P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf

PDF 1 MB Posted

Attached to
RFP for Ridgeland High School Renovations
Solicitation number
PE-55462-NONST-2026-000000017
Issued by
Wilcox County, Georgia

About this file

This is a Plumbing Enlarged Plans document for the Ridgeland High School Renovations project prepared for Walker County Schools in Lafayette, Georgia by Southern A&E, LLC. The document presents detailed plumbing floor plans for Phase 2 of the renovation project, focusing on gymnasium locker rooms, multiple toilet facilities (rooms 106, 522, 808A, 809A, 903, and 904), and visitor facilities (rooms 5029 and 5030). The plans specify replacement of existing plumbing fixtures including water closets, urinals, lavatories, drinking fountains, and floor drains with new ADA-compliant fixtures where applicable. The scope of work encompasses replacing approximately 20+ water closets (both standard WC-1 and ADA WC-2 models), 10+ urinals (standard UR-1 and ADA UR-2 models), 15+ lavatories (LAV-1, LAV-2, and LAV-3 models), multiple drinking fountains (EDF-1 and EDF-2), and numerous floor drains, along with associated plumbing components including flush valves, faucets, traps, and supply lines. The document was issued for construction on October 31, 2025, with revisions dated November 21, 2025, and includes architectural E-size sheet specifications at 1/4" = 1'-0" scale.

The document is a technical specification drawing set with no explicit pricing information, set-asides, or contract terms included. The plumbing plans are coordinated with new flooring installation and require field verification of exact locations and mounting heights for existing fixtures. Work includes provisions for replacing floor drain extension kits as necessary and cleaning or replacing existing grates and covers where fixtures cannot be replaced. The engineer of record is Southern A&E, LLC (Professional Engineer Firm License No. PEF003374, expiration June 30, 2026), and the project is under Bid Package BP-1 with SA&E Project Number 01-920-045.

View the file

Other files

File Type Posted
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UR-2

UR-1

WC-1

WC-2

LAV-2 LAV-1 LAV-1 LAV-2

WC-2

WC-1

UR-1

UR-1 WC-1

WC-1

WC-1

WC-2

LAV-2 LAV-1 LAV-1 LAV-2

WC-2

WC-1

WC-1

WC-1

P1

P2

P4

P3

P1

P2 P2

P1

P1

P1 P1

P1

P1

P1

P3

P3

P5 P5 P5P5 P6 P6 P6 P6

P8 P8 P8 P8 P8 P8 P8 P8

EDF-2 EDF-2

P8

P8

P8 P8

P8

P8 P8

P8

P8 P8

P8

P8

P8 P8

P8

P8

P8P8

P8 P8

P8P8 P8 P8

P8 P8

P8 P8

P10P10

D31 D31

STAIR

VEST.

STAIR

VEST.

BOYS P.E.

TOILET

GIRLS VARSITY

TOILET

STOR.

LOCKERS

LOCKERS

LOCKERS

LOCKERS

MECH.

LAUNDRY

OFFICE

EQUIP. STOR.

STOR.

WEIGHT ROOM

OFFICE

EQUIP. STOR.

PASS.

PASS.

GIRLS P.E.

SHOWERS

SHOWERS

SHOWERS

SHOWERS

BOYS VARSITY

TOILET

TOILET

P19 P19

P19

P19

P19P19

P19P19

P19 P19

P19P19

P19

D26 D26 D26D26

P19

P19

D30

D30 D30

D30

HB-1HB-1HB-1 HB-1

1 1 1

LAV-3

LAV-3

UR-2

WC-1

WC-1 WC-1

P8

P8

P1 P1

P1

P4

P11

P11

DRESSING

C.B.V.I.

TOILET

809A

TOILET

808A

CORRIDOR

800B

CORRIDOR

800A

CORRIDOR

801A

ELEC.

P8

P8

UR-2

UR-1

UR-1

WC-2

WC-1

WC-1

LAV-2

LAV-1

LAV-1

LAV-2

WC-1

WC-1

WC-2

UR-2

UR-1

UR-1

P1

P1P1

P1

P2 P2

P4

P3

P3

P4

P3

P3

P2

P6

P6

P2

D26

D26

EDF-2

EDF-1 P9

P10

P8P8

HB-1

HB-1D26

LAV-1

LAV-1

WC-2

WC-2 P2

P2

P17

P17

P8

HB-1 D26

WC-2

LAV-1

P2

P6

TOILET

106.1

STOR.

RISER ROOM

CLASSROOM

WC-2

LAV-1

P2

P6

PRINCIPAL

CONF.

CORRIDOR

500A

VEST.

500F

CLOSET

TOILET

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

P203

PLUMBING ENLARGED PLANS

SCALE: = 1'-0"

0 4 84

1/4"

1/4" = 1'-0"P203

1 ENLARGED PLUMBING FLOOR PLAN - PHASE 2 - GYMNASIUM LOCKER ROOMS

1/4" = 1'-0"P203

2 ENLARGED PLUMBING FLOOR PLAN - PHASE 2 - TOILET 808A AND 809A

1/4" = 1'-0"P203

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - TOILET 106

1/4" = 1'-0"P203

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - TOILET 522

1/4" = 1'-0"P203

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - VISITORS 5029 AND HOME 5030

1/4" = 1'-0"P203

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - TOILET 903 AND 904

KEYNOTE SCHEDULE

# KEYNOTE DESCRIPTION

D26 REPLACE EXISTING HOSE BIBB WITH NEW HB-1. FIELD VERIFY EXACT LOCATION OF EXISTING.

D30 EXISTING FLOOR CLEANOUT TO REMAIN. REPLACE EXISTING CLEANOUT COVER WITH NEW. IF

CLEANOUT COVER CANNOT BE REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.

D31 EXISTING DRINKING FOUNTAIN TO REMAIN.

P1 REPLACE EXISTING WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-1 AND

WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM

GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).

P2 REPLACE EXISTING ADA WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-2

AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM

GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).

P3 REPLACE EXISTING URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-1 AND UFV-1 AND

TRAP ADAPTER FITTING.

P4 REPLACE EXISTING ADA URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-2 AND UFV-1

AND TRAP ADAPTER FITTING.

P5 REPLACE EXISTING LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-2 AND LFT-1.

FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP

GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF

EXISTING.

P6 REPLACE EXISTING ADA LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-1 AND LFT-1.

FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP

GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF

EXISTING.

P8 REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN

EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT

LOCATION AND EXTENSION HEIGHT. IF FLOOR DRAIN GRATE CANNOT BE REPLACED,

THOUROUGHLY CLEAN GRATE AND REINSTALL.

P9 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-1. PROVIDE AND INSTALL WITH NEW

OUTLET STOP. RETURN EXISTING EXTERNAL WATER FILTER TO OWNER.

P10 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-2. PROVIDE AND INSTALL WITH NEW

OUTLET STOP. RETURN EXISTING EXTERNAL WATER FILTER TO OWNER.

P11 REPLACE EXISTING LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-3 AND LFT-1.

FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP

GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION OF EXISTING.

P17 REPLACE EXISTING COUNTERTOP LAVATORY AND ASSOCIATED FAUCET WITH NEW WALL

MOUNTED LAV-1 AND LFT-1. FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP

ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. PROVIDE WITH NEW WALL CARRIER.

FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF EXISTING.

P19 EXISTING SHOWER TO REMAIN.

# Doc # Date

1 AD2 11-21-2025

File details come from the government source that posted it. Updated .