This is a Division Cost Breakdown template in VA Form 6238 format for construction estimate worksheets. The document is a blank 28-sheet estimating template used by the Department of Veterans Affairs for the Summation Construction Program, designed to organize and calculate project costs by CSI Division classification. The template includes sheet 1, which provides a summary-level breakdown of all construction divisions with line items for subtotal, overhead (10%), profit (10%), bonds (3%), and project total. Sheets 2-28 detail individual divisions (Division 00 through Division 48) with columns for quantity, unit, unit cost, total labor, total materials, and total cost for each system or subsystem within that division.

The template is structured to accommodate the full spectrum of construction work, including special sections, general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, and electrical power generation. This blank template is associated with RFP 36C77626R0002 for the EHRM Infrastructure Upgrades Tier 1 Construction Project at the Clement J Zablocki VA Medical Center in Milwaukee, Wisconsin, and serves as the cost estimation and breakdown framework that contractors would complete as part of their proposal submission.

View the file

Other files

File Type Posted
695-21-700 Technical Question Tracking Sheet - Milw EHRM FINAL 7-22-26.pdf PDF
695-21-700 Amend 5 CIVIL UPDATED Narrative 2026-07-17.pdf PDF
36C77626R0002 0005.docx DOCX document
695-21-700 Amend 5 CIVIL UPDATED full set 2026-07-17.pdf PDF
695-21-700 CIVIL Full - 7-10-26.pdf PDF
695-21-700 Specs Part 2 - 7-10-26.pdf PDF
695-21-700 ELEC Full - 7-10-26.pdf PDF
695-21-700 FIRE X Full - 7-10-26.pdf PDF
695-21-700 MECH Full - 7-10-26.pdf PDF
695-21-700 Tech Qtn Tracking Sheet - Milw EHRM FINAL 7-15-26.pdf PDF
695-21-700 Specs Part 1 - 7-10-26.pdf PDF
695-21-700 Specs Part 3 - 7-10-26.pdf PDF
695-21-700 TECH Full - 7-10-26.pdf PDF
695-21-700 Site Visit Sign In Sheet 5-6-2026.pdf PDF
36C77626R0002 Amendment 0001.pdf PDF
RFP 36C77626R0002.pdf PDF
RFP Attachment 9 - Drawings 695-21-700 Part 2.pdf PDF
RFP Attachment 10 - Drawings 695-21-700 Part 3.pdf PDF
RFP Attachment 14 - Drawings 695-21-700 Part 7.pdf PDF
RFP Attachment 21 - Drawings 695-21-700 Part 14.pdf PDF
RFP Attachment 26 - Drawings 695-21-700 Part 19.pdf PDF
RFP Attachment 1 - DBA Rates - Milwaukee County - 1-2-26.pdf PDF
RFP Attachment 4 - Limitations on Subcontracting - Milwaukee.docx DOCX document
RFP Attachment 6 - Specs 695-21-700 Part 2.pdf PDF
RFP Attachment 15 - Drawings 695-21-700 Part 8.pdf PDF
RFP Attachment 17 - Drawings 695-21-700 Part 10.pdf PDF
RFP Attachment 27 - Drawings 695-21-700 Part 20.pdf PDF
RFP Attachment 29 - Drawings 695-21-700 Part 22.pdf PDF
RFP Attachment 31 - Drawings 695-21-700 Part 24.pdf PDF
RFP Attachment 33 - Drawings 695-21-700 Part 26.pdf PDF
RFP Attachment 34 - Drawings 695-21-700 Part 27.pdf PDF
RFP Attachment 2 - Site Visit - Milwaukee.pdf PDF
RFP Attachment 7 - Specs 695-21-700 Part 3.pdf PDF
RFP Attachment 12 - Drawings 695-21-700 Part 5.pdf PDF
RFP Attachment 16 - Drawings 695-21-700 Part 9.pdf PDF
RFP Attachment 19 - Drawings 695-21-700 Part 12.pdf PDF
RFP Attachment 23 - Drawings 695-21-700 Part 16.pdf PDF
RFP Attachment 24 - Drawings 695-21-700 Part 17.pdf PDF
RFP Attachment 25 - Drawings 695-21-700 Part 18.pdf PDF
RFP Attachment 32 - Drawings 695-21-700 Part 25.pdf PDF
RFP Attachment 36 - PPQ.docx DOCX document
RFP Attachment 2A - Site Visit Campus Map - Milwaukee.pdf PDF
RFP Attachment 5 - Specs 695-21-700 Part 1.pdf PDF
RFP Attachment 8 - Drawings 695-21-700 Part 1.pdf PDF
RFP Attachment 11 - Drawings 695-21-700 Part 4.pdf PDF
RFP Attachment 13 - Drawings 695-21-700 Part 6.pdf PDF
RFP Attachment 18 - Drawings 695-21-700 Part 11.pdf PDF
RFP Attachment 20 - Drawings 695-21-700 Part 13.pdf PDF
RFP Attachment 22 - Drawings 695-21-700 Part 15.pdf PDF
RFP Attachment 28 - Drawings 695-21-700 Part 21.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 1 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMNOTESTOTAL
ABCD
DIVISION 00-SPECIAL SECTIONS$ - 0
DIVISION 01-GENERAL REQUIREMENTS$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0
DIVISION 03-CONCRETE$ - 0
DIVISION 04-MASONRY$ - 0
DIVISION 05-METALS$ - 0
DIVISION 06-WOOD, PLASTICS, AND COMPOSITES$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0
DIVISION 08-OPENINGS$ - 0
DIVISION 09-FINISHES$ - 0
DIVISION 10-SPECIALTIES$ - 0
DIVISION 11-EQUIPMENT$ - 0
DIVISION 12-FURNISHINGS$ - 0
DIVISION 13-SPECIAL CONSTRUCTION$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0
DIVISION 22-PLUMBING$ - 0
DIVISION 23-HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0
DIVISION 26-ELECTRICAL$ - 0
DIVISION 27-COMMUNICATIONS$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0
DIVISION 31-EARTHWORK$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0
DIVISION 33-UTILITIES$ - 0
DIVISION 34-TRANSPORTATION$ - 0
DIVISION 48-ELECTRICAL POWER GENERATION$ - 0
SUBTOTAL$ - 0
OVERHEAD@10.00%$ - 0
PROFIT@10.00%$ - 0
BONDS@3.00%$ - 0
PROJECT TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

