These are electrical design and construction documents for a Data Center infrastructure upgrade project at the VA Medical Center in Huntington, West Virginia (Project Number IM 360://581-22-700). The documents comprise comprehensive electrical plans across multiple phases, including ground floor electrical plans, roof plans, fire alarm plans, and grounding plans for Phases 1A, 1B, 2A, and 2B of construction.

The electrical scope includes installation of power distribution systems with redundant A-Side and B-Side power feeders to critical equipment, UPS systems (UPS-A and UPS-B), panelboards (DC-PNL-A, DC-PNL-B, DC-PNL-LS), automatic transfer switches (ATS-A, ATS-B), battery management systems, CRAC units, and associated raceways and conductors. The fire alarm system incorporates gaseous suppression system controls, emergency power-off switches for UPS and HVAC equipment, manual release and abort buttons, addressable fire alarm devices, and smoke/heat detectors throughout the data center and associated support spaces. Grounding provisions include ground grid conductors, secondary bonding busbars, electrostatic discharge flooring bonds, and telecommunications bonding connections designed to achieve a grounding system resistance-to-earth of 5 ohms or less as verified by IEEE 81 four-point fall-of-potential testing. The contractor is responsible for field verification of existing conditions, coordination with VA for phasing during active operations to maintain power to essential equipment, demolition of obsolete equipment and raceways back to source, and updated circuit panel directories for all impacted panels. All work must comply with VA standards, NEC, NFPA requirements, and existing fire ratings with sealed penetrations.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AAAAAAA

AAAAAAAAAAAAAAAAAA

A A

B B

A A

B B

DATA CENTER

X Y Z

ELECTRICAL 2

GC114a

143 SF

BMS

GC114

158 SF

IRM MECH. SUPPORT

GC103

436 SF

DATA CENTER

GC115-1

851 SF

BATTERY

GC119

161 SF

COMPUTER

470 SF

TELE

GC118

243 SF

CORRIDOR

312 SF

ENTRANCE #2

179 SF

IRM

GC117

223 SF

RELOCATED TELEPHONE

TERMINAL BOARDS

RELOCATED SURGE

PROTECTION MODULES

RELOCATED TELEPHONE

PUNCH BLOCKS

UPS-A

HDA-A

MDA-A

RELOCATED TELEPHONE

TERMINAL BOARDS

RELOCATED SURGE

PROTECTION MODULES

RELOCATED TELEPHONE

PUNCH BLOCKS

RELOCATED

FIBERNET ISON CKT

RELOCATED

UNIDENTIFIED

EQUIPMENT

RELOCATED

UNIDENTIFIED

PANEL

RELOCATED

COMPUTER ALRM

C R A C

01S-AC-XX-3

GC115-1-VRF-10-GC114a

EXISTING UPS

GC115-1-VRF-11-GC114a

DC-6A

DC-6B

GC115-1-VRF-09-1

PANEL 'PDUIC'

BATTERY

MANAGEMENT

SYSTEM

DC-DP-N

DC-DP-A

PANEL 'PDUIC'

PANEL 'CP-1'

DC-GC114A

DC-GC114B

CORRIDOR

212 SF

ELECTRICAL 1

100 SF

XFMR 'ELA-G-LSA'

PANEL 'EPD-GESA'

A/C CONTROLLER

UPS BYPASS

PACS PANEL

DISC. XFMR 'ELA-G-LSA'

GC115-1-VRF-06-6

GC115-1-VRF-08-6

GC115-1-VRF-07-6

GC115-1-CRAC-01-GC115-1

DC-DP-B

DC-PNL-B

DC-ATS-A

DC-ATS-B

PATCH PANELS

QTY. (3)

TELECOM

DEVICES

ELEC

GC111

52 SF

WOMEN

GC109

146 SFMEN

GC108

173 SF

STAIR 9

207 SF

ELEV.

E-6

69 SF

ELEV.

