This file contains plumbing enlarged plans for renovations to Ridgeland High School, prepared for Walker County Schools in Lafayette, Georgia by Southern A&E, LLC (Engineer Firm License No. PEF003374). The project encompasses comprehensive plumbing work across multiple phases, including the renovation and demolition of plumbing systems in specific areas such as Home Economics, Teachers Lounge restrooms, Toilet 233.2, and mechanical spaces (Mech 246, Mech 257). The scope of work includes replacement of water closets, urinals, lavatories, and drinking fountains with new fixtures designated as WC-1, WC-2, UR-1, UR-2, LAV-1, LAV-2, EDF-1, and EDF-2, along with associated flush valves, faucets, and supply lines. The plans also detail the removal and capping of existing sanitary waste pipes, cold water lines, and hot water lines, as well as the retention of existing floor cleanouts, floor drains, sanitary waste lines, and gas lines. The project is issued for construction under Bid Package BP-1, with the drawings prepared at various scales including 1/8" = 1'-0" and 1/4" = 1'-0".
The keynote schedule provides detailed specifications for 52 plumbing-related tasks (D1-D40, G11-G14, and P1-P52), including fixture replacements, pipe removals, and connections to existing systems. Notable specifications include connections to existing water heater, existing gas lines with 7" W.C. pressure ratings, and gas input requirements ranging from 60,000 to 100,000 Btu/h for various HVAC units. The plans incorporate both above-floor and below-floor plumbing configurations and require field verification of existing pipe sizes and locations. The document was prepared on 10-31-2025 and revised on 11-21-2025, with the original sheet size of Arch E (30" × 42"). No pricing terms, set-asides, response dates, or contract award information are contained in this technical drawing document.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P13
D13 D37
D1
D2
D2
C.B.V.I. CLASSROOM
BOYS
COMMONS
200E
ELEC.
OFFICE
MECH.
STOR.
MECH.
HOME ECC.
TEACHERS LOUNGE
C L
A S
S R
O O
M
CORRIDOR
200D
D1
D3
D3
D4 D4
D5
D6
D6 D8
D11
D5
D7
D7
D7
D6
D6
D5
D7
D12
D1
D18
D15
D14 D19
D16
D17
D17
D20
D20
D20
D20
D20
D7 D7 D22 D22
D22
D22
D23
D6
D23
D9
D10
D5 D5
D5
D23D6
D9
D25
D25
D35
D17
D16
D36
P1
P1
P1
P1
P1
P1
P2P2
P3
P3
P3
P6
P6 P5
P5
GIRLS
D19
D19
D19 D19
D26
D26
P7P7
D34
D39
D20
D20
D20
S S
S S
D40
G13 G13
G11
P201
P201
3/4" HWR
DCS-1P14
P18
3/4" HWR
D30
D18
D18
D30
P15 P40
P33
D22
D22
D22
D22
D23
D23
GAS INPUT: AH
31100000 Btu/h
G13
G13
G14
WC-2 WC-2
WC-1WC-1
WC-1
WC-1
WC-1UR-1
UR-1
WC-1
UR-2
LAV-1
LAV-2LAV-2
LAV-1
HB-1 HB-1
P201
P201
D34
GAS INPUT:GDF
14 150000 Btu/h
G14
P48
P49
1 1/4" CW
1 1/4" CW
P32
3/4" HW
3/4" HW
1 1/4" CW
3/4" CW
1" HW
1" HW
P50
P51
D24
1/2" HW
4" SS
3" SS
3" SS
4" SS
4" SS
P16
P16
3" SS
P22
P23
P26
P24
D20
D20
D20
D20
D20
D20
D20
P24
P26
P41
P26
P44
P24P24
P24
P24
4" SS
P47
P26
4" SS
4" SS
SS
SS
TEACHERS LOUNGE
WOMENS
221.1
MENS
FD-2
LAV-1 LAV-2
WC-1
WC-1
UR-2
WC-2
LAV-1LAV-2
DCS-1
D19
P31 2" CW
P27
3" V
2" V
3" V
P28
P35
2" CW
3/4" CW
3/4" CW
2" CW
3" V P32
P36
P39
P38
P37
P33
WCO-1
P26
3/4" HWR
3/4" HW
3/4" CW
P34
D25
D22 D22
D22
2" V
3/4" HW
HB-1
SA-4
SA-1
3/4" CW
3/4" CW
3/4" CW
P35
HB-1
UR-1
3/4" CW
P35
P35
IM-1
P27
2" V
P52
WCO-2
P25
WC-2
WC-1WC-1
P29 3" V
P1
P1
P1
P1
P1
P1
P2P2
P3
P3
P4
P5
P6
P5
P6
P8P8
P8P8
P2P2
P6P6
WC-2WC-2
WC-1 WC-1
WC-1WC-1
WC-1 UR-1
UR-1WC-1
UR-2
LAV-2
LAV-1
LAV-2
LAV-1
LAV-1
WC-2
LAV-1
WC-2
P8 P8
P7
P7
D26
D26
EDF-2 EDF-1P10 P9
G - 7" W.C.
G
W .C
G - 7" W.C.
G - 7" W.C.
G14 G14
G14
G14
G14
G14
G14
GAS INPUT:AH
56 60000 Btu/h
GAS INPUT: AH
4860000 Btu/h
GAS INPUT: AH
49100000 Btu/h
GAS INPUT: AH
5960000 Btu/h
GAS INPUT: AH
52100000 Btu/h
GAS INPUT:AH
51 80000 Btu/h
GAS INPUT:AH
50 80000 Btu/h
G13
G13
G13
HB-1
HB-1
GAS INPUT:AH
46 60000 Btu/h
GAS INPUT:AH
47 100000 Btu/h
GAS INPUT:AH
45 80000 Btu/h
GAS INPUT: AH
4480000 Btu/h
GAS INPUT: AH
4360000 Btu/h
GAS INPUT: AH
4280000 Btu/h
GAS INPUT: AH
4160000 Btu/h
GAS INPUT: AH
4080000 Btu/h
EDF-2 EDF-1P10 P9
G
W .C
G - 7" W.C.
G13
G14
G14
G14
G14
G14
G14
G14
G14
TOILET
233.2
MECH.
BOYS
GIRLS
4" SS
4" SS
3" SS
3" SS
4" SS
P26
P28
P24
P22
P21
P21
P16
D20
D20
MECH.
GIRLS
BOYS
FCO-2
FCO-2WC-2
FD-1
SH-3
FD-1
SA-2
LAV-1
3/4" HW
3/4" CW
1 1/4" CW
3/4" HW
P39
P39
P29
3" V
3" V
3" V
P34
D25 D38
1 1/4" CW
P28
1/4" = 1'-0"P201
8 ENLARGED PLUMBING FLOOR PLAN - PHASE 1 - BOYS 410 AND GIRLS 406
1/8" = 1'-0"P201
1 PLUMBING DEMOLITION PLAN - HOME EC AND TEACHERS LOUNGE RESTROOMS
1/8" = 1'-0"P201
2 PLUMBING RENOVATION PLAN - HOME EC AND TEACHERS LOUNGE RESTROOMS
1/4" = 1'-0"P201
ENLARGED BELOW FLOOR PLAN -
TEACHERS LOUNGE RESTROOMS
1/4" = 1'-0"P201
ENLARGED ABOVE FLOOR PLAN -
TEACHERS LOUNGE RESTROOMS
1/4" = 1'-0"P201
ENLARGED PLUMBING FLOOR PLAN -
PHASE 1 - MECH 246
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
12" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
P201
PLUMBING ENLARGED PLANS
SCALE: = 1'-0"
0 4 84
1/4"
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D1 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BEHIND CHASE AND CAP. REMOVE ALL ASSOCIATED COLD AND HOT WATER PIPE BACK TO RESPECTIVE MAINS AND CAP. FIELD VERIFY EXACT SIZE AND LOCATION OF
EXISTING PIPE.
