S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77626R0025
About this file
This file is a collection of 100 construction drawings (Part 7 of 24) for the EHRM Infrastructure Upgrades project at the Hershel "Woody" Williams Veterans Affairs Medical Center in Huntington, West Virginia. The drawings include mechanical systems details (HVAC, plumbing, controls), electrical plans and schematics, fire protection systems, telecommunications bonding diagrams, and associated schedules across multiple buildings and levels. The mechanical drawings (M-series sheets) detail ductwork layouts, refrigerant piping, condensate drainage, chilled water systems, fan coil units, and control sequences for various buildings. The electrical drawings (E-series sheets) provide lighting plans, power distribution, panel locations, receptacle locations, and conduit routing for buildings throughout the facility. The documents are dated September 3, 2025, prepared at 100% Construction Documents phase by SPEES Design Build, and include comprehensive legends, general notes, abbreviations, and typical details for construction implementation. These are design and specification documents, not procurement or contractual documents.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHOWN AREA
PROJECT
NORTH
X Y Z
M-301-2B
M-302-2B
T
H
R
M
H
T M R
T
H
T
H
R
M
GC115-1-CRAC-01
GC115-1-ERV-01
BMS
GC114
ELECTRICAL 2
GC114a
CORRIDOR
MECH / FIRE
5ELECTRICAL 1
ENTRANCE #1
CORRIDOR
DATA CENTER
GC115-1
ENTRANCE #2
GC115-1-CRAC-02
24"x18" 24"x18"
48"x30"
H
TR
M
T H
R
M
R
M
(TYPICAL)
"ø
"ø
10"ø
12"ø
CONTRACTOR TO
BALANCE AT 75
CFM
FSD
SDS, 8X8
50 CFM
SDS, 8X8
60 CFM
RGS, 8ø
60 CFM
RGS, 8ø
155 CFM
SDS, 8X8
145 CFM
RGS (8"Ø)
160 CFM
SDS, 8X8
145 CFM
RGS, 8ø
50 CFM
SDS, 8X8
50 CFM
12"ø
8"ø
8"ø
8"ø
12"ø
8"ø
10"ø
8"ø
10"ø
8"ø
8"ø
8"ø
8"ø
M-302-2B
GC115-EDH-01-5 8
8"ø
GC115-H-01-5
10"ø
10"ø
GC115-1-DH-01-5
GC115-1-DH-02-5
TELE
GC118
BATTERY
GC119
STAIR 1
MEN
GB174
WOMEN
GB175
LINEN
GB169
TR TOWER 1
T1-00G
PUBLIC LOBBY
CG19
CORRIDOR
CG-43
OXYGEN STOR
GC112
IRM MECH.
SUPPORT
GC103
WOMEN
GC109
MEN
GC108
STAIR 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:3
P M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
MH421-2B
PHASE 2B - LVL 00 - DATA CENTER - HVAC
DUCT - FLOOR PLAN
GC115-1
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
PROJECT
NORTH
3/16" = 1'-0"1
PHASE 2B - DATA CENTER -FLOOR PLAN - HVAC DUCT
SEE DETAIL 26 ON SHEET M-503 AND CONTROLS DIAGRAM 6
ON SHEET M-702 FOR SENSOR LAYOUT IN MONITORED
RACKS AND NUMBER OF MONITORED RACKS.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE
THAN 1FT. ABOVE FINISHED FLOOR.
PROVIDE WALL OPENING AND DUCT SLEEVE. SEE DETAIL
NUMBER 23 ON SHEET M-503.
PROVIDE WALL OPENING AND DUCT SLEEVE. SEE DETAIL
NUMBER 25 ON SHEET M-503. FURNISH AND INSTALL
FIRE/SMOKE DAMPER.
TIE IN NEW DUCTWORK TO DUCTWORK INSTALLED IN
PREVIOUS PHASE.
SEE EXHAUST CONTINUATION ON SHEET MH422-2B.
SEE OUTSIDE AIR DUCT CONTINUATION ON SHEET
MH422-2B.
FURNISH AND INSTALL ELECTRIC DUCT HEATER.
Revisions: Date:
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
KEYNOTES #
/0
3/
X Y Z
GC115-GV-01
GC115-GV-02
GC115-1-CU-08-1
GC115-1-CU-01-3
GC115-1-CU-03-3
GC115-1-CU-02-3
GC115-1-CU-06-6
GC115-1-CU-04-4
GC115-1-CU-05-6
GC115-1-CU-07-6
GC115-1-COND-01
GC115-1-COND-02
GC115-1-CU-10-GC114
GC115-1-CU-09-GC114a
3 5
3 5
3 5
3 5
GC115-GV-03
GC115-GV-04
GC115-1-RD-02
GC115-1-RD-01
GC115-1-CU-12-GC119
GC115-1-CU-11-GC118 2
3 5
3 5
R L /R
S R
L /R
S R
L /R
S
RL/RS
(E)RL/RS
(E)RL/RS
(E )R
L /R
S
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:3
P M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
MH422-2B
PHASE 2B - ROOF - DATA CENTER - ROOF
PLAN
GC115-1
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
SEE EXHAUST CONTINUATION ON SHEET MH421-2B.
SEE DETAIL NUMBER 12 ON SHEET M-502.
SEE DETAIL NUMBER 6 ON SHEET M-501.
SEE DETAIL NUMBER 7 ON SHEET M-501.
