EHRM Infrastructure Upgrades – Milwaukee, WI: Final Bid Documents Summary

This document is a comprehensive set of final bid documents for the EHRM (Electronic Health Records Management) Infrastructure Upgrades project at the Clement J. Zablocki Department of Veterans Affairs Medical Center in Milwaukee, Wisconsin (Project Number 695-21-700, dated September 5, 2025). The project scope encompasses facility-wide telecommunications infrastructure improvements including fiber optic backbone cabling installation throughout multiple buildings, relocation and consolidation of telecommunications rooms, removal of abandoned equipment and cabling, redundant fiber run implementation, new main fiber line installation from the provider point, additional IT infrastructure deployment, supplemental outlets in telecommunications rooms, and facility power distribution upgrades. The work involves 18 buildings across the medical center campus, with specific focus areas including Building 111 (main hospital), Buildings 3, 4, 5, 6, and 7, as well as Buildings 20, 43, 70, 97, 102, 107, 108, 109, 112, 113, 123, 144, 146, 147, and 148. The project requires strict coordination to maintain 24/7 medical center operations, with restricted access areas requiring after-hours work (5:00 PM to 7:00 AM weekdays or weekends). Phasing notes specify backbone fiber cabling installation (Phase 1B), telecommunications room buildout with switches (Phase 2), horizontal cabling installation (Phase 3), equipment cutover (Phase 4), demolition (Phase 5), and project completion (Phase 6), with all work to be completed within the overall contract duration. The contractor is responsible for ICRA (Infection Control Risk Assessment) compliance, including containment barriers in active medical areas, daily HEPA vacuuming and disinfection, fire-rated wall penetration sealing, and coordination with VA Office of Information and Technology (OIT) for existing system maintenance throughout construction.

View the file

Other files

File Type Posted
695-21-700 Technical Question Tracking Sheet - Milw EHRM FINAL 7-22-26.pdf PDF
695-21-700 Amend 5 CIVIL UPDATED full set 2026-07-17.pdf PDF
695-21-700 Amend 5 CIVIL UPDATED Narrative 2026-07-17.pdf PDF
36C77626R0002 0005.docx DOCX document
695-21-700 Tech Qtn Tracking Sheet - Milw EHRM FINAL 7-15-26.pdf PDF
695-21-700 Specs Part 1 - 7-10-26.pdf PDF
695-21-700 Specs Part 3 - 7-10-26.pdf PDF
695-21-700 TECH Full - 7-10-26.pdf PDF
695-21-700 CIVIL Full - 7-10-26.pdf PDF
695-21-700 Specs Part 2 - 7-10-26.pdf PDF
695-21-700 ELEC Full - 7-10-26.pdf PDF
695-21-700 FIRE X Full - 7-10-26.pdf PDF
695-21-700 MECH Full - 7-10-26.pdf PDF
695-21-700 Site Visit Sign In Sheet 5-6-2026.pdf PDF
36C77626R0002 Amendment 0001.pdf PDF
RFP 36C77626R0002.pdf PDF
RFP Attachment 2 - Site Visit - Milwaukee.pdf PDF
RFP Attachment 7 - Specs 695-21-700 Part 3.pdf PDF
RFP Attachment 12 - Drawings 695-21-700 Part 5.pdf PDF
RFP Attachment 16 - Drawings 695-21-700 Part 9.pdf PDF
RFP Attachment 19 - Drawings 695-21-700 Part 12.pdf PDF
RFP Attachment 23 - Drawings 695-21-700 Part 16.pdf PDF
RFP Attachment 24 - Drawings 695-21-700 Part 17.pdf PDF
RFP Attachment 25 - Drawings 695-21-700 Part 18.pdf PDF
RFP Attachment 32 - Drawings 695-21-700 Part 25.pdf PDF
RFP Attachment 36 - PPQ.docx DOCX document
RFP Attachment 3 - Division Cost Breakdown - Milwaukee.xlsx XLSX spreadsheet
RFP Attachment 9 - Drawings 695-21-700 Part 2.pdf PDF
RFP Attachment 10 - Drawings 695-21-700 Part 3.pdf PDF
RFP Attachment 14 - Drawings 695-21-700 Part 7.pdf PDF
RFP Attachment 21 - Drawings 695-21-700 Part 14.pdf PDF
RFP Attachment 26 - Drawings 695-21-700 Part 19.pdf PDF
RFP Attachment 1 - DBA Rates - Milwaukee County - 1-2-26.pdf PDF
RFP Attachment 4 - Limitations on Subcontracting - Milwaukee.docx DOCX document
RFP Attachment 6 - Specs 695-21-700 Part 2.pdf PDF
RFP Attachment 15 - Drawings 695-21-700 Part 8.pdf PDF
RFP Attachment 17 - Drawings 695-21-700 Part 10.pdf PDF
RFP Attachment 27 - Drawings 695-21-700 Part 20.pdf PDF
RFP Attachment 29 - Drawings 695-21-700 Part 22.pdf PDF
RFP Attachment 31 - Drawings 695-21-700 Part 24.pdf PDF
RFP Attachment 33 - Drawings 695-21-700 Part 26.pdf PDF
RFP Attachment 34 - Drawings 695-21-700 Part 27.pdf PDF
RFP Attachment 2A - Site Visit Campus Map - Milwaukee.pdf PDF
RFP Attachment 5 - Specs 695-21-700 Part 1.pdf PDF
RFP Attachment 11 - Drawings 695-21-700 Part 4.pdf PDF
RFP Attachment 13 - Drawings 695-21-700 Part 6.pdf PDF
RFP Attachment 18 - Drawings 695-21-700 Part 11.pdf PDF
RFP Attachment 20 - Drawings 695-21-700 Part 13.pdf PDF
RFP Attachment 22 - Drawings 695-21-700 Part 15.pdf PDF
RFP Attachment 28 - Drawings 695-21-700 Part 21.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

NORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

EGRESS ROUTE ID AND

SECTION LENGTH

ROOM

ROOM OCCUPANCY

150 SF

EGRESS : EGRESS ID

Egress Length

ROOM OCCUPANCY & AREA

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

SHEET KEYNOTE

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

BUILDING SUMMARY

PROJECT INFORMATION

THE PROJECT WILL UPGRADE THE FACILITIES FIBER THROUGHOUT THE BUILDINGS TO EACH TELECOMMUNICATIONS ROOM, RELOCATION AND CONSOLIDATION OF A LIMITED NUMBER OF TELECOMMUNICATIONS ROOM, REMOVAL OF ABANDONED EQUIPMENT AND CABLING, PROVIDE A REDUNDANT FIBER RUN THROUGHOUT THE FACILITY TO EACH TELECOMMUNICATIONS ROOM, PROVIDE A NEW MAIN FIBER LINE COMING INTO THE BUILDING FROM THE PROVIDER POINT, INSTALL ADDITIONAL IT INFRASTRUCTURE THROUGHOUT THE FACILITY, PROVIDE ADDITIONAL OUTLETS IN EACH TELECOMMUNICATIONS ROOM, AND

UPGRADE FACILITY POWER DISTRIBUTION AS REQUIRED.

ANNOTATION DRAWING SYMBOLSGENERAL NOTES

PROJECT NAME: EHRM INFRASTRUCTURE UPGRADES - MILWAUKEE, WI

PROJECT NUMBER: 695-21-700

PROJECT LOCATION: CLEMENT J. ZABLOCKI DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

5000 W NATIONAL AVE. MILWAUKEE, WI 53295

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW

ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE

SUBMITTING COST QUOTATIONS FOR WORK.

3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE

PROVIDED PRIOR TO CONTINUING WITH WORK.

4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT

5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE

CONTRACTOR'S EXPENSE.

7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.

8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH

RESPECT TO DELIVERY DATE, QUALITY, OR COST.

9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S

MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.

10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL

EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.