D2 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. REMOVE ALL ASSOCIATED COLD AND HOT WATER PIPE BACK TO BELOW SLAB AND CAP. ALL WATER PIPING BELOW SLAB TO BE ABANDONED IN
PLACE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.
D3 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. REMOVE ASSOCIATED SANITARY VENT PIPE BACK TO MAIN AND CAP. REMOVE ASSOCIATED COLD AND HOT WATER PIPE BACK TO ABOVE CEILING. CAP COLD WATER PIPE BACK AT BALL VALVE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.
D4 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. REMOVE ASSOCIATED COLD WATER PIPE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.
D5 REMOVE HW PIPE BACK TO THIS POINT.
D6 REMOVE SECTION OF HW PIPE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
D7 REMOVE SECTION OF CW PIPE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
D8 REMOVE CW PIPE BACK TO BALL VALVE AND CAP.
D9 REMOVE HW PIPE BACK TO THIS POINT AND CAP.
D10 REMOVE CW PIPE BACK TO THIS POINT AND CAP.
D11 REMOVE CW PIPE BACK TO THIS POINT.
D12 HW AND CW PIPE BELOW SLAB TO BE ABANDONED IN PLACE.
D13 REMOVE PLUMBING FIXTURE AND ASSOCIATED TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY
LINES. FIELD VERIFY EXACT LOCATION OF EXISTING.
D14 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. FIELD VERIFY
EXACT SIZE AND LOCATION OF EXISTING PIPE.
D15 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE AS SHOWN. FIELD VERIFY EXACT SIZE AND
LOCATION OF EXISTING PIPE.
D16 REMOVE SECTION OF SANITARY WASTE LINE.
D17 REMOVE SECTION OF SANITARY WASTE LINE BACK TO THIS POINT. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.
D18 EXISTING FLOOR CLEANOUT TO REMAIN.
D19 EXISTING FLOOR DRAIN TO REMAIN. REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT LOCATION AND EXTENSION HEIGHT. IF
FLOOR DRAIN GRATE CANNOT BE REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.
D20 EXISTING SANITARY WASTE LINE TO REMAIN.
D22 EXISTING CW LINE TO REMAIN.
D23 EXISTING HW LINE TO REMAIN.
D24 EXISTING MOP SINK TO REMAIN.
D25 EXISTING 2" SANITARY VENT TO REMAIN.
D26 REPLACE EXISTING HOSE BIBB WITH NEW HB-1. FIELD VERIFY EXACT LOCATION OF EXISTING.
D30 EXISTING FLOOR CLEANOUT TO REMAIN. REPLACE EXISTING CLEANOUT COVER WITH NEW. IF CLEANOUT COVER CANNOT BE
REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.
D34 EXISTING FLOOR DRAIN TO REMAIN.
D35 REMOVE EXISTING SANITARY VENT BACK TO THIS POINT AND CAP.
D36 REMOVE FLOOR DRAIN. REMOVE ALL ASSOCIATED SANITARY WASTE PIPE.
D37 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ALL ASSOCIATED SANITARY WASTE PIPE ABOVE AND BELOW SLAB. REMOVE ASSOCIATED SANITARY VENT PIPE BACK TO MAIN AND CAP. REMOVE ASSOCIATED COLD AND HOT WATER PIPE BACK TO ABOVE CEILING. CAP COLD WATER PIPE BACK AT BALL VALVE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.
D38 EXISTING 4" VENT UP TO REMAIN.
D39 REMOVE EXISTING CLEANOUT AND ASSOCIATED SANITARY WASTE PIPE.
D40 EXISTING MOP SINK TO REMAIN.
G11 EXISTING GAS METER TO REMAIN.
G13 EXISTING LOW PRESSURE (7" WC) GAS LINE TO REMAIN.
G14 DISCONNECT GAS LINE FROM EXISTING GAS EQUIPMENT AND RECONNECT TO NEW. FIELD VERIFY EXACT LOCATION OF EXISTING
EQUIPMENT AND GAS LINE.
P1 REPLACE EXISTING WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-1 AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).
P2 REPLACE EXISTING ADA WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-2 AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).
P3 REPLACE EXISTING URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-1 AND UFV-1 AND TRAP ADAPTER FITTING.
P4 REPLACE EXISTING ADA URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-2 AND UFV-1 AND TRAP ADAPTER FITTING.
P5 REPLACE EXISTING LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-2 AND LFT-1. FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF
EXISTING.
P6 REPLACE EXISTING ADA LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-1 AND LFT-1. FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF
EXISTING.
P7 REMOVE EXPOSED LAVATORY SANITARY WASTE LINES AND INSTALL NEW SANITARY WASTE LINES IN CHASE. CONNECT TO EXISTING
SANITARY WASTE LINE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P8 REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT LOCATION AND EXTENSION HEIGHT. IF FLOOR DRAIN GRATE CANNOT BE REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.
P9 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-1. PROVIDE AND INSTALL WITH NEW OUTLET STOP. RETURN EXISTING
EXTERNAL WATER FILTER TO OWNER.
P10 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-2. PROVIDE AND INSTALL WITH NEW OUTLET STOP. RETURN EXISTING
EXTERNAL WATER FILTER TO OWNER.
P13 EXISTING WATER HEATER TO REMAIN.
P14 FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. FIELD VERIFY
EXACT LOCATION AND MOUNTING HEIGHT OF EXISTING.
P15 CONNECT NEW 3/4" CW AND HW PIPE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P16 CONNECT NEW 4" SANITARY WASTE LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P18 3/4" HWR LINE DOWN TO CP-1. CONNECT NEW HWR FROM CP-1 TO EXISTING CW LINE - RE: DETAIL 2/P601.
P21 4" SANITARY WASTE DOWN FROM FLOOR CLEANOUT.
P22 3" SANITARY WASTE DOWN FROM FLOOR DRAIN.
P23 3" SANITARY WASTE DOWN FROM WALL CLEANOUT.
P24 4" SANITARY WASTE DOWN FROM WATER CLOSET.
P25 4" SANITARY WASTE DOWN.
P26 3" SANITARY WASTE DOWN.
P27 3" SANITARY WASTE DOWN AND 2" SANITARY VENT UP.
P28 3" SANITARY WASTE DOWN AND 3" SANITARY VENT UP.
P29 3" SANITARY VENT UP.
P31 CONNECT NEW 2" CW LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P32 CONNECT NEW 3/4" HW TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P33 CONNECT NEW 2" SANITARY WASTE TO EXISTING SANITARY WASTE STACK. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P34 CONNECT NEW 3" SANITARY VENT LINE TO EXISTING. FEILD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P35 CW DOWN.
P36 HW DOWN.
P37 HW UP.
P38 HWR UP.
P39 CW AND HW DOWN.
P40 3/4" CW, 3/4" HW, AND 2" SANITARY WASTE PIPE DOWN TO WM-1.
P41 CONNECT NEW 3" SANITARY WASTE LINE TO EXISTING 4". FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P44 4" SANITARY WASTE DOWN FROM WALL CLEANOUT.
P47 4" SANITARY VENT UP.
P48 CONNECT NEW 1-1/4" CW LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P49 CONNECT NEW 3/4" CW LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P50 CONNECT NEW 1" HW TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P51 CONNECT NEW 1/2" HW TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
P52 3" SANITARY WASTE DOWN AND 2" SANITARY VENT UP. CONNECT NEW 2" SANITARY VENT TO EXISTING. FIELD VERIFY EXACT SIZE AND
LOCATION OF EXISTING.
# Doc # Date
AD1 11-13-2025
1 AD2 11-21-2025
1/4" = 1'-0"P201
ENLARGED PLUMBING BELOW FLOOR
PLAN - TOILET 233.2
1/4" = 1'-0"P201
ENLARGED PLUMBING ABOVE FLOOR
PLAN - TOILET 233.2
File details come from the government source that posted it. Updated .