PROJECT

NORTH

IRM

ELEC

CORRIDOR

5000B

WOMEN

COMMUNICATION

IRM

ELEC

CORRIDOR

5000B

WOMEN

O P

EXPOSED

TR

ELEC

CORRIDOR

5000B

WOMEN

1/4" = 1'-0"1

RM 5044 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"2

RM 5044 - DEMOLITION RCP

1/4" = 1'-0"3

RM 5044 - FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

EXISTING DUCTWORK TO REMAIN.

EXISTING FIRE PROTECTION PIPING TO REMAIN.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT

MORE THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).

PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES

PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE

SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE

SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS

OF DESIGN MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.

PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION

23 05 11.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

CONDENSATE LINE TO BE CONNECTED TO THE EXISTING

SINK SANITARY LINE. SEE DETAIL NUMBER 1 ON SHEET

M-501.

SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED

AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR

IV SPRINKLER DESIGNER. SPRINKLER HAZARD

CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM

APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS

WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL

GUARD.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

05-M-402.

1/4" = 1'-0"4

RM 5044 - RCP

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING

CONCEALED IN WALLS, CHASES OR CEILING SPACES.

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,

EXISTING WORK TO REMAIN SHOWN LIGHT.

KEYNOTES #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

05-M-401

BUILDING 05 - LEVEL 00 - FIRE PROTECTION,

PLUMBING, AND MECHANICAL - DEMOLITION,

FLOOR PLANS & RCPS 05

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

Revisions: Date: 09 /0

3/

NORTH

N O P

3.5

COUNSEL

COUNSEL

COUNSEL

CORRIDOR

5100B

COUNSEL

COUNSEL

COUNSEL

COUNSEL

CORRIDOR

5100B

105-CU-01-5044

4 5 7

3/8"Ø RL, 5/8"Ø RS6

STAIRS 3

5128B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

05-M-402

BUILDING 05 - LEVEL 01 -MECHANICAL PIPING -

FLOOR PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL REFRIGERANT PIPING CONCEALED IN WALLS,

CHASES OR CEILING SPACES.

KEYNOTES #

1/4" = 1'-0"1

LEVEL 01 - FLOOR PLAN

PROJECT

NORTH

SEE DETAIL NUMBER 11 ON SHEET M-502.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISHED

FLOOR BEFORE PENETRATING WALL.

CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET

SHROUDING/CLADDING TO COVER REFRIGERANT PIPING.

USE LOW PROFILE UNISTRUT FOR REFRIGERANT PIPING.

PAINT SHROUD TO MATCH ADJACENT WALL AND

COORDINATE COLOR WITH COR.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).

PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES

PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE

SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE

SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS

OF DESIGN MANUFACTURER.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

05-M-401.

Revisions: Date: 09 /0

3/

A

B C D E G H I J

TR

STAIR

LOBBY

EXAM

CORRIDOR

SOUTH PORCH

COMPENSATED

WORK THERAPY

WAITING

RECEPTION

WOMEN

MEN

HOUSEKEEP

STAIR

NORTH PORCH

RN

6114 GROUP

ELEVATOR

06-M-401

06-M-401

06-M-401

06-M-401

AREA SHOWN

TRUE

NORTH

BUILDING 06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

06-M-101

BUILDING 06 - LEVEL 01 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

LEVEL 01 - OVERALL PLAN

PROJECT

NORTH

SITE PLAN

Revisions: Date: 09 /0

3/

G H I

3 T

G H I

G H I

TH

R

M

TR

STAIR

LOBBY

EXAM

CORRIDOR

06-AC-01-6113

3/4"Ø8

RL/RS

R L /R

S

D

R L /R

S

1/4"Ø RL, 5/8"Ø RS7

D

G H I

EXPOSED

LOBBY

STAIR

TR

CORRIDOR

EXAM

SHOWN AREA

PROJECT

NORTH

IRM

STAIR

2LOBBY

CORRIDOR

EXAM

EXAM

IRM

LOBBY

STAIR

CORRIDOR

1/4" = 1'-0"1

RM 6113 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"2

RM 6113 - DEMOLITION RCP

1/4" = 1'-0"3

RM 6113 - FLOOR PLAN

1/4" = 1'-0"4

RM 6113 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH EXISTING THERMOSTAT. TURN OVER TO COR.

DEMOLISH EXISTING DUCTLESS AC UNIT. DEMOLISH

REFRIGERANT PIPE SERVING DUCTLESS AC UNIT.

