Summary of Electrical Schedules - EHRM Infrastructure Upgrades, Huntington

These are 100% construction document electrical schedule drawings for the EHRM (Electronic Health Record Management) Infrastructure Upgrades project at the VA Huntington facility located at 1540 Spring Valley Drive, Huntington, West Virginia 25704-9300. The drawings, prepared by SPEES Design Build (23830 Pacific Highway S., Suite 300, Kent, WA 98032) and issued September 3, 2025, detail electrical distribution systems for Building 01S. The document comprises multiple panelboard schedules and circuit directories specifying branch circuit configurations, including existing panelboard ratings shown in grey text and revised circuits with additional loads shown in black text. Key schedules include panelboards designated 01S-P-DCA through 01S-PA-21, documenting connections between transformers, switchboards, bus ducts, circuit breakers, and distribution panels with specified conduit sizes, conductor gauges, ground wire sizes, voltage drops, and fault current ratings.

The four pages contain detailed electrical equipment interconnection diagrams and schedules for substations throughout the facility. General notes specify that contractors must update all panel circuit directories to reflect changes using typewritten revisions, reference associated equipment load schedules for overall panel load calculations, and note that all digital power meters and surge protective devices are integral to electrical distribution equipment unless otherwise noted. A conduit and wire schedule table (page 4) provides comprehensive routing information for 73 identified conduit tags, specifying service connections, routing paths, conductor specifications, and electrical characteristics including voltage drop percentages and fault current ratings ranging from 8,200 to 42,000 amperes. The document indicates full sprinklered building status and is part of project number 581-22-700.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:1

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

01SEP702

BLDG 01S - ELECTRICAL SCHEDULES

01S

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

ADDITIONAL LOAD.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:1

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

01SEP703

BLDG 01S - ELECTRICAL SCHEDULES

01S

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:1

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

01SEP704

BLDG 01S - ELECTRICAL SCHEDULES

01S

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:1

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

01SEP705

BLDG 01S - ELECTRICAL SCHEDULES

01S

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

FROM TO QTY SIZE (QTY) & SIZE GROUND SIZE

01S-P-DCA PANELBOARD "DC-DP-E" SWITCHBOARD "1S_SGCP-ES" PANELBOARD "DC-DP-E" 2 3" (4) 500 KCMIL 2/0 AWG 2.25% <39,300 - 01S-PB-01 PANELBOARD "1S-MDP-DC-TR-B" SUBSTATION #5 PANELBOARD "1S-MDP-DC-TR-B" 2 3-1/2" (4) 600 KCMIL 2/0 AWG 0.14% <'39,300 - 01S-P-DCB PANELBOARD "DC-DP-N" PANELBOARD "1S-MDP-DC-TR-B" PANELBOARD "DC-DP-N" 2 2-1/2" (4) 350 KCMIL 1/0 AWG 0.48% <42,000 - 01S-PB-02 BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4B" PANELBOARD "1S-MDP-DC-TR-B" TRANSFORMER "1S-TWR4B" 1 1-1/4" (3) 2 AWG 8 AWG 0.15% <42,000 -

01S-PB-03A BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4B" TRANSFORMER "XFMR-1S-TWR4B" ENCLOSED CIRCUIT BREAKER "ECB-1S-TWR4B" 2 2-1/2" (4) 4/0 AWG 2 AWG 0.38% <42,000 - 01S-PB-03B BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4B" ENCLOSED CIRCUIT BREAKER "ECB-1S-TWR4B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4B" 2 2-1/2" (4) 4/0 AWG 2 AWG 0.77% <42,000 01S-PB-03C BUS DUCT "01S-BD-TWR4B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4B" CABLE TAP BOX "01S-CTB-TWR4B" 2 2-1/2" (4) 4/0 AWG 2 AWG 1.15% <42,000 - 01S-PB-04 PANELBOARD "01S-T4-00GB" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-00GB" PANELBOARD "01S-T4-00GB" 1 1-1/4" (4) 3 AWG 8 AWG 1.31% <10,000 - 01S-PB-05 PANELBOARD "01S-T4-01B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-01B" PANELBOARD "01S-T4-01B" 1 1-1/4" (4) 3 AWG 8 AWG 1.38% <10,000 - 01S-PB-06 PANELBOARD "01S-T4-02B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-02B" PANELBOARD "01S-T4-02B" 1 1-1/4" (4) 3 AWG 8 AWG 1.54% <10,000 - 01S-PB-07 PANELBOARD "01S-T4-03B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-03B" PANELBOARD "01S-T4-03B" 1 1-1/4" (4) 3 AWG 8 AWG 1.64% <10,000 - 01S-PB-08 PANELBOARD "01S-T4-04B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-04B" PANELBOARD "01S-T4-04B" 1 1-1/4" (4) 3 AWG 8 AWG 1.80% <10,000 - 01S-PB-09 PANELBOARD "01S-T4-05B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-05B" PANELBOARD "01S-T4-05B" 1 1-1/4" (4) 3 AWG 8 AWG 1.97% <10,000 -

01S-PB-10A TRANSFORMER "1S-TWR1B" SUBSTATION 6 TRANSFORMER "1S-TWR1B" 1 2" (3) 3/0 AWG 6 AWG 0.43% 15,900 - 01S-PB-10B ENCLOSED CIRCUIT BREAKER "ECB-1S-TWR1B" TRANSFORMER "1S-TWR1B" ENCLOSED CIRCUIT BREAKER "ECB-1S-TWR1B" 2 2" (4) 3/0 AWG 6 AWG 0.10% 15,900 - 01S-PB-11A BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR1B" ENCLOSED CIRCUIT BREAKER "ECB-1S-TWR1B" CABLE TAP BOX "01S-CTB-TWR1B" 2 2" (4) 3/0 AWG 6 AWG 0.48% 15,900 - 01S-PB-11B BUS DUCT "01S-BD-TWR1B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR1B" BUS DUCT "01S-BD-TWR1B" 2 2" (4) 3/0 AWG 6 AWG 0.54% 15,900 - 01S-PB-12 PANELBOARD "01S-BB100B-1SB" BUS DUCT CIRCUIT BREAKER "01S-BDCB-BB100B-1SB" PANELBOARD "01S-BB100B-1SB" 1 1-1/4" (4) 3 AWG 8 AWG 1.41% <10,000 - 01S-PB-13 PANELBOARD "01S-T1-00GB" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-00GB" PANELBOARD "01S-T1-00GB" 1 1-1/4" (4) 3 AWG 8 AWG 0.73% <10,000 - 01S-PB-14 PANELBOARD "01S-T1-01B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-01B" PANELBOARD "01S-T1-01B" 1 1-1/4" (4) 3 AWG 8 AWG 0.96% <10,000 - 01S-PB-15 PANELBOARD "01S-T1-02B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-02B" PANELBOARD "01S-T1-02B" 1 1-1/4" (4) 3 AWG 8 AWG 1.13% <10,000 - 01S-PB-16 PANELBOARD "01S-T1-03B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-03B" PANELBOARD "01S-T1-03B" 1 1-1/4" (4) 3 AWG 8 AWG 1.29% <10,000 - 01S-PB-17 PANELBOARD "01S-T1-04B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-04B" PANELBOARD "01S-T1-04B" 1 1-1/4" (4) 3 AWG 8 AWG 1.29% <10,000 - 01S-PB-18 PANELBOARD "01S-T1-05B" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-05B" PANELBOARD "01S-T1-05B" 1 1-1/4" (4) 3 AWG 8 AWG 1.48% <10,000 - 01S-PB-19 AUTOMATIC TRANSFER SWITCH "01-ATS-CE" SUBSTATION 4 AUTOMATIC TRANSFER SWITCH "ATS-CE" 2 3" (4) 400 KCMIL 3 AWG 0.87% <25,600

01S-PA-01 BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4A" PANELBOARD "1S_MDP-CE" TRANSFORMER "XFMR-1S-TWR4A" 1 2-1/2" (3) 4/0 AWG 2 AWG 1.65% <21,700 - 01S-PA-02A BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4A" TRANSFORMER "XFMR-1S-TWR4A" ENCLOSED CIRCUIT BREAKER "ECB-XFMR-1S-TWR4A" 1 3" (4) 400 KCMIL 1/0 AWG 0.08% <21,700 - 01S-PA-02B BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4A" ENCLOSED CIRCUIT BREAKER "ECB-XFMR-1S-TWR4A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4A" 1 3" (4) 400 KCMIL 1/0 AWG 0.47% <21,700 01S-PA-02C BUS DUCT "01S-BD-TWR4A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR4A" CABLE TAP BOX "01S-CTB-TWR4A" 1 3" (4) 400 KCMIL 1/0 AWG 1.26% <21,700 - 01S-PA-03 PANELBOARD "01S-T4-00GA" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-00GA" PANELBOARD "01S-T4-00GA" 1 1-1/4" (4) 3 AWG 8 AWG 1.36% <10,000 - 01S-PA-04 PANELBOARD "01S-T4-01A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-01A" PANELBOARD "01S-T4-01A" 1 1-1/4" (4) 3 AWG 8 AWG 1.52% <10,000 - 01S-PA-05 PANELBOARD "01S-T4-02A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-02A" PANELBOARD "01S-T4-02A" 1 1-1/4" (4) 3 AWG 8 AWG 1.69% <10,000 - 01S-PA-06 PANELBOARD "01S-T4-03A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-03A" PANELBOARD "01S-T4-03A" 1 1-1/4" (4) 3 AWG 8 AWG 1.66% <10,000 - 01S-PA-07 PANELBOARD "01S-T4-04A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-04A" PANELBOARD "01S-T4-04A" 1 1-1/4" (4) 3 AWG 8 AWG 1.82% <10,000 - 01S-PA-08 PANELBOARD "01S-T4-05A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T4-05A" PANELBOARD "01S-T4-05A" 1 1-1/4" (4) 3 AWG 8 AWG 1.99% <10,000 -

01S-PA-10A BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR1A" ENCLOSED CIRCUIT BREAKER "ECB-XFMR-1S-TWR1-A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR1A" 2 3" (4) 500 KCMIL 3 AWG 0.10% <10,000 - 01S-PA-10B BUS DUCT "01S-BD-TWR1A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-TWR1A" CABLE TAP BOX "01S-CTB-TWR1A" 2 2-1/2" (4) 250 KCMIL 3 AWG 0.48% <10,000 - 01S-PA-11 PANELBOARD "01S-BB100B-1SA" BUS DUCT CIRCUIT BREAKER "01S-BDCB-BB100B-1SA" PANELBOARD "01S-BB100B-1SA" 1 3" (4) 250 KCMIL 4 AWG 1.71% <10,000 - 01S-PA-12 PANELBOARD "01S-T1-00GA" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-00GA" PANELBOARD "01S-T1-00GA" 1 3" (4) 250 KCMIL 4 AWG 1.63% <10,000 - 01S-PA-13 PANELBOARD "01S-T1-01A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-01A" PANELBOARD "01S-T1-01A" 1 3" (4) 250 KCMIL 4 AWG 1.81% <10,000 - 01S-PA-14 PANELBOARD "01S-T1-02A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-02A" PANELBOARD "01S-T1-02A" 1 3" (4) 250 KCMIL 4 AWG 1.96% <10,000 - 01S-PA-15 PANELBOARD "01S-T1-03A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-03A" PANELBOARD "01S-T1-03A" 1 3" (4) 250 KCMIL 4 AWG 1.96% <10,000 - 01S-PA-16 PANELBOARD "01S-T1-04A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-04A" PANELBOARD "01S-T1-04A" 1 3" (4) 250 KCMIL 4 AWG 2.13% <10,000 - 01S-PA-17 PANELBOARD "01S-T1-05A" BUS DUCT CIRCUIT BREAKER "01S-BDCB-T1-05A" PANELBOARD "01S-T1-05A" 1 3" (4) 250 KCMIL 4 AWG 2.32% <10,000 - 01S-PA-18 PANELBOARD "01S-6B-100A" PANELBOARD "01S-T1-05A" PANELBOARD "01S-6B-100A" 1 1-1/4" (4) 3 AWG 8 AWG 2.64% <10,000 - 01S-PA-19 PANELBOARD "1S-MDP-CE" PANELBOARD "1S-SGCP-ES" AUTOMATIC TRANSFER SWITCH "ATS-CE" 2 3" (4) 400 KCMIL 3 AWG 1.25% <8,200 - 01S-PA-20 PANELBOARD "1S-MDP-CE" AUTOMATIC TRANSFER SWITCH "ATS-CE" PANELBOARD "1S_MDP-CE" 2 3" (4) 400 KCMIL 3 AWG 1.51% <22,900 - 01S-PA-21 CONDENSING UNIT "01S-CU-01-BB100B-1S" PANELBOARD "01S-T1-01A" CONDENSING UNIT "01S-CU-01-BB100B-1S" 1 3/4" (2) 8 AWG 10 AWG 2.23% <10,000 -

NOTE(S):

1. NONE

BLDG 1S - CONDUIT AND WIRE SCHEDULE - HUNTINGTON EHRM UPGRADES

CONDUIT TAG SERVICE

ROUTING CONDUIT CONDUCTORS

NOTESVOLTAGE

DROP

FAULT

CURRENT

(A)