This is a technology design document and specification package for EHRM Infrastructure Upgrades at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves comprehensive telecommunications infrastructure installation across multiple buildings (Buildings 3-7, 20, 43, 70, 97, 102, 107-109, 111-113, 123-124, 144, 146-148, and 150-152) including structured cabling systems, information outlets, wireless access points, surveillance cameras, and backbone connectivity. The scope encompasses installation of Category 6A copper cabling for data communications, replacement of existing telecommunications equipment, installation of new telecommunications rooms (TR) and telecom enclosures (TE) with proper grounding and fire-stopping, and establishment of redundant backbone paths (Leg A and Leg B) utilizing existing tunnels and new underground conduit runs with six (6) 4-inch conduits in ductbank. The project requires contractors to assume 40% allowance for new backbox locations, provide 10% additional outlets as future expansion capacity, maintain existing system operability during installation with coordination of power outages requiring three-week advance notice, and include potholing for utility location, removal and replacement of impacted infrastructure, and proper cable slack management at hand holes and maintenance holes.

The document comprises technology design sheets and schedules dated July 10, 2026 (Addendum 4), with final bid documents issued September 5, 2025, for solicitation 36C77626R0002 issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Detailed specifications reference compliance with ADA standards, ASTM E814 fire-stop standards for rated wall and floor penetrations, minimum 25-foot slack loops in hand holes, and coordination with existing biomedical and auxiliary systems scheduled to remain operational. All cabling shall not exceed 290 feet per cable run, and contractors must verify existing conditions on-site prior to bid submission. Demolition includes removal of existing network cabling to termination points, replacement of wireless access point and surveillance camera cables only, and proper disposal of removed materials. The document includes 520 design sheets covering individual building floor plans, demolition plans, technology room enlargements, technology details, riser diagrams, and schedules for all systems.

View the file

Other files

File Type Posted
36C77626R0002 Amendment 0006.pdf PDF
695-21-700 Technical Question Tracking Sheet - Milw EHRM FINAL 7-22-26.pdf PDF
695-21-700 Amend 5 CIVIL UPDATED Narrative 2026-07-17.pdf PDF
695-21-700 Amend 5 CIVIL UPDATED full set 2026-07-17.pdf PDF
36C77626R0002 0005.docx DOCX document
695-21-700 MECH Full - 7-10-26.pdf PDF
695-21-700 Spec and Drawing Narrative 7-10-26.pdf PDF
36C77626R0002 Amendment 0004.pdf PDF
695-21-700 Tech Qtn Tracking Sheet - Milw EHRM FINAL 7-15-26.pdf PDF
695-21-700 PLUMB Full - 7-10-26.pdf PDF
695-21-700 ARCH Full - 7-10-26.pdf PDF
695-21-700 Specs Part 3 - 7-10-26.pdf PDF
695-21-700 Specs Part 1 - 7-10-26.pdf PDF
695-21-700 CIVIL Full - 7-10-26.pdf PDF
695-21-700 Specs Part 2 - 7-10-26.pdf PDF
695-21-700 ELEC Full - 7-10-26.pdf PDF
695-21-700 FIRE X Full - 7-10-26.pdf PDF
36C77626R0002 Amendment 0003.pdf PDF
695-21-700 Site Visit Sign In Sheet 5-6-2026.pdf PDF
36C77626R0002 Amendment 0002.pdf PDF
AMENDED RFP Attachment 2 - Site Visit - Milwaukee.pdf PDF
36C77626R0002 Amendment 0001.pdf PDF
RFP 36C77626R0002.pdf PDF
RFP Attachment 27 - Drawings 695-21-700 Part 20.pdf PDF
RFP Attachment 29 - Drawings 695-21-700 Part 22.pdf PDF
RFP Attachment 3 - Division Cost Breakdown - Milwaukee.xlsx XLSX spreadsheet
RFP Attachment 19 - Drawings 695-21-700 Part 12.pdf PDF
RFP Attachment 6 - Specs 695-21-700 Part 2.pdf PDF
RFP Attachment 14 - Drawings 695-21-700 Part 7.pdf PDF
RFP Attachment 13 - Drawings 695-21-700 Part 6.pdf PDF
RFP Attachment 25 - Drawings 695-21-700 Part 18.pdf PDF
RFP Attachment 36 - PPQ.docx DOCX document
RFP Attachment 24 - Drawings 695-21-700 Part 17.pdf PDF
RFP Attachment 12 - Drawings 695-21-700 Part 5.pdf PDF
RFP Attachment 22 - Drawings 695-21-700 Part 15.pdf PDF
RFP Attachment 28 - Drawings 695-21-700 Part 21.pdf PDF
RFP Attachment 30 - Drawings 695-21-700 Part 23.pdf PDF
RFP Attachment 10 - Drawings 695-21-700 Part 3.pdf PDF
RFP Attachment 5 - Specs 695-21-700 Part 1.pdf PDF
RFP Attachment 18 - Drawings 695-21-700 Part 11.pdf PDF
RFP Attachment 8 - Drawings 695-21-700 Part 1.pdf PDF
RFP Attachment 2A - Site Visit Campus Map - Milwaukee.pdf PDF
RFP Attachment 35 - Project Information Sheet for Contractors.docx DOCX document
RFP Attachment 16 - Drawings 695-21-700 Part 9.pdf PDF
RFP Attachment 20 - Drawings 695-21-700 Part 13.pdf PDF
RFP Attachment 32 - Drawings 695-21-700 Part 25.pdf PDF
RFP Attachment 7 - Specs 695-21-700 Part 3.pdf PDF
RFP Attachment 26 - Drawings 695-21-700 Part 19.pdf PDF
RFP Attachment 9 - Drawings 695-21-700 Part 2.pdf PDF
RFP Attachment 2 - Site Visit - Milwaukee.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNOLOGY SYMBOL LIST

SYMBOL: DESCRIPTION: NOTE:

EQUIPMENT

LIST ABBREV.:

W

1.

CEILING INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-C

1.

WALL INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-W

1.

WALL INFORMATION OUTLET, WALL TELEPHONE

COMMUNICATION

SC-IO-W

1.

FLOOR INFORMATION OUTLET, DATA COMMUNICATION

ONLY

SC-IO-F

1D-WAP

1.

CEILING INFORMATION OUTLET, DATA

COMMUNICATION ONLY, WIRELESS ACCESS POINT

SC-IO-C

1., 2.ELECTRICAL FLOOR BOX WITH TECHNOLOGY

TV

1.

WALL INFORMATION OUTLET, TELEVISION, MOUNTED

AT +84" UNLESS OTHERWISE NOTED

SC-IO-W

1.

FLOOR INFORMATION OUTLET, COMBINATION

TELEPHONE/DATA COMMUNICATION

SC-IO-F

N/A

1.

CEILING INFORMATION OUTLET, DATA

COMMUNICATION ONLY

SC-IO-C

CCTV 4.

VIDEO SURVEILLANCE CAMERA WITH LENS, WALL

MOUNT OR CEILING MOUNTN/A

M

T

M .AC-CR2

.DOOR CONTACT; LETTER INDICATES AD FOLLOWS:

M = MOUNT

S - SURFACE R - RECESSED

T = TECHNOLOGY/TYPE

M = MAGNETIC REED

AC-DC

CARD ACCESS READER WITH KEYPAD; LETTER

INDICATES AS FOLLOWS:

M = MOUNT

C - CEILING D - DESK F- FLUSH H - HIDDEN M -

MULLION

P - PEDESTAL R - RACK S - SURFACE W - WALL

3.

CONTROLLED SECURITY SCHEME SCHEDULE

IDENTIFIER

N/ACSS

TECHNOLOGY ABBREVIATION KEY

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

ABBR: DESCRIPTION:

UNLESS OTHERWISE NOTESUON

TECHNOLOGY GENERAL NOTES:

1. ###-### INDICATES TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT

LIST ABBREVIATION"

2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL

DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.

TECHNOLOGY MOUNTING SUBSCRIPT KEY:

A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH

H MOUNT ORIENTED HORIZONTALLY

L MOUNT IN CASEWORK

M MOUNT IN MODULAR FURNITURE

S MOUNT IN SURFACE RACEWAY

A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.

1. THE LOCATION OF THE CONDUIT, HAND HOLES AND/OR MAINTENANCE HOLES SHOWN ARE

APPROXIMATE LOCATIONS. FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIVATE AND/OR

PUBLIC PRIOR TO THE INSTALLATION OF THE COMPONENT. FIELD COORDINATE THE FINAL

LOCATION WITH THE OWNER AND ENGINEER PRIOR TO INSTALLATION.

2. POTHOLING TO LOCATE EXISTING UNDERGROUND UTILITIES, IF APPLICABLE, SHALL BE

INCLUDED IN THE CONTRACTOR'S BID. CONTRACTOR IS RESPONSIBLE FOR FINAL

PLACEMENT OF HAND HOLES AND/OR MAINTENANCE HOLES AND SHALL NOTIFY THE

ENGINEER OF FINAL LOCATIONS PRIOR TO INSTALLATION.

3. HAND HOLES AND/OR MAINTENANCE HOLES SHALL BE CONSTRUCTED SO THAT THE TOP OF

THE FRAME WILL BE FLUSH WITH THE GROUND LINE.

4. REMOVAL AND REPLACEMENT OF THE EXISTING UNDERGROUND UTILITIES THAT ARE

REQUIRED TO COMPLETE THE INSTALLATION SHALL BE INCLUDED IN THE CONTRACTOR'S

BID.

5. CONTRACTOR SHALL INCLUDE IN THEIR BID ANY REMOVAL AND REPLACEMENT OF EXISTING

SIDEWALK, PAVEMENT, GRASS, SHRUBS, TREES, ETC. THAT WILL BE IMPACTED BY THE

INSTALLATION OF THE NEW CONDUITS SHOWN ON THE DRAWINGS. IF TREES ARE REQUIRED

TO BE REMOVED THE CONTRACTOR SHALL CONTACT THE OWNER AND DISCUSS OPTIONS

PRIOR TO CUTTING DOWN ANY TREE OR SHRUB OVER 5' IN HEIGHT.

6. NO ADDITIONAL COST SHALL BE APPROVED FOR PLACING CONDUITS DEEPER THAN

REQUIRED MINIMUM DEPTH TO AVOID EXISTING UNDERGROUND UTILITIES.

7. PROVIDE A MINIMUM OF 25'-0" SLACK LOOP WITHIN EACH HAND HOLES AND/OR

MAINTENANCE HOLES. SLACK LOOP SHALL BE SECURE SO COPPER OR FIBER IS NOT

RESTING ON EARTH AFTER FINAL INSTALLATION.

TECHNOLOGY OUTSIDE PLANT NOTES

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADA STANDARDS FOR

ACCESSIBLE DESIGN. REFER TO THE ADA GUIDELINES FOR ALL CONFIGURATION DETAILS

ON THIS PAGE FOR ADDITIONAL INFORMATION.

2. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.

UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN

MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON

BUILDING STRUCTURE.

3. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM

OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE

OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE

ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE ARCHITECT/ENGINEER.

4. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH

ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING

THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION

LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.

5. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO

ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION

DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN

ADVANCE BY THE OTHER CONTRACTOR.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

7. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL

BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF

THROUGH-PENETRATION FIRESTOPS. REFER TO DIVISION 07 FOR ADDITIONAL

INFORMATION.

8. REMOVE AND REINSTALL ALL CEILING TILES AS REQUIRED FOR THE EXECUTION OF

TELECOMMUNICATIONS WORK THAT IS OUTSIDE THE CONTRACT LIMITS OF CONSTRUCTION.

REPLACE CEILING TILES WITH IDENTICAL MATERIAL WHERE DAMAGED BY THIS

CONTRACTOR.

9. ALL LADDER RACK SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO SPECIFICATION

SECTION 27 05 36 FOR APPROVED MANUFACTURERS AND INSTALLATION REQUIREMENTS.

10. FLUSH MOUNT ALL TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR (CENTERLINE

DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE MOUNTED

WHEN CONDUIT IS SPECIFIED EXPOSED.

11. SCOPE OF WORK INCLUDES THE RE-USE OF THE EXISTING TELECOMMUNICATIONS OUTLET

ROUGH-INS FOR ALL NEW CABLING UP TO FOUR (4) SMALL OUTER DIAMETER CAT6A

CABLES. REFER TO SPECIFICATIONS FOR CAT6A CABLE, MAXIMUM OUTER DIAMETER OF

0.245". WHERE FIVE (5) OR MORE CAT6A CABLES ARE REQUIRED, PROVIDE AND INSTALL A

NEW CONDUIT AND BACKBOX, REFER TO DETAIL 1/TN400 FOR ADDITIONAL INFORMATION.

THE CONDUIT SIZE SHALL BE BASED ON 40% FILL. WHERE A 1.5" CONDUIT IS REQUIRED, A 5"

SQUARE BACKBOX IS REQUIRED. CONTRACTOR SHALL ASSUME 40% ALLOWANCE FOR NEW

BACKBOX LOCATIONS FOR WHERE EXISTING CONDUIT IS NOT OF SUFFICIENT SIZE OR

WHERE 5 OR MORE CAT6A CABLES ARE REQUIRED.

12. FIELD VERIFY LOCATIONS OF INFORMATION OUTLETS IN FURNITURE.

13. EXISTING TELECOM SPACES ARE REFERENCED ON THESE DRAWINGS AS "DATA CLOSETS".

NEW SPACES WITH WALL MOUNT CABINETS ARE REFERRED TO AS A TELECOM

ENCLOSURE, TE. NEW SPACES WITH FULL SIZE RACKS ARE REFERRED TO AS A TELECOM

ROOM, TR.

14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CABLE LOCATIONS WITHIN FURNITURE AND

SHALL BE RESPONSIBLE FOR ALL FURNITURE MOVES TO COMPLETE THE INSTALLATION.

15. PROVIDE ADDITIONAL SLEEVES. FOR BIDDING PURPOSES, THE CONTRACTOR SHOULD

ASSUME A 20% ALLOWANCE FOR ADDITIONAL CONDUIT SLEEVES.

16. SCOPE OF WORK INCLUDES RE-USING EXISTING CABLE SUPPORT PATHWAYS AND

SLEEVES. BASED ON NEW WORK PHASING PLANS, THE CONTRACTOR SHALL PROVIDE

ADDITIONAL PATHWAY AND SLEEVES AS REQUIRED AT 40% FILL.

17. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-PORTS CAT6A

INFORMATION OUTLETS IN THEIR PROPOSAL. FUTURE INFORMATION OUTLET LOCATIONS

WILL BE DETERMINED BY THE VA AT A LATER DATE.

18. INSTALL TEMPORARY FIRESTOPPING AT THE END OF THE WORK SHIFT IF ADDITIONAL

CABLE PULLS ARE REQUIRED THROUGH A RATED WALL.

19. CONTRACTOR TO CONFIRM ALL DATA CABLE RUNS ARE AT 290' OR LESS PRIOR TO

INSTALLATION.

20. CONTRACTOR SHALL REFER TO HAZARDOUS AREA REPORT FOR ADDITIONAL INFORMATION

ON AREAS WITH HAZARDOUS MATERIALS.

21. VA ISSUED DESIGN ALERTS 1-16 ARE APPLICABLE TO THIS PROJECT.

22. STAIRWELLS SHALL NOT BE USED FOR ROUTING UTILITIES OR CABLING UNLESS NOTED

OTHERWISE.

23. SCOPE OF WORK INCLUDES RE-USE OF EXISTING TELECOMMUNICATIONS OUTLET ROUGH-

IN FOR NEW CATEGORY 6A CABLING. NEW CATEGORY 6A CABLING AT EXISTING OUTLET

LOCATIONS SHALL BE AS FOLLOWS BASED ON 0.245" O.D. REDUCED DIAMETER CAT6A

CABLE:

• EXISTING 3/4" CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF TWO (2)

CAT6A CABLES.

• EXISTING 1" CONDUIT ROUGH-IN LOCATIONS TO RECEIVE A MAXIMUM OF FOUR (4)

CAT6A CABLES.

• FOR BIDDING PURPOSES CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR NEW

ROUGH-INS FOR 40% OF THE TOTAL NUMBER OF WORK AREA OUTLETS.

24. FOR EXISTING ROUGH-IN WITH SHALLOW BACK BOXES: PROVIDE A SURFACE MOUNT

BACKBOX INSTALLED OVER TOP OF EXISTING IN-WALL BACKBOX (LEVITON 42777 OR SIM).

WITH AN ANGLED FACEPLATE (LEVITON 42081 SERIES OR SIM) TO ALLOW FOR BEND RADIUS

OF NEW CAT6A CABLING.

25. FOR MAIN CABLE ROUTES WITHIN CORRIDORS, THE CONTRACTOR SHALL ASSUME THAT ALL

WALLS WILL REQUIRE NEW SLEEVES TO ALLOW FOR NEW HORIZONTAL CABLING TO BE

ROUTED PRIOR TO REMOVING EXISTING HORIZONTAL CABLING. SLEEVES THROUGH RATED

WALLS SHALL INCLUDE LISTED FIRE STOP. SLEEVE REQUIREMENTS INDICATED PER

SPECIFICATION.

26. ALL HORIZONTAL CABLING AND THEIR PATHWAYS PASSING THROUGH A WALL, RATED FIRE

OR SMOKE BARRIER MUST BE PROPERLY SLEEVED AND FIRE STOPPED USING APPROVED

(UL CLASSIFIED) FIRE STOP ASSEMBLIES AS REQUIRED FOR THE WALL RATING. FIRESTOP

ASSEMBLIES ARE TO BE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS FOR THE

TYPE OF BARRIER, PATHWAY SIZE, AND QUANTITY OF CABLES.

27. THE CONTRACTOR SHALL INCLUDE IN THEIR BID THE QUANTITY OF SLEEVES THROUGH ALL

WALLS, RATED OR UNRATED, AND ALL FLOORS REQUIRED FOR A COMPLETE INSTALLATION.

TECHNOLOGY INSTALLATION NOTES:

1. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILED PHASING INFORMATION.

2. THE EXISTING MAIN COMPUTER ROOM AND ALL EXISTING TELECOM ROOMS TO REMAIN

OPERATIONAL DURING THE INSTALLATION OF THE NEW BACKBONE CABLING AND

STRUCTURED CABLING. THE EXISTING SYSTEMS SHALL NOT BE DISRUPTED UNLESS

COORDINATED IN ADVANCE WITH THE CONTRACTING OFFICER.

3. THE EXISTING ACCESS CONTROL AND VIDEO SURVEILLANCE SYSTEMS SHALL REMAIN

OPERATIONAL DURING THE INSTALLATION OF THE NEW BACKBONE CABLING AND

STRUCTURED CABLING. THE EXISTING SYSTEMS SHALL NOT BE DISRUPTED UNLESS

COORDINATED IN ADVANCE WITH THE CONTRACTING OFFICER.

TECHNOLOGY PHASING NOTES

GENERAL NOTES:

1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT.

REFER TO THE TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE DESCRIPTION

AND ITEMS.

2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED ON

THE SHEET INDEX. REFER TO THE GENERAL TECHNOLOGY NOTES FOR ADDITIONAL

INFORMATION.

3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE TYPE

KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL

INFORMATION.

4. REFER TO RISERS ON SHEET(S): TN500 - TN511

TECHNOLOGY SYMBOL NOTES:

1. "#D" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO

INFORMATION OUTLET SCHEDULE ON TN600 FOR ADDITIONAL INFORMATION.

2. INFORMATION OUTLET INSTALLED IN E.C. PROVIDED FLOOR BOX. "#D" INDICATES

INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO INFORMATION OUTLET

SCHEDULE ON TN600 FOR ADDITIONAL INFORMATION. REFER TO THE ELECTRICAL FLOOR

PLANS AND ELECTRICAL EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.

3. REFER TO CONTROLLED SECURITY SCHEME (CSS) SCHEDULE ON TN601 FOR ADDITIONAL

INFORMATION.

4. REFER TO INDIVIDUAL CAMERA REQUIREMENTS SCHEDULE ON TN601 FOR ADDITIONAL

INFORMATION. SUBSCRIPT INDICATED CAMERA NUMBER. A CAMERA HEIGHT IDENTIFIES THE

HEIGHT FROM THE FLOOR TO THE CENTERLINE OF THE CAMERA. NO HEIGHT INDICATES A

CEILING MOUNT CAMERA.

CABLE TRAY, CHANNEL TRAY, BASKET

TRAY

WIDTH X HEIGHT

DIAMETERø C CONDUIT

CONDUIT DOWN

CONDUIT UP OR UP/DOWN

CONDUIT SLEEVE

CONTINUATION

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N O R

HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

CIVIL CONTRACTORC.C.

GENERAL CONTRACTORG.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE

INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY

BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE

SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.

2. ITEMS (i.e. SPEAKERS, SWITCHES, ETC.) REMOVED AND NOT RELOCATED REMAIN THE

PROPERTY OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN. (i.e., FOR

MAINTENANCE PURPOSES).

3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION

SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED

PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL

LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.

4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO

EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.

CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT

AFFECTED BY OTHER CONSTRUCTION. NO POWER OUTAGES SHALL BE DONE DURING

NORMAL BUSINESS HOURS WHICH ARE 7:00 AM TO 4:00 PM DURING THE WEEK. A POWER

OUTAGE REQUEST SHALL BE SUBMITTED TO THE COR A MINIMUM OF 3 WEEKS BEFORE A

REQUESTED POWER OUTAGE AND REQUIRES COR'S APPROVAL.

5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE

CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.

WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,

ETC., SHALL ALSO BE REMOVED.

6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE

REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.

7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING

EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE

INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.

8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A

JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND

CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.

9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE

SOURCE.

10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND

ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE

RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.

11. REFER TO SPECIFICATIONS SECTION 27 05 00 AND 27 05 05 FOR ADDITIONAL

INFORMATION.

12. FOR ALL TELECOMMUNICATIONS ROOMS THAT ARE RE-USED, EXISTING EQUIPMENT

WHICH IS REMOVED SHALL BE RETURNED TO CONTRACTING OFFICER.

TECHNOLOGY DEMOLITION NOTES

M

A X

20" MAX.

M

A X

20"-25" MAX.

M

A X

M

IN

. 4

M

A X

M

A X

10" MAX. 10"-24" MAX.

ADA GUIDELINES - FRONT ACCESS

ADA STANDARDS FOR ACCESSIBLE DESIGN

INSTALL ABOVE COUNTER

DEVICE AT 44" ABOVE

FINISHED FLOOR.

INSTALL ABOVE COUNTER

DEVICE AT 40" ABOVE

FINISHED FLOOR.

INSTALL DEVICE AT 18"

ABOVE FINISHED FLOOR.

ADA GUIDELINES - SIDE ACCESS

INSTALL DEVICE AT 44"

ABOVE FINISHED FLOOR.

INSTALL DEVICE AT 42"

ABOVE FINISHED FLOOR.

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03 0

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s

/2

.0 V

A .M

W I E

H R

M U p g ra d e /T

.0

V

A M ilw E

H R

M

C .r v t

/1

/2

:2

:1

P

M

TECHNOLOGY COVERSHEET

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

T1001

5000 W. NATIONAL AVENUE MILWAUKEE, WI

148 002 148-TN100 2/TN330 TR-148-002

147 002 147-TN100 1/TN330 TR-147-002

146 005 146-TN100 4/TN329 TR-146-005

144 146 144-TN101D 1/TN329 TR-144-146

144 175 144-TN101B 4/TN328 TR-144-175

144 G22 144-TN100D 1/TN328 TR-144-G22

144 G68 144-TN100B 4/TN327 TR-144-G68

123 E105E 123-TN101E 1/TN327 TR-123-E105E

123 D113 123-TN101D 1/TN325 TR-123-D113

123 C113 123-TN101C 4/TN325 TR-123-C113

123 B113 123-TN101B 4/TN326 TR-123-B113

123 A107 123-TN101A 1/TN326 TR-123-A107

113 106 113-TN100 4/TN324 TE-113-106

112 108 112-TN111 1/TN324 TE-112-108

111 10409 111-TN1110H 4/TN323 TR-111-10409

111 9409 111-TN1109H 1/TN323 TR-111-9409

111 8409 111-TN1108H 4/TN322 TR-111-8409

111 7412 111-T2107H 1/TN322 TR-111-7412

111 6410B 111-TN1106H 4/TN321 TR-111-6410A

111 5311 111-T2105H 1/TN321 TR-111-5311

111 4315 111-TN1104H 4/TN320 TR-111-4315

111 3308 111-TN1103H 1/TN320 TR-111-3308

111 2235 111-TN1102K 4/TN319 TR-111-2235

111 2428A 111-TN1102F 1/TN319 TR-111-2428A

111 2557 111-TN1102E 4/TN318 TR-111-2557

111 1537B 111-TN1101D 1/TN318 TR-111-1537B

111 1180 111-TN1101K 1/TN317 TR-111-1180

111 1473 111-TN1101F 4/TN315 TR-111-1473

111 1474 111-TN1101F 4/TN316 MCR-111-1474J

111 1470 111-TN1101F 1/TN316 TR-111-1470

111 B0423 111-TN1100K 1/TN315 TR-111-B0423

111 B0622 111-TN1100F 4/TN314 TR-111-B0622

111 B0610E 111-TN1100E 1/TN314 TR-111-B0610E

109 B001 109-TN100 4/TN313 TE-109-B001

108 200 108-TN102 1/TN313 TE-108-200

107 200 107-TN102 4/TN311 TE-107-200

102 144 102-TN101 1/TN312 TR-102-144

102 B100FC 102-TN101 1/TN310 TR-102-B100FC

97 005 97-TN101 1/TN311 TE-97-005

70 B-159 70-TN101A 1/TN308 TR-70-B-159

70 C-126 70-TN101C-N 4/TN308 TR-70-C-126

70 E-104 70-TN101E-N 4/TN309 TR-70-E-104

70 D-125 70-TN101D-S 1/TN309 TR-70-D-125

43 A303 43-TN103 4/TN307 TR-43-A303

43 A201 43-TN102 1/TN307 TR-43-A201

43 A156 43-TN101 4/TN306 TR-43-A156

20 20-1-030 20-TN101 1/TN306 TR-20-1-030

7 B09 07-TN100 4/TN305 TR-7-B09

6 C302 06-TN103C 1/TN305 TR-6-C302

6 6-1-C012 06-TN101C 1/TN304 TR-6-1-C012

6 A104 06-TN101A 1/TN302 TR-6-A104

6 D203 06-TN102D 4/TN303 TR-6-D203

6 B103 06-TN101B 1/TN303 TR-6-B103

5 204 05-TN102 4/TN301 TR-5-204

5 117 05-TN101 1/TN301 TR-5-117

4 2110 04-TN104 4/TN300 TR-4-2110

3 1454 03-TN101 1/TN300 TE-3-1454

BLDG NO.

ROOM

NUMBER

FLOOR PLAN

REFERENCE

DETAIL SHEET

REFERENCE

TR #

TELECOM ROOM REFERENCES

Revisions: Date:

ADDENDUM 4 7.10.26

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03 0

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s

/2

.0 V

A .M

W I E

H R

M U p g ra d e /T

.0

V

A M ilw E

H R

M

C .r v t

/1

/2

:2

:1

P

M

TECHNOLOGY SHEET INDEX

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

T1002

5000 W. NATIONAL AVENUE MILWAUKEE, WI

TECHNOLOGY SHEET INDEX

T1001 TECHNOLOGY COVERSHEET

T1002 TECHNOLOGY SHEET INDEX

T1003 TECHNOLOGY SITE PLAN

03-TD101 BUILDING 03 FIRST FLOOR DEMO PLAN - TECHNOLOGY

03-TD102 BUILDING 03 SECOND FLOOR DEMO PLAN - TECHNOLOGY

03-TN101 BUILDING 03 FIRST FLOOR PLAN - TECHNOLOGY

03-TN102 BUILDING 03 SECOND FLOOR PLAN - TECHNOLOGY

04-TD100 BUILDING 04 BASEMENT DEMO PLAN - TECHNOLOGY

04-TD101 BUILDING 04 FIRST FLOOR DEMO PLAN - TECHNOLOGY

04-TD102 BUILDING 04 SECOND FLOOR DEMO PLAN - TECHNOLOGY

04-TN100 BUILDING 04 BASEMENT PLAN - TECHNOLOGY

04-TN101 BUILDING 04 FIRST FLOOR PLAN - TECHNOLOGY

04-TN102 BUILDING 04 SECOND FLOOR PLAN - TECHNOLOGY

05-TD101 BUILDING 05 FIRST FLOOR DEMO - TECHNOLOGY

05-TD102 BUILDING 05 SECOND FLOOR DEMO PLAN - TECHNOLOGY

05-TD103 BUILDING 05 THIRD FLOOR DEMO PLAN - TECHNOLOGY

05-TN101 BUILDING 05 FIRST FLOOR PLAN - TECHNOLOGY

05-TN102 BUILDING 05 SECOND FLOOR PLAN - TECHNOLOGY

05-TN103 BUILDING 05 THIRD FLOOR PLAN - TECHNOLOGY

06-TD100A BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

06-TD100B BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

06-TD100C BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

06-TD100D BUILDING 06 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

06-TD101A BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

06-TD101B BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

06-TD101C BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C

06-TD101D BUILDING 06 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D

06-TD102A BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA A

06-TD102B BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA B

06-TD102C BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C

06-TD102D BUILDING 06 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D

06-TD103C BUILDING 06 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA C

06-TN100 BUILDING 06 BASEMENT FLOOR OVERALL PLAN - TECHNOLOGY

06-TN100A BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA A

06-TN100B BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA B

06-TN100C BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA C

06-TN100D BUILDING 06 BASEMENT PLAN - TECHNOLOGY - AREA D

06-TN101 BUILDING 06 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

06-TN101A BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

06-TN101B BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

06-TN101C BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA C

06-TN101D BUILDING 06 FIRST FLOOR PLAN - TECHNOLOGY - AREA D

06-TN102 BUILDING 06 SECOND FLOOR OVERALL PLAN - TECHNOLOGY

06-TN102A BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA A

06-TN102B BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA B

06-TN102C BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA C

06-TN102D BUILDING 06 SECOND FLOOR PLAN - TECHNOLOGY - AREA D

06-TN103 BUILDING 06 THIRD FLOOR OVERALL PLAN - TECHNOLOGY

06-TN103C BUILDING 06 THIRD FLOOR PLAN - TECHNOLOGY - AREA C

07-TD100 BUILDING 07 BASEMENT DEMO PLAN - TECHNOLOGY

07-TD101 BUILDING 07 FIRST FLOOR DEMO PLAN - TECHNOLOGY

07-TD102 BUILDING 07 SECOND FLOOR DEMO PLAN - TECHNOLOGY

07-TD103 BUILDING 07 THIRD FLOOR DEMO PLAN - TECHNOLOGY

07-TN100 BUILDING 07 BASEMENT PLAN - TECHNOLOGY

07-TN101 BUILDING 07 FIRST FLOOR PLAN - TECHNOLOGY

07-TN102 BUILDING 07 SECOND FLOOR PLAN - TECHNOLOGY

07-TN103 BUILDING 07 THIRD FLOOR PLAN - TECHNOLOGY

20-TD101 BUILDING 20 FIRST FLOOR DEMO PLAN - TECHNOLOGY

20-TN101 BUILDING 20 FIRST FLOOR PLAN - TECHNOLOGY

43-TD101 BUILDING 43 FIRST FLOOR DEMO PLAN - TECHNOLOGY

43-TD102 BUILDING 43 SECOND FLOOR DEMO PLAN - TECHNOLOGY

43-TD103 BUILDING 43 THIRD FLOOR DEMO PLAN - TECHNOLOGY

43-TN101 BUILDING 43 FIRST FLOOR PLAN - TECHNOLOGY

43-TN102 BUILDING 43 SECOND FLOOR PLAN - TECHNOLOGY

43-TN103 BUILDING 43 THIRD FLOOR PLAN - TECHNOLOGY

70-TD100 BUILDING 70 BASEMENT DEMOLITION PLAN - TECHNOLOGY

70-TD100A BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

70-TD100B BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

70-TD100C-N BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C NORTH

70-TD100C-S BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C SOUTH

70-TD100D-N BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D NORTH

70-TD100D-S BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D SOUTH

70-TD100E-N BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E NORTH

70-TD100E-S BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E SOUTH

70-TD100K BUILDING 70 BASEMENT DEMO PLAN - TECHNOLOGY - AREA K

70-TD101A BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

70-TD101B BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

70-TD101C-N BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C NORTH

70-TD101C-S BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C SOUTH

70-TD101D-N BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D NORTH

70-TD101D-S BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D SOUTH

70-TD101E-N BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E NORTH

70-TD101E-S BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E SOUTH

70-TD101K BUILDING 70 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA K

70-TD102A BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA A

70-TD102B BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA B

70-TD102C-N BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C NORTH

70-TD102C-S BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C SOUTH

70-TD102D-N BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D NORTH

70-TD102D-S BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D SOUTH

70-TD102E-N BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA E NORTH

70-TD102E-S BUILDING 70 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA E SOUTH

70-TD103 BUILDING 70 THIRD FLOOR DEMO PLAN - TECHNOLOGY

70-TN100 BUILDING 70 BASEMENT OVERALL PLAN - TECHNOLOGY

70-TN100A BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA A

70-TN100B BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA B

70-TN100C-N BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA C NORTH

70-TN100C-S BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA C SOUTH

70-TN100D-N BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA D NORTH

70-TN100D-S BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA D SOUTH

70-TN100E-N BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA E NORTH

70-TN100E-S BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA E SOUTH

70-TN100K BUILDING 70 BASEMENT PLAN - TECHNOLOGY - AREA K

70-TN101 BUILDING 70 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

70-TN101A BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

70-TN101B BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

70-TN101C-N BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA C NORTH

70-TN101C-S BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA C SOUTH

TECHNOLOGY SHEET INDEX

70-TN101D-N BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA D NORTH

70-TN101D-S BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA D SOUTH

70-TN101E-N BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA E NORTH

70-TN101E-S BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA E SOUTH

70-TN101K BUILDING 70 FIRST FLOOR PLAN - TECHNOLOGY - AREA K

70-TN102 BUILDING 70 SECOND FLOOR OVERALL PLAN - TECHNOLOGY

70-TN102A BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA A

70-TN102B BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA B

70-TN102C-N BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA C NORTH

70-TN102C-S BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA C SOUTH

70-TN102D-N BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA D NORTH

70-TN102D-S BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA D SOUTH

70-TN102E-N BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA E NORTH

70-TN102E-S BUILDING 70 SECOND FLOOR PLAN - TECHNOLOGY - AREA E SOUTH

70-TN103 BUILDING 70 THIRD FLOOR PLAN - TECHNOLOGY

97-TD101 BUILDING 97 FIRST FLOOR DEMO PLAN - TECHNOLOGY

97-TN101 BUILDING 97 FIRST FLOOR PLAN - TECHNOLOGY

102-TD100 BUILDING 102 BASEMENT DEMO PLAN - TECHNOLOGY

102-TD101 BUILDING 102 FIRST FLOOR DEMO PLAN - TECHNOLOGY

102-TN100 BUILDING 102 BASEMENT PLAN - TECHNOLOGY

102-TN101 BUILDING 102 FIRST FLOOR PLAN - TECHNOLOGY

107-TD101 BUILDING 107 FIRST FLOOR DEMO PLAN - TECHNOLOGY

107-TD102 BUILDING 107 MEZZANINE FLOOR DEMO PLAN - TECHNOLOGY

107-TN101 BUILDING 107 FIRST FLOOR PLAN - TECHNOLOGY

107-TN102 BUILDING 107 MEZZANINE FLOOR PLAN - TECHNOLOGY

108-TD101 BUILDING 108 FIRST FLOOR DEMO PLAN - TECHNOLOGY

108-TD102 BUILDING 108 SECOND FLOOR DEMO PLAN - TECHNOLOGY

108-TN101 BUILDING 108 FIRST FLOOR PLAN - TECHNOLOGY

108-TN102 BUILDING 108 SECOND FLOOR PLAN - TECHNOLOGY

109-TD100 BUILDING 109 BASEMENT, FIRST FLOOR AND SECOND FLOOR DEMO PLAN -

TECHNOLOGY

109-TN100 BUILDING 109 BASEMENT, FIRST FLOOR AND SECOND FLOOR PLAN -

TECHNOLOGY

111-TD1009 BUILDING 111 SUB-BASEMENT OVERALL DEMO PLAN - TECHNOLOGY

111-TD1009A BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

111-TD1009B BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

111-TD1009C BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

111-TD1009D BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

111-TD1009E BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA E

111-TD1009F BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA F

111-TD1009G BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA G

111-TD1009H BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA H

111-TD1009I BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA I

111-TD1009J BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA J

111-TD1009K BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA K

111-TD1009L BUILDING 111 SUB-BASEMENT DEMO PLAN - TECHNOLOGY - AREA L

111-TD1100 BUILDING 111 BASEMENT OVERALL DEMO PLAN - TECHNOLOGY

111-TD1100A BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

111-TD1100B BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

111-TD1100C BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

111-TD1100D BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

111-TD1100E BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E

111-TD1100F BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA F

111-TD1100G BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA G

111-TD1100H BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA H

111-TD1100I BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA I

111-TD1100J BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA J

111-TD1100K BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA K

111-TD1100L BUILDING 111 BASEMENT DEMO PLAN - TECHNOLOGY - AREA L

111-TD1101 BUILDING 111 FIRST FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1101A BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1101B BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1101C BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C

111-TD1101D BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1101E BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1101F BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1101G BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA G

111-TD1101H BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1101I BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1101J BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1101K BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1101L BUILDING 111 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1102 BUILDING 111 SECOND FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1102A BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1102B BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1102C BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA C

111-TD1102D BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1102E BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1102F BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1102G BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA G

111-TD1102H BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1102I BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1102J BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1102K BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1102L BUILDING 111 SECOND FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1103 BUILDING 111 THIRD FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1103A BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1103B BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1103C BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA C

111-TD1103D BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1103E BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1103F BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1103G BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA G

111-TD1103H BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1103I BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1103J BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1103K BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1103L BUILDING 111 THIRD FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1104 BUILDING 111 FOURTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1104A BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1104B BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1104D BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1104E BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1104F BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1104H BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1104I BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1104J BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1104K BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

TECHNOLOGY SHEET INDEX

111-TD1104L BUILDING 111 FOURTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1105 BUILDING 111 FIFTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1105A BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1105B BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1105D BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1105E BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1105F BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1105H BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1105I BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1105J BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1105K BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1105L BUILDING 111 FIFTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1106 BUILDING 111 SIXTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1106A BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1106B BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1106D BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1106E BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1106F BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1106H BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1106I BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA I

111-TD1106J BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1106K BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1106L BUILDING 111 SIXTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1107 BUILDING 111 SEVENTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1107A BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1107B BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1107D BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1107E BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1107F BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1107H BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1107J BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1107K BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1107L BUILDING 111 SEVENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1108 BUILDING 111 EIGHTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1108A BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1108B BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1108D BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1108E BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1108F BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1108H BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1108J BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1108K BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1108L BUILDING 111 EIGHTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1109 BUILDING 111 NINTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1109A BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1109B BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1109D BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1109E BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1109F BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1109H BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1109J BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1109K BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1109L BUILDING 111 NINTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TD1110 BUILDING 111 TENTH FLOOR OVERALL DEMO PLAN - TECHNOLOGY

111-TD1110A BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA A

111-TD1110B BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA B

111-TD1110D BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA D

111-TD1110E BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA E

111-TD1110F BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA F

111-TD1110H BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA H

111-TD1110J BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA J

111-TD1110K BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA K

111-TD1110L BUILDING 111 TENTH FLOOR DEMO PLAN - TECHNOLOGY - AREA L

111-TN1009 BUILDING 111 SUB-BASEMENT OVERALL PLAN - TECHNOLOGY

111-TN1009A BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA A

111-TN1009B BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA B

111-TN1009C BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA C

111-TN1009D BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA D

111-TN1009E BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA E

111-TN1009F BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA F

111-TN1009G BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA G

111-TN1009H BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA H

111-TN1009I BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA I

111-TN1009J BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA J

111-TN1009K BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA K

111-TN1009L BUILDING 111 SUB-BASEMENT PLAN - TECHNOLOGY - AREA L

111-TN1100 BUILDING 111 BASEMENT OVERALL PLAN - TECHNOLOGY

111-TN1100A BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA A

111-TN1100B BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA B

111-TN1100C BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA C

111-TN1100D BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA D

111-TN1100E BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA E

111-TN1100F BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA F

111-TN1100G BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA G

111-TN1100H BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA H

111-TN1100I BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA I

111-TN1100J BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA J

111-TN1100K BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA K

111-TN1100L BUILDING 111 BASEMENT PLAN - TECHNOLOGY - AREA L

111-TN1101 BUILDING 111 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1101A BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1101B BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1101C BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA C

111-TN1101D BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1101E BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1101F BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1101G BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA G