FROM BELOW, FOR CONTINUATION SEE SHEET MP420-2B.
PIPE INSTALLED IN PREVIOUS PHASE TO REMAIN.
CONDENSING UNIT INSTALLED IN PREVIOUS PHASE TO
REMAIN.
SEE OUTSIDE AIR DUCT CONTINUATION ON SHEET
MH421-2B.
GRAVITY VENTILATORS INSTALLED IN PREVIOUS PHASE TO
REMAIN.
PROJECT
NORTH
3/16" = 1'-0"1
PHASE 2B - DATA CENTER - ROOF PLAN
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
KEYNOTES #
Revisions: Date: 09 /0
3/
NORTH
X Y Z
DATA CENTER
GC115-1
ENTRANCE #2
ENTRANCE #1
ELECTRICAL 1
MECH / FIRE
CORRIDOR
ELECTRICAL 2
GC114a
BMS
GC114
TELE
GC118
BATTERY
GC119
3"Ø
3"Ø
SAN
S A
N4
GC115-1-FD-01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:4
P M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
PP-423-2B
PHASE 2B - LVL 00 - DATA CENTER - PLUMBING
PIPING
GC115-1
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
PROJECT
NORTH
Revisions: Date:
3/16" = 1'-0"1
PHASE 2B - DATA CENTER -FOUNDATION PLAN - PLUMBING PIPING
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF ROOMS.
2. ALL SANITARY PIPING SHALL SLOPE AT 1/4" PER LINEAR
FOOT IN THE DIRECTION OF FLOW.
KEYNOTES
TIE IN TO SANITARY PIPING INSTALLED IN PREVIOUS PHASE.
SANITARY PIPING SHALL BE ROUTED UNDER THE FLOOR.
3" FLOOR CLEAN OUT.
FURNISH AND INSTALL NEW FLOOR DRAIN.
SEE SHEET 01S-M-401 FOR CONTINUATION.
/0
3/
A B D E F H I J K L MGC N O P Q R S T U V W X Y Z
A16 A15 A14
A7A6 A5
A4 A3
A8
A11 A10A9
A2 A1
02-M-402
02-M-402
PAINT SHOP
TOILET
BD102A
PAINT
BOOTH
BD102B
TLT
PAINT
VAULT
STORAGE
BD102D
M&O
FOREMAN
BD102C
DIAGNOST
TREATMENT
B20
FEED/
BEDDING
B21
ELEC.
B22
REFRIG
B23
QUARNTN
ROOM
B01
SIG./PH.
B27
T. SURG.
B19A
PRO LAB
B19
S. SURG.
B18A
ELEVATOR
SE-1
CORRIDOR
CB-6
CORRIDOR
CB-5
WORK/SUPP
B18
POST OP
B17
PREP/
SCRUB
B16
ANIMAL
B15
ANIMAL
B14
ANIMAL
B24
ANIMAL
B25
ANIMAL
B26
ANIMAL
B13
CLN CAGE
WASH
B08
SOILED
CAGE
WASH
B10
CAGE STO.
B08A
RECEIVING
B02
MEN
B03
WOMEN
B04
COLD RM
B05
H.A.C.
B06
NECROPSY
B07
TRASH
B32
MU FLAM
B31
VA FLAM
B28
VA GAS
B29
MU GAS
B30
EMERG.
GENERATOR
BB115
ELECTRICAL
SWITCH
BB116
VET OFF
B12
PRO LAB
B11
SUP. OFF
B12A
TR
B09
CORRIDOR
CB-2
CORRIDOR
CB-1
STAIR
ENGR.
CONTROL
BB117C
ELEC.
BB117A
TELE.
BB117B
MECHANICAL
ROOM
BB117
STAIR
S-1
CORRIDOR
CART LIFT
MACH RM
BB106E
H.A.C.
BB106D
BB102B
MEDIVATOR
BB106C
PREP. &
ASSEMBLY
STERILE
BB106A
STERIL
BB106B
H.A.C.
BB102A
M. LKR
BB103
DECON VEST
SOILED
MACH RM.
BB104
ADMIN
OFFICE
BB105
AUTO CART
WASH
BB102C
A CHIEF SPS
BB105B
CHIEF SPS
BB105A
STERILE
PROCESSING
SERVICE
CLEAN
SUPPLY
BB106 OFFICE
BB106F
CLEAN
RECEIVING
ANTEROOM
BB110C
WAREHOUSE
OFFICE
BB110A
TOILET
BB110B
CORRIDOR
CORRIDOR
RECEIVING &
SHIPPING
DOCK
BB109
WAREHOUSE
BB110
ELECTRICAL
SWITCH
GEAR
ELEVATOR
MACHINE
ROOM
MAINT.
ELEV
P9
ELEC
BD102
ELECTRIC
BD103
STORAGE
BD107
WATER
INTAKE
BD108
WATER
SOFTENER
BD106
BD105
BIOMEDICAL
ENGINEERING
BD104
BD100
MAS MAIL
ROOM
BD101
CORRIDOR
CORRIDOR
CB
ELEC
SHREDDING
MAS
STOR
TLT
ELEV
F8
ENG.
PLUMPING
SHOP
BD112
ENG. AIR
CONDITIONING
SHOP
BD110
HOT WATER
HEATERS
ENG
STORAGE
BD106A
ENG.
ELECTRICAL
SHOP
HVAC
BD104A
LOCKSMITH
BD104B
ENG. M&R
FOREMAN
CARPENTRY
SHOP
TOILET
BB108A
DECONTAMINATION
BB102
CORRIDOR
TR TOWER 3
T3-00B
T3-SA
T3-SB
BUILDING 02
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:1
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
02-M-101
BUILDING 02 - BASEMENT - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
SITE PLAN
1/16" = 1'-0"1
BASEMENT - OVERALL PLAN A
PROJECT
NORTH
Revisions: Date: 09 /0
3/
A B D E F H I J K L MGC N O P Q R T U V W X Y Z
A16 A15 A14
A7A6 A5A4
A3
A8
A11A10A9
A2 A1
02-M-403
02-M-403
TR TOWER 3
T3-00G
T3-SA
T3-SB
CORRIDOR
CG-43
LAUNDRY
PLANT
FOREMAN
GD114C
UNIFORM
STOR
GD114B
SEWING
GD114A
BOILER
ROOM
GD114G
SOILED
GD113
CPU ROOM
GD112
LOUNGE/BREAK
PT. CLOTH
GD111
LOCKERS
G112D
SHR
GD112B
MEN
GD112A
FPMS
GC155
GD110A
GD110
ELEV
F8
FREEZER
FREEZER
FRIDGE
FREEZER
SALAD PREP
GD109
MECH
GD105
GD104
GD106
IRM
GD108
IRM
GD100
GD103
GD102
GD101
GD107
MAINT. ELEV
P9
SERVICE
LOBBY
CG17
GB168g
BVA
GB168c
IRM
GB168a
EXAM
GB168k
FEE CLAIMS
GB168b
BOOTH
EXAMINER
GB168j
GB168l
GB168
GB168i
GB168h
MEDICAL
RECORDS
GB168d
GB168f
GB168e
STAIR 4
MECH RM
GB167
HEALTH
TECH
GB149c
HEALTH
TECH
GB149d
EXAM
GB149e
EXAM
GB149f
EXAM
GB149g
AUDIOLOGY
ROOM
GB149
RECEP
GB148
OFFICE
GB148a
OFFICE
GB148b
OFFICE
GB146
TLT
GB145
CERUMEN
MGMT
GB147b
TLT
GB144
GB143
HAC
GB142
GERI PACT
GB151
GERI PACT
GB152
GB140
GB141
STORAGE
GB141a
CLEAN
SUPPLY
GB139
AMCARE
ADMIN
GB150
AMCARE
GB150A
AMCARE
ADMIN
GB168rr
GERI PACT
GB155H
CORRIDOR
CG11
CORRIDOR
CG13
RECEIVING
ENTRY
EXAMINER
GB149h
EXAMINER
GB149i
BOOTH
BOOTH
BOOTH
ELEC.
GB166b
TEL
GB166a
EXAMINER
GB149j
POSTIOGRAPHY
& LAB
GA121
CORRIDOR
CG14
CORRIDOR
CG15
STAIR 3
GC160
MECH
GB166
ELEVATOR
EQUIP.
G01
LIFT EQUIP.
G06
CORRIDOR
G07
LOBBY
G05
CORRIDOR
C-G1
ELEC.
G03
STAIR
S-1
ELEVATOR
SE-1
SIGNAL/PH
SE-2
OPEN
MECHANICAL
SPACE
GO7
MECH.
G02
ELEVATOR
P-2
STAIR
S-2
BREAKROOM
GA107
RECEIVING
ENTRY
GC180
STORAGE
GC181
LAB
GC184
X-RAY
GC185
STAIR 6
GC186
CHAIR 5
GC189
CHAIR 6
GC190
CHAIR 4
GC197
CORRIDOR
GC198
CORRIDOR
T3-00M
CORRIDOR
T3-00N
LOUNGE
GD114E
TOILET
GD114D
LAUNDRY
GD114
STORAGE
GD114F
GC216
GC217
GC218
GC219
GC221
GC222
GC223
GC225
Room
XXX
Room
XXX
Room
XXX
AREA SHOWN
TRUE
NORTH
BUILDING 02
1/16" = 1'-0"1
LEVEL 00 - OVERALL PLAN A
SITE PLAN
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:2
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
02-M-102
BUILDING 02 - LEVEL 00 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
Revisions: Date: 09 /0
3/
NORTH
A7
A6
A5
A4
A3
A8
A11
A10
A9
A2
A1
PAINT SHOP
TOILET
BD102A
TLT
PAINT VAULT
STORAGE
BD102D
M&O FOREMAN
BD102C
ELEVATOR MACHINE ROOM
MAINT. ELEV
P9
ELEC
BD102
ELECTRIC
BD103
STORAGE
BD107
WATER INTAKE
BD108
WATER SOFTENER
BD106
BD105
BIOMEDICAL ENGINEERING
BD104
BD100
MAS MAIL ROOM
BD101
CORRIDOR
CORRIDOR
CB
ELEC
SHREDDING
MAS
STOR
TLT
ELEV
F8
ENG. PLUMPING SHOP
BD112
ENG. AIR CONDITIONING SHOP
BD110
HOT WATER HEATERS
ENG STORAGE
BD106A
ENG. ELECTRICAL SHOP
HVAC
BD104A
LOCKSMITH
BD104B
ENG. M&R FOREMAN
CARPENTRY SHOP
E(CHS) (E)CHR
E(CHS)
(E)CHR
E(CHS)
(E)CHR
E(CHS)
(E)CHR
HWS
HWR
CHS
C H
R
1 1/4" Ø1 1/4" Ø
1" Ø1" Ø
(E)FCU 6-2-B
(E)FCU 5-2-B
(E) FCU 2-2-B (E) FCU 3-2-B
(E) FCU 4-2-B
TR TOWER 3
T3-00B
02-ML-02
02-ML-014
T3-SAT3-SB
(E) FCU 1-2-B
(E)HWR
(E)HWS
(E)HWR
(E)HWS
(E)HWS
(E)HWR
(E)HWR
(E)HWS
EXISTING 4"
LINES
EXISTING 4"
LINES
2 2 2
2 2
HWS
HWR
CHS
CHR
PIPE ROUTING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:2
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
02-M-401
BASEMENT FLOOR PLAN - MECHANICAL
PIPING TO TR TOWER 3
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
FURNISH AND INSTALL NEW CHILLED WATER SUPPLY AND
RETURN PIPE. TIE-IN TO EXISTING CHILLED WATER LINES.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
FOR CONTINUATION SEE SHEET 02-M-402.
FURNISH AND INSTALL NEW METRAFLEX FLANGED LOOP.
SEE EQUIPMENT SCHEDULES ON SHEET M-602.
FURNISH AND INSTALL NEW HOT WATER SUPPLY AND
RETURN PIPE. TIE-IN TO EXISTING HOT WATER LINES.
PROJECT
NORTH
1" = 10'-0"1
BASEMENT FLOOR PLAN - MECHANICAL PIPING TO TR TOWER 3
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES OR
CEILING SPACES.
KEYNOTES #
Revisions: Date: 09 /0
3/
NORTH
T3-00B
A7 A6
A5
A4
A8 A9
TR TOWER 3
T3-00B
HWS
HWRCHS
CHR
M&O FOREMAN
BD102C
STORAGE
BD102D
PAINT
BOOTH
BD102B
TOILET
BD102A
CARPENTRY
SHOP
02-FCU-01-T3-00B
3/4" Ø
3/4" Ø
5/8" Ø
1 1/4" Ø 71
3/4" Ø 4
T
H
M
D
D
D
D
D
T3-SA
T3-SB
3/4" Ø
3/4" Ø
A7 A6
A8 A9
TR TOWER 3
T3-00B
EXPOSED
CARPENTRY
SHOP
T3-SA
T3-SB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:1
:4
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
02-M-402
BUILDING 02 - T3 - BASEMENT - FIRE
PROTECTION, PLUMBING, AND MECHANICAL -
FLOOR PLAN & RCP 02
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
PROJECT
NORTH
SEE PIPE RISER DIAGRAM NUMBER 3 ON SHEET M-505.
FOR CONTINUATION SEE SHEET 02-M-401.
INSTALL CHILLED WATER SUPPLY AND RETURN LINES.
PROVIDE PIPE INSULATION FOR ALL CHILLED WATER
LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION
23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
CONDENSATE LINE TO BE ROUTED TO THE EXISTING
FLOOR SINK SANITARY LINE. SEE DETAIL NUMBER 2 ON
SHEET M-501.
TO FLOOR ABOVE, FOR CONTINUATION SEE SHEET
02-M-403.
SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED
AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR
IV SPRINKLER DESIGNER. SPRINKLER HAZARD
CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM
APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS
WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL
GUARD.
INSTALL HOT WATER SUPPLY AND RETURN LINES.
PROVIDE PIPE INSULATION FOR ALL CHILLED WATER
LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
02-M-403.
1/4" = 1'-0"1
RM T3-00B - FLOOR PLAN
1/4" = 1'-0"2
RM T3-00B - RCP
PROJECT
NORTH
Revisions: Date:
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. ROUTE ALL CONDENSATE PIPING CONCEALED IN WALLS,
CHASES OR CEILING SPACES.
KEYNOTES #
/0
3/
NORTH
T3-00G
A7 A6
A8 A9
D H
W S
H W
R C
H S
C H
R
TR TOWER 3
T3-00G
LAUNDRY
GD114
M
T
H
02-FCU-02-T3-00G
3/4" Ø
3/4" Ø
3/4" Ø
T3-SA
T3-SB
A7 A6
A8 A9
TR TOWER 3
T3-00G
LAUNDRY
GD114
EXPOSED
T3-SA
T3-SB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:3
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
02-M-403
BUILDING 02 - T3 - LEVEL 00 - FIRE
PROTECTION, PLUMBING, AND MECHANICAL -
FLOOR PLAN & RCP 02
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
RM T3-00G - FLOOR PLAN
1/4" = 1'-0"2
RM T3-00G - RCP
SEE PIPE RISER DIAGRAM NUMBER 3 ON SHEET M-505.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
02-M-402.
INSTALL CHILLED WATER SUPPLY AND RETURN LINES.
PROVIDE PIPE INSULATION FOR ALL CHILLED WATER
LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07
11. PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION
23 05 11.
SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED
AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR
IV SPRINKLER DESIGNER. SPRINKLER HAZARD
CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM
APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS
WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL
GUARD.
INSTALL HOT WATER SUPPLY AND RETURN LINES.
PROVIDE PIPE INSULATION FOR ALL CHILLED WATER
LINES. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
INSTALL MANUAL AIR VENT ON HYDRONIC HOT AND
CHILLED WATER PIPING AT HIGH POINT IN TELECOM
ROOM. SEE DETAIL 8 ON SHEET M-501.
PROJECT
NORTH
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN
LIGHT.
3. ROUTE ALL CONDENSATE PIPING CONCEALED IN WALLS,
CHASES OR CEILING SPACES.
KEYNOTES #
Revisions: Date: 09 /0
3/
A B C D E F G
TANKS
SP3004-3
TANKS
SP30004A-3
GENERATOR
SP3000-3
PARTS
SP3001-3
KITCHEN
SP3000-3
PUMP
SP3011-3
CONTROL
SP3012-3
BOILER 1
SP3013-3
BOILER 2
SP3014-3
BOILER 3
SP3015-3
BOILER 4
SP3016-3
PIT
03-M-401
TE
SP3005-3A
STORAGE
SP3005-3
BUILDING 03
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032 NON SPRINKLERED
(206) 590-2118
RAY SPEES
/2
/2
:5
:0
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
03-M-101
BUILDING 03 - LEVEL 01 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
LEVEL 01 - OVERALL PLAN
PROJECT
NORTH
SITE PLAN
Revisions: Date: 09 /0
3/
SP3005-3
PROJECT
NORTH
E F
STORAGE
SP3005-3
TANKS
SP3004-3
TANKS
SP30004A-3
E F
D
D
3/4"Ø 2
345 1
(E)FD
03-RCU-01-SP3005-3
1/4" = 1'-0"1
RM SP3005-3 - FLOOR PLAN
PROJECT
NORTH
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.
PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION
23 05 11.
ROUTE CONDENSATE LINE DOWN TO 1'-0" ABOVE FINISH
FLOOR LEVEL AFTER PENETRATING WALL.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET
SHROUDING/CLADDING TO COVER CONDENSATE PIPING.
USE LOW PROFILE UNISTRUT FOR CONDENSATE PIPING.
PAINT SHROUD TO MATCH ADJACENT WALL AND
COORDINATE COLOR WITH COR.
CONDENSATE LINE TO BE ROUTED TO THE EXISTING
FLOOR DRAIN. SEE DETAIL NUMBER 2 ON SHEET M-501.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. ROUTE ALL CONDENSATE PIPING CONCEALED IN WALLS,
CHASES OR CEILING SPACES.
KEYNOTES #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032 NON SPRINKLERED
(206) 590-2118
RAY SPEES
/2
/2
:5
:0
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
03-M-401
BUILDING 03 - LEVEL 01 - PLUMBING AND
MECHANICAL - FLOOR PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
Revisions: Date: 09 /0
3/
A B C D E F G H I J K L M N
04-M-401
04-M-401
04-M-401
04-M-401
CAN STORAGE
STAIRS
RECEIVING
RETAIL STORE
DINING ROOM
EXT SHELTER
MEN
WOMEN
TR
ELEVATOR
ELEV ROOM
STORAGE
SERVING AREA
REFRIGERATORS
SALAD ROOM
MECHANICAL
E-121
ELEC
E-122
SECURE STOR
STAFF TLT
DISHWASHING
KITCHEN
RETAIL STOCK
RETAIL STOCK
LOCKER
CORRIDOR
CHIEF VCS
NO ROOM NUMBER
NRN
AREA SHOWN
PROJECT
NORTH
BUILDING 04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:4
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
04-M-101
BUILDING 04 - LEVEL 00 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/8" = 1'-0"1
LEVEL 00 - OVERALL PLAN
PROJECT
NORTH
SITE PLAN
Revisions: Date: 09 /0
3/
L M N
L M N
L M N
T
H
R
M
04-VRF-02-4001
3/4"Ø
D
R S
/R L
D
1/4"Ø RL, 1/2"Ø RS 5
04-VRF-01-4001
3/8"Ø RL, 5/8"Ø RS
WOMEN
TR
ELEVATOR
STORAGE
CORRIDOR
L M N
EXPOSED
WOMEN
TR
ELEVATOR
STORAGE
CORRIDOR
WOMEN
OFFICE
ELEVATOR
STORAGE
CORRIDOR
WOMEN
ELEVATOR
STORAGE
WOMEN
OFFICE
ELEVATOR
STORAGE
CORRIDOR
WOMEN
ELEVATOR
STORAGE
SHOWN AREA
PROJECT
NORTH
1/4" = 1'-0"1
RM 4001 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"2
RM 4001 - DEMOLITION RCP
1/4" = 1'-0"3
RM 4001 - FLOOR PLAN
1/4" = 1'-0"4
RM 4001 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH EXISTING DUCTLESS AC UNIT. DEMOLISH
REFRIGERANT PIPE SERVING DUCTLESS AC UNIT.
DEMOLISH EXISTING CONDENSATE PUMP. DEMOLISH
CONDENSATE PIPE.
DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.
EXISTING PIPING TO REMAIN.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT
MORE THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).
PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE
SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE
SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.
PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION 23
05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
04-M-402.
SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED
AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR
IV SPRINKLER DESIGNER. SPRINKLER HAZARD
CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM
APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS
WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL
GUARD.