DEMOLISH EXISTING CONDENSATE PUMP. DEMOLISH

CONDENSATE PIPE. DEMOLISH ASSOCIATED CONDENSING

UNIT.

DEMOLISH FLOOR MOUNTED SUPPLY REGISTER. DEMOLISH

BRANCH DUCTWORK BACK TO MAIN. CAP AND SEAL

DUCTWORK AT MAIN.

DEMOLISH CEILING RETURN GRILLE. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED

AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR

IV SPRINKLER DESIGNER. SPRINKLER HAZARD

CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM

APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS

WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL

GUARD.

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT

MORE THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).

PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES

PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE

SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE

SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS

OF DESIGN MANUFACTURER. LINE SET SHALL BE AT A

HEIGHT OF 12' AFF.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.

PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION

23 05 11.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET

SHROUDING/CLADDING TO COVER REFRIGERANT PIPING.

USE LOW PROFILE UNISTRUT FOR REFRIGERANT PIPING.

PAINT SHROUD TO MATCH ADJACENT WALL AND

COORDINATE COLOR WITH COR.

CONDENSATE LINE TO BE ROUTED TO THE EXISTING SINK

SANITARY LINE. SEE DETAIL NUMBER 1 ON SHEET M-501.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

06-M-402.

DEMOLISH EXISTING SIDEWALL QUICK RESPONSE

SPRINKLER.

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING

CONCEALED IN WALLS, CHASES OR CEILING SPACES.

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,

EXISTING WORK TO REMAIN SHOWN LIGHT.

KEYNOTES #

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

06-M-401

BUILDING 06 - LEVEL 01 - FIRE PROTECTION,

PLUMBING, AND MECHANICAL - DEMOLITION,

FLOOR PLANS & RCPS 06

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

Revisions: Date: 09 /0

3/

E G H

06-CU-01-61131

2RL/RS

1/4"Ø RL, 5/8"Ø RS3

SHOWN AREA

PROJECT

NORTH

MECHANICAL

ROOF PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

06-M-402

BUILDING 06 - ROOF PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

ROOF PLAN

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL REFRIGERANT PIPING CONCEALED IN WALLS,

CHASES OR CEILING SPACES.

KEYNOTES #

SEE DETAIL NUMBER 12 ON SHEET M-502.

SEE DETAIL NUMBER 6 ON SHEET M-501.

SEE DETAIL NUMBER 7 ON SHEET M-501.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

06-M-401.

PROJECT

NORTH

Revisions: Date: 09 /0

3/

A B C D E F G H

TR

ELECTRICAL

CONFERENCE

OFFICE

ELEV EQUIP

W/C STOR

CONC COVERED

PORCH

OFFICE

TOILET

HSKP

LOUNGE / CONF

STORAGE

STEAM /MECH

SPRINKLER

ELEVATOR LOBBY

ELEVATOR

E1-7

CORRIDOR

CORRIDOR

07-M-401

07-M-401

07-M-401

07-M-401

AREA SHOWN

TRUE

NORTH

BUILDING 07

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:0

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

07-M-101

BUILDING 07 - LEVEL 00 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

LEVEL 00 - OVERALL PLAN

SITE PLAN

PROJECT

NORTH

Revisions: Date: 09 /0

3/

RECEPTION

WAITING

STORAGE

EXAM

TOILET

BARIATRIC EXAM

STAIR 2

DIRTY

CLEAN

INTAKE

TOILET

TOILET

ENTRY

STAIR 1

CORRIDOR

ELEVATOR

CORRIDOR

CORRIDOR

WAITING AREA

7104A

07-M-402

AREA SHOWN

TRUE

NORTH

BUILDING 07

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:1

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

07-M-102

BUILDING 07 - LEVEL 01 - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

LEVEL 01 - OVERALL PLAN

SITE PLAN

Revisions: Date:

PROJECT

NORTH

/0

3/

MECH (TE)

07-M-404

07-M-404

AREA SHOWN

TRUE

NORTH

BUILDING 07

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:1

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

07-M-103

BUILDING 07 - LEVEL ATTIC - OVERALL PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

LEVEL ATTIC - OVERALL PLAN

PROJECT

NORTH

SITE PLAN

Revisions: Date: 09 /0

3/

A B

T

(E)14"x6"

(E)14"x8"

10"x4"

R

SR

L12

(E)FP

A B

A B

T

H

M

R

TR

ELECTRICAL

CONFERENCE

OFFICE

07-AC-01-7004

RL/RS

1/4"Ø RL, 5/8"Ø RS 8

(E)14"x8"