Department of Veterans Affairs

DIVISION 00

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 2 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 00-SPECIAL SECTIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 01

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 3 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 01-GENERAL REQUIREMENTSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 02

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 4 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 02-EXISTING CONDITIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 03

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 5 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 03-CONCRETEQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 04

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 6 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 04-MASONRYQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 05

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 7 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 05-METALSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 06

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 8 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 06-WOOD, PLASTICS, AND COMPOSITESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 07

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 9 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 07-THERMAL AND MOISTURE PROTECTIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 08

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 10 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 08-OPENINGSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 09

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 11 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 09-FINISHESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 10

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 12 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 10-SPECIALTIESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 11

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 13 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 11-EQUIPMENTQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 12

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 14 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 12-FURNISHINGSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 13

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 15 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 13-SPECIAL CONSTRUCTIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 14

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 16 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 14-CONVEYING EQUIPMENTQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 21

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 17 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 21-FIRE SUPPRESSIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 22

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 18 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 22-PLUMBINGQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 23

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 19 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 23-HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)QTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 25

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 20 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 25-INTEGRATED AUTOMATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 26

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 21 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 26-ELECTRICALQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 27

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 22 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 27-COMMUNICATIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 28

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 23 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 28-ELECTRONIC SAFETY AND SECURITYQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 31

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 24 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 31-EARTHWORKQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 32

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 25 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 32-EXTERIOR IMPROVEMENTSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 33

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 26 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 33-UTILITIESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 34

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 27 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 34-TRANSPORTATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 48

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 28 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 48-ELECTRICAL POWER GENERATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A image1.png

File details come from the government source that posted it. Updated .