PROVIDE DRIP PAN WITH MOISTURE SENSOR FOR
EXISTING OVERHEAD PIPING. TIE MOISTURE SENSOR
INTO BMS FOR ALARM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
04-M-401
BUILDING 04 - LEVEL 00 - FIRE PROTECTION,
PLUMBING, AND MECHANICAL - DEMOLITION,
FLOOR PLANS & RCPS 04
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
/0
3/
I J K L M N
104-CU-01-4001RS/RL
4 5 6 7
3/8"Ø RL, 5/8"Ø RS8
AUDITORIUM
VCS STOR
MEDIA
STAIR
LOBBY
ELEVATOR
VCS STORAGE
D
VCS
STORAGE
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
04-M-402
BUILDING 04 - LEVEL 01 - MECHANICAL PIPING
- FLOOR PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
SEE DETAIL NUMBER 11 ON SHEET M-502.
CONDENSATE TO BE DISCHARGED TO THE GROUND.
TERMINATE CONDENSATE PIPING WITH A DOWNTURNED
ELBOW 12" ABOVE FINISHED GRADE.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
ROUTE REFRIGERANT AND CONDENSATE LINE DOWN TO
1'-0" ABOVE FINISH FLOOR LEVEL BEFORE PENETRATING
WALL.
CONTRACTOR TO PROVIDE PREFABRICATED COMMERCIAL
REFRIGERATION LINE - SET COVER TO CONCEAL
REFRIGERANT OR CONDENSATE PIPING. CONTRACTOR TO
COORDINATE COLOR WITH VA COR.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
04-M-401.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).
PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE
SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE
SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
KEYNOTES #
Revisions: Date: 09 /0
3/
A B C D E F G H I J K L M N O P
3.5
COUNSEL
STOR
ELEC
CORRIDOR
5000B
CORRIDOR
5000A
WOMEN
MEN
STOR
ENTRANCE
LOBBY
ELEV.
5E1
SPKR
ELEV. EQUIP
GROUP ROOM 2
STAIR 2
EXAM
GROUP ROOM 3
COMMUNICATION
MEN
WOMEN
TR
PIT
MECHANICAL
GROUP ROOM 1
KITCHEN
COUNSEL
05-M-401
05-M-401
05-M-401
05-M-401
STAFF
LOUNGE
BUILDING 05
AREA SHOWN
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
05-M-101
BUILDING 05 - LEVEL 00 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/8" = 1'-0"1
LEVEL 00 - OVERALL PLAN
PROJECT
NORTH
SITE PLAN
Revisions: Date: 09 /0
3/
O P
10"x10" S.A (UP)
(E )F
P
(E)10"Ø
(E)FP
O P
O P
T
H
M
TR
ELEC
CORRIDOR
5000B
WOMEN
COMMUNICATION
R
05-VRF-01-5044
RL/RS
D
D
8 11
3/4"Ø
3/8"Ø RL, 5/8"Ø RS
05-VRF-02-5044
R L /R
S
10"x10" S.A (UP)
(E )F
P
(E)FP
1/4"Ø RL, 1/2"Ø RS 5
SHOWN AREA
PROJECT
NORTH
IRM
ELEC
CORRIDOR
5000B
WOMEN
COMMUNICATION
IRM
ELEC
CORRIDOR
5000B
WOMEN
O P
EXPOSED
TR
ELEC
CORRIDOR
5000B
WOMEN
1/4" = 1'-0"1
RM 5044 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"2
RM 5044 - DEMOLITION RCP
1/4" = 1'-0"3
RM 5044 - FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH CEILING SUPPLY DIFFUSER. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
EXISTING DUCTWORK TO REMAIN.
EXISTING FIRE PROTECTION PIPING TO REMAIN.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT
MORE THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).
PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE
SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE
SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.
PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION
23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING
SINK SANITARY LINE. SEE DETAIL NUMBER 1 ON SHEET
M-501.
SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED
AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR
IV SPRINKLER DESIGNER. SPRINKLER HAZARD
CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM
APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS
WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL
GUARD.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
05-M-402.
1/4" = 1'-0"4
RM 5044 - RCP
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
05-M-401
BUILDING 05 - LEVEL 00 - FIRE PROTECTION,
PLUMBING, AND MECHANICAL - DEMOLITION,
FLOOR PLANS & RCPS 05
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
Revisions: Date: 09 /0
3/
NORTH
N O P
3.5
COUNSEL
COUNSEL
COUNSEL
CORRIDOR
5100B
COUNSEL
COUNSEL
COUNSEL
COUNSEL
CORRIDOR
5100B
105-CU-01-5044
4 5 7
3/8"Ø RL, 5/8"Ø RS6
STAIRS 3
5128B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
05-M-402
BUILDING 05 - LEVEL 01 -MECHANICAL PIPING -
FLOOR PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL REFRIGERANT PIPING CONCEALED IN WALLS,
CHASES OR CEILING SPACES.
KEYNOTES #
1/4" = 1'-0"1
LEVEL 01 - FLOOR PLAN
PROJECT
NORTH
SEE DETAIL NUMBER 11 ON SHEET M-502.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISHED
FLOOR BEFORE PENETRATING WALL.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET
SHROUDING/CLADDING TO COVER REFRIGERANT PIPING.
USE LOW PROFILE UNISTRUT FOR REFRIGERANT PIPING.
PAINT SHROUD TO MATCH ADJACENT WALL AND
COORDINATE COLOR WITH COR.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).
PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE
SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE
SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
05-M-401.
