RFP Attachment 32 - Drawings 695-21-700 Part 25.pdf
PDF 7 MB Posted
- Solicitation number
- 36C77626R0002
About this file
This file contains architectural and engineering drawings for technology infrastructure upgrades at Building 111 of the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin, as part of RFP 36C77626R0002 (Project #695-21-700). The drawings, prepared by Romanyk Consulting Corp. and IMEG Corp., depict detailed floor plans for basement through fifth floor levels with technology routing, telecommunications room locations, and network cable termination points. The plans identify multiple telecommunications rooms (TRs) across various floors designated as TR-111-B0610E, TR-111-B0622, TR-111-1537B, TR-111-1473, TR-111-2235, TR-111-2428A, TR-111-2557, TR-111-3308, TR-111-4315, and TR-111-5311, with network cables specified to terminate at designated locations per floor sections labeled A through L.
The drawings specify that contractors must provide new J-hook routes for all new cabling according to manufacturer recommendations, install fire-rated sleeves at rated walls where cabling passes through, provide CAT6A information outlets with an allowance for 10 percent additional outlets for future expansion, and refer to additional specification sheets (TN400, TN402, and TN500-TN509) for technology rough-in details, penetration details, and riser diagrams. The documents note that existing vertical chases are to be used for backbone pathways and that total newly installed data drop counts may vary by plus or minus 10 percent from those identified on the drawings without changing the contractor's scope. Design development submissions occurred in June and August 2021, with final bid documents dated September 5, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LADDER UP
LADDER UP
LADDER UP
LADDER UP
LADDER UP
LADDER UP
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 111 SUB-BASEMENT PLAN -
TECHNOLOGY - AREA K
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1009K
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA K
GENERAL NOTES:
1. NO WORK SHOWN ON THIS SHEET. SHEET SHOWN FOR REFERENCE
ONLY.
Revisions: Date:
TRENCHTRENCHTRENCH
LADDER UPLADDER UPLADDER UP
B-9
B-10
B0255
B0250
B0245
B-8
B0255A
B-9
B-10
B0255
B0250
B0245
B-8
B0255A
B-9
B-10
B0255
B0250
B0245
B-8
B0255A
STAIR
STAIR
TRANSFORMER
RM
MER
MER
STAIR
SWITCHBOARD RM
STAIR
STAIR
TRANSFORMER
RM
MER
MER
STAIR
SWITCHBOARD RM
STAIR
STAIR
TRANSFORMER
RM
MER
MER
STAIR
SWITCHBOARD RM
DN
UP
UP
DN
UP
UP
DN
UP
UP
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 111 SUB-BASEMENT PLAN -
TECHNOLOGY - AREA L
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1009L
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA L
GENERAL NOTES:
1. NO WORK SHOWN ON THIS SHEET. SHEET SHOWN FOR REFERENCE
ONLY.
D N
D N
ELECTRICAL
B0630EC
B-C-8
B0430
B0460EC
B-B-5B-B-4
B-B-7
B-A-3
B-A-1
B0830
B0431
C0B7
C0012X
C0B11A
B0855
B0855
B0855A
B0858C
C0027B
B0858
B0858BHC
B0831
B-11
B0625
B-13
B0625B
B0625A
B0625E
B-B-7
B0621A
B0621
B0621B
B0012W
B0626EC
B0626
C0C25
C0C7
B0526
C0C4
B0528
B0530
B-3
B0532HC B-17
C0C3
B0507
B0503
B0501
CBB03C
B0520
B0561B
B0561A
B0561
B0560A
B0560
B0559
B0558
B0557
B0556
B0555
B0553
B0551HC
B0504ECB0506B0508B0510B0512
B0514
B0513AEC
B0529
B0531EC
B0529B
B0529A
B0513DECB0513B
B0513
B0533
B-18
B0320A
B0320
B0305E
STR-B-18
B0305D
B0458
B0443
B0443A
B0441
B0439
B0437B B0437A
B0437B0435
B0462D
B0431BB0431CB0431B
B0464
B0462A
B0610
C0026B
B0602EC
C0026C
B00610A
B600
B0464A
B0464CEC
B0464D
B0464B
C0026G
B0610D
B0627D
B0610C B0610D B0620A
B0620 B0620B B0622
B0622A B0624
C0C25C1
B0627BEC
B0627E
B0627C
B0627
B0435A
B0443B
B0443A
B0451 B0451E
B0451D
B0451A
B0449A B0449B
B0449
B0451B1
B0451B
B0451C
B0012TB0012S
C0B8
B0462B B0462C
B0435B
B0433A B0433
B0431E
BCU01BBCU01B
B-25
C0B3
CBBO3A
C0A9
C0B5
B0446EC B0448EC
B0450EC
B0452A
B0452
B0454
B0456
B0456B
CBB9
B0444
B0415
B0280
B0280A B0280B
B0223
B0219EC
B0221EC
B0225
B0235
B-5
B0237
B0239A
B0239
C0A4A
C0A4
B0240
B0234
B0240A
B0232HC
C0B11
B0414
B0427B
B0427A
B0424
B0425
B0427
B0429
B0430A
B0430
B0215ECB0214ECB0423
B0421
B0421A
B0428
B0416 B0418
B0427
B0410
B0417
B0422
B0442B0438 B0436A
B0436
B0434
B0432
B-B-10
C0B5A
B-27 B-1
B-B-9
B-B-12
B0430
B-B-11
B0413
B0413A
B0413B
B0401 B-A-5 B-A-6
B0301EC
B0305
B0305C
B0305B
B-A-7B-A-8
B0105 B0305A
B0305D
B0100HC
B0103
B0109
C0A5 C0A7
A0002
B0140
B0114EC
B0142
B0141
B0107
B0110B0113EC
B0114AEC
B0140A
C0A8
B0123AEC
B0104
B0104A
B0130
B0138
B1049A
B0151A
C0A6C
B0129
B0128
B0130BEC
B0130AEC
B0125 A0027A
B0144
B0145
B0146B0147
B0148
B0149 B0150B0151
B0156
B0155
B0137
B0137A
B0152
B0153
B0154
A0027
B-4
B0126HC B-31
B0150AB-27
B0200B0201
B0108 B-A-2
C0A3
B0245
B0621
B0449C
B0250
B0255
B0255A
B0205
B0206
B0212
B0241
B0242
B0246A
B0243
B0246
B0248
B0244
B0256
B0257
B0258
B0211
B0208
B0254A
B0201
B0200
B0249
B0251A B0251
B0014
B0011
B0204 B0203
B0247
B0252
B0254
B0207
B0210
B0007
C0A15
C0A14
C0A13
C0A12
C0A10
B0253
B0202
C0A17
B0236
B0238 B0261
B0004 B0010
B0009
B0006
B0005
B0002
B0001
B0260
B0003 B0008
B0012
B0013
B0259
B0016
B-8
B0209
CB0505
B0015
B0515
B-C-2B-C-1
B-A-3B-A-4
B0235A
B0239B
B0452A
B0253A
B0253B
B0830
B-28
B0520A
ELECTRICAL
FIRE
APPARATUS
TEL
ELECTRICAL
FIRE
APPARATUS
FIRE
APPARATUS
FIRE
APPARATUS
FIRE
APPARATUS
FAC
STORAGE
CREDIT UNION
CORRIDOR
HALLWAY
PASSAGE
STORAGE
DRY
STORAGE
EQUIP
STORAGE
PAPER AND
SUPPLIES STORAGE
UNEXCAVATED
ENGG RM
CORRIDOR
PASSAGE
HACWATER
SOFTENER RM
STAIR
WAREHOUSE
STAIR
DELIVERY AREA [KITCHEN]
ELEVATOR EQUIP RM
MORGUE
ELEVATOR PIT
ELEVATOR BANK
OFFICE
LOGISTICS NX TEAM
OFFICE
STORAGE
ELECTRICAL
MER
HALLWAY
CORRIDOR
MALE LOCKER RM
HALLWAY
PT OFFICE
TREATMENT RM
STAIR 3
HAC SHAFT
HALLWAY
PHYSICAL
THERAPY
RECEPTION
PHYSICAL
THERAPY WAITING
AREA
PHYSICAL THERAPY WORK RM
ELEVATOR LOBBY
TREATMENT/POOL
VET
TRANSPORTATION
OFFICE
OFFICE
IMPLANT
COORDINATOR
OFFICE
OFFICE
PT EXAM RM
PT EXAM RM
PT EXAM RM
PT EXAM RM
TEL
HAC
ELECTRICALPT OFFICEPT OFFICEPT OFFICEOFFICE
STORAGE
ELECTRICAL
PT OFFICE
ELECTRICAL
STORAGE
FIBER
CLOSET
ELECTRICALSTORAGE
TREATMENT RM
HYDRO
THERAPY
TREATMENT RM
STAIR
MER
PHYSICAL THERAPY
AREA WELL
STAIR
MER
TRASH/RECYCLE
LOGISITICS MAIL RM
LOGISITICS MAIL RM
OFFICE
OFFICE
SUPV
OFFICE
CLEAN
LED
STORAGE
CLEAN
LED
STORAGE
CART
STORAGE
RECREATION
ACTIVITY ASST
STORAGEACCOUNTING
MGRS
OFFICE
EQUIP RM
DIETICIAN OFFICE
OUTPATIENT PT
HALLWAY
ELECTRICAL
TOILET
SBC
AMERITECH
CABLE VAULT
ELECTRICAL
STORAGE
BATT RM
STORAGE
STORAGE
BREAK
RM [SPD]
EXAM BREAK RM LOGISTICS OFFICE VTS
ESCORT
OFFICE
VTS
ESCORT
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
ELECTRICAL
TEL
WASH RM
MEDICAL SUPPLY STORAGE
MEDICAL DISTRIBUTION
BULK IV
STORAGE
PROSTH-PHARM STORAGE
WAREHOUSE
TOILET
SUPPLY
CHAIN MGMT
LOGISTICS
DEPUTY DIVISION
MGR
OFFICE
LOGISTICS
DIVISION MGR
MATERIAL MGT OFFICE
SUPPLY
CHAIN MGMT
SUPPLY
CHAIN MGMT
MER
OXYGEN
STORAGE
NITROUS OXIDE
CORRIDOR
OT OFFICE
POLICE OFFICE
BREAK RM
SUPV
OFFICE
OFFICE
PNEUMATIC TUBE RM PM SHOP
LOAN
OFFICER
TELLERSHALLWAY
SHAFT
CORRIDOR
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
ELECTRICAL ELECTRICAL
ELECTRICAL
REPAIR AREA
SCRUBBER RM
SCRUBBER RM
LOADING DOCK
REGULATED
MED WASTE
HOLDING
SOILED
LINEN
HOLDING
LINEN
DISTRIBUTION
LINEAR
ACCELERATOR 1
CORRIDOR
SWITCHGEAR RM
GENERATOR RM
FEMALE TOILET
FEMALE LOCKER RM
ELECTRICAL
OFFICE EQUIP
REPAIR
SHOP
STAIR
PLUMBING SHOP
ELECTRICAL STORAGE
ELECTRICAL SHOP
WAITING RM
CORRIDOR
LOCKER RM
BREAK RM
TOILET
HAC
PASSAGE
UNISEX TOILET
CLOSET
CLOSET
LEAD
PHYSICIST
LEAD
PHYSICIAN
PHYSCIAN OFFICE
PHYSICIST
THERAPIST WORK RM
SUPERVISOR
ELECTRICALELECTRICALEXAM 4
EXAM 5/ED
UNISEX TOILET
BLOCK/DARK RM
CONTROL
CONTROL
PASSAGE
EXAM
LINEAR
ACCELERATOR 2
DOSIMETRY
PATIENT
EFFECTSPOLICE
OFFICE
LOG
OFFICE
LOG
OFFICE
LOGISTICS DIRTY LED
ELEVATOR BANK
ELEVATOR LOBBY
SHAFT
STAIR
ELEVATOR
ELEVATOR
STORAGE
ELEVATOR BANK
CT
CONTROL
STORAGE
WAITING RM
ELECTRICAL
OT/PT
CLINIC
TREATMENT RM
MER
SUPV
TREATMENT RM
OT/PT
STORAGE
HAC
FEMALE TOILET
MALE
TOILET
CORRIDOR
CORRIDOR
HALLWAY
WAITING RM
ELECTRICAL
RESP
THERAPY
OFFICE
RECEPTION
FEMALE TOILET
TELELECTRICAL
ELECTRICAL
PASSAGE
CORRIDOR
ELECTRICAL
OT/PT
CHARTING
OT/PT
BREAKROOM
OT STORAGE
PROSTHETICS INVENTORY
UNEXCAVATED
PASSAGE
PASSAGE
CORRIDOR
OFFICE
BIOFEEDBACK
ELECTRICAL
FIBER
CLOSET
TELFEMALE TOILET
EXAM
EXAM
AMPUTEE
LIMB CLINICEXAM
WORK
ORTHO
WORKSHOPPROSTHETHICS WORKSHOP
ADMIN
PROSTHETICS SVC CHIEF
OFFICE
WHEELCHAIR REPAIR
WHEELCHAIR WASH
OFFICE
COPY/MAIL
KITCHENETTE
FEMALE
LOCKER RM
STAIR
HAC SHAFT
WORKSHOPSTAIR
CLEAN
CART AND
ELEVATORELEVATOR EQUIP
MALE
TOILET FIRE
APPARATUS
CORRIDOR
PALLETS
PALLETS
MER 1
MER 2
CONFERENCE
ROOM
MER RM
TRANSFORMER RM
SWITCHBOARD RM
EXAM
EXAM
EXAM
TOILET
NURSE
PRACTITIONER
RADIATION
ONCOLOGY
SERVICE CHIEF
TOILET
CLEAN
HAC
CONFERENCE
ROOM
PHYSICIAN
OFFICE
BLOCK MOLD
FILM PROCESS
STORAGE
EXAM
NURSE
WORKSTATIONS
RESIDENT
WORKSTATIONS
RECEPTION
WAITING
STAFF
LOUNGE
PHYSICIST
WORKROOM
CHIEF
PHYSICIST
CONTROL
ROOM
CONTROL
ROOM
CONSULT
/ EXAM
VITALS
LOCKERS
NURSE
ADMIN
PROCEDURE
HOLDING
BAY
EXAM
DRESSING
/ TOILET
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
MECH /
ELEC
SCHEDULERS
CORRIDOR
LOGISTICS
- CLEAN
LOGISTICS
- DIRTYPHYSICS
STORAGE
CT
SCANNER
DRESSING
ROOM
WAITING
ROOM
CT
STORAGE
CT
EQUIPMENT
CONTROL
ROOM
DOSIMETRY
SOILED
CT
ENTRY
ROOM
DRESSING
/ TOILET
LINAC 2
LINAC 1
CLEAN
LINENS
MECHANICAL
ROOM
TRASH
STAIR
ELEVATOR BANK
PET-MRI
VESTIBULE
FEMALE LOCKER
RM
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
OFFICE
STORAGE, EQUIPMENT
SCRUBBER RM
STORAGE
STORAGE
CANCER CARE
COORDINATORS
RESEARCH
PHYSICIAN
WORKSTATIONS
STAIR
EQUIPMENT ROOM
SLIDER FENCE
TRENCH
B0012P
LOADING
DOCK
B0457
LOADING
DOCK
OH D OH D OH D
OH D
OH D
O H
D
F D F D
UP
DN
DN
DN
UP
DN
UP DN
DN
UP
DN
DN
DN
UP
DN
DN
DN
FIRE
PUMP
ROOM
A B C
D E F
G H I
J K L
TELECOMMUNICATIONS RM.
B0423
TELECOMMUNICATIONS RM.
B0610E
TELECOMMUNICATIONS RM.
B0622
CORRIDOR
C0C25C2J
TELECOMMUNICATIONS RM.
B0610E
TELECOMMUNICATIONS RM.
B0622
TELECOMMUNICATIONS RM.
B0423
TN315
TN314
TN314
TR-111-B0610E
TR-111-B0622
TR-111-B0423
CONDUIT DOWN
TO SUB
BASEMENT
CONDUIT TO ABOVE
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
0' 15' 30' 60'
Graphic Scale : 1" = 30'-0"
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT OVERALL PLAN -
TECHNOLOGY
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1" = 30'-0"
BUILDING 111 BASEMENT OVERALL PLAN - TECHNOLOGY
KEYNOTES:
1. EXISTING VERTICAL CHASE TO BE USED FOR
BACKBONE PATHWAYS. REFER TO NEW WORK
PLANS FOR ADDITIONAL INFORMATION.
NTS
KEY PLAN - BLDG 111
B0526
B0520A
MALE LOCKER RM
EQUIPMENT ROOM
UP DN
1D-WAP
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA A
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100A
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA A
GENERAL NOTES:
1. NO WORK SHOWN ON THIS SHEET. SHEET SHOWN FOR REFERENCE ONLY.
NTS
B0630EC
C0012X
B-11
B0626EC
B0626
C0C7
B0520
B0561B
B0561A
B0561
B0560A
B0560
B0559
B0558
B0557
B0621
ELECTRICAL
HALLWAY
STAIR
ELECTRICAL
MER
HALLWAY
CORRIDOR
TREATMENT/POOL
VET
TRANSPORTATION
OFFICE
OFFICE
IMPLANT
COORDINATOR
OFFICE
OFFICE
PT EXAM RM
PT EXAM RM
MER 2
FEMALE LOCKER
DN
DN
1D-WAP
1D-WAP2
D 2D
2D
2D
2D
D
2D
2D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA B
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100B
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA B
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-111-
B0610E.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
NTS
B0830
C0012X
B0855
B0855
B0855A
B0858C
C0027B
B0858
B0858BHC
B0831
B0625
B-13
B0625B
B0625A
B0625E
B-B-7
B0621A
B0621
B0621B
B0012W
B0626EC
B0626
B0830
ELECTRICAL
STORAGE
HALLWAY
STORAGE
DRY
STORAGE
EQUIP
STORAGE
PAPER AND
SUPPLIES STORAGE
UNEXCAVATED
ENGG RM
CORRIDOR
PASSAGE
HACWATER
SOFTENER RM
WAREHOUSE
STAIR
DELIVERY AREA [KITCHEN]
ELEVATOR EQUIP RM
MORGUE
ELEVATOR PIT
ELEVATOR BANK
OFFICE
LOGISTICS NX TEAM
OFFICE
STORAGE
ELECTRICAL
MER
PALLETS
PALLETS
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
D
D
D
D
D
D
1D-WAP 1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-CAM 2D
D
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA C
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100C
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA C
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-111-
B0622.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING DATA
DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE DETERMINED
BY THE VA AT A LATER DATE.
NTS
B-C-8
C0C4
B0528
B0530
B-3
B0532HC B-17
C0C3
B0512
B0514
B0513AEC
B0529
B0531EC
B0529B
B0529A
B0513DECB0513B
B0513
B0533
B-18
B0320A
B0320
B0515
FIRE
APPARATUS
HALLWAY
PT OFFICE
TREATMENT RM
STAIR 3
HAC SHAFT
HALLWAY
PT OFFICEOFFICE
STORAGE
ELECTRICAL
PT OFFICE
ELECTRICAL
STORAGE
FIBER
CLOSET
ELECTRICALSTORAGE
TREATMENT RM
HYDRO
THERAPY
TREATMENT RM
STAIR
MER
PHYSICAL THERAPY
FEMALE LOCKER
RM
1D-WAP
1D-WAP
2D
D
1D-CAM
1D-CAM
1D-WAP
1D-WAP
D
D
2D
2D
D
D
D
D
D
D
2D 2D
D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
D
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA A
AREA D
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
EXISTING DATA CLOSET
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA D
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100D
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA D
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-111-B0610E.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS. THESE
DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL
NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10%
IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S SCOPE
SHALL BE UNCHANGED.
6. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT
BE IN THE EXACT LOCATION AS IDENTIFIED.
7. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL
2-PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR
THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
NTS
C0C25
C0C7
C0C3
B0507
B0503
B0501
CBB03C
B0520
B0558
B0557
B0556
B0555
B0553
B0551HC
B0504ECB0506B0508B0510B0512
B0462D
B0431BB0431CB0431B
B0464
B0462A
B0610
C0026B
B0602EC
C0026C
B00610A
B600
B0464A
B0464CEC
B0464D
B0464B
C0026G
B0610D
B0627D
B0610C B0610D B0620A
B0620 B0620B B0622
B0462B B0462C
B0435B
CB0505
B-C-2B-C-1
B-A-3B-A-4
ELECTRICAL
HALLWAY
CORRIDOR
HALLWAY
PHYSICAL
THERAPY
RECEPTION
PHYSICAL
THERAPY WAITING
AREA
PHYSICAL THERAPY WORK RM
ELEVATOR LOBBY
TREATMENT/POOL
PT EXAM RM
PT EXAM RM
PT EXAM RM
PT EXAM RM
TEL
HAC
ELECTRICALPT OFFICEPT OFFICEPT OFFICEOFFICE
RECREATION
ACTIVITY ASST
STORAGEACCOUNTING
MGRS
OFFICE
EQUIP RM
DIETICIAN OFFICE
OUTPATIENT PT
HALLWAY
ELECTRICAL
TOILET
SBC
AMERITECH
CABLE VAULT
ELECTRICAL
STORAGE
BATT RM
STORAGE
STORAGE
BREAK
RM [SPD]
EXAM BREAK RM LOGISTICS OFFICE VTS
ESCORT
OFFICE
VTS
ESCORT
OFFICE
OFFICE
OT OFFICE
POLICE OFFICE
BREAK RM
SUPV
OFFICE
OFFICE
OT/PT
CLINIC
FEMALE LOCKER
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
DN
1D-WAP
1D-WAP
1D-WAP
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
1D-WAP
1D-WAP
1D-WAP
1D-CAM
1D-CAM
D
2D 2D2D2D
D
D
2D
2D
2D
D
2D
2D2D
2D
2D
D
D
D
2D 2D
D
D
D
D
D
1D-WAP
1D-WAP
1D-WAP
D
2D
D
2D
2D
D
D
D
2D 2D
TELECOMMUNICATIONS RM.
B0610E
TELECOMMUNICATIONS RM.
B0622
TELECOMMUNICATIONS RM.
B0622
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA B
AREA E
AREA C
AREA F
AREA B
AREA E
AREA A
AREA D
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
TN314
TN314
TR-111-B0610E
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA E
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100E
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA E
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-111-B0610E.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL
NEW CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY
EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE
TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY
+/- 10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S
SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY
NOT BE IN THE EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10%
ADDITIONAL 2-PORTS CAT6A INFORMATION OUTLETS IN THEIR
PROPOSAL FOR THIS SHEET. FUTURE INFORMATION OUTLET
LOCATIONS WILL BE DETERMINED BY THE VA AT A LATER DATE.
KEYNOTES:
1. FIRE RATED SLEEVES SHALL BE INSTALLED AT ANY RATED
WALL WHERE CABLING MUST PASS THROUGH. COORDINATE
WITH ARCHITECTURAL DRAWINGS AND VERIFY EXACT
LOCATIONS OF FIRE SEPARATIONS.
NTS
B-B-7
B0625
B0621A
B0621
B0437B B0437A
B0464D
B0610D
B0627D
B0620B B0622
B0622A B0624
C0C25C1
B0627BEC
B0627E
B0627C
B0627
B0435A
B0443B
B0443A
B0451 B0451E
B0451D
B0451A
B0449A B0449B
B0451B1
B0451B
B0451C
B0435B
B0449C
B-28
ELECTRICAL
FIRE
APPARATUS
WAREHOUSE
OFFICE
LOGISITICS MAIL RM
SUPV
OFFICE
CLEAN
LED
STORAGE
STORAGE
STORAGE
BREAK
RM [SPD]
VTS
ESCORT
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
ELECTRICAL
TEL
WASH RM
MEDICAL SUPPLY STORAGE
MEDICAL DISTRIBUTION
BULK IV
STORAGE
PROSTH-PHARM STORAGE
WAREHOUSE
TOILET
SUPPLY
CHAIN MGMT
LOGISTICS
DEPUTY DIVISION
MGR
OFFICE
LOGISTICS
DIVISION MGR
SUPPLY
CHAIN MGMT
SUPPLY
CHAIN MGMT
MER
BREAK RM
SUPV
OFFICE
OFFICE
PALLETS
CONFERENCE
ROOM
STAIR
SLIDER FENCE
DN
DN
DN
DN
1D-CAM
1D-WAP
1D-CAM
1D-WAP
1D-WAP
1D-CAM
2D
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-WAP
D
2D
D
2D 2D 2D
2D 2D
1D-WAP
D
D
2D
2D
D
2D
D
D
D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
D
-C A
M
2D
2D
2D
2D
D
D
D
2D
2D
2D
2D
TELECOMMUNICATIONS RM.
B0622
CORRIDOR
C0C25C2J
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA C
AREA F
AREA C
AREA F
AREA B
AREA E
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
TN314
TN314
TR-111-B0622
EXISTING DATA CLOSET
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA F
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100F
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA F
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-
111-B0622.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY
EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE
TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY +/-
10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S
SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT
BE IN THE EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL
2-PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR
THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
KEYNOTES:
1. FIRE RATED SLEEVES SHALL BE INSTALLED AT ANY RATED WALL
WHERE CABLING MUST PASS THROUGH. COORDINATE WITH
ARCHITECTURAL DRAWINGS AND VERIFY EXACT LOCATIONS OF
FIRE SEPARATIONS.
NTS
B0305E
STR-B-18
B0305D
B0305C
B0305B
B0104A
AREA WELL
STAIR
MER
TREATMENT RM
MER
OT/PT
CHARTING
OT/PT
BREAKROOM
ELEVATOR BANK
UP
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA D
AREA G
AREA D
AREA G
AREA E
AREA H
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA G
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100G
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA G
GENERAL NOTES:
1. NO WORK SHOWN ON THIS SHEET. SHEET SHOWN FOR REFERENCE ONLY.
NTS
B0430
B0460EC
B-B-5B-B-4
B0431 B0305E
STR-B-18
B0462D
B0431BB0431CB0431B
B0462A B0462B
B0435B
B0433A B0433
B0431E
BCU01BBCU01B
B-25
C0B3
CBBO3A
C0A9
C0B5
B0415
C0B11
B0414
B0421A
B0416
B0432
B-B-10
C0B5A
B-27 B-1
B-B-9
B-B-12
B0430
B-B-11
B0413
B0413A
B0413B
B0401 B-A-5 B-A-6
B0301EC
B0305
B0305C
B0305B
B-A-7B-A-8
B0100HC
B0201
B0202
B-A-3B-A-4
TEL
ELECTRICAL
FIRE
APPARATUS
FIRE
APPARATUS
CREDIT UNION
AREA WELL
STAIR
RECREATION
ACTIVITY ASST
STORAGEACCOUNTING
MGRS
OFFICE
BREAK RM
SUPV
OFFICE
OFFICE
PNEUMATIC TUBE RM PM SHOP
LOAN
OFFICER
TELLERSHALLWAY
SHAFT
CORRIDOR
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
LINEAR
ACCELERATOR 1
PASSAGE
UNISEX TOILET
UNISEX TOILET
CONTROL
LOGISTICS DIRTY LED
ELEVATOR BANK
ELEVATOR LOBBY
SHAFT
STAIR
ELEVATOR
ELEVATOR
STORAGE
ELEVATOR BANK
CT
CONTROL
STORAGE
WAITING RM
ELECTRICAL
OT/PT
CLINIC
TREATMENT RM
MER
HAC
RECEPTION
WAITING
SCHEDULERS
ELEVATOR BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
ELEVATOR
BANK
UP
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-WAP
2D
D
D
2D
2D
2D
2D 2D
1D-CAM
V
V
2D 2V
2D
1D-WAP 1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
D
D 2D
D
2D
2D
2D
D
V
D
V
D
V
2D 2V
1D-CAM
1D-CAM
2D
2D
2D
2D
3D 1V 2V
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA D
AREA G
AREA E
AREA H
AREA E
AREA H
AREA F
AREA I
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:4
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA H
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100H
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA H
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR
PER KEYNOTES.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY
EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE
TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY +/-
10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S
SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT
BE IN THE EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL
2-PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR
THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
KEYNOTES:
1. TERMINATE TECHNOLOGY CABLING ON THIS SIDE OF THE LINE TO
TR-111-B0601E.
2. TERMINATE TECHNOLOGY CABLES ON THIS SIDE OF THE LINE TO
TR-111-B0423.
NTS
C0B7
B0458
B0443
B0443A
B0441
B0439
B0437B B0437A
B0437B0435
B0449
B0451B
B0451C
B0012TB0012S
C0B8
B0435B
B0433
B0431E
B0446EC B0448EC
B0450EC
B0452A
B0452
B0454
B0456
B0456B
CBB9
B0444
B0415
B0414
B0427B
B0427A
B0424
B0425
B0427
B0421A
B0416 B0418
B0427
B0410
B0417
B0422
B0442B0438 B0436A
B0436
B0434
B0432
B-B-11
B0449C
B0452A
CORRIDOR
TRASH/RECYCLE
LOGISITICS MAIL RM
LOGISITICS MAIL RM
OFFICE
OFFICE
SUPV
OFFICE
CLEAN
LED
STORAGE
CLEAN
LED
STORAGE
CART
STORAGE
MATERIAL MGT OFFICE
SUPPLY
CHAIN MGMT
MER
OXYGEN
STORAGE
NITROUS OXIDE
CORRIDOR
BREAK RM
SUPV
OFFICE
OFFICE
PNEUMATIC TUBE RM PM SHOP
LOAN
OFFICER
ELECTRICAL ELECTRICAL
ELECTRICAL
REPAIR AREA
SCRUBBER RM
SCRUBBER RM
LOADING DOCK
REGULATED
MED WASTE
HOLDING
SOILED
LINEN
HOLDING
LINEN
DISTRIBUTION
LINEAR
ACCELERATOR 1
UNISEX TOILET
CLOSET
CLOSET
LEAD
PHYSICIST
LEAD
PHYSICIAN
PHYSCIAN OFFICE
UNISEX TOILET
CONTROL
CONTROL
PASSAGE
EXAM
LINEAR
ACCELERATOR 2
DOSIMETRY
PATIENT
EFFECTSPOLICE
OFFICE
LOG
OFFICE
LOG
OFFICE
LOGISTICS DIRTY LED
ELEVATOR BANK
ELEVATOR BANK
CONFERENCE
ROOM
SCRUBBER RM
B0457
LOADING
DOCK
OHD
OHD
OHD
UP
DN
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-CAM
D
2D
2D2D
2D 2V
D
V
D
V
D
V
D
V
D
V
D
1D 1V
1D 3V
2D3V
D
V
2D
D
D
2D
D
D
2D2D
2D
D
D
2D
2D
1D-CAM
2D
1D-WAP
1D-WAP
1D-WAP
2D
1D-CAM
2D 2V
2D 2V
D
2D 2V4V
D
V
2D 2V4V
D
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
AREA E
AREA H
AREA F
AREA I
AREA F
AREA I
AREA H
AREA K
AREA I
AREA L
AREA I
AREA L
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:4
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA I
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100I
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA I
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR PER
KEYNOTES.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED
ON THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE
UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
KEYNOTES:
1. TERMINATE TECHNOLOGY CABLING ON THIS SIDE OF THE LINE TO
TR-111-B0610E.
2. TERMINATE TECHNOLOGY CABLES ON THIS SIDE OF THE LINE TO
TR-111-B0423.
3. FIRE RATED SLEEVES SHALL BE INSTALLED AT ANY RATED WALL
WHERE CABLING MUST PASS THROUGH. COORDINATE WITH
ARCHITECTURAL DRAWINGS AND VERIFY EXACT LOCATIONS OF FIRE
SEPARATIONS.
NTS
B-A-1
C0A7
C0A8
B0123AEC
B0104
B0104A
B0130
B0138
B1049A
B0151A
C0A6C
B0129
B0128
B0130BEC
B0130AEC
B0125 A0027A
B0149 B0150B0151
B0156
B0155
B0137
B0137A
B0152
B0153
B0154
A0027
B-4
B0126HC B-31
B0150AB-27
B0200B0201
FAC
CORRIDOR
CORRIDOR
ELECTRICAL
OT/PT
CHARTING
OT/PT
BREAKROOM
OT STORAGE
PROSTHETICS INVENTORY
UNEXCAVATED
PASSAGE
PASSAGE
CORRIDOR
OFFICE
BIOFEEDBACK
ELECTRICAL
FIBER
CLOSET
TELFEMALE TOILET
ORTHO
WORKSHOPPROSTHETHICS WORKSHOP
ADMIN
PROSTHETICS SVC CHIEF
OFFICE
WHEELCHAIR REPAIR
WHEELCHAIR WASH
OFFICE
COPY/MAIL
KITCHENETTE
FEMALE
LOCKER RM
STAIR
HAC SHAFT
WORKSHOPSTAIR
CLEAN
CART AND
ELEVATORELEVATOR EQUIP
1D-WAP
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-WAP
1D-CAM
1D-WAP
1D-WAP
D
2D 2D 2D 2D 2D 2D
2D 4D 2D 4D 4D
D
2D
D
2D
2D
D
D
D
D
D
D
D
2D
D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
2D
2D
2D
2D
2D
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
AREA G
AREA J
AREA G
AREA J
AREA H
AREA K
EXISTING
DATA
CLOSET
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:4
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA J
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100J
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA J
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-111-B0423.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY
EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE
TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY +/-
10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S SCOPE
SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE
IN THE EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL
2-PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR
THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
#KEYNOTES:
1. CAT 6A CABLING TO ALL INFORMATION OUTLETS ON THIS SIDE OF
THE MATCH LINE, A WING, SHALL BE SHIELDED CABLE.
NTS
C0B11A
C0A9 C0B11
B0414
B0214ECB0423
B0421
B0421A
B0428
B0416
B-A-7B-A-8
B0105 B0305A
B0305D
B0100HC
B0103
B0109
C0A5 C0A7
A0002
B0140
B0114EC
B0142
B0141
B0107
B0110B0113EC
B0114AEC
B0140A
B0138
B1049A B0144
B0145
B0146B0147
B0148
B0149 B0150
B0137
B0152
B0150A
B0108 B-A-2
C0A3
B0205
B0206
B0212
B0241
B0242
B0246A
B0243
B0246
B0248
B0244
B0256
B0257
B0258
B0211
B0208
B0254A
B0201
B0200
B0249
B0251A B0251
B0204 B0203
B0247
B0252
B0254
B0207
B0210
B0007
C0A15
C0A14
C0A13
C0A12
C0A10
B0253
B0202
B0236
B0261
B0004
B0002
B0001
B0260
B0003 B0008
B0259
B0209
B0253A
B0253B
PASSAGE
CORRIDOR PASSAGE
UNISEX TOILET
ELECTRICALEXAM 4
EXAM 5/ED
UNISEX TOILET
BLOCK/DARK RM
CONTROL
SUPV
TREATMENT RM
OT/PT
STORAGE
HAC
FEMALE TOILET
MALE
TOILET
CORRIDOR
CORRIDOR
HALLWAY
WAITING RM
ELECTRICAL
RESP
THERAPY
OFFICE
RECEPTION
FEMALE TOILET
TELELECTRICAL
ELECTRICAL
PASSAGE
PROSTHETICS INVENTORY
PASSAGE
EXAM
EXAM
AMPUTEE
LIMB CLINICEXAM
WORK
ORTHO
WORKSHOPPROSTHETHICS WORKSHOP
WHEELCHAIR REPAIR
WHEELCHAIR WASH
OFFICE
WORKSHOP
MALE
TOILET FIRE
APPARATUS
CORRIDOR
EXAM
EXAM
EXAM
TOILET
NURSE
PRACTITIONER
RADIATION
ONCOLOGY
SERVICE CHIEF
TOILET
CLEAN
HAC
CONFERENCE
ROOM
PHYSICIAN
OFFICE
BLOCK MOLD
FILM PROCESS
STORAGE
EXAM
NURSE
WORKSTATIONS
RESIDENT
WORKSTATIONS
RECEPTION
WAITING
STAFF
LOUNGE
PHYSICIST
WORKROOM
CHIEF
PHYSICIST
CONSULT
/ EXAM
VITALS
LOCKERS
NURSE
ADMIN
PROCEDURE
HOLDING
BAY
EXAM
DRESSING
/ TOILET
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
MECH /
ELEC
SCHEDULERS
LOGISTICS
- CLEAN
PHYSICS
STORAGE
CT
SCANNER
CONTROL
ROOM
DOSIMETRY
SOILED
CT
ENTRY
ROOM
DRESSING
/ TOILET
CLEAN
LINENS
ELEVATOR
BANK
ELEVATOR
BANK
STORAGE
STORAGE
CANCER CARE
COORDINATORS
RESEARCH
PHYSICIAN
WORKSTATIONS
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
D
2D
2D
D
2D 2V
D
2D
2D
3D1V
D
V
1V 2D
D
V
3D 1V
D
V
3D1V
1D-WAP
1D-WAP
1D-WAP
D
D
2D
D
V
D
D
1D-WAP
D
V 4
D V
D
V D
V
4D 1V
4D 1V
D
V
D
V
1D 1D
1D-WAP
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
1D-WAP
1D1D
1D-WAP
D
V
D
V
1D-WAP
D
V
D
V
D
V
D
1D3V
1D 3V 1D 3V
D
V
1D3V
D
V
1D3V 1D3V 1D3V
1D 3V 1D 3V
1D 3V
1D3V 1D3V
3D1V
1D-CAM
1D-CAM
1D-WAP
D
V
D
V 3D 1V
1D-WAP
3D 1V
D
V
D
V
1D-WAP
D
V
D
V
D
V
D
V
D
V
D
V
W
3D 1V
3D1V
D
3D 1V
D
V
3D 1V
3D 1V
1D-WAP
D
V
D
V
D
V
1D-WAP 1
D
V
D
V
D
V
1D-WAP
W
W
D
TELECOMMUNICATIONS RM.
B0423
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
AREA G
AREA J
AREA H
AREA K
AREA H
AREA K
AREA I
AREA L
TN315
TN315
TR-111-B0423
1 1
TELECOM ROOM
LOCATIONS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:4
P M
BUILDING 111 BASEMENT PLAN - TECHNOLOGY -
AREA K
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
111-TN1100K
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA K
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-111-B0423.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER
MANUFACTURER RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY
EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE
TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY
+/- 10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S
SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT
BE IN THE EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL
2-PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL
FOR THIS SHEET. FUTURE INFORMATION OUTLET LOCATIONS
WILL BE DETERMINED BY THE VA AT A LATER DATE.
#KEYNOTES:
1. CAT 6A CABLING TO ALL INFORMATION OUTLETS ON THIS SIDE OF
THE MATCH LINE, A WING, SHALL BE SHIELDED CABLE.
NTS
D
D N
ELECTRICAL
B-A-3
CBB9
B0280
B0280A B0280B
B0223
B0219EC
B0221EC
B0225
B0235
B-5
B0237
B0239A
B0239
C0A4A
C0A4
B0240
B0234
B0240A
B0232HC
B0414
B0427B
B0427A B0425
B0427
B0429
B0430A
B0430
B0215ECB0214ECB0423
B0421
B0421A
B0428
B0416 B0418
B0427
C0A3
B0245
B0250
B0255
B0255A
B0256
B0257
B0258
B0014
B0011
B0007
C0A15
C0A17
B0236
B0238
B0004 B0010
B0009
B0006
B0005
B0002
B0260
B0003 B0008
B0012
B0013
B0259
B0016
B-8
B0015
B0235A
B0239B
B0452A
FIRE
APPARATUS
SOILED
LINEN
HOLDING
CORRIDOR
SWITCHGEAR RM
GENERATOR RM
FEMALE TOILET
FEMALE LOCKER RM
ELECTRICAL
OFFICE EQUIP
REPAIR
SHOP
STAIR
PLUMBING SHOP
ELECTRICAL STORAGE
ELECTRICAL SHOP
WAITING RM
CORRIDOR
LOCKER RM
BREAK RM
TOILET
HAC
UNISEX TOILET
CLOSET
CLOSET
LEAD
PHYSICIAN
PHYSCIAN OFFICE
PHYSICIST
THERAPIST WORK RM
SUPERVISOR
ELECTRICALELECTRICALEXAM 4
EXAM 5/ED
UNISEX TOILET
BLOCK/DARK RM
CONTROL
CONTROL
PASSAGE
CORRIDOR
MER 1
MER RM
TRANSFORMER RM
SWITCHBOARD RM
BLOCK MOLD
FILM PROCESS
STORAGE
CONTROL
ROOM
CONTROL
ROOM
DRESSING
/ TOILET
CORRIDOR
CORRIDOR
CORRIDOR
LOGISTICS
- CLEAN
LOGISTICS
- DIRTY
CT
SCANNER
DRESSING
ROOM
WAITING
ROOM
CT
STORAGE
CT
EQUIPMENT
CONTROL
ROOM
SOILED
CT
ENTRY
ROOM
DRESSING
/ TOILET
LINAC 2
LINAC 1
CLEAN
LINENS
MECHANICAL
ROOM
TRASH
STAIR
PET-MRI
VESTIBULE
OFFICE
STORAGE, EQUIPMENT
SCRUBBER RM
CANCER…