RFP Attachment 31 - Drawings 695-21-700 Part 24.pdf
PDF 9 MB Posted
- Solicitation number
- 36C77626R0002
About this file
This file is a set of architectural construction drawings for the U.S. Department of Veterans Affairs (VA). The drawings document demolition plans for Building 111 at the VA Milwaukee facility located at 5000 W. National Avenue, Milwaukee, Wisconsin. The project is identified as EHRM Infrastructure Upgrades with drawing number 695-21-700, prepared by Romanyk Consulting Corp. as the Architect/Engineer of Record and IMEG Corp. as the Consultant. The drawings are dated September 5, 2025, and represent Final Bid Documents at 35% Schematic Design phase (submitted 5.17.21), 65% Design Development phase (submitted 6.15.21 and resubmitted 8.25.21).
The drawings depict detailed floor plans for the Second Floor (Technology Areas I, J, K, and L) and Third Floor (Technology Areas A through J) showing demolition scope focused on network cabling removal to points of termination in telecommunications rooms. Key requirements include: removal of all network cabling while retaining wireless access points (1D-WAP), surveillance cameras (1D-CAM), and biomedical information outlets; protection of existing nurse call and security equipment in data closets; coordination with the Contracting Officer Representative (COR) for device downtime; and reference to architectural phasing plans for cabling demolition timing. The facility is fully sprinklered. The drawings are prepared in Autodesk format and include multiple area subdivisions with room-by-room designations for various clinical and administrative spaces.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCRUB
FIRE
APPARATUS
FIBER
CLOSET
FIRE
APPARATUS
STORAGE
OR-RECOVERY
CORRIDOR
LOUNGE OR
ANEST WORK
RESIDENTS C-ARM ALCOVE CART/EQUIPHAC
MER 4
CHIEF
OFFICE
STAIR
ELECTRICAL
PACU
OR-RECOVERY
ISOLATION
OR-RECOVERY
SOILED
UTILITY
OR-RECOVERY
CORRIDOR
ELEVATOR
ELEVATOR
BREAK RM
WORK RM
CLEAN UTILITY
OR-RECOVERY
WORK AREA
CORRIDOR
ANESTHESIOLOGY
RESIDENCE LOUNGE
CORRIDOR
CORRIDOR
WAITING RM
SCHEDULER
RECEPTION AREAANTE RM
NURSING OFFICE
SUPV
OFFICE
OFFICE
MERHAC
CLEAN SUPPLY
PREP-HOLD
CONTROL
PATIENT PREP
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
EQUIP
ANGIO 1
CONTROLSOILED UTILITY
PREP-HOLD
X-RAY
STORAGE
SUPV
OFFICE
PATIENT
HOLDING
RADIOLOGY OFFICE
PATIENT WAITING AREA
DRESSING RM
DRESSING RM
PATIENT TOILET
CT SCAN
SHARED
CONTROL
ELECTRICAL
SPEECH RM
STORAGE
2246A
2B08
2450B
2B07
C2B17
2228 2230 22342232HC
2456A
2-6
2454EC
C2B12
C2B12A
C2B13A C2B13
2431B
24182412
2431B
2424B
24352431AHC
2437A
C2B18
C2B19
C2B14 2459A
2434A
2479B
2479A
2472 2474
2474AEC
2450A
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
2D2V2D2V 2D2V
D
D
V
D
1D-WAP
3D
D
V
2D2V
D
V
D
V
2D 2V
2D2V
2D 2V
D
V
W V
M
4D 2V
D
V
2D2V 2D2V 2D2V 2D2V
D
V
2V
2D 2D
D
2D2D 2D 2V
2D
D
D
V
V
D
V
V
V
2D 2V
D
V
1V
D
V
2D 2V
2D 2V 2D 2V 2 D
V
2D2V
W
D 2
D V 2D 4V 1D
1V
D
1D-CAM
D
V
2D 2V
D
V
2D 2V
2D 2V
2D 2V
2D2V2D2V2 D
V
D
2D 2V2D 2V2D 2V
D
V
V
2D 2V
2D 2V 2D 2V
2D2V
1D-WAP 1D-WAP
2D2V
4D
4D 4D
2D2V
D 4D
V
D
4D
D
4D
4D
D
2D2V
D
V
M
M
M
M
M
2D 2V
2D2V
2D2V
D
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
1 1
1 1 1
2 2
2 2
1 2
1 1
2 2
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:3
P M
BUILDING 111 SECOND FLOOR DEMO PLAN -
TECHNOLOGY - AREA I
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1102I
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
KEYNOTES:
1. INFORMATION OUTLET FOR BIOMED, PROTECT
IN PLACE.