11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA

REGULATIONS DURING CONSTRUCTION.

12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.

13. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE

PROVIDED.

14. EXECUTION OF THIS PROJECT WILL BE COORDINATED AND DELIVERED IN CLOSE COORDINATION WITH OTHER

CONSULTANTS UNDER A SEPARATE CONTRACT.

A101

A101

SCOPE OF WORK SUMMARY:

PROJECT TEAM

1 OR

VICINITY MAP

INDEX OF DRAWINGS

111-AE101

DISCIPLINE:

A - ARCHITECTURE

C - CIVIL

E - ELECTRICAL

G - GENERAL

M - MECHANICAL

P - PLUMBING

T - TELECOMMUNICATIONS

SHEET TYPE DESIGNATOR

BUILDING NUMBER

SHEET NUMBER WITHIN SERIES

PROJECT DRAWING INDEX ON SHEET GI101

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

95% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS RESUBMISSION

6.23.22

6.6.23

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e E

H R

M

R

C o n s o lid a te d M o d e l (R rv t

/3 /2

:2

:1

P

M

GENERAL INFORMATION

SEPTEMBER 5, 2025

695-21-700

PROJECT NUMBER - 695-21-700

EHRM INFRASTRUCTURE UPGRADES – MILWAUKEE, WI

FINAL BID DOCUMENTS EHRM INFRASTRUCTURE

UPGRADES – MILWAUKEE, WI

FINAL BID DOCUMENTS

SEPTEMBER 5, 2025

RCO EM

5000 W. NATIONAL AVENUE MILWAUKEE, WI

GI100

PROJECT ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, TX 75093

Rebecca C. Olson, AIA, ACHA, NCARB, LEED AP

855.424.3838 x302

913.908.3280 cell rebecca.olson@romanykconsulting.com

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855-424-3838 x324 319-721-4986 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Yumei Wang, PE, RCDD, CTS, LEED AP Yumei.Wang@RomanykConsulting.com

855-424-3838 x311 402-321-3766 cell

PLUMBING ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855-424-3838 x324 319-721-4986 cell

OWNER:

Department of Veteran Affairs Clement J. Zablocki Medical Center 5000 W National Ave., Milwaukee, WI 53295

Jeremy Fraser Jeremy.Fraser@va.gov

CIVIL ENGINEER:

IMEG - St. Louis Branch 15 Sunnen Drive, Suite 104 St. Louis, MO 63143

Bob Jurkowski, PE bob.j.jurkowski@imegcorp.com

314.951.2546

TECHNOLOGY ENGINEER:

IMEG - St. Louis Branch 15 Sunnen Drive, Suite 104 St. Louis, MO 63143

Scott Thomas scott.b.thomas@imegcorp.com

314-932-2611 314-495-8123 cell

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.02

CONTRACTING OFFICER'S REPRESENTATIVE:

Department of Veteran Affairs Clement J. Zablocki Medical Center 5000 W National Ave., Milwaukee, WI 53295

Jim Beier, PE James.beier@va.gov

Revisions: Date:

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

G ra p h ic S c a le

/1

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e E

H R

M

R

C o n s o lid a te d M o d e l (R rv t

/3 /2

:2

:1

P

M

SHEET INDEX

RCO EM

FINAL BID DOCUMENTS 695-21-700EHRM INFRASTRUCTURE

UPGRADES – MILWAUKEE, WI

SEPTEMBER 5, 2025

GI101

5000 W. NATIONAL AVENUE MILWAUKEE, WI

SHEET # SHEET TITLE

GENERAL

GI100 GENERAL INFORMATION

GI101 SHEET INDEX

GI102 SHEET INDEX

GI103 ABBREVIATIONS & SYMBOLS

GI104 SITE PLAN REFERENCE & ARCHITECTURE ROOM SCHEDULE & PHASING NOTES

GI105 ABA INFORMATION

GI106 ICRA DETAILS

GI107 ICRA DETAILS CLASS 1 & 2

GI108 ICRA DETAILS CLASS 3

GI109 CLASS IV ICRA DETAILS

GI110 CLASS IV ICRA DETAILS

GC100 CODE SUMMARY

GC101 OCCUPANCY SUMMARY

GC102 FIRE/SMOKE BARRIER DESCRIPTION

GC103 PROTOTYPE LAYOUT - BUILDING 111 BASEMENT

GC104 PROTOTYPE LAYOUT - BUILDING 111 BASEMENT - TECHNOLOGY

GC105 PROTOTYPE LAYOUT - BUILDING 4 SECOND FLOOR

GC106 PROTOTYPE LAYOUT - BUILDING 4 SECOND FLOOR - TECHNOLOGY

03-GC101 BUILDING 03 FIRST FLOOR LIFE SAFETY PLAN

04-GC101 BUILDING 04 SECOND FLOOR LIFE SAFETY PLAN

05-GC101 BUILDING 05 FIRST & SECOND FLOOR LIFE SAFETY PLAN

05-GC102 BUILDING 05 THIRD FLOOR LIFE SAFETY PLAN

06-GC101 BUILDING 06 FIRST FLOOR LIFE SAFETY PLAN

06-GC102 BUILDING 06 SECOND FLOOR LIFE SAFETY PLAN

06-GC103 BUILDING 06 THIRD FLOOR LIFE SAFETY PLAN

07-GC101 BUILDING 07 BASEMENT LIFE SAFETY PLAN

20-GC101 BUILDING 20 FIRST FLOOR LIFE SAFETY PLAN

43-GC101 BUILDING 43 FIRST AND SECOND FLOOR LIFE SAFETY PLAN

70-GC101 BUILDING 70 FIRST FLOOR LIFE SAFETY PLAN

97-GC101 BUILDING 97 FIRST FLOOR LIFE SAFETY PLAN

102-GC101 BUILDING 102 BASEMENT LIFE SAFETY PLAN

107-GC101 BUILDING 107 MEZZANINE LIFE SAFETY PLAN

108-GC101 BUILDING 108 SECOND FLOOR LIFE SAFETY PLAN

109-GC101 BUILDING 109 BASEMENT FLOOR LIFE SAFETY PLAN

111-GC100 BUILDING 111 BASEMENT LIFE SAFETY PLAN

111-GC101 BUILDING 111 FIRST FLOOR LIFE SAFETY PLAN

111-GC102 BUILDING 111 SECOND FLOOR LIFE SAFETY PLAN

111-GC103 BUILDING 111 THIRD FLOOR LIFE SAFETY PLAN

111-GC104 BUILDING 111 FOURTH FLOOR LIFE SAFETY PLAN

111-GC105 BUILDING 111 FIFTH FLOOR LIFE SAFETY PLAN

111-GC106 BUILDING 111 SIXTH FLOOR LIFE SAFETY PLAN

111-GC107 BUILDING 111 SEVENTH FLOOR LIFE SAFETY PLAN

111-GC108 BUILDING 111 EIGHT FLOOR LIFE SAFETY PLAN

111-GC109 BUILDING 111 NINTH FLOOR LIFE SAFETY PLAN

111-GC110 BUILDING 111 TENTH FLOOR LIFE SAFETY PLAN

112-GC101 BUILDING 112 FIRST FLOOR LIFE SAFETY PLAN

113-GC101 BUILDING 113 GROUND FLOOR LIFE SAFETY PLAN

123-GC101 BUILDING 123 FIRST FLOOR LIFE SAFETY PLAN

144-GC100 BUILDING 144 BASEMENT - LIFE SAFETY PLAN

144-GC101 BUILDING 144 LEVEL 01 - LIFE SAFETY PLAN

146-GC101 BUILDING 146 BASEMENT FLOOR LIFE SAFETY PLAN

147-GC100 BUILDING 147 BASEMENT FLOOR LIFE SAFETY PLAN

148-GC101 BUILDING 148 BASEMENT LIFE SAFETY PLAN

CIVIL

100-CJ100 CIVIL NOTES

100-CD100 OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN

100-CD101 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 5, 6 & 7

100-CD102 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 3 & 4

100-CD103 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS NRF & 150

100-CD104 EXISTING CONDITIONS AND DEMOLITION PLAN - SOUTHWEST POND

100-CD105 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 109 & 152

100-CD106 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 124 & 70

100-CD107 EXISTING CONDITIONS AND DEMOLITION PLAN - EAST POND

100-CD108 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 146, 147 & 148

100-CD109 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 20 & 97

100-CD110 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDGS 107 & 108

100-CD111 EXISTING CONDITIONS AND DEMOLITION PLAN - BLDG 123

100-CD112 EXISTING CONDITIONS AND DEMOLITION PLAN - SECONDARY CONNECTION

100-CS100 OVERALL SITE PLAN

100-CS101 SITE PLAN - BLDGS 5, 6 & 7

100-CS102 SITE PLAN - BLDGS 3 & 4

100-CS103 SITE PLAN - BLDGS NRF & 150

100-CS104 SITE PLAN - SOUTHWEST POND

100-CS105 SITE PLAN - BLDGS 109 & 152

100-CS106 SITE PLAN - BLDGS 124 & 70

100-CS107 SITE PLAN - EAST POND

100-CS108 SITE PLAN - 146, 147 & 148

100-CS109 SITE PLAN - BLDGS 20 & 97

100-CS110 SITE PLAN - BLDGS 107 & 108

100-CS111 SITE PLAN - BLDG 123

100-CS112 SITE PLAN - SECONDARY CONNECTION

100-CG100 OVERALL EROSION CONTROL PLAN

100-CG101 EROSION CONTROL PLAN - BLDGS 5, 6 & 7

100-CG102 EROSION CONTROL PLAN - BLDGS 3 & 4

100-CG103 EROSION CONTROL PLAN - BLDGS NRF & 150

100-CG104 EROSION CONTROL PLAN - SOUTHWEST POND

100-CG105 EROSION CONTROL PLAN - BLDGS 109 & 152

100-CG106 EROSION CONTROL PLAN - BLDGS 124 & 70

100-CG107 EROSION CONTROL PLAN - EAST POND

100-CG108 EROSION CONTROL PLAN - BLDGS 146, 147 & 148

100-CG109 EROSION CONTROL PLAN - BLDGS 20 & 97

100-CG110 EROSION CONTROL PLAN - BLDGS 107 & 108

100-CG111 EROSION CONTROL PLAN - BLDG 123

100-CU100 FIBER BACKBONE

100-CU101 FIBER BACKBONE

100-CU102 FIBER BACKBONE

100-CU103 FIBER BACKBONE

100-CU104 FIBER BACKBONE

100-CU105 FIBER BACKBONE

100-CU106 FIBER BACKBONE

100-CU107 FIBER BACKBONE

100-CU108 FIBER BACKBONE

100-CU109 FIBER BACKBONE

100-CU110 FIBER BACKBONE

100-CU111 FIBER BACKBONE

100-CU112 FIBER BACKBONE

100-CU113 FIBER BACKBONE

100-CU114 FIBER BACKBONE

100-CU115 FIBER BACKBONE

100-CU116 FIBER BACKBONE

100-CU117 STORM PLAN AND PROFILE 1, 2 & 3

100-CU118 STORM PLAN AND PROFILE 4 & 5

100-CU119 STORM PLAN AND PROFILE 6 & 7

100-CU120 STORM PLAN AND PROFILE 8, 9 & 10

100-CU121 STORM PLAN AND PROFILE 11, 12 & 13

100-CU122 STORM PLAN AND PROFILE 14, 15 & 16

100-CU123 STORM PLAN AND PROFILE 17, 18 & 19