Revisions: Date: 09 /0
3/
A
B C D E G H I J
TR
STAIR
LOBBY
EXAM
CORRIDOR
SOUTH PORCH
COMPENSATED
WORK THERAPY
WAITING
RECEPTION
WOMEN
MEN
HOUSEKEEP
STAIR
NORTH PORCH
RN
6114 GROUP
ELEVATOR
06-M-401
06-M-401
06-M-401
06-M-401
AREA SHOWN
TRUE
NORTH
BUILDING 06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
06-M-101
BUILDING 06 - LEVEL 01 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
LEVEL 01 - OVERALL PLAN
PROJECT
NORTH
SITE PLAN
Revisions: Date: 09 /0
3/
G H I
3 T
G H I
G H I
TH
R
M
TR
STAIR
LOBBY
EXAM
CORRIDOR
06-AC-01-6113
3/4"Ø8
RL/RS
R L /R
S
D
R L /R
S
1/4"Ø RL, 5/8"Ø RS7
D
G H I
EXPOSED
LOBBY
STAIR
TR
CORRIDOR
EXAM
SHOWN AREA
PROJECT
NORTH
IRM
STAIR
2LOBBY
CORRIDOR
EXAM
EXAM
IRM
LOBBY
STAIR
CORRIDOR
1/4" = 1'-0"1
RM 6113 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"2
RM 6113 - DEMOLITION RCP
1/4" = 1'-0"3
RM 6113 - FLOOR PLAN
1/4" = 1'-0"4
RM 6113 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH EXISTING THERMOSTAT. TURN OVER TO COR.
DEMOLISH EXISTING DUCTLESS AC UNIT. DEMOLISH
REFRIGERANT PIPE SERVING DUCTLESS AC UNIT.
DEMOLISH EXISTING CONDENSATE PUMP. DEMOLISH
CONDENSATE PIPE. DEMOLISH ASSOCIATED CONDENSING
UNIT.
DEMOLISH FLOOR MOUNTED SUPPLY REGISTER. DEMOLISH
BRANCH DUCTWORK BACK TO MAIN. CAP AND SEAL
DUCTWORK AT MAIN.
DEMOLISH CEILING RETURN GRILLE. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED
AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR
IV SPRINKLER DESIGNER. SPRINKLER HAZARD
CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM
APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS
WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL
GUARD.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT
MORE THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).
PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE
SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE
SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER. LINE SET SHALL BE AT A
HEIGHT OF 12' AFF.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.
PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION
23 05 11.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET
SHROUDING/CLADDING TO COVER REFRIGERANT PIPING.
USE LOW PROFILE UNISTRUT FOR REFRIGERANT PIPING.
PAINT SHROUD TO MATCH ADJACENT WALL AND
COORDINATE COLOR WITH COR.
CONDENSATE LINE TO BE ROUTED TO THE EXISTING SINK
SANITARY LINE. SEE DETAIL NUMBER 1 ON SHEET M-501.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
06-M-402.
DEMOLISH EXISTING SIDEWALL QUICK RESPONSE
SPRINKLER.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
06-M-401
BUILDING 06 - LEVEL 01 - FIRE PROTECTION,
PLUMBING, AND MECHANICAL - DEMOLITION,
FLOOR PLANS & RCPS 06
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
Revisions: Date: 09 /0
3/
E G H
06-CU-01-61131
2RL/RS
1/4"Ø RL, 5/8"Ø RS3
SHOWN AREA
PROJECT
NORTH
MECHANICAL
ROOF PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
06-M-402
BUILDING 06 - ROOF PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
ROOF PLAN
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL REFRIGERANT PIPING CONCEALED IN WALLS,
CHASES OR CEILING SPACES.
KEYNOTES #
SEE DETAIL NUMBER 12 ON SHEET M-502.
SEE DETAIL NUMBER 6 ON SHEET M-501.
SEE DETAIL NUMBER 7 ON SHEET M-501.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
06-M-401.
PROJECT
NORTH
Revisions: Date: 09 /0
3/
A B C D E F G H
TR
ELECTRICAL
CONFERENCE
OFFICE
ELEV EQUIP
W/C STOR
CONC COVERED
PORCH
OFFICE
TOILET
HSKP
LOUNGE / CONF
STORAGE
STEAM /MECH
SPRINKLER
ELEVATOR LOBBY
ELEVATOR
E1-7
CORRIDOR
CORRIDOR
07-M-401
07-M-401
07-M-401
07-M-401
AREA SHOWN
TRUE
NORTH
BUILDING 07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:0
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
07-M-101
BUILDING 07 - LEVEL 00 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
LEVEL 00 - OVERALL PLAN
SITE PLAN
PROJECT
NORTH
Revisions: Date: 09 /0
3/
RECEPTION
WAITING
STORAGE
EXAM
TOILET
BARIATRIC EXAM
STAIR 2
DIRTY
CLEAN
INTAKE
TOILET
TOILET
ENTRY
STAIR 1
CORRIDOR
ELEVATOR
CORRIDOR
CORRIDOR
WAITING AREA
7104A
07-M-402
AREA SHOWN
TRUE
NORTH
BUILDING 07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:1
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
07-M-102
BUILDING 07 - LEVEL 01 - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
LEVEL 01 - OVERALL PLAN
SITE PLAN
Revisions: Date:
PROJECT
NORTH
/0
3/
MECH (TE)
07-M-404
07-M-404
AREA SHOWN
TRUE
NORTH
BUILDING 07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:1
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
07-M-103
BUILDING 07 - LEVEL ATTIC - OVERALL PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
LEVEL ATTIC - OVERALL PLAN
PROJECT
NORTH
SITE PLAN
Revisions: Date: 09 /0
3/
A B
T
(E)14"x6"
(E)14"x8"
10"x4"
R
SR
L12
(E)FP
A B
A B
T
H
M
R
TR
ELECTRICAL
CONFERENCE
OFFICE
07-AC-01-7004
RL/RS
1/4"Ø RL, 5/8"Ø RS 8
(E)14"x8"
(E)14"x6"
R S R
L12
(E)FP13
3/4"Ø
D
A B
TR
ELECTRICAL
CONFERENCE
OFFICE
EXPOSED
SHOWN AREA
PROJECT
NORTH
IT
ELECTRICAL
CONFERENCE
OFFICE
ELECTRICAL
OFFICE
7002IT
CONFERENCE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:1
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
07-M-401
BUILDING 07 - LEVEL 00 - FIRE PROTECTION,
PLUMBING, AND MECHANICAL - DEMOLITION,
FLOOR PLANS & RCPS 07
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
RM 7004 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"2
RM 7004 - DEMOLITION RCP
1/4" = 1'-0"3
RM 7004 - FLOOR PLAN
1/4" = 1'-0"4
RM 7004 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMOLISH EXISTING THERMOSTAT. TURN OVER TO COR.