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
CLOSETS SHALL REMAIN. PROTECT IN PLACE.
Revisions: Date:
1D-WAP
4D
4D
4D
1D-WAP
3D
3D
3D
ELECTRICAL
FIRE APPARATUS
LINEN
CORRIDOR
CORRIDOR
CORRIDOR
GI
FELLOW
WORK RM
OFFICE
CORRIDOR
NURSES
STATION
CORRIDOR
KITCHENETTE ALCOVE
CONSULTATION
PROCEDURE RM
WAITING ROOMPORCEDURE RM 3PROCEDURE RM 4
SCRUB
ALCOVE
SHAFT
FIBER
ELECTRICAL FILES
BREAK RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
UNISEX TOILET
CONTROL
OR #8
CONTROL TOILET
GU
PROCEDURE RM
FEMALE
LOCKERS
PASSAGE
NURSE
PREP-HOLD
SCRUB
FEMALE TOLIET
HAC SHAFT
STAIR
GU
STORAGE
GI
STORAGE
GI LAB
PGM
MGR
OFFICE
STORAGE
OR #7
OR #6
CLEAN SUPPLY CLEAN SUPPLY
EM /
CART
ALCOVE
C-ARM
ALCOVE
2164EC
C2A19C
2142H
C2A18
C2A19
C2A20
C2A22
C2A21
2181A
2171216721632161
C2A20A
2-30
2158EC 2170A
2168A
2166A
2168B
2166B
2161A
2153B 2153A
2142F
2142E
2142J
2142G
2140A
2152HC 2-31
2-4 2148 2146
2142A
2142B
2142C 2142D
C2A20B
C2A20C
1D-WAP
1D-WAP
1D-WAP
1D-WAP 1D-WAP1D-WAP
1D-WAP
8D
8D
8D
8D
D
D
D
D
D
D
V
1D-CAM
2D 2V
V
D
V
D
V
1V
D
2D
D
V
D
V
D
V
D
V
1D-WAP
2D2V
2V
2D 2V
D
V
D
V
2D2V
2D 2V
1D
D
V
V
D
V
D
V
D
V
D
V
2D2V
2D 2V
2D 2V 4D2V
D
V
D
4V 2V
V2V
D
1D 2V
D
V
D
1D 2V
D
V
V
1D 2V
D
V
D
V
1V
V
D
V
D
V
2D2V
2D 2V
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
EXISTING
DATA
CLOSET
1 1 1 1
1 1
+40''
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:3
P M
BUILDING 111 SECOND FLOOR DEMO PLAN -
TECHNOLOGY - AREA J
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1102J
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
KEYNOTES:
1. INFORMATION OUTLET FOR BIOMED, PROTECT
IN PLACE.
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
IT
ICE
M/C
CORRIDOR
ELECTRICAL
DRESSING
FIRE
APPARATUS
EQUIP
ALCOVE
LINEN
NURSES
STATION
NOURISHMENT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
ELEVATORELEVATORUNISEX TOILET
NURSES
STATION
FILES
RECEPTION
REGISTRATION
GI/GU/AMBULATARY CARE
CORRIDOR
LOCKERS
MALE
CHANGING
DRESSING
FEMALE TOILET
MALE
TOILET
MED RM
ELECTRICAL
SOILED UTILITY
CONSULTATION
GI
FELLOW
WORK RM
OFFICE
CORRIDOR
STATION
CORRIDOR
AMB
SURGY
WAITING RM
KITCHENETTE ALCOVE
CONSULTATION
PROCEDURE RM
PATIENT RM 12 PATIENT RM 13 PATIENT RM 14
OFFICESHOWERTOILET
FEMALE
LOCKERS
PASSAGE
NURSE
PREP-HOLD
SCRUB
PATIENT RM 10
PATIENT TOILET
PATIENT RM 11
BREAK RM
FEMALE TOLIET
STORAGE
CLEAN SUPPLY CLEAN SUPPLY
EQUIP
TOILET PATIENT RM 8 PATIENT RM 7
TOILET
PATIENT RM 6
FEMALE LOCKER
GI
RECOVERY
GI
RECOVERY
ELECTRICAL
FEMALE TOILET
LOCKER
RM MALE
OFFICE
LOUNGE
LOCKER
RM, FEMALE
MALE
TOILET
LOUNGE OR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PATIENT TOILET
CLEAN
HOLDING
TOILET
PATIENT RM 5
EQUIP STORAGE
STORAGE
PATIENT RM 4
PATIENT RM 3
PATIENT RM 2
CLEAN LINEN V17 MER
HAC
SPEC
SERV RM
STERILE SUPPLY
CLEAN
CART
STAGING
HAC
CO2, N2
O2 TANKS
ANTE RM
CLEAN CART LIFT
CART/EQUIP
SHAFT
SHAFT
CURTAIN,
TYP.