100-CU124 STORM PLAN AND PROFILE 20 & 21

100-CU125 STORM PLAN AND PROFILE 22 & 23

100-CU126 STORM PLAN AND PROFILE 24 & 25

100-CU127 STORM PLAN AND PROFILE 26, 27 & 28

100-CU128 STORM PLAN AND PROFILE 29 & 30

100-CU129 STORM PLAN AND PROFILE 31, 32 & 33

100-CU130 STORM PLAN AND PROFILE 34 & 35

100-CK100 CIVIL DETAILS

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.02

SHEET # SHEET TITLE

STRUCTURAL

S001 GENERAL NOTES, EQUIPMENT PLAN AND DETAIL

ARCHITECTURAL

03-AD101 BUILDING 03 FIRST FLOOR DEMO PLAN & RCP

03-AE101 BUILDING 03 FIRST FLOOR PLAN & RCP

04-AD101 BUILDING 04 SECOND FLOOR DEMO PLAN

04-AD102 BUILDING 04 SECOND FLOOR RCP DEMO PLAN

04-AE101 BUILDING 04 SECOND FLOOR PLAN

04-AE102 BUILDING 04 SECOND FLOOR RCP

05-AD101 BUILDING 05 SECOND FLOOR DEMO PLAN

05-AE101 BUILDING 05 FIRST AND SECOND FLOOR PLAN

05-AE102 BUILDING 05 THIRD FLOOR PLAN

06-AD101 BUILDING 06 FIRST FLOOR OVERALL DEMO PLAN

06-AD102 BUILDING 06 SECOND FLOOR OVERALL DEMO PLAN

06-AD103 BUILDING 06 THIRD FLOOR OVERALL DEMO PLAN

06-AD104 BUILDING 06 FIRST FLOOR ENLARGED DEMO PLAN & RCP

06-AD105 BUILDING 06 ENLARGED SECOND AND THIRD FLOOR DEMO PLAN & RCP

06-AE101 BUILDING 06 FIRST FLOOR PLAN

06-AE102 BUILDING 06 SECOND FLOOR OVERALL PLAN

06-AE103 BUILDING 06 THIRD FLOOR OVERALL PLAN

06-AE104 BUILDING 06 ENLARGED FIRST FLOOR PLAN & RCP

06-AE105 BUILDING 06 ENLARGED SECOND AND THIRD FLOOR PLAN & RCP

07-AD101 BUILDING 07 BASEMENT DEMO PLAN

07-AE101 BUILDING 07 BASEMENT FLOOR PLAN

20-AD101 BUILDING 20 FIRST FLOOR DEMO PLAN AND RCP

20-AE101 BUILDING 20 FIRST FLOOR PLAN

43-AD101 BUILDING 43 FIRST FLOOR DEMO PLAN

43-AD102 BUILDING 43 SECOND FLOOR DEMO PLAN

43-AD103 BUILDING 43 THIRD FLOOR DEMO PLAN

43-AD104 BUILDING 43 FIRST FLOOR ENLARGED DEMO PLAN & RCP

43-AE101 BUILDING 43 FIRST FLOOR PLAN

43-AE102 BUILDING 43 SECOND FLOOR PLAN

43-AE103 BUILDING 43 THIRD FLOOR PLAN

43-AE104 BUILDING 43 FIRST AND SECOND FLOOR ENLARGED PLAN AND RCP

70-AD101 BUILDING 70 FIRST FLOOR DEMO PLAN

70-AD102 BUILDING 70 FIRST FLOOR ENLARGED DEMO PLAN

70-AD103 BUILDING 70 FIRST FLOOR ENLARGED DEMO PLAN

70-AE101 BUILDING 70 FIRST FLOOR PLAN

70-AE102 BUILDING 70 FIRST FLOOR - ENLARGED PLANS

70-AE103 BUILDING 70 FIRST FLOOR - ENLARGED PLANS

97-AD101 BUILDING 97 FIRST FLOOR DEMO PLAN

97-AE101 BUILDING 97 FIRST FLOOR PLAN

97-AE102 BUILDING 97 ROOF PLAN

102-AD101 BUILDING 102 BASEMENT DEMO PLAN

102-AD102 BUILDING 102 FIRST FLOOR DEMO PLAN

102-AD103 BUILDING 102 ENLARGED DEMO PLANS & RCP

102-AE101 BUILDING 102 BASEMENT FLOOR PLAN

102-AE102 BUILDING 102 FIRST FLOOR PLAN

102-AE103 BUILDING 102 ENLARGED PLAN & RCP

107-AD101 BUILDING 107 MEZZANINE DEMO PLAN

107-AD102 BUILDING 107 MEZZANINE DEMO RCP

107-AE101 BUILDING 107 MEZZANINE FLOOR PLAN

107-AE102 BUILDING 107 MEZZANINE RCP PLAN

108-AD101 BUILDING 108 SECOND FLOOR DEMO PLAN

108-AD102 BUILDING 108 SECOND FLOOR RCP DEMO PLAN

108-AE101 BUILDING 108 SECOND FLOOR PLAN

108-AE102 BUILDING 108 SECOND FLOOR RCP PLAN

109-AD101 BUILDING 109 BASEMENT FLOOR DEMO PLAN

109-AE101 BUILDING 109 BASEMENT FLOOR PLAN

111-AD101 BUILDING 111 BASEMENT OVERALL DEMO PLAN

111-AD102 BUILDING 111 BASEMENT DEMO ENLARGED PLAN AND RCP

111-AD103 BUILDING 111 FIRST FLOOR DEMO PLAN

111-AD104 BUILDING 111 FIRST FLOOR ENLARGED DEMO PLAN

111-AD105 BUILDING 111 SECOND FLOOR DEMO PLAN

111-AD106 BUILDING 111 SECOND FLOOR DEMO RCP

111-AD107 BUILDING 111 THIRD FLOOR DEMO PLAN

111-AD108 BUILDING 111 FOURTH FLOOR DEMO PLAN

111-AD109 BUILDING 111 FIFTH FLOOR DEMO PLAN

111-AD110 BUILDING 111 SIXTH FLOOR DEMO PLAN

111-AD111 BUILDING 111 SEVENTH FLOOR DEMO PLAN

111-AD112 BUILDING 111 EIGHTH FLOOR DEMO PLAN

111-AD113 BUILDING 111 NINTH FLOOR DEMO PLAN

111-AD114 BUILDING 111 TENTH FLOOR DEMO PLAN

111-AE101 BUILDING 111 BASEMENT OVERALL FLOOR PLAN

111-AE102 BUILDING 111 BASEMENT FLOOR PLAN AND RCP

111-AE103 BUILDING 111 FIRST FLOOR PLAN

111-AE104 BUILDING 111 FIRST FLOOR ENLARGED PLAN

111-AE105 BUILDING 111 FIRST FLOOR RCP PLAN

111-AE106 BUILDING 111 SECOND FLOOR PLAN

111-AE107 BUILDING 111 SECOND FLOOR RCP

111-AE108 BUILDING 111 THIRD FLOOR PLAN

111-AE109 BUILDING 111 FOURTH FLOOR PLAN

111-AE110 BUILDING 111 FIFTH FLOOR PLAN

111-AE111 BUILDING 111 SIXTH FLOOR PLAN

111-AE112 BUILDING 111 SEVENTH FLOOR PLAN

111-AE113 BUILDING 111 EIGHTH FLOOR PLAN

111-AE114 BUILDING 111 NINTH FLOOR PLAN

111-AE115 BUILDING 111 TENTH FLOOR PLAN

112-AD101 BUILDING 112 FIRST FLOOR DEMO PLAN

112-AE101 BUILDING 112 FIRST FLOOR PLAN

113-AD101 BUILDING 113 GROUND FLOOR DEMO PLAN

113-AE101 BUILDING 113 GROUND FLOOR PLAN

123-AD101 BUILDING 123 OVERALL FIRST FLOOR DEMO PLAN

123-AD102 BUILDING 123 FIRST FLOOR DEMO PLAN

123-AE101 BUILDING 123 FIRST FLOOR PLAN

123-AE102 BUILDING 123 FIRST FLOOR RCP PLAN

144-AE101 BUILDING 144 BASEMENT - FLOOR PLAN

144-AE102 BUILDING 144 FIRST FLOOR PLAN

146-AE101 BUILDING 146 BASEMENT - FLOOR PLAN

147-AE101 BUILDING 147 BASEMENT - FLOOR PLAN

148-AE101 BUILDING 148 BASEMENT - FLOOR PLAN

AE500 PARTITION TYPES

AE520 INTERIOR DETAILS

AE601 DOOR SCHEDULE & DETAILS

AE602 ROOM FINISH SCHEDULE

AW100 SIGNAGE PLAN DETAILS

FIRE PROTECTION

F-001 FIRE PROTECTION LEGENDS, SCHEDULES AND ABBREVIATIONS

05-FD101 BUILDING 05 LEVEL 01 - FIRE PROTECTION DEMOLITION PLAN

05-FD102 BUILDING 05 LEVEL 02 - FIRE PROTECTION DEMOLITION PLAN

05-FP101 BUILDING 05 LEVEL 01 - FIRE PROTECTION FLOOR PLAN

05-FP102 BUILDING 05 LEVEL 02 - FIRE PROTECTION FLOOR PLAN

06-FD101 BUILDING 06 LEVEL 01 - FIRE PROTECTION DEMOLITION PLAN PLAN

06-FD102 BUILDING 06 LEVEL 02 - FIRE PROTECTION DEMOLITION PLAN PLAN

06-FD103 BUILDING 06 LEVEL 03 - FIRE PROTECTION DEMOLITION PLAN PLAN

06-FP101 BUILDING 06 LEVEL 01 - FIRE PROTECTION FLOOR PLAN

06-FP102 BUILDING 06 LEVEL 02 - FIRE PROTECTION FLOOR PLAN

06-FP103 BUILDING 06 LEVEL 03 - FIRE PROTECTION FLOOR PLAN

07-FD101 BUILDING 07 BASEMENT - FIRE PROTECTION DEMOLITION PLAN

07-FP101 BUILDING 07 BASEMENT - FIRE PROTECTION FLOOR PLAN

43-FD101 BUILDING 43 LEVEL 01 FIRE PROTECTION DEMOLITION PLAN

43-FD102 BUILDING 43 LEVEL 02 FIRE PROTECTION DEMOLITION PLAN

43-FP101 BUILDING 43 LEVEL 01 - FIRE PROTECTION FLOOR PLAN

43-FP102 BUILDING 43 LEVEL 02 - FIRE PROTECTION FLOOR PLAN

SHEET # SHEET TITLE

70-FD101 BUILDING 70 ENLARGED PLANS - FIRE PROTECTION DEMOLITION PLAN

70-FP101 BUILDING 70 ENLARGED PLANS - FIRE PROTECTION FLOOR PLAN

97-FD101 BUILDING 97 ENLARGED PLANS - FIRE PROTECTION DEMOLITION

97-FP101 BUILDING 97 ENLARGED PLANS - FIRE PROTECTION

102-FD101 BUILDING 102 LEVEL 00 PLAN - FIRE PROTECTION DEMOLITION PLAN

102-FD102 BUILDING 102 LEVEL 01 PLAN - FIRE PROTECTION DEMOLITION PLAN

102-FP101 BUILDING 102 LEVEL 00 PLAN - FIRE PROTECTION FLOOR PLAN

102-FP102 BUILDING 102 LEVEL 01 PLAN - FIRE PROTECTION FLOOR PLAN

109-FD101 BUILDING 109 BASEMENT - FIRE PROTECTION DEMOLITION PLAN

109-FP101 BUILDING 109 BASEMENT - FIRE PROTECTION FLOOR PLAN

111-FD101 BUILDING 111 BASEMENT - FIRE PROTECTION DEMOLITION PLAN

111-FD102 BUILDING 111 LEVEL 01 - FIRE PROTECTION DEMOLITION PLAN

111-FD103 BUILDING 111 LEVEL 02 - FIRE PROTECTION DEMOLITION PLAN

111-FD104 BUILDING 111 LEVEL 03 - FIRE PROTECTION DEMOLITION PLAN

111-FD105 BUILDING 111 LEVEL 04 - FIRE PROTECTION DEMOLITION PLAN

111-FD106 BUILDING 111 LEVEL 05 - FIRE PROTECTION DEMOLITION PLAN

111-FD107 BUILDING 111 LEVEL 06 - FIRE PROTECTION DEMOLITION PLAN

111-FD108 BUILDING 111 LEVEL 07 - FIRE PROTECTION DEMOLITION PLAN

111-FD109 BUILDING 111 LEVEL 08 - FIRE PROTECTION DEMOLITION PLAN

111-FD110 BUILDING 111 LEVEL 09 - FIRE PROTECTION DEMOLITION PLAN

111-FD111 BUILDING 111 LEVEL 10 - FIRE PROTECTION DEMOLITION PLAN

111-FP101 BUILDING 111 BASEMENT - FIRE PROTECTION FLOOR PLAN

111-FP102 BUILDING 111 LEVEL 01 - FIRE PROTECTION FLOOR PLAN

111-FP103 BUILDING 111 LEVEL 02 - FIRE PROTECTION FLOOR PLAN

111-FP104 BUILDING 111 LEVEL 03 - FIRE PROTECTION FLOOR PLAN

111-FP105 BUILDING 111 LEVEL 04 - FIRE PROTECTION FLOOR PLAN

111-FP106 BUILDING 111 LEVEL 05 - FIRE PROTECTION FLOOR PLAN

111-FP107 BUILDING 111 LEVEL 06 - FIRE PROTECTION FLOOR PLAN

111-FP108 BUILDING 111 LEVEL 07 - FIRE PROTECTION FLOOR PLAN

111-FP109 BUILDING 111 LEVEL 08 - FIRE PROTECTION FLOOR PLAN

111-FP110 BUILDING 111 LEVEL 09 - FIRE PROTECTION FLOOR PLAN

111-FP111 BUILDING 111 LEVEL 10 - FIRE PROTECTION FLOOR PLAN

123-FD101 BUILDING 123 LEVEL 01 OVERALL AND ENLARGED - FIRE PROTECTION DEMOLITION PLAN

123-FP101 BUILDING 123 LEVEL 01 OVERALL AND ENLARGED - FIRE PROTECTION FLOOR PLAN

PLUMBING

P-001 PLUMBING LEGENDS, SCHEDULES, AND ABBREVIATIONS

P-002 PLUMBING DETAILS

PS-101 PLUMBING SITE PLAN

03-PP101 BLDG 3 - FIRST FLOOR OVERALL & ENLARGED PLUMBING PLANS

04-PP102 BLDG 4 - SECOND FLOOR OVERALL AND ENLARGED PLUMBING PLANS

05-PP101 BLDG 5 - BASEMENT/FIRST FLOOR OVERALL & ENLARGED - PLUMBING

05-PP102 BLDG 5 - SECOND FLOOR OVERALL & ENLARGED - PLUMBING

06-PD101 BUILDING 06 LEVEL 01 - PLUMBING DEMOLITION PLAN

06-PD102 BUILDING 06 LEVEL 02 - PLUMBING DEMOLITION PLAN

06-PD103 BUILDING 06 LEVEL 03 - PLUMBING DEMOLITION PLAN

06-PP101 BUILDING 06 LEVEL 01 - PLUMBING FLOOR PLAN

06-PP102 BUILDING 06 LEVEL 02 - PLUMBING FLOOR PLAN

06-PP103 BUILDING 06 LEVEL 03 - PLUMBING FLOOR PLAN

07-PP101 BUILDING 07 BASEMENT - PLUMBING FLOOR PLAN

20-PP102 BLDG 20 SECOND FLOOR PLUMBING PLANS

43-PD101 BUILDING 43 LEVEL 01 - PLUMBING DEMOLITION PLAN

43-PD102 BUILDING 43 LEVEL 02 - PLUMBING DEMOLITION PLAN

43-PP101 BUILDING 43 LEVEL 01 - PLUMBING FLOOR PLAN

43-PP102 BUILDING 43 LEVEL 02 - PLUMBING FLOOR PLAN

70-PD101 BUILDING 70 LEVEL 01 - PLUMBING DEMOLITION PLAN

70-PP101 BUILDING 70 LEVEL 01 - PLUMBING FLOOR PLAN

97-PP101 BLDG 97 - FIRST FLOOR OVERALL AND ENLARGED - PLUMBING

102-PP101 BUILDING 102 BASEMENT - PLUMBING FLOOR PLAN

102-PP102 BUILDING 102 BASEMENT - PLUMBING FLOOR PLAN

102-PP103 BUILDING 102 LEVEL 01 - PLUMBING FLOOR PLAN

107-PP101 BLDG 107 - FIRST FLOOR OVERALL AND ENLARGED - PLUMBING

108-PP101 BLDG 108 - SECOND FLOOR OVERALL AND ENLARGED - PLUMBING

109-PP101 BLDG 109 - BASEMENT OVERALL AND ENLARGED - PLUMBING

111-PD101 BUILDING 111 BASEMENT - PLUMBING DEMOLITION PLAN

111-PD102 BUILDING 111 LEVEL 01 - PLUMBING DEMOLITION PLAN

111-PD103 BUILDING 111 LEVEL 01 - PLUMBING DEMOLITION PLAN

111-PD104 BUILDING 111 LEVEL 02 - PLUMBING DEMOLITION PLAN

111-PD105 BUILDING 111 LEVEL 03 - PLUMBING DEMOLITION PLAN

111-PD106 BUILDING 111 LEVEL 04 - PLUMBING DEMOLITION PLAN

111-PD107 BUILDING 111 LEVEL 05 - PLUMBING DEMOLITION PLAN

111-PD108 BUILDING 111 LEVEL 06 - PLUMBING DEMOLITION PLAN

111-PD109 BUILDING 111 LEVEL 07 - PLUMBING DEMOLITION PLAN

111-PD110 BUILDING 111 LEVEL 08 - PLUMBING DEMOLITION PLAN

111-PD111 BUILDING 111 LEVEL 09 - PLUMBING DEMOLITION PLAN

111-PD112 BUILDING 111 LEVEL 10 - PLUMBING DEMOLITION PLAN

111-PP101 BUILDING 111 BASEMENT - PLUMBING FLOOR PLAN

111-PP102 BUILDING 111 BASEMENT - PLUMBING ENLARGED PLANS

111-PP103 BUILDING 111 LEVEL 01 - PLUMBING FLOOR PLAN

111-PP104 BUILDING 111 BASEMENT & LEVEL 01 - PLUMBING FLOOR PLAN

111-PP105 BUILDING 111 LEVEL 01 - PLUMBING FLOOR PLAN

111-PP106 BUILDING 111 LEVEL 02 - PLUMBING FLOOR PLAN

111-PP107 BUILDING 111 LEVEL 02 - PLUMBING FLOOR PLAN

111-PP108 BUILDING 111 LEVEL 02 - PLUMBING FLOOR PLAN

111-PP109 BUILDING 111 LEVEL 03 - PLUMBING FLOOR PLAN

111-PP110 BUILDING 111 LEVEL 04 - PLUMBING FLOOR PLAN

111-PP111 BUILDING 111 LEVEL 05 - PLUMBING FLOOR PLAN

111-PP112 BUILDING 111 LEVEL 06 - PLUMBING FLOOR PLAN

111-PP113 BUILDING 111 LEVEL 07 - PLUMBING FLOOR PLAN

111-PP114 BUILDING 111 LEVEL 08 - PLUMBING FLOOR PLAN

111-PP115 BUILDING 111 LEVEL 09 - PLUMBING FLOOR PLAN

111-PP116 BUILDING 111 LEVEL 10 - PLUMBING FLOOR PLAN

112-PP101 BUILDING 112 LEVEL 01 - PLUMBING FLOOR PLAN

123-PD101 BUILDING 123 LEVEL 01 - PLUMBING DEMOLITION PLAN

123-PP101 BUILDING 123 LEVEL 01 - PLUMBING FLOOR PLAN

MECHANICAL

M-001 MECHANICAL INFORMATION AND ABBREVIATIONS

M-002 MECHANICAL SCHEDULES

M-003 MECHANICAL CONTROLS

M-004 MECHANICAL DETAILS AND LEGENDS

03-MD101 BLDG 3 - FIRST FLOOR OVERALL & ENLARGED MECHANICAL DEMOLITION PLANS

03-MH101 BLDG 3 - FIRST FLOOR OVERALL & ENLARGED MECHANICAL PLANS

04-MD102 BLDG 4 - SECOND FLOOR OVERALL & ENLARGED - MECHANICAL DEMOLITION

04-MH102 BLDG 4 - SECOND FLOOR OVERALL AND ENLARGED MECHANICAL PLANS

05-MD101 BLDG 5 - FIRST FLOOR OVERALL & ENLARGED - MECHANICAL DEMO

05-MH101 BLDG 5 - BASEMENT/FIRST FLOOR OVERALL & ENLARGED - MECHANICAL

05-MH102 BLDG 5 - SECOND FLOOR OVERALL & ENLARGED - MECHANICAL

06-MD101 BUILDING 06 LEVEL 01 - MECHANICAL DEMOLITION PLAN

06-MD102 BUILDING 06 LEVEL 02 - MECHANICAL DEMOLITION PLAN

06-MD103 BUILDING 06 LEVEL 03 - MECHANICAL DEMOLITION PLAN

06-MH101 BUILDING 06 LEVEL 01 - MECHANICAL FLOOR PLAN

06-MH102 BUILDING 06 LEVEL 02 - MECHANICAL FLOOR PLAN

06-MH103 BUILDING 06 LEVEL 03 - MECHANICAL FLOOR PLAN

07-MD101 BUILDING 07 BASEMENT - MECHANICAL DEMOLITION PLAN

07-MH101 BUILDING 07 BASEMENT - MECHANICAL FLOOR PLAN

20-MD102 BLDG 20 - SECOND FLOOR OVERALL & ENLARGED - MECHANICAL DEMO

20-MH102 BLDG 20 SECOND FLOOR MECHANICAL PLANS

43-MD101 BUILDING 43 LEVEL 01 - MECHANICAL DEMOLITION PLAN

43-MD102 BUILDING 43 LEVEL 02 - MECHANICAL DEMOLITION PLAN

43-MH101 BUILDING 43 LEVEL 01 - MECHANICAL FLOOR PLAN

43-MH102 BUILDING 43 LEVEL 02 - MECHANICAL FLOOR PLAN

70-MD101 BUILDING 70 LEVEL 01 - MECHANICAL DEMOLITION PLAN

70-MH101 BUILDING 70 LEVEL 01 - MECHANICAL FLOOR PLAN

97-MD101 BLDG 97 - FIRST FLOOR OVERALL & ENLARGED - MECHANICAL DEMOLITION

97-MH101 BLDG 97 - FIRST FLOOR OVERALL AND ENLARGED - MECHANICAL

102-MD101 BUILDING 102 BASEMENT - MECHANICAL DEMOLITION PLAN

SHEET # SHEET TITLE

102-MD102 BUILDING 102 LEVEL 01 - MECHANICAL DEMOLITION PLAN

102-MH101 BUILDING 102 BASEMENT - MECHANICAL FLOOR PLAN

102-MH102 BUILDING 102 LEVEL 01 - MECHANICAL FLOOR PLAN

107-MD101 BLDG 107 - FIRST FLOOR OVERALL & ENLARGED - MECHANICAL DEMOLITION

107-MH101 BLDG 107 - FIRST FLOOR OVERALL & ENLARGED - MECHANICAL

108-MD101 BLDG 108 - SECOND FLOOR OVERALL & ENLARGED - MECHANICAL DEMOLITION

108-MH101 BLDG 108 - SECOND FLOOR OVERALL AND ENLARGED - MECHANICAL

109-MD101 BLDG 109 - BASEMENT OVERALL & ENLARGED - MECHANICAL DEMOLITION

109-MH101 BLDG 109 - BASEMENT OVERALL & ENLARGED - MECHANICAL

111-MD101 BUILDING 111 BASEMENT - OVERALL & ENLARGED MECHANICAL DEMOLITION PLANS

111-MD102 BUILDING 111 LEVEL 01 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD103 BUILDING 111 LEVEL 02 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD104 BUILDING 111 LEVEL 03 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD105 BUILDING 111 LEVEL 04 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD106 BUILDING 111 LEVEL 05 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD107 BUILDING 111 LEVEL 06 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD108 BUILDING 111 LEVEL 07 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD109 BUILDING 111 LEVEL 08 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD110 BUILDING 111 LEVEL 09 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MD111 BUILDING 111 LEVEL 10 - MECHANICAL OVERALL & ENLARGED DEMOLITION PLANS

111-MH101 BUILDING 111 BASEMENT - MECHANICAL FLOOR PLAN

111-MH102 BUILDING 111 LEVEL 01 - MECHANICAL FLOOR PLAN

111-MH103 BUILDING 111 LEVEL 01 - MECHANICAL ENLARGED PLANS

111-MH104 BUILDING 111 LEVEL 01 - MECHANICAL ENLARGED PLANS

111-MH105 BUILDING 111 LEVEL 02 - MECHANICAL FLOOR PLAN

111-MH106 BUILDING 111 LEVEL 03 - MECHANICAL FLOOR PLAN

111-MH107 BUILDING 111 LEVEL 03 - MECHANICAL FLOOR PLAN

111-MH108 BUILDING 111 LEVEL 04 - MECHANICAL FLOOR PLAN

111-MH109 BUILDING 111 LEVEL 05 - MECHANICAL FLOOR PLAN

111-MH110 BUILDING 111 LEVEL 06 - MECHANICAL FLOOR PLAN

111-MH111 BUILDING 111 LEVEL 07 - MECHANICAL FLOOR PLAN

111-MH112 BUILDING 111 LEVEL 08 - MECHANICAL FLOOR PLAN

111-MH113 BUILDING 111 LEVEL 09 - MECHANICAL FLOOR PLAN

111-MH114 BUILDING 111 LEVEL 10 - MECHANICAL FLOOR PLAN

112-MD101 BLDG 112 - FIRST FLOOR OVERALL & ENLARGED - MECHANICAL DEMOLITION

112-MH101 BLDG 112 - FIRST FLOOR OVERALL AND ENLARGED - MECHANICAL

123-MD101 BUILDING 123 LEVEL 01 - MECHANICAL DEMOLITION PLAN

123-MH101 BUILDING 123 LEVEL 01 - MECHANICAL PLAN

ELECTRICAL

E-001 ELECTRICAL LEGENDS, SCHEDULES AND ABBREVIATIONS

E-002 ELECTRICAL LEGENDS, SCHEDULES AND ABBREVIATIONS

ES-100 ELECTRICAL SITE PLAN

03-ED101 BLDG 3 - FIRST FLOOR OVERALL AND ENLARGED - ELECTRICAL DEMOLITION

03-EP101 BLDG 3 - BASEMENT/FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

04-ED101 BLDG 4 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

04-EP101 BLDG 4 - BASEMENT/SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

05-ED101 BLDG 5 - BASEMENT/FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMO

05-ED102 BLDG 5 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL DEMO

05-EP101 BLDG 5 - BASEMENT/FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

05-EP102 BLDG 5 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

06-ED101 BLDG 6 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

06-ED102 BLDG 6 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

06-ED103 BLDG 6 - THIRD FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

06-EP100 BLDG 6 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

06-EP101 BLDG 6 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

06-EP102 BLDG 6 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

06-EP103 BLDG 6 - THIRD FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

07-ED101 BLDG 7 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMO

07-EP101 BLDG 7 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

20-ED101 BLDG 20 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL DEMO

20-EP100 BLDG 20 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

20-EP101 BLDG 20 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

43-ED100 BLDG 43 - BASEMENT - OVERALL & ENLARGED - ELECTRICAL DEMO

43-ED101 BLDG 43 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMO

43-ED102 BLDG 43 - SECOND & THIRD FLOOR OVERALL & ENLARGED - ELECTRICAL DEMO

43-EP100 BLDG 43 - BASEMENT - OVERALL & ENLARGED - ELECTRICAL NEW WORK

43-EP101 BLDG 43 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

43-EP102 BLDG 43 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

70-ED101 BLDG 70 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

70-EP100 BLDG 70 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

70-EP101 BLDG 70 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

70-EP102 BLDG 70 - FIRST FLOOR ENLARGED - ELECTRICAL NEW WORK

97-ED101 BLDG 97 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

97-EP101 BLDG 97 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

102-ED101 BLDG 102 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

102-ED102 BLDG 102 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

102-EP101 BLDG 102 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

102-EP102 BLDG 102 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

107-ED101 BLDG 107 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

107-ED102 BLDG 107 - MEZZANINE OVERALL & ENLARGED - ELECTRICAL DEMOLITION

107-EP101 BLDG 107 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

107-EP102 BLDG 107 - MEZZANINE OVERALL & ENLARGED - ELECTRICAL NEW WORK

108-ED101 BLDG 108 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

108-EP101 BLDG 108 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

109-ED101 BLDG 109 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

109-EP101 BLDG 109 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-ED101 BLDG 111 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED102 BLDG 111 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED103 BLDG 111 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL DEMO

111-ED104 BLDG 111 - THIRD FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED105 BLDG 111 - FOURTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED106 BLDG 111 - FIFTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED107 BLDG 111 - SIXTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED108 BLDG 111 - SEVENTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED109 BLDG 111 - EIGHTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED110 BLDG 111 - NINTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-ED111 BLDG 111 - TENTH FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

111-EP100 BLDG 111 - SITE - ELECTRICAL NEW WORK

111-EP101 BLDG 111 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP102 BLDG 111 - BASEMENT AND FIRST FLOOR - ELECTRICAL CONDUIT NEW WORK

111-EP103 BLDG 111 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP104 BLDG 111 - FIRST FLOOR ENLARGED - ELECTRICAL NEW WORK

111-EP105 BLDG 111 - SECOND FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP106 BLDG 111 - THIRD FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP107 BLDG 111 - FOURTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP108 BLDG 111 - FIFTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP109 BLDG 111 - SIXTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP110 BLDG 111 - SEVENTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP111 BLDG 111 - EIGHTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP112 BLDG 111 - NINTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP113 BLDG 111 - TENTH FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

111-EP114 BLDG 111 - ELECTRICAL RISER DIAGRAM

111-EP115 BLDG 111 - ELECTRICAL SCHEDULES

112-ED101 BLDG 112 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

112-EP101 BLDG 112 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

113-ED101 BLDG 113 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

113-EP101 BLDG 113 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

123-ED101 BLDG 123 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

123-EP101 BLDG 123 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

123-EP102 BLDG 123 - FIRST FLOOR ENLARGED - ELECTRICAL NEW WORK

144-ED101 BLDG 144 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

144-ED102 BLDG 144 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL DEMOLITION

144-EP101 BLDG 144 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

144-EP102 BLDG 144 - FIRST FLOOR OVERALL & ENLARGED - ELECTRICAL NEW WORK

146-E100 BLDG 146, 147, 148 - SITE - ELECTRICAL PLAN

146-ED101 BLDG 146 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

SHEET # SHEET TITLE

146-EP101 BLDG 146 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

147-ED101 BUILDING 147 BASEMENT - ELECTRICAL DEMOLITION PLAN

147-EP101 BLDG 147 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

148-ED101 BLDG 148 - BASEMENT OVERALL & ENLARGED - ELECTRICAL DEMOLITION

148-EP101 BLDG 148 - BASEMENT OVERALL & ENLARGED - ELECTRICAL NEW WORK

E-400 ELECTRICAL PANEL SCHEDULES

E-401 ELECTRICAL PANEL SCHEDULES

E-402 ELECTRICAL PANEL SCHEDULES

E-403 ELECTRICAL PANEL SCHEDULES

E-404 ELECTRICAL PANEL SCHEDULES

E-405 ELECTRICAL PANEL SCHEDULES

E-406 ELECTRICAL PANEL SCHEDULES

E-407 ELECTRICAL PANEL SCHEDULES

E-408 ELECTRICAL PANEL SCHEDULES

E-409 ELECTRICAL PANEL SCHEDULES

E-410 ELECTRICAL PANEL SCHEDULES

E-411 ELECTRICAL PANEL SCHEDULES

E-412 ELECTRICAL PANEL SCHEDULES

E-413 ELECTRICAL PANEL SCHEDULES

E-414 ELECTRICAL PANEL SCHEDULES

E-500 ELECTRICAL DETAILS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

Grand total: 516

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

G ra p h ic S c a

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e E

H R

M

R

C o n s o lid a te d M o d e l (R rv t

/3 /2

:2

:1

P

M

SHEET INDEX

RCO EM

FINAL BID DOCUMENTS 695-21-700EHRM INFRASTRUCTURE

UPGRADES – MILWAUKEE, WI

SEPTEMBER 5, 2025

GI102

5000 W. NATIONAL AVENUE MILWAUKEE, WI

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.02

70-TD102E-S BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA E SOUTH

70-TD102E-N BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA E NORTH

70-TD102D-S BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D SOUTH

70-TD102D-N BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D NORTH

70-TD102C-S BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C SOUTH

70-TD102C-N BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C NORTH

70-TD102B BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA B

70-TD102A BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA A

70-TD101K BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA K

70-TD101E-S BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E SOUTH

70-TD101E-N BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E NORTH

70-TD101D-S BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D SOUTH

70-TD101D-N BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D NORTH

70-TD101C-S BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C SOUTH

70-TD101C-N BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C NORTH

70-TD101B BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

70-TD101A BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

70-TD100K BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA K

70-TD100E-S BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E SOUTH

70-TD100E-N BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E NORTH

70-TD100D-S BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D SOUTH

70-TD100D-N BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D NORTH

70-TD100C-S BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C SOUTH

70-TD100C-N BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C NORTH

70-TD100B BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

70-TD100A BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

43-TN103 BUILDING 43 THIRD FLOOR PLAN - TECHNOLOGY

43-TN102 BUILDING 43 SECOND FLOOR PLAN - TECHNOLOGY

43-TN101 BUILDING 43 FIRST FLOOR PLAN - TECHNOLOGY

43-TD103 BUILDING 43 THIRD FLOOR DEMO PLAN - TECHNOLOGY

43-TD102 BUILDING 43 SECOND FLOOR DEMO PLAN - TECHNOLOGY

43-TD101 BUILDING 43 BASEMENT DEMO PLAN - TECHNOLOGY

20-TN101 BUILDING 20 FIRST FLOOR PLAN - TECHNOLOGY

20-TD101 BUILDING 20 FIRST FLOOR DEMO PLAN - TECHNOLOGY

07-TN103 BUILDING 07 THIRD FLOOR PLAN - TECHNOLOGY

07-TN102 BUILDING 07 SECOND FLOOR PLAN - TECHNOLOGY

07-TN101 BUILDING 07 FIRST FLOOR PLAN - TECHNOLOGY

07-TN100 BUILDING 07 BASEMENT PLAN - TECHNOLOGY

07-TD103 BUILDING 07 THIRD FLOOR DEMO PLAN - TECHNOLOGY

07-TD102 BUILDING 07 SECOND FLOOR DEMO PLAN - TECHNOLOGY

07-TD101 BUILDING 07 FIRST FLOOR DEMO PLAN - TECHNOLOGY

07-TD100 BUILDING 07 BASEMENT DEMO PLAN - TECHNOLOGY

06-TN103C BUILDING 06 THIRD FLOOR PLAN - TECHNOLOGY - AREA C

06-TN103 BUILDING 06 THIRD FLOOR OVERALL PLAN - TECHNOLOGY

06-TN102D BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA D

06-TN102C BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA C

06-TN102B BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA B

06-TN102A BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA A

06-TN102 BUILDING 06 SECOND FLOOR OVERALL PLAN - TECHNOLOGY

06-TN101D BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA D

06-TN101C BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA C

06-TN101B BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

06-TN101A BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

06-TN101 BUILDING 06 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

06-TN100D BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA D

06-TN100C BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA C

06-TN100B BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA B

06-TN100A BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA A

06-TN100 BUILDING 06 BASEMENT FLOOR OVERALL PLAN - TECHNOLOGY

06-TD103C BUILDING 06 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA C

06-TD102D BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D

06-TD102C BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C

06-TD102B BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA B

06-TD102A BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA A

06-TD101D BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D

06-TD101C BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C

06-TD101B BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

06-TD101A BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

06-TD100D BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

06-TD100C BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

06-TD100B BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

06-TD100A BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

05-TN103 BUILDING 05 THIRD FLOOR PLAN - TECHNOLOGY

05-TN102 BUILDING 05 SECOND FLOOR PLAN - TECHNOLOGY

05-TN101 BUILDING 05 FIRST FLOOR PLAN - TECHNOLOGY

05-TD103 BUILDING 05 THIRD FLOOR DEMO PLAN - TECHNOLOGY

05-TD102 BUILDING 05 SECOND FLOOR DEMO PLAN - TECHNOLOGY

05-TD101 BUILDING 05 FIRST FLOOR DEMO - TECHNOLOGY

04-TN102 BUILDING 04 SECOND FLOOR PLAN - TECHNOLOGY

04-TN101 BUILDING 04 FIRST FLOOR PLAN - TECHNOLOGY

04-TN100 BUILDING 04 BASEMENT PLAN - TECHNOLOGY

04-TD102 BUILDING 04 SECOND FLOOR DEMO PLAN - TECHNOLOGY

04-TD101 BUILDING 04 FIRST FLOOR DEMO PLAN - TECHNOLOGY

04-TD100 BUILDING 04 BASEMENT DEMO PLAN - TECHNOLOGY

03-TN102 BUILDING 03 SECOND FLOOR PLAN - TECHNOLOGY

03-TN101 BUILDING 03 FIRST FLOOR PLAN - TECHNOLOGY

03-TD102 BUILDING 03 SECOND FLOOR DEMO PLAN - TECHNOLOGY

03-TD101 BUILDING 03 FIRST FLOOR DEMO PLAN - TECHNOLOGY

TI003 TECHNOLOGY SITE PLAN

TI002 TECHNOLOGY SHEET INDEX

TI001 TECHNOLOGY COVERSHEET

TECHNOLOGY SHEET INDEX

111-TD1102C BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C

111-TD1102B BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1102A BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1102 BUILDING 111 SECOND FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1101L BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1101K BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1101J BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1101I BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1101H BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1101G BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA G

111-TD1101F BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1101E BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1101D BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1101C BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C

111-TD1101B BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1101A BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1101 BUILDING 111 FIRST FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1100L BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA L

111-TD1100K BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA K

111-TD1100J BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA J

111-TD1100I BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA I

111-TD1100H BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA H

111-TD1100G BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA G

111-TD1100F BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA F

111-TD1100E BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E

111-TD1100D BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

111-TD1100C BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

111-TD1100B BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

111-TD1100A BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

111-TD1100 BUILDING 111 BASEMENT OVERALL DEMO PLAN - TECHNOLOGY

111-TD1009L BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA L

111-TD1009K BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA K

111-TD1009J BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA J

111-TD1009I BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA I

111-TD1009H BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA H

111-TD1009G BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA G

111-TD1009F BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA F

111-TD1009E BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA E

111-TD1009D BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

111-TD1009C BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

111-TD1009B BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

111-TD1009A BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

111-TD1009 BUILDING 111 SUB-BASEMENT OVERALL DEMO PLAN - TECHNOLOGY

109-TN100 BUILDING 109 BASEMENT PLAN - TECHNOLOGY

109-TD100 BUILDING 109 BASEMENT DEMO PLAN - TECHNOLOGY

108-TN102 BUILDING 108 SECOND FLOOR PLAN - TECHNOLOGY

108-TN101 BUILDING 108 FIRST FLOOR PLAN - TECHNOLOGY

108-TD102 BUILDING 108 SECOND FLOOR DEMO PLAN - TECHNOLOGY

108-TD101 BUILDING 108 FIRST FLOOR DEMO PLAN - TECHNOLOGY

107-TN102 BUILDING 107 MEZZANINE FLOOR PLAN - TECHNOLOGY

107-TN101 BUILDING 107 FIRST FLOOR PLAN - TECHNOLOGY

107-TD102 BUILDING 107 MEZZANINE FLOOR DEMO PLAN - TECHNOLOGY

107-TD101 BUILDING 107 FIRST FLOOR DEMO PLAN - TECHNOLOGY

102-TN101 BUILDING 102 FIRST FLOOR PLAN - TECHNOLOGY

102-TN100 BUILDING 102 BASEMENT PLAN - TECHNOLOGY

102-TD101 BUILDING 102 FIRST FLOOR DEMO PLAN - TECHNOLOGY

102-TD100 BUILDING 102 BASEMENT DEMO PLAN - TECHNOLOGY

97-TN101 BUILDING 97 FIRST FLOOR PLAN - TECHNOLOGY

97-TD101 BUILDING 97 FIRST FLOOR DEMO PLAN - TECHNOLOGY

70-TN103 BUILDING 70 THIRD FLOOR PLAN - TECHNOLOGY

70-TN102E-S BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA E SOUTH

70-TN102E-N BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA E NORTH

70-TN102D-S BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA D SOUTH

70-TN102D-N BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA D NORTH

70-TN102C-S BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA C SOUTH

70-TN102C-N BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA C NORTH

70-TN102B BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA B

70-TN102A BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA A

70-TN102 BUILDING 70 SECOND FLOOR OVERALL PLAN - TECHNOLOGY

70-TN101K BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA K

70-TN101E-S BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA E SOUTH

70-TN101E-N BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA E NORTH

70-TN101D-S BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA D SOUTH

70-TN101D-N BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA D NORTH

70-TN101C-S BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA C SOUTH

70-TN101C-N BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA C NORTH

70-TN101B BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

70-TN101A BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

70-TN101 BUILDING 70 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

70-TN100K BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA K

70-TN100E-S BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA E SOUTH

70-TN100E-N BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA E NORTH

70-TN100D-S BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA D SOUTH

70-TN100D-N BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA D NORTH

70-TN100C-S BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA C SOUTH

70-TN100C-N BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA C NORTH

70-TN100B BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA B

70-TN100A BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA A

70-TN100 BUILDING 70 BASEMENT OVERALL PLAN - TECHNOLOGY

70-TD103 BUILDING 70 THIRD FLOOR DEMO PLAN - TECHNOLOGY

111-TD1110E BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1110D BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1110B BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1110A BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1110 BUILDING 111 TENTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1109L BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1109K BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1109J BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1109H BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1109F BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1109E BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1109D BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1109B BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1109A BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1109 BUILDING 111 NINTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1108L BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1108K BUILDING…