E-5

69 SF

OXYGEN STOR

GC112

92 SF

MEN

GB174

51 SF

STAIR 1

157 SF

LINEN

GB169

202 SF

HAC

GB170

39 SF

GB173

19 SF

WOMEN

GB175

49 SF

TO SHEET

01EP400Go-2A

DC-DP-E

DC-PNL-LS

ACCESS CONTROL

PANEL "01-ACP-GC115"

XFMR 'LPPGC'

XFMR '1-CPGC (ABOVE)

CPGC

LSGC

JBOX

LPGC

EXISTING BONDING BUSBAR

UNKNOWN EQUIPMENT

CABINET

CONTROL PANEL

PANEL 'EPC'

I.R.M. OUTER OFFICE

PANEL 'EPC-A'

KEYPAD

TRANSFORMER "1_EPC"

PANEL 'EPC-B'(BELOW)

FLOW SWITCH (ABOVE)

CONTROL PANEL

TRANSFORMER 'DC-TX-LS' (ABOVE)

PANELBOARD 'DC-PNL-A' (BELOW)

DISCONNECT 'DISC-DC-LS'

DC-TX-PNL-A (ABOVE)

DC-TX-UPS-A (BELOW)

GC115-1-VRF-TEMP1-4

GC115-1-VRF-TEMP2-4

BMS PANEL

DC-P-79

DC-PNL-B-10,12

DC-PNL-B-14,16

AREA SHOWN

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:5 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gf-2A

DATA CENTER - ELECTRICAL PLAN - PHASE 2A

(3 OF 3)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

3. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. FOR CLARITY, CONDUIT AND WIRE TAG HAVE ONLY BEEN PROVIDED FOR NEW OR

MODIFIED FEEDERS. EQUIPMENT TAGS HAVE BEEN PROVIDED ONLY FOR NEW OR

MODIFIED DEVICES.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ELECTRICAL PLAN - PHASE 2A (3 OF 3) 2'0 4' 8'

PROJECT

NORTH

Revisions: Date:

KEY NOTES

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

PROVIDE RACEWAYS AND CONDUCTORS PER MANUFACTURERE'S REQUIREMENTS.

REFERENCE MECHANICAL DRAWINGS AND COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

PROJECT

NORTH

KEY PLAN

E

J

A A A

A A A A A A A

J

BBBBBBBBBBBBBBBBBBBB

B

B

B B

A

A

A

A A

A A A A A A

A

A

A

A

A

A

A

A

A

A

A A A A A A A A A A A A AAAAAAA

AAAAAAA

AAAAAAA

A

A

A A A A A A A

A

A

A

A

A

A

A

A

A

A

AAAAAAA

A

A

AAAAAAA

A

A

A

A

B

B

B

B

B

B

B

B

B

B

B B B B B B B B B B B B B

A

A

A

A

A

A

A

A

A

A

A A A A A A

A A A A A A A A A A A

A

A

A

A

A

A

A

A

A

A

A

AAAAAAA

AAAAAAA

AAAAAAA

A

A

AAAAAAA

A

A

A

A

AAAAAAA

A

A

A

A

A

A

A

A

A

AA

AAAAAAA

AA

AAA

A

A

A

A

AAAAAAAAAAAAAAAAAAAAAAAAAAA

BBBBBBBBBBBBBBBBBB

BBBBBBBBBBB

BB

BBBBBBBB

B B

AAAAAAA

AAAAAAA

A

A

BB

BBBBBBB

AAAAAAA

AAAAAAA

AAAAAAA

AAAAAAA

AAAAAAA AAAAAAA

A

A

A

AAAAAAAAAAAAAA

BBBBBBB

B

B

B

B

BBBBBBB

BBBBBBB

B

B

B

BBBBBBB

BBBBBBB

BBBB

BBBBB

BBBBB

BBBBBBB

B

B

BBBB

BB

BBBB BB

BBBBBBB B B B

BB

BBBBBBB

A A

B B

A A

B B

AREA SHOWN

X Y Z

DATA RACK

DATA RACK

DATA RACK,

TYP.

DATA RACK

TELEPHONE

TERMINAL BOARDS

SURGE PROTECTION

MODULES

TELEPHONE

PUNCH BLOCKS

FIBERNET ISON CKT

UNIDENTIFIED EQUIPMENT

UNIDENTIFIED

PANEL

COMPUTER ALRM

DATA RACK

PANEL 'CP-1'

RACK G

RACK H

RACK I

PANEL 'PDUIC'

TELECOM

DEVICES

PATCH PANELS

QTY. (3)

TYP.

