Plumbing Enlarged Plans for Ridgeland High School Renovations

This document is a set of plumbing construction drawings prepared by Southern A&E, LLC for the Walker County Board of Education's Ridgeland High School Renovations project located at 2478 Happy Valley Road, Rossville, Georgia 30741. The enlarged plumbing floor plans detail fixture replacements and modifications across multiple phases and building areas, including Boys and Girls restrooms (Rooms 107 and 111), Men's and Women's restrooms (Rooms 631-632, 639-640, and 516-514), the Football Fieldhouse Lower Level, the Gymnasium (Room 765), and various administrative areas. The plans specify replacement of water closets (WC-1, WC-2), urinals (UR-1, UR-2), lavatories (LAV-1, LAV-2, LAV-3), floor drains, hose bibbs, drinking fountains, and associated piping systems including cold water, hot water, sanitary waste, and vent lines. A mandatory pre-proposal meeting for general contractors is scheduled for November 20, 2025 at 9:00 AM on-site, with sealed proposals due by 2:00 PM on December 11, 2025 to the Facilities and Operations Department at 298 Culberson Avenue, LaFayette, Georgia 30728. Attendance at the mandatory pre-proposal meeting is required; proposals from entities that do not attend will be returned unopened.

The construction drawings are scaled at 1/4" = 1'-0" and include comprehensive keynote schedules detailing demolition requirements, fixture installations, piping connections, and field verification procedures. The plans reference connections to existing sanitary waste lines, vent lines, and cold water supply lines with specific size designations (ranging from 2" to 4" diameter pipes). The engineer firm, Southern A&E, LLC, holds Professional Engineers and Land Surveyors License No. PEF003374, valid through June 30, 2026. The drawings were issued for construction and revised on November 21, 2025 as part of Bid Package BP-1 for the overall Ridgeland High School Renovations project.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1

P1

P1

P1

P1

P1

P1

P1

P1

P2P2

P4

P3

P3

P3

P6

P7

P7

P7

P7

P6

P12

P7

P6

P1

P1

P1

P1

P1

P8

P8

P8

D21 D21 D21 D21

D21 D21 D21 D21

D28 D28 D28D28

D26

D26

D26

D28 D28 D28D28

D19

BOYS TOILET

GIRLS TOILET

GIRLS TOILET

VEST.

VEST.

STOR.

PASSAGE

LECTURE ROOM

LAV-1

LAV-2

LAV-2WC-1

WC-1

WC-1

WC-1

WC-1

WC-1

WC-2WC-2

WC-1

WC-1

WC-1

UR-1

UR-1

UR-1

UR-2

LAV-2

LAV-2

LAV-1

EDF-2

LAV-1

LAV-2

LAV-2

WC-1

WC-1

WC-1

WC-1

WC-1

STOR.

BOYS TOILET

UR-1UR-2

WC-1

WC-1

WC-2

LAV-2 LAV-1

HB-1

HB-1

HB-1

P30

2" CW

3/4" CW

2" CW

SA-3

P34

2" V

P27

HB-1

P35

P29

P29

P27

P35 2" V

P27

WCO-2

P25

P24P24

P24

P43

P43

P26 P26

P26

3" SS

S S

SS

P42

P42

4" SS

4" SS

P44

WC-2

LAV-1

WC-1WC-2

WC-2

UR-2

P8

P8

LAV-1

LAV-1

P2

P2

P1

P4

P11

P11

P2

P6

CORRIDOR

500D

LOUNGE

ASST. PRINCIPAL

RECORDS

WOMEN

MEN

CLINIC

JAN.

EXAM

RECEPTION

D26

D26HB-1

HB-1

D18

D18

WC-1 WC-1 WC-2

UR-1 UR-1 UR-2

LAV-2 LAV-1

WC-1

WC-1

WC-2

P8

P8

P8

P8

P1

P1

P2

P2P1P1

P3

P3 P4

P5 P6

P7

D26

D26

P20

LAV-1

LAV-2

P6

P5

P7

P20

MENS

WOMENS

CORRIDOR

500A

GYMNASIUM

STOR.

STOR.

VEST.

500F

HB-1

HB-1

UR-1 UR-1 UR-2

LAV-1

LAV-2

WC-1 WC-1 WC-2

WC-2WC-1WC-1

LAV-1LAV-2

P8

P8

P8

P8

P6P5

P5

P6

P1 P1 P2

P2P1P1

P7

P7

P3 P3 P4

D26

D26

P20

P20

HB-1

HB-1

P8

P8 P8

P8

LAV-1

LAV-2

LAV-2

LAV-1

UR-2

UR-1

UR-1 WC-1

WC-1

WC-1

WC-1 WC-1

WC-1

WC-2WC-2

P1

P1

P1P1

P1 P1

P2P2

P3

P3

P4

P5

P6

P5

P6

P7

P7

D26

D26HB-1

HB-1

D18

1/4" = 1'-0"P202

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - BOYS 107 AND GIRLS 111

1/4" = 1'-0"P202

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - MENS 640 AND WOMEN 639

1/4" = 1'-0"P202

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - MENS 631 AND WOMEN 632

1/4" = 1'-0"P202

ENLARGED PLUMBING FLOOR PLAN -

PHASE 2 - MENS 516 AND WOMAN 514

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

P202

PLUMBING ENLARGED PLANS

SCALE: = 1'-0"

0 4 84

1/4"

1/4" = 1'-0"P202

ENLARGED PLUMBING DEMOLITION PLAN -

PHASE 1 - MENS 5003 AND WOMENS 1001

1/4" = 1'-0"P202

ENLARGED PLUMBING ABOVE FLOOR

PLAN - PHASE 1 - MENS 5003 AND

WOMENS 1001

1/4" = 1'-0"P202

ENLARGED PLUMBING BELOW FLOOR

PLAN - PHASE 1 - FOOTBALL FIELDHOUSE -

LOWER LEVEL

KEYNOTE SCHEDULE

# KEYNOTE DESCRIPTION

D18 EXISTING FLOOR CLEANOUT TO REMAIN.

D19 EXISTING FLOOR DRAIN TO REMAIN. REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW.

PROVIDE PROVIDE FLOOR DRAIN EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW

FLOORING. FIELD VERIFY EXACT LOCATION AND EXTENSION HEIGHT. IF FLOOR DRAIN GRATE

CANNOT BE REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.

D21 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ALL ASSOCIATED CW AND HW PIPE BACK TO

MAIN AND CAP. REMOVE CW AND HW PIPING IN A WAY THAT THERE IS NO MORE THAN 1 FOOT

OF DEAD LEG PIPING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

D26 REPLACE EXISTING HOSE BIBB WITH NEW HB-1. FIELD VERIFY EXACT LOCATION OF EXISTING.

D28 REMOVE FLOOR DRAIN. REMOVE ALL ASSOCIATED SANITARY WASTE AND VENT LINE BACK TO

MAIN AND CAP.

P1 REPLACE EXISTING WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-1 AND

WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM

GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).

P2 REPLACE EXISTING ADA WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-2

AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM

GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).

P3 REPLACE EXISTING URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-1 AND UFV-1 AND

TRAP ADAPTER FITTING.

P4 REPLACE EXISTING ADA URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-2 AND UFV-1

AND TRAP ADAPTER FITTING.

P5 REPLACE EXISTING LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-2 AND LFT-1.

FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP

GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF

EXISTING.

P6 REPLACE EXISTING ADA LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-1 AND LFT-1.

FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP

GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF

EXISTING.

P7 REMOVE EXPOSED LAVATORY SANITARY WASTE LINES AND INSTALL NEW SANITARY WASTE

LINES IN CHASE. CONNECT TO EXISTING SANITARY WASTE LINE. FIELD VERIFY EXACT SIZE

AND LOCATION OF EXISTING.

P8 REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN

EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT

LOCATION AND EXTENSION HEIGHT. IF FLOOR DRAIN GRATE CANNOT BE REPLACED,

THOUROUGHLY CLEAN GRATE AND REINSTALL.

P11 REPLACE EXISTING LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-3 AND LFT-1.

FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP

GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION OF EXISTING.

P12 REMOVE AND REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-2.

P20 REPLACE EXISTING WALL CLEANOUT COVER. FIELD VERIFY EXACT LOCATION.

P24 4" SANITARY WASTE DOWN FROM WATER CLOSET.

P25 4" SANITARY WASTE DOWN.

P26 3" SANITARY WASTE DOWN.

P27 3" SANITARY WASTE DOWN AND 2" SANITARY VENT UP.

P29 3" SANITARY VENT UP.

P30 CONNECT NEW 2" CW LINE TO EXISTING MINIMUM 2" CW LINE. FIELD VERIFY EXACT SIZE AND

LOCATION OF EXISTING.

P34 CONNECT NEW 3" SANITARY VENT LINE TO EXISTING. FEILD VERIFY EXACT SIZE AND

LOCATION OF EXISTING.

P35 CW DOWN.

P42 4" SANITARY WASTE DOWN AND 3" SANITARY VENT UP.

P43 CONNECT NEW SANITARY WASTE LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND

LOCATION OF EXISTING.

P44 4" SANITARY WASTE DOWN FROM WALL CLEANOUT.

# Doc # Date

1 AD2 11-21-2025

File details come from the government source that posted it. Updated .