111-TN1101H BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1101I BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1101J BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1101K BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1101L BUILDING 111 FIRST FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1102 BUILDING 111 SECOND FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1102A BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1102B BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1102C BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA C

111-TN1102D BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1102E BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA E

TECHNOLOGY SHEET INDEX

111-TN1102F BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1102G BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA G

111-TN1102H BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1102I BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1102J BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1102K BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1102L BUILDING 111 SECOND FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1103 BUILDING 111 THIRD FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1103A BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1103B BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1103C BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA C

111-TN1103D BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1103E BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1103F BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1103H BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1103I BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1103J BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1103K BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1103L BUILDING 111 THIRD FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1104 BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY

111-TN1104A BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1104B BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1104D BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1104E BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1104F BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1104H BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1104I BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1104J BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1104K BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1104L BUILDING 111 FOURTH FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1105 BUILDING 111 FIFTH FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1105A BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1105B BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1105D BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1105E BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1105F BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1105H BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1105I BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1105J BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1105K BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1105L BUILDING 111 FIFTH FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1106 BUILDING 111 SIXTH FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1106A BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1106B BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1106D BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1106E BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1106F BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1106H BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1106I BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1106J BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1106K BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1106L BUILDING 111 SIXTH FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1107 BUILDING 111 SEVENTH FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1107A BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1107B BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1107D BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1107E BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1107F BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1107H BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1107I BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA I

111-TN1107J BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1107K BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1107L BUILDING 111 SEVENTH FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1108 BUILDING 111 EIGHTH FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1108A BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1108B BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1108D BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1108E BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1108F BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1108H BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1108J BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1108K BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1108L BUILDING 111 EIGHTH FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1109 BUILDING 111 NINTH FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1109A BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1109B BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1109D BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1109E BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1109F BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1109H BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1109J BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1109K BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1109L BUILDING 111 NINTH FLOOR PLAN - TECHNOLOGY - AREA L

111-TN1110 BUILDING 111 TENTH FLOOR OVERALL PLAN - TECHNOLOGY

111-TN1110A BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA A

111-TN1110B BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA B

111-TN1110D BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA D

111-TN1110E BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA E

111-TN1110F BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA F

111-TN1110H BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA H

111-TN1110J BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA J

111-TN1110K BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA K

111-TN1110L BUILDING 111 TENTH FLOOR PLAN - TECHNOLOGY - AREA L

112-TD111 BUILDING 112 FIRST FLOOR DEMO PLAN - TECHNOLOGY

112-TN111 BUILDING 112 FIRST FLOOR PLAN - TECHNOLOGY

113-TD100 BUILDING 113 BASEMENT DEMO PLAN - TECHNOLOGY

113-TD101 BUILDING 113 FIRST FLOOR DEMO PLAN - TECHNOLOGY

113-TN100 BUILDING 113 BASEMENT FLOOR PLAN - TECHNOLOGY

113-TN101 BUILDING 113 FIRST FLOOR PLAN - TECHNOLOGY

123-TD101A BUILDING 123 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

123-TD101B BUILDING 123 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

123-TD101C BUILDING 123 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C

123-TD101D BUILDING 123 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D

123-TD101E BUILDING 123 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E

123-TN101 BUILDING 123 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

123-TN101A BUILDING 123 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

123-TN101B BUILDING 123 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

123-TN101C BUILDING 123 FIRST FLOOR PLAN - TECHNOLOGY - AREA C

TECHNOLOGY SHEET INDEX

123-TN101D BUILDING 123 FIRST FLOOR PLAN - TECHNOLOGY - AREA D

123-TN101E BUILDING 123 FIRST FLOOR PLAN - TECHNOLOGY - AREA E

144-TD100 BUILDING 144 BASEMENT OVERALL DEMO PLAN - TECHNOLOGY

144-TD100A BUILDING 144 BASEMENT DEMO PLAN - TECHNOLOGY - AREA A

144-TD100B BUILDING 144 BASEMENT DEMO PLAN - TECHNOLOGY - AREA B

144-TD100C BUILDING 144 BASEMENT DEMO PLAN - TECHNOLOGY - AREA C

144-TD100D BUILDING 144 BASEMENT DEMO PLAN - TECHNOLOGY - AREA D

144-TD100E BUILDING 144 BASEMENT DEMO PLAN - TECHNOLOGY - AREA E

144-TD100F BUILDING 144 BASEMENT DEMO PLAN - TECHNOLOGY - AREA F

144-TD101A BUILDING 144 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA A

144-TD101B BUILDING 144 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA B

144-TD101C BUILDING 144 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA C

144-TD101D BUILDING 144 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA D

144-TD101E BUILDING 144 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA E

144-TD101F BUILDING 144 FIRST FLOOR DEMO PLAN - TECHNOLOGY - AREA F

144-TN100 BUILDING 144 BASEMENT OVERALL PLAN - TECHNOLOGY

144-TN100A BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA A

144-TN100B BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA B

144-TN100C BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA C

144-TN100D BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA D

144-TN100E BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA E

144-TN100F BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA F

144-TN101 BUILDING 144 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

144-TN101A BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

144-TN101B BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

144-TN101C BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA C

144-TN101D BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA D

144-TN101E BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA E

144-TN101F BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA F

146-TD100 BUILDING 146 BASEMENT DEMO PLAN - TECHNOLOGY

146-TD101 BUILDING 146 FIRST FLOOR DEMO PLAN - TECHNOLOGY

146-TN100 BUILDING 146 BASEMENT PLAN - TECHNOLOGY

146-TN101 BUILDING 146 FIRST FLOOR PLAN - TECHNOLOGY

147-TD100 BUILDING 147 BASEMENT DEMO PLAN - TECHNOLOGY

147-TD101 BUILDING 147 FIRST FLOOR DEMO PLAN - TECHNOLOGY

147-TN100 BUILDING 147 BASEMENT PLAN - TECHNOLOGY

147-TN101 BUILDING 147 FIRST FLOOR PLAN - TECHNOLOGY

148-TD10…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .