This is a civil site control plan and legend for a federal construction project. The document presents a detailed survey map for the U.S. Department of Veterans Affairs (VA) EHRM Infrastructure Upgrades project located at 5000 W. National Avenue in Milwaukee, Wisconsin. The project is identified as number 695-21-700 and is classified as Final Bid Documents with an issue date of September 5, 2025.
The plan includes comprehensive civil notes and specifications addressing site preparation, erosion control, utility protection, and construction requirements. Key requirements outlined in the civil notes include: implementation of sediment and erosion control devices prior to grading operations; verification and protection of all existing utilities before construction begins, with contractor responsibility for locating and protecting underground utilities using methods such as ground-penetrating radar; establishment of construction limits and site control boundaries; management of stormwater runoff and sediment traps; restoration of disturbed areas; and coordination with public and private utility locates. The document specifies that sewer lines, manholes, and cleanouts must be adjusted to final grades following grading activities. The surveyed site map displays existing infrastructure including power poles, utility pedestals, telephone poles, sanitary and storm sewers, water lines, easements, property lines, and other utility features. Romanyk Consulting Corp., located in Plano, Texas, is identified as the Architect/Engineer of Record, with IMEG serving as the consultant. The Office of Construction and Facilities Management and the VA Department of Veterans Affairs are the responsible federal entities for this fully sprinklered infrastructure upgrade project.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RAILROAD SPIKE, FOUND
Know what's below.
before you dig.Call
R
SURVEY BOUNDARY
HANDHOLE
POWER POLE
STORM MANHOLE
HYDRANT
WATER VALVE
GAS VALVE
STORM INLET
LIGHT POLE
SIGN
STORM DOUBLE INLET
SPOT ELEVATION
MEASURED DIMENSION
L E G E N D
RECORDED DIMENSION
R.O.W. MARKER, FOUND
ELECTRIC PEDESTAL/TRANSFORMER
TELEPHONE PEDESTAL
TELEPHONE POLE
SOIL BORING HOLE
FLARED END SECTION
SECTION LINE
EASEMENT LINE
CHAIN LINK FENCE
OVERHEAD ELECTRIC
GAS LINE
UNDERGROUND ELECTRIC
GUARD RAIL
SANITARY/STORM CLEANOUT
TELEPHONE LINE
R.O.W. LINE
ELECTRIC MANHOLE
TELEPHONE MANHOLE
UTILITY MANHOLE
LIGHT JUNCTION BOX
CONIFER TREE
DECIDUOUS TREE
TREE STUMP
BUSH/SHRUB
VAPOR LIGHT
CONTROL POINT
UNKNOWN MANHOLE
WELL
GUY WIRE
FLAGPOLE
POST/BOLLARD
TREE LINE
HISTORICAL LINE - AS NOTED
PROPERTY LINE
DOWNSPOUT
BENCHMARK
ELECTRIC METER
WATER METER
FORCE MAIN
SANITARY SEWER
STORM SEWER
PIPE UNDERDRAIN
WATER LINE
SETBACK LINE
UTILITY LINE
GUY POLE
GRADE LABEL
POWER POLE W/ LIGHT
POWER POLE W/ METER
DRAINAGE SLOPE
LINE CONTINUATION
CONTOUR
CENTERLINE
SANITARY MANHOLE
FLOOD PLAIN
FLOODWAY
PROPOSED EXISTING
SILT FENCE
CONCRETE MONUMENT, FOUND
CONSTRUCTION LIMITS
PIPE, FOUND
STORM INLET
SPRINKLER BOX
WATER SERVICE
EDGE OF WATER LINE/DITCH FLOWLINE
PROJECT
LOCATION
GENERAL NOTES
1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY
WITH THE CITY OF MILWAUKEE DESIGN AND SPECIFICATIONS, LATEST EDITION,
AND THE STANDARDS OF THE WISCONSIN DEPARTMENT OF NATURAL
RESOURCES, LATEST EDITION.
2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED
FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR
LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE
MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR
SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR
EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.
3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE
PROPERLY DISPOSED OF OFF-SITE UNLESS NOTED.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
5. PORTLAND CEMENT CONCRETE. CONCRETE SHALL HAVE THE FOLLOWING
PROPERTIES. COMPRESSING STRENGTH SHALL BE 4000PSI IN 28 DAYS, AIR
ENTRAINMENT SHALL BE BETWEEN 5 % AND 8% AND SLUMP SHALL BE 4 INCHES
OR LESS ALL AS MEASURED BY THE APPROPRIATE ASTM METHODS.
REINFORCING STEEL SHALL BE ASTM CERTIFIED 60KSI TENSILE STRENGTH.
REINFORCING STEEL SHALL BE #4 SIZE UNLESS OTHERWISE SPECIFIED.
HANDRAILS, BOLLARDS, AND OTHER APPURTENANCES SHALL BE INSTALLED PER
PLAN AND MEET JURISDICTIONAL REQUIREMENTS. ALL PROPRIETARY PRODUCTS
ARE MENTIONED FOR REFERENCE ONLY. CONTRACTOR CAN SUBMIT EQUAL ITEM
FOR APPROVAL.
6. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR
ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING
MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED AREAS
AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.
7. IF SURPLUS SOIL NEEDS TO BE REMOVED FROM SITE, SOIL SHALL BE
CONSIDERED CONTAMINATED AND TREATED AS SUCH PER SPECIFICATION 31 20
00. CONTRACTOR SHALL PROPOSED A STORAGE AREA ON SITE, WITHIN PROJECT
BOUNDARIES, FOR VA REVIEW AND APPROVAL. SURPLUS SOILS CAN BE USED AS
BACKFILL IF THE VA GEMS AND/OR COR APPROVE, AFTER REVIEW OF PROPOSED
WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PICK A PERMITTED
LOCATION FOR SOIL STORAGE AND ASSUME ALL COSTS FOR SOIL DISPOSAL.
GRADING NOTES
1. ALL ELEVATIONS SHOWN ARE TO FLOWLINE FINISHED GRADE OR TOP OF
PAVEMENT UNLESS OTHERWISE STATED.
2. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREAS.
DO NOT ALLOW WATER TO POND ON PROPERTY.
3. PRIOR TO PLACEMENT OF ANY FILL, THE STRIPPED SITE SHALL BE SCARIFIED TO
A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY. ANY UNSUITABLE
SOILS FOUND AT THIS TIME SHALL BE DRIED AND RECOMPACTED OR REMOVED IF
REQUIRED COMPACTION CANNOT BE OBTAINED. CUT AREAS SHALL ALSO BE
SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY.
4. ALL FILL MATERIAL SHALL CONSIST OF APPROVED, SUITABLE SOILS PLACED IN
LOOSE LIFTS OF 9 INCHES OR LESS AND COMPACTED TO AT LEAST 95% OF THE
MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698) IN ALL
PAVEMENT AREAS.
5. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM
CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM
THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS REQUIRED BY
THE PERMIT.
6. ALL DISTURBED EMBANKMENTS GREATER THAN 3:1 SLOPES SHALL BE SEEDED
ACCORDING TO A RECOMMENDED SEEDING MIX BY THE LANDSCAPER AND
COVERED WITH EROSION CONTROL BLANKETS OR AS DIRECTED BY PLAN
DOCUMENTS.
7. CONTRACTOR SHALL ADHERE TO THE CITY OF MILWAUKEE EROSION AND
SEDIMENT CONTROL REGULATIONS AND THE STATE OF WISCONSIN
CONSTRUCTION SITE EROSION CONTROL MANUAL.
8. ALL AREAS TO BE GREENSPACE AT PROJECT COMPLETION SHALL BE LEFT WITH 6
INCHES OF TOPSOIL WHEN MASS GRADING ACTIVITIES ARE COMPLETE.
EROSION CONTROL NOTES
1. EROSION CONTROL SHALL BE INSTALLED PRIOR TO ANY GRADING
OPERATIONS WHERE POSSIBLE.
2. CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT OFF-SITE
TRACKING OF SEDIMENT ONTO PUBLIC ROADWAYS. ANY SEDIMENT
DEPOSITED ON PUBLIC ROADS SHALL BE REMOVED BY SHOVELING OR
STREET CLEANING BEFORE THE END OF EACH WORKING DAY.
3. SHOWN LOCATION OF SILTATION CONTROL IS APPROXIMATE. ACTUAL
LOCATIONS TO BE DETERMINED IN THE FIELD AT THE TIME OF
CONSTRUCTION.
4. WATER PUMPED DURING CONSTRUCTION OPERATIONS SHALL BE FILTERED.
5. ONCE CONSTRUCTION HAS BEEN COMPLETED, OR TEMPORARILY SUSPENDED
FOR LONGER THAN 14 DAYS (SUCH AS WINTER SHUTDOWN), THE
CONTRACTOR SHALL INITIATE SEEDING ON ALL AREAS DISTURBED
IMMEDIATELY OF THE LAST DISTURBANCE. EROSION CONTROL DEVICES
SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE CONTRACTOR
ESTABLISHES A GOOD STAND OF GRASS OF UNIFORM COLOR AND DENSITY
TO THE SATISFACTION OF THE ENGINEER.
6. CONTRACTOR SHALL ADHERE TO THE WISCONSIN CONSTRUCTION SITE
EROSION CONTROL MANUAL.
7. ALL EROSION CONTROL MEASURES MUST BE INSTALLED ( WHERE POSSIBLE )
PRIOR TO THE COMMENCEMENT OF ANY EARTH DISTURBING OPERATIONS.
THE REMAINING EROSION CONTROL MEASURES SHALL BE INSTALLED AS
SOON AS REASONABLY POSSIBLE AFTER GRADING OPERATIONS BEGIN.
WHERE THE PRESENCE OF SILT FENCE WILL INTERFERE WITH ACTIVITIES,
DIVERSION DITCHES AND SMALL TEMPORARY SEDIMENT TRAPS SHALL BE
UTILIZED UNTIL SILT FENCE OR OTHER MEASURES MAY BE INSTALLED AND
VEGETATION ESTABLISHED.
8. EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER
EACH PRECIPITATION EVENT AND REPLACED OR REPAIRED AS NECESSARY
AND BE PROPERLY DOCUMENTED BY CONTRACTOR IN DAILY LOG TO COR.
9. SILT FENCE AND SEDIMENT BASIN SHALL BE CLEANED OR REPLACED WHEN
SILT BUILDS UP TO WITHIN ONE FOOT OF THE TOP OF THE SILT FENCE.
10. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF
FROM CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM THE REQUIRED MONITORING, INSPECTION AND MAINTENANCE AS
REQUIRED BY THE PERMIT.
11. CONCRETE WASHOUT DEBRIS SHOULD BE HAULED OFF-SITE. WASHOUT
SHOULD BE FILLED IN AND SEEDED.
12. ALL AREAS DISTURBED BEYOND LIMITS SHOWN SHOULD BE SEEDED WITH
ADJACENT SEED MIXTURE OR IN-KIND.
13. THERE ARE NO EXPECTED DOWNSTREAM IMPACTS OTHER THAN THOSE
ALLOWED PER ORDINANCE (2 YEAR, PRE-DEVELOPED RATE OF RELEASE)
UTILITY NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL
EXISTING UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON
THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH
THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES AND/OR PAVED
STREETS CAUSED BY TRENCHING AND GRADING OPERATIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE. EXISTING UTILITY LOCATIONS
SHOWN ON THE DRAWINGS ARE APPROXIMATE.
2. ALL EXISTING UNDERGROUND UTILITIES SHOWN WERE LOCATED PARTIALLY IN
THE FIELD AND PARTIALLY FROM REVIEW OF EXISTING PUBLIC RECORDS. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT EACH UTILITY
COMPANY FOR THE FIELD LOCATION OF THEIR EXISTING LINES IN OR NEARBY
THE CONSTRUCTION AREA PRIOR TO BEGINNING ANY CONSTRUCTION.
CONTRACTOR IS REQUIRED TO PROVIDE GROUND PENETRATING RADAR
SURVEY WITHIN 10 FEET OF ALL NEW PROPOSED UNDERGROUND UTILITY
ROUTES (20 FEET WIDE SURVEY FOR ALL NEW ROUTES). CONTRACTOR IS
RESPONSIBLE TO PROVIDE POTHOLING AT ALL LOCATIONS WHERE A NEW
UNDERGROUND UTILITY WILL CROSS AN EXISTING UNDERGROUND UTILITY
IDENTIFIED BY THE GROUND PENETRATING RADAR PROVIDED BY CONTRACTOR.
3. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE
EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY DAMAGE.
4. THE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE
APPROXIMATE, ARE SHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND
ARE NOT TO BE REFERENCED FOR CONSTRUCTION PURPOSES. THE IMPLIED
PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE
OWNER, ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE
AND COMPLETE REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST
ON THE CONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY LOCATION,
IDENTIFICATION, AND MARKING ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR. REROUTING, DISCONNECTION, PROTECTION, ETC. OF ANY
UTILITY MUST BE COORDINATED BETWEEN THE CONTRACTOR, UTILITY
COMPANY AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS
ASSOCIATED WITH BURIED AND ABOVEGROUND UTILITIES, REMAINS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
5. UTILITY PIPING. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THE
PIPE MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION METHODS
INCLUDING BACKFILL MATERIAL AND MATERIAL DEPTHS. PIPE MATERIAL SHALL
BE AS SPECIFIED ON THE PLANS. ALL MATERIAL SHALL MEET THE
REQUIREMENTS OF THE LOCAL JURISDICTION FOR STRENGTH, MATERIAL TYPE
AND CONFORMITY WITH THE EXISTING SYSTEM. SEWER LINES SHALL BE
CONSTRUCTED STRAIGHT TO THE SPECIFIED LINE AND GRADES. MANHOLES,
STORM INLETS, VALVE BOXES AND APPURTENANCES SHALL BE ADJUSTED TO
GRADE OR PER PLAN PRIOR TO SEEDING/LANDSCAPING ACTIVITIES.
6. CONTRACTOR IS RESPONSIBLE FOR PUBLIC AND PRIVATE UTILITY LOCATES.
THE VA PREFERRED VENDOR IS "PRIVATE LINES". TELEPHONE: 715-445-5383.
EMAIL: PRLINES@YAHOO.COM.
SITE CONTROL
SCALE: 1" = '200
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
RJJ LKS
Revisions: Date:
FINAL BID DOCUMENTS 695-21-700
of
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 5, 2025
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6" G ra ph ic
S ca le
1"
'-0
0' 1'
2' 6"
G ra ph ic
S ca le
3/ 4"
'-0
0' 2'
4' 1'
G ra ph ic
S ca le
1/ 2"
'-0
0' 2'
1' 4'
G ra ph ic
S ca le
1/ 4"
'-0
0' 8'
4'
G ra ph ic
S ca le
1/ 8"
'-0
0'
8'
G ra ph ic
S ca le
1/
1' -0
0' 4"
8" 1'
2'
G ra ph ic
S ca le
3/
1' -0
0' 1'
6" 3"
1'
G ra ph ic
S ca le
1/
2"
'-0
Sprinklered
Office of Construction and Facilities Management FULLY SPRINKLERED 5000 W. NATIONAL AVENUE MILWAUKEE, WI
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
95% CONSTRUCTION DOCUMENTS 6.23.22
95% CONSTRUCTION DOCUMENTS RESUBMISSION 6.6.23
0' 3'
6'
1'
G ra ph ic
S ca le
/1
6"
'-0
LINNEA K.
SHAW
062-074863
CIVIL NOTES
100-CJ100
CONTROL POINT
THIS SHEET TO BE PRINTED IN COLOR.