A0205A
2232EC
A0265A
C2A23C
2107B
2142H
C2A17
C2A15
C2A14
C2A16
C2A18
C2A12
C2A19 C2A13
C2A23
2-A-72-A-82301
2180A
C2A23A
2177A 2178A
21052132EC
C2A22
C2A21
2181A
2123 2122 2121
212821302127
2142F
2142E
2142J
2142G
2124A
2140A
2142C 2142D
2119A 2119 2118
2117A
2205EC
2206A
2225A
C2A10
C2A10A
C2A11
C2A02
2116A
2112 2261A
2108AHC
2240HC
C2A04A
2A204B
2-33
2-29
1D-WAP
1D-WAP
1D-CAM
1D-WAP1D-CAM
1D-WAP
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D2V
D
V
D
V
D
V
D
V
1D 1V 1V D
1D1V 2D
1D1V
2D1V
1D
1V 1D2V
D
2D 2V
D
V
W D
V
D
V
V
W
D
D
D
D
1V
1V
1V
1V
1V 2D2V
4D 2V
2D
W
2D 2V 2D 2V 2D 2V
2D 2V
D
D
V
2D 2V 2D 2V
2D
1D-WAP
1V
1V
V
2D2V
D
V
D
V
D
V
2D2V
D
V
D
V
1D D
D 1
D V2 D
1V
1D 2V
V
1D
1D 2V
D
1D
1D 2V
D
2D 2V
D
V
D
V
2D 2V
D
V
D
V
V
1D-WAP
2D2V
D
V
D
V
D
V
1D-WAP
D
V
2D 2V1D
2D2V 2D4V
2V
D
V
D
V
D
2D2V
2D2V
D
V
D
V
D
V
D
V
D
V
D
D
V
D
2D 2V 2D 2V
2D 2D
1D1V
1D2D 2D 2D
D
V
D
V
1V
2D2V
D
V
D
2D 2D 2D
D
D
D
1D
D
V 2 D
V
1D1V
D
V
D
V
D
V
OFFICE
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
EXISTING
DATA CLOSET
1 1
1 1 1 1
1 2
3 3
+84''
2 2
3 3 2
2 2
2 2
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 SECOND FLOOR DEMO PLAN -
TECHNOLOGY - AREA K
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1102K
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA K
KEYNOTES:
1. INFORMATION OUTLET FOR BIOMED, PROTECT
IN PLACE.
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
IT
CART/EQUIP
SCRUB
SCRUB
SCRUB
FIRE
APPARATUS
ELECTRICAL
PASSAGE
OFFICE
LOUNGE
MALE
TOILET
LOUNGE OR
CORRIDOR
CORRIDOR
SPEC
SERV RM
STERILE SUPPLY
CLEAN
CART
STAGING
OR #5
PUMP RM
PASSAGE
PASSAGE
STERILE SUPPLY
STERILE SUPPLY
PASSAGE
ALCOVE
HAC
STAIR
SHAFT
SHAFT
UTILITY
ELECTRICAL
MEDS
ANEST WORK
CORRIDOR
ANTE RM
CLEAN CART LIFT
SOILED
CART LIFT
CORRIDOR
STAT LAB
CART/EQUIP SCRUB CART/EQUIPSCRUB
OR #4
OR #3
OR #2
OR #1
CORRIDOR
RESIDENTS C-ARM ALCOVE CART/EQUIPHAC
STORAGE
MER 4A
ROOF
STORAGE
C2A09A
2252A
2248A
2246A
2A04
2232EC
C2A03
2225A
C2A11
C2A02
C2A05
C2A07
C2A06
2240HC
2-5
2-37
2-36
2234EC
C2A09
C2A04A
C2A04
2A204B 2256A C2A04C2254A
C2A08
2228 2230 22342232HC
2450A
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D
3D
3D 3D
3D
3D
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
8D
8D
8D
8D
8D
8D
1D-CAM
2D2V
1D-CAM
1D-CAM
1D1D
2D2V
D
V 1 D
2D 2V 4D
4D
D
V 1D-CAM
V
2D2V 1D 1D 1D 1D 1D-CAM
4D 2V
4D
4D
2D2V 1D 1D 1D 1D
1D-CAM
4D
4D 2D2V
2D2V 1D 1D 1D 1D
1D
1D-CAM
4D
4D
1D-CAM
D
V
D
D
D
D
D
V
1D
1D
1D1D
2D2V
1D
1V
2D2V 1D-CAM
D
V4D
4D
1V
V
W
1D-CAM
1D
M
D
V
D
V 3 D
V
D
V
OFFICE
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
EXISTING
DATA CLOSET
1 1 1 12
1 1 1 1
1 1 1 12
2 1
3 3
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 SECOND FLOOR DEMO PLAN -
TECHNOLOGY - AREA L
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1102L
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 SECOND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA L
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
ITIT
STAGE
UP
UP
UP
UP
UP
UP
P N E U M A T I C T U B E
STORAGE
STORAGE
HAC
FAC
LINEN
CHUTE
FAC
ELECTRICAL
ELECTRICALELECTRICAL
STORAGE
ELECTRICAL
ELECTRICAL
ELECTRICAL
ELECTRICAL
ELECTRICAL
FAC
STORAGE
FAC
FAC
ELECTRICAL
COPY / SUPPLY
ELECTRICAL
FAC
STORAGE
HAMPER
HAMPER
STORAGE
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
TOILET
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CHART/CONTROL
WORK
RECEPTION
FEMALE STAFF TOILET
COMPUTER RM
MEDSLAUNDRY
STAFF
LOUNGE
CONSULT
STORAGE
STORAGE
LOCKERS
PASSAGE
IV
TREATMENT
REPORT
MALE
STAFF
TOILET
MEDS
NURSE
STATION
CLEAN
UTILITY
PATIENT RM
TOILET
TOILET
PATIENT RM PATIENT RM
PATIENT RM
DINING
ELECTRICAL
ELECTRICAL
HAC
TOILET
TOILET
TOILET
PATIENT RM
PATIENT RM
TOILET
PATIENT RM
TOILET
SUN RM
STAIR
HAC
DAY RM
COMPUTER RM
MEDITATION RM
/ PATIENT ED
PATIENT
RM
TOILETTOILET
PATIENT RM
TOILET
PATIENT RM
TOILET
PATIENT RM
SECLUSION ANTE RM
SECLUSION
RESTRAINT
TOILETSTORAGE
TOILET
PATIENT RM
LAUNDRY
TOILET
PATIENT RM
RESTRAINT TOILET
STORAGE
TOILET
VEST
CORRIDOR
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
NOURISH
SECLUSION
QUIET
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
TOILETTOILET
PATIENT RM
WAITING
OFFICE
INPATIENT
MH PGM MGR
INPATIENT
MH PGM MGR
CLINICAL UNIT SUPV
WAITING
ELECTRICAL
ELECTRICAL
DAY RM DINING DAY RM DINING
BARIATRIC RM
TOILET
STAIR
HAC
PATIENT RM
TOILET
TOILET
PATIENT RM
TOILET
CORRIDOR
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
CLEAN LINEN
TOILET
PATIENT RM
TOILET
CLEAN
UTILITY
SOILED UTILITY
EQUIP CONSULT CONSULT
SOILED UTILITY
INTAKE
VESTIBULE
INTAKE
VESTIBULE
CORRIDOR
HAC
IT RECEPTION
IRM
MER
IRM
OFFICE
OFFICE
OFFICE
OFFICE COMPUTER RM
CORRIDOR
CORRIDOR
STORAGE
RESIDENT FELLOW OFFICETECH
OFFICE
OFFICE
HALLWAY
TECH
OFFICE
HALLWAY
HALLWAY
HALLWAY
H A
LL
W
A Y
PHYS
DOCTOR
OFFICE
PHYS
DOCTOR
OFFICE
OFFICE
PHYS
DOCTOR
OFFICE
FA PANEL
ACUTE MH STAFF
SOCIAL
WORKERS
NURSE
SUPV
OFFICE
TC
SHAFT
OFFICE
FELLOW OFFICE
HALLWAY
OFFICE PSYCHOLOGY INTERN OFFICE
INTERN OFFICE
PSYCHOLOGY INTERN OFFICE
PSYCHOLOGY INTERN OFFICE
FELLOW OFFICE
PSYCHOLOGY INTERN OFFICEPSYCHOLOGY INTERN OFFICE PSYCHOLOGY INTERN OFFICEPSYCHOLOGY FELLOW OFFICE
FOOD PREP AREA
CONFERENCE
DIRECTOR
PSYCHOLOGY
TRAINING
OFFICE
ELEVATOR
ELEVATOR
CORRIDOR
RECREATION HALL
STAIR 6
STAIR 7OFFICEMH CONFERENCEPSYCHIATRIC RESIDENTS OFFICE
OFFICE
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
STAIR
SHAFT
MALE
TOILET
FEMALE TOILET
TECH
OFFICE
ELEVATOR LOBBY
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
SHAFT
HAC
CORRIDOR
CORRIDOR
HALLWAY
WAITING
HALLWAY
HALLWAY
HALLWAY
HALLWAY
SUPPLY EXAM
RECEPTIONIST EXAM EXAM EXAM EXAM OFFICE EXAM BREAK
RM
UNISEX TOILET
ELECTRICAL
DIETICIAN OFFICE
EXAM
ANTE RM
OFFICE
CALL CENTER
HACSHAFT
STAIR
DOCTOR OFFICEDOCTOR OFFICE
OFFICE
DOCTOR OFFICE
MSA
SUPV
OFFICE
GROUP RM 3
LEAD
MSA
0FFICE
FM STORAGE
SHAFT
OFFICEOFFICE
OFFICE
SOCIAL
WORKER
OFFICE
LPN OFFICE
STAFF
TOILET
HW OFFICE
CORRIDOR
WAITING
RECEPTION
LPN
OFFICE
PHARMACY OFFICE
LPN
OFFICE
WORK AREA
STAFF
LOUNGE
UNISEX TOILETVACANT
SHAFT
MALE
TOILETCORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
SHAFT
DOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICE
DIVISION
MGR OFFICE
DOCTOR OFFICE
RESIDENT OFFICEDOCTOR OFFICE
OFFICERN OFFICEDOCTOR OFFICE
OFFICE
DOCTOR OFFICE
SOCIAL
WORKER
OFFICE
SOCIAL
WORKER
OFFICERN OFFICE
DOCTOR OFFICE
WC
STORAGE
FEMALE TOILET
DOCTOR OFFICE
SOCIAL
WORKER
OFFICE
OFFICEOFFICEOFFICE
DOCTOR OFFICEOFFICE
OFFICE
DOCTOR OFFICE
OFFICE
OFFICE
OFFICE
MH
DIVISION
MGR OFFICE
CONFERENCE
HAC SHAFT
STAIR
DOCTOR OFFICE FELLOW OFFICE
SOCIAL
WORKER
OFFICE
DOCTOR OFFICE
CORRIDOR
DOCTOR OFFICE
OFFICE
GROUP RM 2GROUP RM 1
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
FAC
SHAFT
SHAFT
SHAFT
SHAFT
SHAFT
SHAFT
FIRE
APPARATUS
3436HC
3B08
LN-3
3-B-7
3650AEC
3650EC3545EC
3218EC
3232EC
3149EC
3126AEC
3116EC
3A05
3A06
3A01
3406EC
3409EC
3530S
3528H
3520H
3522H
C3A06
C3C07
C3C08
C3C09
C3C10
C3C12
C3C13
C3C11
C3C14
C3C01
3644B
36143643
3644A
3644P
3644C
3509A
3615A
3616A
3616 3618
3622EC
3617AEC
3623HC
3618A
3619A
3620A
3627A
STR-3-2
3628HC
3630A
3636A3635A
3633A
3638A
36423648
3649A
3540B
3538B 3540A
3538A
C3C05
C3C04
C3C03 C3C05
C3C02
C3C05A
3538C
3534A
3530A
3532A
3534A3532A
3320A
3517EC
3519EC
3511B 3511A
3528A
3525HC
3524B
3524A
3522A
C3C03A
3520A
3518A
3518B
3515B
3515A
3510 3508 3506 36103608
C3B10
3450HC
3325A
3320B
3320C
3320E
3320F 3321
C3B03
C3B01
33083310
C3B09
C3B13
C3B12
C3B11
C 3B
3-25
3410A
C3B06
3413 3415 3417 3419 34233421
3-B-10
3-B-11
C3B04
3-6
34323430
3428C3B05
3-B-9
3-B-12
STR-3-1
3-27
C3B02
3-A-5 3-A-6
3-A-8 3-A-7
3-29
3402HC
C3A07 C3A04
C3A03
C3A02 C3A01
C3A05
3213 3214
3205 3207 3215 3217 3217A 3219 3219A 3221
3228AEC
3228B
3227A
3232HC3-37
3-5 32513249
3247B
3247A
3-36
32163211
3206A
3204A
C3A15
3100 3200
3232A
3-33
3104AC3A13
C3A14
C3A08
C3A12
C3A11
C3A09
3-30
310531073109311131133115311731193121
32413239323732353233323132293150314831463144
3A03A
314531433141
31103112
3126BEC
3130HC 3-31
3-4 3132 3134
3139B3139A
3-3
3-38
3-39
3-20 3-40
3-18
3-17
3-C-1 3-C-2
3-C-4 3-C-3
EXISTING DATA CLOSET
A B C
D E F
G H I
J K L
EXISTING DATA CLOSET
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
0' 15' 30' 60'
Graphic Scale : 1" = 30'-0"
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 THIRD FLOOR OVERALL DEMO
PLAN - TECHNOLOGY
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1" = 30'-0"
BUILDING 111 THIRD FLOOR OVERALL DEMOLITION PLAN - TECHNOLOGY
NOTES:
1. UNLESS NOTED OTHERWISE, ALL NURSE CALL AND SECURITY EQUIPMENT IN
EXISTING DATA CLOSETS SHALL REMAIN. PROTECT IN PLACE.
STORAGE
CORRIDOR
SECLUSION
QUIET
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
TOILETTOILET
PATIENT RM
STAIR
3530S
C3C05A
3538C
3534A
3530A
3532A
3534A3532A
1D-CAM
1D-CAM
1D-WAP
1D-WAP
2D 2V
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA A
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103A
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
CORRIDOR
COMPUTER RM
MEDITATION RM
/ PATIENT ED
PATIENT
RM
TOILETTOILET
PATIENT RM
TOILET
PATIENT RM
TOILET
RESTRAINT
TOILET
TOILET
RESTRAINT TOILET
PATIENT RM
C3C09
3630A
3636A3635A
3633A
3638A3649A
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-WAP
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA B
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103B
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
UP
PATIENT RM
SUN RM
STAIR
COMPUTER RM
MEDITATION RM
/ PATIENT ED
PATIENT
RM
36323630A
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA C
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103C
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
HAMPER
HAMPER
STORAGE
MEDS
NURSE
STATION
RESTRAINT TOILET
STORAGE
TOILET
VEST
CORRIDOR
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
NOURISH
SECLUSION
QUIET
PATIENT RM
TOILET
ELECTRICAL
ELECTRICAL
DAY RM DINING DAY RM DINING
BARIATRIC RM
TOILET
STAIR
HAC
PATIENT RM
TOILET
TOILET
PATIENT RM
TOILET
CORRIDOR
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
CLEAN LINEN
TOILET
PATIENT RM
TOILET
CLEAN
UTILITY
SOILED UTILITY
EQUIP CONSULT CONSULT
OFFICE
OFFICE
FAC
SHAFT
SHAFT
3530S
3528H
3520H
3522H
3538B 3540A
3538A
C3C05
C3C04
C3C03 C3C05
C3C02
3538C
3530A
3517EC
3519EC
3511B 3511A
3528A
3525HC
3524B
3524A
3522A
C3C03A
3520A
3518A
3518B
3515B
3515A 3512
3510 3508 3506
3320B
3320C
3-3
3-18
3-17
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D 2V
D
V
D
V
D
V
1V 1V
D
D
D
V
D
V
D
V
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:4
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA D
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103D
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
ELECTRICAL
ELECTRICALELECTRICAL CORRIDOR
CORRIDOR
CORRIDOR
TOILET
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CHART/CONTROL
WORK
RECEPTION
FEMALE STAFF TOILET
COMPUTER RM
MEDSLAUNDRY
STAFF
LOUNGE
CONSULT
STORAGE
STORAGE
LOCKERS
PASSAGE
IV
TREATMENT
REPORT
MALE
STAFF
TOILET
MEDS
NURSE
STATION
CLEAN
UTILITY
PATIENT RM
TOILET
TOILET
PATIENT RM
DINING
DAY RM
COMPUTER RM
PATIENT RM
TOILET
PATIENT RM
SECLUSION ANTE RM
SECLUSION
RESTRAINT
TOILETSTORAGE
TOILET
PATIENT RM
LAUNDRY
TOILET
PATIENT RM
RESTRAINT TOILET
STORAGE
TOILET
VEST
CORRIDOR
WAITING
OFFICE
INPATIENT
MH PGM MGR
INPATIENT
MH PGM MGR
CLINICAL UNIT SUPV
WAITINGCONSULT CONSULT
SOILED UTILITY
INTAKE
VESTIBULE
INTAKE
VESTIBULE
CORRIDOR
HAC
IT RECEPTION
IRM
MER
OFFICE
OFFICE
FA PANEL
ACUTE MH STAFF
SOCIAL
WORKERS
NURSE
SUPV
TC
PSYCHOLOGY INTERN OFFICE
FELLOW OFFICE
PSYCHOLOGY INTERN OFFICEPSYCHOLOGY INTERN OFFICE PSYCHOLOGY INTERN OFFICEPSYCHOLOGY FELLOW OFFICE
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
SHAFT
SHAFT
3650AEC
3650EC3545EC C3C07
C3C08
C3C09
C3C10
C3C13
C3C11
C3C14
C3C01
3644B
36143643
3644A
3644P
3644C
3509A
3615A
3616A
3630A
3638A
36423648
3649A
3540B
3538B 3540A
3538A
C3C05
3320A
35043508 3506 36103608
C3B10
3450HC
3325A
3320B
3413 3415 3417 3419 3421
3-38
3-40
3-C-1 3-C-2
3-C-4 3-C-3
1D-CAM 1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D 2V
D
V
D
2D2V D
V
D
V
2D 2V2D 2V
D
V
D
V
2D 2V
2D2V
D
V
2D 2V
D
V
D
4D
2D2V 2D1V 2D2V 2D2V 2D2V
D
V
D
V
D
V
D
V
D
V
2D 2V
D
V
2D 2V2D 2V2D 2V 2D 2V
2D 2V
D
V
D
V
D
V
D
V
2D 2V
2D 2V
2D 2V
2D2V
D
V
D
V
2D 2V
2D2V
4D 2V 4D 2V
D
V
2D2V
2D 2V
2D2V
2D 4V
D
V
V
D
V2 D
V
1V
1D-WAP
2D
1D-CAM
1D-CAM
2D2V
D
V
D
V
D
V
2D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
1 1
3 2
1 222
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:5
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA E
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103E
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
STORAGE
STORAGE
FAC
STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
TOILET
TOILET
PATIENT RM PATIENT RM
PATIENT RM
DINING
ELECTRICAL
ELECTRICAL
HAC
TOILET
TOILET
TOILET
PATIENT RM
PATIENT RM
TOILET
PATIENT RM
TOILET
SUN RM
STAIR
HAC
DAY RM
COMPUTER RM
/ PATIENT ED
PSYCHOLOGY INTERN OFFICEPSYCHOLOGY INTERN OFFICE PSYCHOLOGY INTERN OFFICEPSYCHOLOGY FELLOW OFFICE
FOOD PREP AREA
SHAFT
SHAFT
C3C10
C3C12
C3C13
3615A
3616A
3616 3618
3622EC
3617AEC
3623HC
3618A
3619A
3620A
3627A
STR-3-2
3628HC
3630A
3419 34233421
3-39
3-20
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-CAM
1D-WAP
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:5
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA F
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103F
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
OFFICE
OFFICE
OFFICE
OFFICE
DOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICE
DIVISION
MGR OFFICE
DOCTOR OFFICE
3320C
3320E
310531073109311131133115311731193121
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:5
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA G
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103G
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
LINEN
CHUTE
FAC
ELECTRICAL
COPY / SUPPLY
ELECTRICAL
IRM
MER
IRM
OFFICE
OFFICE
OFFICE
OFFICE COMPUTER RM
CORRIDOR
CORRIDOR
STORAGE
RESIDENT FELLOW OFFICETECH
OFFICE
OFFICE
HALLWAY
TECH
OFFICE
HALLWAY
HALLWAY
HALLWAY
H A
LL
W
A Y
PHYS
DOCTOR
OFFICE
PHYS
DOCTOR
OFFICE
OFFICE
PHYS
DOCTOR
OFFICE
SOCIAL
WORKERS
NURSE
SUPV
OFFICE
TC
SHAFT
OFFICE
FELLOW OFFICE
HALLWAY
OFFICE PSYCHOLOGY INTERN OFFICE
INTERN OFFICE
PSYCHOLOGY INTERN OFFICE
PSYCHOLOGY INTERN OFFICE
FELLOW OFFICE
PSYCHOLOGY INTERN OFFICEPSYCHOLOGY INTERN OFFICE PSYCHOLOGY INTERN OFFICEPSYCHOLOGY FELLOW OFFICE
ELEVATOR
ELEVATOR
CORRIDOR
PSYCHIATRIC RESIDENTS OFFICE
OFFICE
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
STAIR
SHAFT
MALE
TOILET
FEMALE TOILET
TECH
OFFICE
ELEVATOR LOBBY
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
SHAFT
HAC
RECEPTIONIST EXAM EXAM EXAM EXAM
CORRIDORDOCTOR OFFICEDOCTOR OFFICE
LN-3
3-B-7
3406EC
3409EC
3325A
3320B
3320C
3320E
3320F
C3B03
C3B01
33083310
C3B09
C3B13
C3B12
C3B11
C 3B
3-25
3410A
C3B06
3413 3415 3417 3419 3421
3-B-10
3-B-11
C3B04
3428C3B05
3-B-9
3-B-12
STR-3-1
3-27
C3B02
3-A-5 3-A-6
3-A-8 3-A-7
3-29
3402HC
C3A1531053107
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D 2V
2D2V
D
2D2V
2D2V
2D 2V2D2V
2D 2V
2D2V
2D2V
2D 2V
2D2V
D
V
D
V
2D 2V
D
V
D
D
D
V
D
V
D
4D 2V
4D2V
4D 2V 4D2V 2D2V
2D 2V
1D1D
D
V
2D2V
D
V
2D 4V 2 D
V
D
V 2
D V
D
V
D
V
D
V
D
V
D
V
D
V
2D2V
D
V
D
V
2D 2V
D
V
4D
D
V
D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
EXISTING
DATA CLOSET
TR-111-3308
1 1
2 1
2 2
1 1
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:5
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA H
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103H
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
STAGE
UP
HAC
FAC
STORAGE
HALLWAY
PSYCHOLOGY INTERN OFFICE
INTERN OFFICE
PSYCHOLOGY INTERN OFFICE
PSYCHOLOGY INTERN OFFICEPSYCHOLOGY INTERN OFFICE PSYCHOLOGY INTERN OFFICEPSYCHOLOGY FELLOW OFFICE
FOOD PREP AREA
CONFERENCE
DIRECTOR
PSYCHOLOGY
TRAINING
OFFICE
ELEVATOR
ELEVATOR
CORRIDOR
RECREATION HALL
STAIR 6
STAIR 7OFFICEMH CONFERENCEPSYCHIATRIC RESIDENTS OFFICE
OFFICE
EXAM EXAM EXAM OFFICE EXAM BREAK
3436HC
3B08
C3B06
3419 34233421
C3B04
3-6
34323430
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
D
V
V
2D2V
2D2V 2D2V
D
V
D
V2
D V
D
V
D
V
D
V
D
V
D
V
D
V
2D 2V
2D2V 2D2V
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
2 2
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:5
:5
P M
BUILDING 111 THIRD FLOOR DEMO PLAN -
TECHNOLOGY - AREA I
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TD1103I
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 THIRD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA I
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
5. UNLESS NOTED OTHERWISE, ALL NURSE CALL
AND SECURITY EQUIPMENT IN EXISTING DATA
ELECTRICAL
ELECTRICAL
FAC
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
SHAFT
DOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICEDOCTOR OFFICE
DIVISION
MGR OFFICE
DOCTOR OFFICE
RN OFFICE
DOCTOR OFFICE
DOCTOR OFFICE
SOCIAL
WORKER
OFFICE
OFFICEOFFICEOFFICE
DOCTOR OFFICEOFFICE
OFFICE
DOCTOR OFFICE
OFFICE
OFFICE
OFFICE
MH
DIVISION
MGR OFFICE
CONFERENCE
HAC SHAFT
STAIR
DOCTOR OFFICE FELLOW OFFICE
SOCIAL
WORKER
OFFICE
DOCTOR OFFICE
CORRIDOR
DOCTOR OFFICE
OFFICE
GROUP RM 2GROUP RM 1
FIRE
APPARATUS
3126AEC
3116EC
3A01
C3A14
C3A12
C3A11
C3A09
3-30
310531073109311131133115311731193121
31463144
314531433141
31103112
3126BEC
3130HC 3-31
3-4 3132 3134
3139B3139A
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
2D 1V
2D1V 2D1V
2D1V
2D 1V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
2D1V
2D 1V
D
V
W
2D1V
2D1V
2D1V 2 D
V
D
V
2D1V
2D1V 2D1V
D
V
D
V
D
V
D
V
D
V
2D1V
2D 1V
2D1V
2D 1V 2D 1V
D
V
2D 1V
2D 1V
2D1V
D
V
D
V
D
V
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
2 1 2 1 2 2
2 1
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65…