DEMOLISH EXISTING DUCTLESS AC UNIT. DEMOLISH
REFRIGERANT PIPE SERVING DUCTLESS AC UNIT.
DEMOLISH EXISTING CONDENSATE PUMP. DEMOLISH
CONDENSATE PIPE.
DEMOLISH CEILING SUPPLY GRILLE. DEMOLISH BRANCH
DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT
MAIN.
DEMOLISH EXISTING QUICK RESPONSE SPRINKLER.
SPRINKLER SYSTEM TO BE WET PIPE SYSTEM DESIGNED
AND INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
WORKING DRAWINGS PREPARED BY A NICET LEVEL III OR
IV SPRINKLER DESIGNER. SPRINKLER HAZARD
CLASSIFICATION IS LIGHT HAZARD. PROVIDE FM
APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS
WITH FUSIBLE LINKS. PROVIDE LISTED MECHANICAL
GUARD.
EXISTING CONDENSATE DRAIN PIPE TO REMAIN
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT
MORE THAN 1 FT. ABOVE FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER
REQUIREMENTS (INDOOR UNIT TO OUTDOOR UNIT).
PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE
SUPPORT PER SPECIFICATION SECTION 23 05 11. PIPE
SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION
SECTION 23 07 11. PROVIDE PIPE SUPPORT PER
SPECIFICATION SECTION 23 05 11.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
07-M-402.
EXISTING REFRIGERANT PIPING TO REMAIN.
EXISTING FIRE PROTECTION PIPING TO REMAIN.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY. CONTRACTOR SHALL RACK PIPING AS CLOSE AS
POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
Revisions: Date: 09 /0
3/
A B C D E
WAITING AREA
7104A
WAITING
RECEPTION
1 07-CU-01-7004
RL/RS
ENTRY
CORRIDOR
CORRIDOR
2 3
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:1
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
07-M-402
BUILDING 07 - LEVEL 01 - MECHANICAL PIPING
- FLOOR PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
PIPE ROUTING - RM 7104A - FLOOR PLAN
PROJECT
NORTH
SEE DETAIL NUMBER 11 ON SHEET M-502.
ROUTE REFRIGERANT LINE DOWN TO 1'-0" ABOVE FINISHED
FLOOR BEFORE PENETRATING WALL.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET
SHROUDING/CLADDING TO COVER REFRIGERANT PIPING.
USE LOW PROFILE UNISTRUT FOR REFRIGERANT PIPING.
PAINT SHROUD TO MATCH ADJACENT WALL AND
COORDINATE COLOR WITH COR.
TO FLOOR BELOW, FOR CONTINUATION SEE SHEET
07-M-401.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL REFRIGERANT PIPING CONCEALED IN WALLS,
CHASES OR CEILING SPACES.
KEYNOTES #
Revisions: Date: 09 /0
3/
D E F G H
STAIR 2
E1-13
EXAM
TOILET
CORRIDOR
CLEAN
EXAM
STORAGE
3 4CORRIDOR
SECURE MEDS
EXAM
TOILET
SOILED HOLDING
3/4"Ø
D
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:4
:1
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
07-M-403
BUILDING 07 - LEVEL 02 - FLOOR PLAN
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/4" = 1'-0"1
PIPE ROUTING - RM 7218 - FLOOR PLAN
PROJECT
NORTH
CONDENSATE LINE TO BE ROUTED TO THE EXISTING SINK
SANITARY LINE. SEE DETAIL NUMBER 1 ON SHEET M-501.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 4 ON SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE DETAIL
NUMBER 3 ON SHEET M-501.
FROM FLOOR ABOVE, FOR CONTINUATION SEE SHEET
07-M-404.
INSTALL NEW CONDENSATE LINE. PROVIDE INSULATION
FOR ALL CONDENSATE LINES PER SPECIFICATION 23 07 11.
PROVIDE PIPE SUPPORT PER SPECIFICATION SECTION
23 05 11.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK…
This is the start of the file's text. The full file is on GovTribe.