C R A C

C R A C

EXISTING UPS

TO

SHEET 01EP100G

C R A C

DC-P-02

DC-P-21

DC-P-22

DC-ATS-A

DC-P-08

DC-ATS-B

DC-PNL-B

BATTERY

MANAGEMENT

SYSTEM

EDH-11

DC-GC114ADC-GC114B

DC-6A

DC-6B

DC-DP-N

XFMR 'ELA-G-LSA'

PANEL 'EPD-GESA'

A/C CONTROLLER

UPS BYPASS

PACS PANEL

DISC. XFMR 'ELA-G-LSA'

DC-DP-A

DC-DP-B

TO SHEET 01EP400Gk-1A

TO SHEET

01EP400Gm-1B

DC-PNL-LS3

ACCESS CONTROL

PANEL "01-ACP-GC115"

XFMR 'LPPGC'

XFMR '1-CPGC (ABOVE)

CPGC

LSGC

JBOX

LPGC

EXISTING BONDING BUSBAR

UNKNOWN EQUIPMENT

CABINET

CONTROL PANEL

PANEL 'EPC'

I.R.M. OUTER OFFICE

PANEL 'EPC-A'

KEYPAD

TRANSFORMER "1_EPC"

PANEL 'EPC-B'(BELOW)

FLOW SWITCH (ABOVE)

CONTROL PANEL

TRANSFORMER 'DC-TX-LS' (ABOVE)

PANELBOARD 'DC-PNL-A' (BELOW)

DISCONNECT 'DISC-DC-LS'

DC-TX-PNL-A (ABOVE)

DC-TX-UPS-A (BELOW)

TO SHEET 01EP100G

BMS PANEL

DC-DP-E

FROM SHEET 01EP100G

01S-P-DCB

GC115-1-VRF-TEMP1-4

GC115-1-VRF-TEMP2-4

DATA CENTER

ELECTRICAL 2

GC114a

143 SF

BMS

GC114

158 SF

IRM MECH. SUPPORT

GC103

436 SF

ELEC

GC111

52 SF

WOMEN

GC109

146 SFMEN

GC108

173 SF

STAIR 9

207 SF

ELEV.

E-6

69 SF

ELEV.

E-5

69 SF

OXYGEN STOR

GC112

92 SF

DATA CENTER

GC115-1

851 SF

BATTERY

GC119

161 SF

MEN

GB174

51 SF

STAIR 1

157 SF

LINEN

GB169

202 SF

HAC

GB170

39 SF

GB173

19 SF

WOMEN

GB175

49 SF

COMPUTER

470 SF

TELE

GC118

243 SF

ELECTRICAL 1

100 SF

CORRIDOR

312 SF

ENTRANCE #2

179 SF

IRM

GC117

223 SF

CORRIDOR

212 SF

TR TOWER 1

T1-00G

169 SF

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gg-2B

DATA CENTER - ELECTRICAL PLAN - PHASE 2B

(1 OF 3)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

6. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

9. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

10. FOR CLARITY, CONDUIT AND WIRE TAG HAVE ONLY BEEN PROVIDED FOR NEW OR

MODIFIED FEEDERS. EQUIPMENT TAGS HAVE BEEN PROVIDED ONLY FOR NEW OR

MODIFIED DEVICES.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ELECTRICAL PLAN - PHASE 2B (1 OF 3) 2'0 4' 8'

PROJECT

NORTH

PHASING NOTES

1. PHASE PROVIDED TO DEMOLISH EXISTING

COMPUTER ROOM MECHANICAL EQUIPMENT.

Revisions: Date:

KEY NOTES

EXISTING EQUIPMENT SHALL BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

DISCONNECT EXISTING EQUIPMENT AND PRESERVE FOR RELOCATION. DEMOLISH

SUPPORTING CONDUIT AND WIRING AS SHOWN.

TEMPORARY ELECTRICAL CONNECTION DURING DEMOLITION PHASE. PROVIDE

CONDUIT AND WIRE AS INDICATED BY THE TAG. TEMPORARY CONNECTION SHALL

BE REMOVED AND DEVICES SHALL BE RECONNECTED AS SHOWN ON SHEET

01EP400Gg.

MECHANICAL UNIT SHALL BE SALVAGED TO VA. ASSOCIATED CONDUCTORS AND

RACEWAYS SHALL BE DEMOLISHED BACK TO SOURCE.

J

A A A

A A A A A A A

J

AAA

AAAAAAA

BBBBBB

BBBBBBBBBBBBBB

J

BBBBBBBBBBBBBBBBBBBB

A A A A A A

A

A

A

A

A

A

A

A

A

A

A A A A A A A A A A A A

AAAAAAA

A

A

A A A A A A A

AAAAAAA

AAAAAAA

A

A

A

A

A

A

A

A

A

A

B

B

B B B

B

B

B

B

B

B

B

B

B B B

BBBB

BBBBBBB

B B B B B B

BBBBBBB

BBBBBBB

B

B

B

BBBBBBBBBBBBBBBBBBBBB

B

B

B

B

B

B

B

B

B

B

B

B

B B B B B B B B B B

BBBBBBB

B B B B B B B B

B

B

B B B B B B B

AAAAAAA

A

A

AAAAAAAA

AAAAAAA A

A

A

AAAAAAA

A

A

A

A

A

A

AAAA

A

A

A

A

AA

A

A

AA

AAA

A

A

A

A

AAAAAAAAAAAAAAA

AAAAAAAAAAAAAA

A A

A A

AAAAAAA

AAAAAAA

EP507

EP506

EP507

AA

B

B

B B

A

A

A

A A

BBBBBBB

BBBBBBB

B

B

B

B

B

A A

A

A

B B

B

B

B

EP502

A

A

A

A

A

A

A A

AA

A

A

AAAAAAA

B B B B B B B B B B B

BBBBBBB

B

B

B

B

B

B

B

AAAA

AAAA AAAAAAA

A

A

B B

B B B

B B B B B

B

B

BBBB

BBBBB

BBBBB

BBBBBBB

BBBB

B

B

B

BBBBBBB

B

B

B

B

BBBBBBB

BBBBBBB

B

B

B

BBBBBBB

BBBBBBB

BBBB

BBBBBBB

BBBBBBB

A A

B B

A A

B B

AREA SHOWN

X Y Z

TELEPHONE

TERMINAL BOARDS

SURGE PROTECTION

MODULES

TELEPHONE

PUNCH BLOCKS

FIBERNET ISON CKT

UNIDENTIFIED EQUIPMENT

UNIDENTIFIED

PANEL

COMPUTER ALRM

DATA RACK

EXISTING UPS

TRANSFORMERS

'DC-TX-PNL-A' (ABOVE)

'DC-TX-UPS-A' (BELOW)

TO

SHEET 01EP100G

01S-P-DCA 2

GC115-1-VRF-10-GC114a

DC-P-29

CORRIDOR

549 SF

DATA CENTER

GC115-1

1365 SF

ENTRANCE #2

179 SF

DC-ATS-B

DC-P-07

DC-P-03

ELECTRICAL 1

165 SF

GC-115-CRAC-02-GC115-1

CRAC

BATTERY

MANAGEMENT

SYSTEM

DC-PNL-LS

DC-P-15

DC-P-18

DC-P-08

DC-P-02

DC-P-09

DC-P-14

DC-P-12

GC115-1-VRF-16-GC119

GC115-1-VRF-15-GC118

GC115-1-VRF-14-GC118

GC115-1-VRF-02-3

GC115-1-VRF-01-3

GC115-1-VRF-03-3

GC115-1-VRF-04-4

GC115-1-VRF-05-4

GC115-1-VRF-09-01

GC115-VRF-08-6

GC115-VRF-06-6

GC115-VRF-07-6

DC-6B

DC-6A

DC-GC114ADC-GC114B

GC115-1-VRF-11-GC114a

GC115-1-VRF-13-GC114

GC115-1-VRF-12-GC114

DC-DP-N

ENTRANCE #1

158 SF

DC-3A

DC-3B

P-TR-2B

P-TR-2A

D

D

BATTERY

GC119

161 SF

CORRIDOR

549 SF

ELECTRICAL 2

GC114a

143 SF

BMS

GC114

158 SF

IRM MECH. SUPPORT

GC103

436 SF

TELE

GC118

243 SF

CLOSET 1

24 SF

CLOSET 2

19 SF

DC-3A-29

XFMR 'ELA-G-LSA'

PANEL 'EPD-GESA'

A/C CONTROLLER

UPS BYPASS

PACS PANEL

DISC. XFMR 'ELA-G-LSA'

DC-DP-A

GC115-H-01-5

DC-DP-B

DC-TBECB

DC-P-BTB

DC-P-ATB

DC-PNL-A

MECH / FIRE

123 SF

ELEC

GC111

52 SF

WOMEN

GC109

146 SFMEN

GC108

173 SF

STAIR 9

207 SF

ELEV.

E-6

69 SF

ELEV.

E-5

69 SF

OXYGEN STOR

GC112

92 SF

STAIR 1

157 SF

LINEN

GB169

202 SF

MEN

GB174

51 SF

HAC

GB170

39 SF

GB173

19 SF

WOMEN

GB175

49 SF

DC-ATS-A

DC-PNL-B

DC-P-70

DC-P-15

DC-P-71

DC-P-28

ACCESS CONTROL

PANEL "01-ACP-GC115"

XFMR 'LPPGC'

XFMR '1-CPGC (ABOVE)

CPGC

LSGC

JBOX

LPGC

EXISTING BONDING BUSBAR

UNKNOWN EQUIPMENT

CABINET

CONTROL PANEL

PANEL 'EPC'

I.R.M. OUTER OFFICE

PANEL 'EPC-A'

KEYPAD

TRANSFORMER "1_EPC"

PANEL 'EPC-B'(BELOW)

FLOW SWITCH (ABOVE)

CONTROL PANEL

TRANSFORMER

"DC-TX-LS"

DISCONNECT

"DISC-DC-LS"

DC-P-10

DC-P-32

DC-P-33

DC-P-34

DC-C-14

DC-C-06

DC-C-13BMS PANEL

DC-DP-E

FROM SHEET 01EP100G

01S-P-DCB

EP504

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:2 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gh-2B

DATA CENTER - ELECTRICAL PLAN - PHASE 2B

(2 OF 3)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

3. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ELECTRICAL PLAN - PHASE 2B (2 OF 3) 2'0 4' 8'

PROJECT

NORTH

PHASING NOTES

1. PHASE PROVIDED FOR INSTALLATION OF

PERMANENT, REDUNDANT A-SIDE

ELECTRICAL EQUIPMENT.

Revisions: Date:

KEY NOTES

INTERCEPT RACEWAY AND CONDUCTORS TO EXTEND TO RELOCATED EQUIPMENT.

DEMOLISH TEMPORARY ELECTRICAL CONNECTIONS PROVIDED ON SHEET

01EP400Gb-2B AS REQUIRED.

SOURCE A POWER PANELBOARD "DC-3A".

SOURCE B POWER PANELBOARD "DC-3B".

SECONDARY BONDING BUSBAR.

A-SIDE BUSWAY SHALL BE DE-ENERGIZED FOR INSTALLATION OF BUS EXTENSION. B-

SIDE BUSWAY SHALL BE INSTALLED PRIOR TO ENSURE NO EQUIPMENT OUTAGES.

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL POWER SUPPLY WITHIN JUNCTION BOX AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER

SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE

DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS

REQUIRED. SEE REQUIREMENTS IN "08 71 00 - DOOR HARDWARE". COORDINATE WITH

ARCHITECT AND DOOR INSTALLER.

BB

B B

AAAAAAA

A A A A A A A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

AA

AA

AA

A

A

A

A

A

AA

A

A

A

A

A A A A A A

AA

A A

B B

A A

B B

DATA CENTER

X Y Z

TELEPHONE

TERMINAL BOARDS

SURGE PROTECTION

MODULES

TELEPHONE

PUNCH BLOCKS

FIBERNET ISON CKT

UNIDENTIFIED EQUIPMENT

UNIDENTIFIED

PANEL

COMPUTER ALARM

DATA RACK

EXISTING UPS

'DC-ATS-A'

DC-ATS-B

DC-PNL-B

MECH / FIRE

123 SF

ELECTRICAL 1

165 SF

CORRIDOR

549 SF

ELECTRICAL 2

GC114a

143 SF

BMS

GC114

158 SF

DATA CENTER

GC115-1

1365 SF

ENTRANCE #2

179 SF

BATTERY

GC119

161 SF

IRM MECH. SUPPORT

GC103

436 SF

GC-115-CRAC-02-GC115-1

CRAC

GC115-1-VRF-16-GC119

GC115-1-VRF-15-GC118

GC115-1-VRF-14-GC118

GC115-1-VRF-02-3

GC115-1-VRF-01-3

GC115-1-VRF-03-3

GC115-1-VRF-04-4

GC115-1-VRF-05-4

GC115-1-VRF-13-GC114

GC115-1-VRF-12-GC114

DC-6B

DC-6A

DC-3B

BATTERY

MANAGEMENT

SYSTEM

DC-DP-N

DC-3A

CORRIDOR

549 SF

CLOSET 1

24 SF

ENTRANCE #1

158 SF

XFMR 'ELA-G-LSA'

PANEL 'EPD-GESA'

A/C CONTROLLER

UPS BYPASS

PACS PANEL

DISC. XFMR 'ELA-G-LSA'

GC115-1-VRF-10-GC114a

GC115-1-VRF-11-GC114a

GC115-1-VRF-09-1

GC115-1-VRF-06-6

GC115-1-VRF-08-6

GC115-1-VRF-07-6

GC115-1-CRAC-01-GC115-1

GC115-H-01-5

DC-DP-B

DC-DP-A

DC-TBECB

DC-P-76

ELEC

GC111

52 SF

WOMEN

GC109

146 SFMEN

GC108

173 SF

STAIR 9

207 SF

ELEV.

E-6

69 SF

ELEV.

E-5

69 SF

OXYGEN STOR

GC112

92 SF

STAIR 1

157 SF

LINEN

GB169

202 SF

TELE

GC118

243 SF

CLOSET 2

19 SF

MEN

GB174

51 SF

HAC

GB170

39 SF

GB173

19 SF

WOMEN

GB175

49 SF

DC-GC114A

DC-GC114B

TO SHEET

01EP400Gq-2B

DC-P-86

DC-P-84

TO SHEET

01EP400Gq-2B

DC-P-85

DC-P-83DC-P-82

DC-P-81

TO SHEET

01EP400Gq-2B

DC-P-18

TO SHEET

01EP400Gq-2B

DC-P-80

ACCESS CONTROL

PANEL "01-ACP-GC115"

XFMR 'LPPGC'

XFMR '1-CPGC (ABOVE)

CPGC

LSGC

JBOX

LPGC

EXISTING BONDING BUSBAR

UNKNOWN EQUIPMENT

CABINET

CONTROL PANEL

PANEL 'EPC'

I.R.M. OUTER OFFICE PANEL 'EPC-A'

KEYPAD

TRANSFORMER "1_EPC"

PANEL 'EPC-B'(BELOW)

FLOW SWITCH (ABOVE)

CONTROL PANEL

DC-PNL-LS

DC-PNL-A

TRANSFORMER

"DC-TX-LS"

DISCONNECT

"DISC-DC-LS"

TRANSFORMERS

'DC-TX-PNL-A' (ABOVE)

'DC-TX-UPS-A' (BELOW)

TO SHEET

01EP400Gq-2B

BMS PANEL

GC115-ERV-01

GC115-EDH-01-5

GC115-1-DH-01-5

GC115-1-DH-02-5

DC-PNL-A-23

DC-PNL-B-23

DC-P-90

DC-DP-E

DC-PNL-A-7,9

DC-P-22

DC-GC114A-23,25

DC-GC114A-14,16

DC-3A-21,23

DC-3A-17,19

DC-3A-6,8

DC-3A-25,27

DC-3B-6,8

DC-PNL-B-22,24

DC-PNL-B-18,20

DC-PNL-B-26,28

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0 /2

:1

:4 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gi-2B

DATA CENTER - ELECTRICAL PLAN - PHASE 2B

(3 OF 3)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

3. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. FOR CLARITY, CONDUIT AND WIRE TAG HAVE ONLY BEEN PROVIDED FOR NEW OR

MODIFIED FEEDERS. EQUIPMENT TAGS HAVE BEEN PROVIDED ONLY FOR NEW OR

MODIFIED DEVICES.

2'0 4' 8'

PROJECT

NORTH

1/4" = 1'-0"01EP100G

1 DATA CENTER - ELECTRICAL PLAN - PHASE 2B (3 OF 3)

Revisions: Date:

KEY NOTES

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

PROVIDE RACEWAYS AND CONDUCTORS PER MANUFACTURER'S REQUIREMENTS.

REFERENCE MECHANICAL DRAWINGS AND COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

A A

A A

B B

AREA SHOWN

X Y Z

DATA CENTER

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C 112

117 SF

PHARMACY RESIDENT

1C 113

168 SF

DIETETICS

1C 114

141 SF

FEMALE TOILET

1B133

49 SF

MALE TOILET

1B132

50 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

PROSTHETICS OFFICE

1B127A

65 SF

TRASH CH

1B128

21 SF

LINEN CH

1B129

21 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:5 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gj-1A

DATA CENTER - ROOF PLAN - PHASE 1A (1 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

6. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

9. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 1A (1 OF 2) 2'0 4' 8'

PROJECT

NORTH

PHASING NOTES

1. PHASE PROVIDED TO RELOCATE ROOFTOP

MECHANICAL EQUIPMENT AWAY FROM

PHASE 1B DEMOLITION AREA.

Revisions: Date:

KEY NOTES

EXISTING MECHINCAL UNITS AND ASSOCIATED DISCONNECT SHALL BE RELOCATED.

REFERENCE MECHANICAL PLAN SHEET MD401 FOR ADDITIONAL INFORMATION.

DEMOLISH ALL CONDUCTORS BACK TO SOURCE PANEL. DEMOLISH RACEWAY TO

SUITABLE LOCATION FOR RECONNECTION; PRESERVE REMAINDER FOR RE-USE.

A A

B B

AREA SHOWN

X Y Z

01-P-06A

01-P-07A

TYP.

EP503

01-P-06B

01-P-07B

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

FROM SHEET 01EP400Gc-1B

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gk-1A

DATA CENTER - ROOF PLAN - PHASE 1A (2 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

6. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

9. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

10. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 1A (2 OF 2) 2'0 4' 8'

PROJECT

NORTH

PHASING NOTES

1. PHASE PROVIDED FOR POWERING

RELOCATED ROOFTOP MECHANICAL

EQUIPMENT.

Revisions: Date:

KEY NOTES

RELOCATED MECHANICAL UNIT AND ASSOCIATED DISCONNECT. COORDINATE WITH

MECHANICAL AS REQUIRED. PROVIDE RACEWAYS AND CONDUCTORS TO ORIGINAL

SOURCE PANELBOARD.

A A

B B

AREA SHOWN

X Y Z

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:1 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gl-1B

DATA CENTER - ROOF PLAN - PHASE 1B (1 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 1B (1 OF 2) 2'0 4' 8'

PROJECT

NORTH

1. SHEET PROVIDED TO MATCH WITH OTHER DISCIPLINES. NO ELECTRICAL WORK

REQUIRED.

Revisions: Date:

A

A

A

A

A

A

A

A

A A A A

A A A A

AAAAAAA

A A A A

AAAAAAA

A A A A A A A A A A A A A

A A

B B

A A

B B

AREA SHOWN

X Y Z

GC115-1-CU-07-6

GC115-1-CU-05-6 GC115-1-CU-06-6

GC115-1-COND-01

GC115-1-CU-08-1

GC115-1-CU-TEMP-4

TYP.

GC115-1-GV-03

GC115-1-GV-04

DC-PNL-A25

TYP.

EP503

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

FROM SHEET

01EP400Gc-1B

DC-P-78

DC-P-22

FROM SHEET

01EP400Gc-1B

DC-P-23

DC-P-77

FROM SHEET 01EP400Gc-1B

DC-P-88

DC-P-89

DC-P-87

3 3

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0 /2

:1

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gm-1B

DATA CENTER - ROOF PLAN - PHASE 1B (2 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

6. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

7. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

8. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

9. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

10. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 1B (2 OF 2) 2'0 4' 8'

PROJECT

NORTH

Revisions: Date:

KEY NOTES

PROVIDE SERVICE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED DIE-

CAST ALUMINUM WITH WHILE-IN-USE COVER.

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED INTERIOR

UNIT(S) AS REQUIRED PER MANUFACTURER'S INSTRUCTION. REFERENCE

MECHANICAL DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR AS

REQUIRED.

B B

A A

B B

AREA SHOWN

X Y Z

GC115-1-CU-07-6 GC115-1-CU-05-6 GC115-1-CU-06-6

GC115-1-CU-08-1

GC115-1-GV-03

GC115-1-GV-04

GC115-1-CU-TEMP-4

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

GC115-1-COND-01

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:3 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gn-2A

DATA CENTER - ROOF PLAN - PHASE 2A (1 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 2A (1 OF 2) 2'0 4' 8'

PROJECT

NORTH

1. SHEET PROVIDED TO MATCH WITH OTHER DISCIPLINES. NO ELECTRICAL WORK

REQUIRED.

Revisions: Date:

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED. 1

A A

B B

A A

B B

AREA SHOWN

X Y Z

GC115-1-CU-07-6 GC115-1-CU-05-6 GC115-1-CU-06-6

GC115-1-CU-08-1

GC115-1-CU-09-GC114a

GC115-1-GV-03 GC115-1-GV-04

GC115-1-CU-TEMP-4

TYP.

EP503

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

FROM SHEET 01EP400Gf-2A

DC-P-79

GC115-1-COND-01

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:4 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Go-2A

DATA CENTER - ROOF PLAN - PHASE 2A (2 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL

BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH PANEL AND CIRCUIT

LABELING LOCATED DIRECTLY ON THE WALL PLATE, I.E., "P4-1", PANEL "4", CIRCUIT

"1". REFERENCE WIRING DEVICE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 2A (2 OF 2) 2'0 4' 8'

PROJECT

NORTH

Revisions: Date:

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED INTERIOR

UNIT(S) AS REQUIRED PER MANUFACTURER'S INSTRUCTION. REFERENCE

MECHANICAL DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR AS

REQUIRED.

A A A A A A A A A A A A A

A A

B B

A A

B B

X Y Z

GC115-1-CU-07-6 GC115-1-CU-05-6 GC115-1-CU-06-6

GC115-1-CU-08-1

GC115-1CU-09-GC114a

GC115-1-CU-TEMP-4

GC115-1-GV-03 GC115-1-GV-04

MECHANICAL AREA

Not Enclosed

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

GC115-1-COND-01

AREA SHOWN

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:5 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gp-2B

DATA CENTER - ROOF PLAN - PHASE 2B (1 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

1/4" = 1'-0"01EP100G

1 DATA CENTER - ROOF PLAN - PHASE 2B (1 OF 2)

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL

BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

EXISTING MECHANICAL UNITS AND ASSOCIATED RACEWAYS AND CONDUCTORS

SHALL BE DEMOLISHED BACK TO SOURCE. ALL ROOFTOP PENETRATIONS SHALL BE

PATCHED AND REPAIRED TO PROVIDE WATERPROOF FINISHED SURFACE.

COORDINATE WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS AS REQUIRED.

REFERENCE MECHANICAL PLAN SHEET MD416 FOR ADDITIONAL INFORMATION.

REFERENCE TR TOWER 1 ENLARGED PLANS FOR WORK TO BE PERFORMED.

TEMPORARY MECHANICAL UNIT SHALL BE SALVAGED BACK TO VA. ASSOCIATED

RACEWAYS AND CONDUCTORS SHALL BE DEMOLISHED BACK TO SOURCE.

PHASING NOTES

1. PHASE PROVIDED TO DEMOLISH EXISTING

ROOFTOP MECHANICAL EQUIPMENT.

2'0 4' 8'

PROJECT

NORTH

Revisions: Date:

AA

AAAA

A

A

A

A

A

A

A

A

A

A

AAAAAAA

AAAAAAA

AA

AAA

BB

BB

A

A

A

A A A

AAAA

A

A

A

AAAAAAA

A

A

A A

B B

A A

B B

AREA SHOWN

X Y Z

GC115-1-CU-04-4

GC115-1-CU-07-6 GC115-1-CU-05-6 GC115-1-CU-06-6

GC115-1-CU-10-GC114

GC115-1-CU-08-1

GC115-1-CU-09-GC114a

GC115-1-CU-01-3

GC115-1-CU-03-3

GC115-1-CU-02-3

GC115-1-COND-02

GC115-1-CU-12-GC119

GC115-1-CU-11-GC118

GC115-1-GV-03 GC115-1-GV-04

GC115-1-GV-01

GC115-1-GV-02

TYP.

EP503

MECHANICAL AREA

Not Enclosed

STAIR

205 SF

TIME KEEPER

1C107

178 SF

H.A.C.

1C107A

20 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

CLINICAL PHARMACY

1C112

117 SF

PHARMACY RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

FEMALE TOILET

1B133

49 SF

STAIR

169 SF

PROSTHETICS OFFICE

1B127

160 SF

E-6

S-3

34 SF

E-5

S-4

34 SF

DC-P-85

DC-P-84

FROM SHEET

01EP400Gi-2B

FROM SHEET

01EP400Gi-2B

DC-P-81

DC-P-82

DC-P-83

FROM SHEET

01EP400Gi-2B

DC-P-18

DC-P-19

FROM SHEET

01EP400Gi-2B

DC-P-86

FROM SHEET

01EP400Gi-2B

DC-P-80

GC115-1-COND-01

DATA CENTER

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01EP400Gq-2B

DATA CENTER - ROOF PLAN - PHASE 2B (2 OF

2)

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED, AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES AND THE LIKE, SHALL

BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED.

COORDINATE WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

FOR TR ROOM PANEL SCHEDULES REFERENCE THE TYPICAL A AND B POWER

SCHEDULE CLASSIFICATION FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.