(E)14"x6"

R S R

L12

(E)FP13

3/4"Ø

D

A B

TR

ELECTRICAL

CONFERENCE

OFFICE

EXPOSED

SHOWN AREA

PROJECT

NORTH

IT

ELECTRICAL

CONFERENCE

OFFICE

ELECTRICAL

OFFICE

7002IT

CONFERENCE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:1

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

07-M-401

BUILDING 07 - LEVEL 00 - FIRE PROTECTION,

PLUMBING, AND MECHANICAL - DEMOLITION,

FLOOR PLANS & RCPS 07

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

RM 7004 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"2

RM 7004 - DEMOLITION RCP

1/4" = 1'-0"3

RM 7004 - FLOOR PLAN

1/4" = 1'-0"4

RM 7004 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

DEMOLISH EXISTING THERMOSTAT. TURN OVER TO COR.

DEMOLISH EXISTING DUCTLESS AC UNIT. DEMOLISH

REFRIGERANT PIPE SERVING DUCTLESS AC UNIT.

DEMOLISH EXISTING CONDENSATE PUMP. DEMOLISH

CONDENSATE PIPE.

DEMOLISH CEILING SUPPLY GRILLE. DEMOLISH BRANCH

DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT

MAIN.

DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.

SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED

AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE

WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR

IV SPRINKLER DESIGNER. SPRINKLER HAZARD

CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM

APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS

WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL

GUARD.

EXISTING CONDENSATE DRAIN PIPE TO REMAIN

INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT

MORE THAN 1 FT. ABOVE FINISHED FLOOR.

INSTALL NEW REFRIGERANT LINES PER MANUFACTURER

REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).

PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES

PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE

SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE

SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS

OF DESIGN MANUFACTURER.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION

SECTION 23 07 11. PROVIDE PIPE SUPPORT PER

SPECIFICATION SECTION 23 05 11.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

07-M-402.

EXISTING REFRIGERANT PIPING TO REMAIN.

EXISTING FIRE PROTECTION PIPING TO REMAIN.

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS

POSSIBLE TO INSIDE WALL OF TELECOM ROOM.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING

CONCEALED IN WALLS, CHASES OR CEILING SPACES.

DEMOLITION GENERAL NOTES

1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,

EXISTING WORK TO REMAIN SHOWN LIGHT.

KEYNOTES #

Revisions: Date: 09 /0

3/

A B C D E

WAITING AREA

7104A

WAITING

RECEPTION

1 07-CU-01-7004

RL/RS

ENTRY

CORRIDOR

CORRIDOR

2 3

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:1

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

07-M-402

BUILDING 07 - LEVEL 01 - MECHANICAL PIPING

- FLOOR PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

PIPE ROUTING - RM 7104A - FLOOR PLAN

PROJECT

NORTH

SEE DETAIL NUMBER 11 ON SHEET M-502.

ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISHED

FLOOR BEFORE PENETRATING WALL.

CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET

SHROUDING/CLADDING TO COVER REFRIGERANT PIPING.

USE LOW PROFILE UNISTRUT FOR REFRIGERANT PIPING.

PAINT SHROUD TO MATCH ADJACENT WALL AND

COORDINATE COLOR WITH COR.

TO FLOOR BELOW, FOR CONTINUATION SEE SHEET

07-M-401.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.

3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT

PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR

UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING

REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

4. ROUTE ALL REFRIGERANT PIPING CONCEALED IN WALLS,

CHASES OR CEILING SPACES.

KEYNOTES #

Revisions: Date: 09 /0

3/

D E F G H

STAIR 2

E1-13

EXAM

TOILET

CORRIDOR

CLEAN

EXAM

STORAGE

3 4CORRIDOR

SECURE MEDS

EXAM

TOILET

SOILED HOLDING

3/4"Ø

D

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:4

:1

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

07-M-403

BUILDING 07 - LEVEL 02 - FLOOR PLAN

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/4" = 1'-0"1

PIPE ROUTING - RM 7218 - FLOOR PLAN

PROJECT

NORTH

CONDENSATE LINE TO BE ROUTED TO THE EXISTING SINK

SANITARY LINE. SEE DETAIL NUMBER 1 ON SHEET M-501.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 4 ON SHEET M-501.

PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL

NUMBER 3 ON SHEET M-501.

FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET

07-M-404.

INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION

FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.

PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION

23 05 11.

KEY PLAN

GENERAL NOTES

1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR

CLARITY.

2. NEW WORK SHOWN DARK, EXISTING WORK…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .