P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf

PDF 1 MB Posted

Attached to
RFP for Ridgeland High School Renovations
Solicitation number
PE-55462-NONST-2026-000000017
Issued by
Wilcox County, Georgia

About this file

This file contains plumbing enlarged plans for renovations to Ridgeland High School, prepared for Walker County Schools in Lafayette, Georgia by Southern A&E, LLC (Engineer Firm License No. PEF003374). The project encompasses comprehensive plumbing work across multiple phases, including the renovation and demolition of plumbing systems in specific areas such as Home Economics, Teachers Lounge restrooms, Toilet 233.2, and mechanical spaces (Mech 246, Mech 257). The scope of work includes replacement of water closets, urinals, lavatories, and drinking fountains with new fixtures designated as WC-1, WC-2, UR-1, UR-2, LAV-1, LAV-2, EDF-1, and EDF-2, along with associated flush valves, faucets, and supply lines. The plans also detail the removal and capping of existing sanitary waste pipes, cold water lines, and hot water lines, as well as the retention of existing floor cleanouts, floor drains, sanitary waste lines, and gas lines. The project is issued for construction under Bid Package BP-1, with the drawings prepared at various scales including 1/8" = 1'-0" and 1/4" = 1'-0".

The keynote schedule provides detailed specifications for 52 plumbing-related tasks (D1-D40, G11-G14, and P1-P52), including fixture replacements, pipe removals, and connections to existing systems. Notable specifications include connections to existing water heater, existing gas lines with 7" W.C. pressure ratings, and gas input requirements ranging from 60,000 to 100,000 Btu/h for various HVAC units. The plans incorporate both above-floor and below-floor plumbing configurations and require field verification of existing pipe sizes and locations. The document was prepared on 10-31-2025 and revised on 11-21-2025, with the original sheet size of Arch E (30" × 42"). No pricing terms, set-asides, response dates, or contract award information are contained in this technical drawing document.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P13

D13 D37

D1

D2

D2

C.B.V.I. CLASSROOM

BOYS

COMMONS

200E

ELEC.

OFFICE

MECH.

STOR.

MECH.

HOME ECC.

TEACHERS LOUNGE

C L

A S

S R

O O

M

CORRIDOR

200D

D1

D3

D3

D4 D4

D5

D6

D6 D8

D11

D5

D7

D7

D7

D6

D6

D5

D7

D12

D1

D18

D15

D14 D19

D16

D17

D17

D20

D20

D20

D20

D20

D7 D7 D22 D22

D22

D22

D23

D6

D23

D9

D10

D5 D5

D5

D23D6

D9

D25

D25

D35

D17

D16

D36

P1

P1

P1

P1

P1

P1

P2P2

P3

P3

P3

P6

P6 P5

P5

GIRLS

D19

D19

D19 D19

D26

D26

P7P7

D34

D39

D20

D20

D20

S S

S S

D40

G13 G13

G11

P201

P201

3/4" HWR

DCS-1P14

P18

3/4" HWR

D30

D18

D18

D30

P15 P40

P33

D22

D22

D22

D22

D23

D23

GAS INPUT: AH

31100000 Btu/h

G13

G13

G14

WC-2 WC-2

WC-1WC-1

WC-1

WC-1

WC-1UR-1

UR-1

WC-1

UR-2

LAV-1

LAV-2LAV-2

LAV-1

HB-1 HB-1

P201

P201

D34

GAS INPUT:GDF

14 150000 Btu/h

G14

P48

P49

1 1/4" CW

1 1/4" CW

P32

3/4" HW

3/4" HW

1 1/4" CW

3/4" CW

1" HW

1" HW

P50

P51

D24

1/2" HW

4" SS

3" SS

3" SS

4" SS

4" SS

P16

P16

3" SS

P22

P23

P26

P24

D20

D20

D20

D20

D20

D20

D20

P24

P26

P41

P26

P44

P24P24

P24

P24

4" SS

P47

P26

4" SS

4" SS

SS

SS

TEACHERS LOUNGE

WOMENS

221.1

MENS

FD-2

LAV-1 LAV-2

WC-1

WC-1

UR-2

WC-2

LAV-1LAV-2

DCS-1

D19

P31 2" CW

P27

3" V

2" V

3" V

P28

P35

2" CW

3/4" CW

3/4" CW

2" CW

3" V P32

P36

P39

P38

P37

P33

WCO-1

P26

3/4" HWR

3/4" HW

3/4" CW

P34

D25

D22 D22

D22

2" V

3/4" HW

HB-1

SA-4

SA-1

3/4" CW

3/4" CW

3/4" CW

P35

HB-1

UR-1

3/4" CW

P35

P35

IM-1

P27

2" V

P52

WCO-2

P25

WC-2

WC-1WC-1

P29 3" V

P1

P1

P1

P1

P1

P1

P2P2

P3

P3

P4

P5

P6

P5

P6

P8P8

P8P8

P2P2

P6P6

WC-2WC-2

WC-1 WC-1

WC-1WC-1

WC-1 UR-1

UR-1WC-1

UR-2

LAV-2

LAV-1

LAV-2

LAV-1

LAV-1

WC-2

LAV-1

WC-2

P8 P8

P7

P7

D26

D26

EDF-2 EDF-1P10 P9

G - 7" W.C.

G

W .C

G - 7" W.C.

G - 7" W.C.

G14 G14

G14

G14

G14

G14

G14

GAS INPUT:AH

56 60000 Btu/h

GAS INPUT: AH

4860000 Btu/h

GAS INPUT: AH

49100000 Btu/h

GAS INPUT: AH

5960000 Btu/h

GAS INPUT: AH

52100000 Btu/h

GAS INPUT:AH

51 80000 Btu/h

GAS INPUT:AH

50 80000 Btu/h

G13

G13

G13

HB-1

HB-1

GAS INPUT:AH

46 60000 Btu/h

GAS INPUT:AH

47 100000 Btu/h

GAS INPUT:AH

45 80000 Btu/h

GAS INPUT: AH

4480000 Btu/h

GAS INPUT: AH

4360000 Btu/h

GAS INPUT: AH

4280000 Btu/h

GAS INPUT: AH

4160000 Btu/h

GAS INPUT: AH

4080000 Btu/h

EDF-2 EDF-1P10 P9

G

W .C

G - 7" W.C.

G13

G14

G14

G14

G14

G14

G14

G14

G14

TOILET

233.2

MECH.

BOYS

GIRLS

4" SS

4" SS

3" SS

3" SS

4" SS

P26

P28

P24

P22

P21

P21

P16

D20

D20

MECH.

GIRLS

BOYS

FCO-2

FCO-2WC-2

FD-1

SH-3

FD-1

SA-2

LAV-1

3/4" HW

3/4" CW

1 1/4" CW

3/4" HW

P39

P39

P29

3" V

3" V

3" V

P34

D25 D38

1 1/4" CW

P28

1/4" = 1'-0"P201

8 ENLARGED PLUMBING FLOOR PLAN - PHASE 1 - BOYS 410 AND GIRLS 406

1/8" = 1'-0"P201

1 PLUMBING DEMOLITION PLAN - HOME EC AND TEACHERS LOUNGE RESTROOMS

1/8" = 1'-0"P201

2 PLUMBING RENOVATION PLAN - HOME EC AND TEACHERS LOUNGE RESTROOMS

1/4" = 1'-0"P201

ENLARGED BELOW FLOOR PLAN -

TEACHERS LOUNGE RESTROOMS

1/4" = 1'-0"P201

ENLARGED ABOVE FLOOR PLAN -

TEACHERS LOUNGE RESTROOMS

1/4" = 1'-0"P201

ENLARGED PLUMBING FLOOR PLAN -

PHASE 1 - MECH 246

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

12" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

P201

PLUMBING ENLARGED PLANS

SCALE: = 1'-0"

0 4 84

1/4"

KEYNOTE SCHEDULE

# KEYNOTE DESCRIPTION

D1 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BEHIND CHASE AND CAP. REMOVE ALL ASSOCIATED COLD AND HOT WATER PIPE BACK TO RESPECTIVE MAINS AND CAP. FIELD VERIFY EXACT SIZE AND LOCATION OF

EXISTING PIPE.

D2 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. REMOVE ALL ASSOCIATED COLD AND HOT WATER PIPE BACK TO BELOW SLAB AND CAP. ALL WATER PIPING BELOW SLAB TO BE ABANDONED IN

PLACE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.

D3 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. REMOVE ASSOCIATED SANITARY VENT PIPE BACK TO MAIN AND CAP. REMOVE ASSOCIATED COLD AND HOT WATER PIPE BACK TO ABOVE CEILING. CAP COLD WATER PIPE BACK AT BALL VALVE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.

D4 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. REMOVE ASSOCIATED COLD WATER PIPE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.

D5 REMOVE HW PIPE BACK TO THIS POINT.

D6 REMOVE SECTION OF HW PIPE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

D7 REMOVE SECTION OF CW PIPE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

D8 REMOVE CW PIPE BACK TO BALL VALVE AND CAP.

D9 REMOVE HW PIPE BACK TO THIS POINT AND CAP.

D10 REMOVE CW PIPE BACK TO THIS POINT AND CAP.

D11 REMOVE CW PIPE BACK TO THIS POINT.

D12 HW AND CW PIPE BELOW SLAB TO BE ABANDONED IN PLACE.

D13 REMOVE PLUMBING FIXTURE AND ASSOCIATED TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY

LINES. FIELD VERIFY EXACT LOCATION OF EXISTING.

D14 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE BACK TO BELOW SLAB AND CAP. FIELD VERIFY

EXACT SIZE AND LOCATION OF EXISTING PIPE.

D15 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ASSOCIATED SANITARY WASTE PIPE AS SHOWN. FIELD VERIFY EXACT SIZE AND

LOCATION OF EXISTING PIPE.

D16 REMOVE SECTION OF SANITARY WASTE LINE.

D17 REMOVE SECTION OF SANITARY WASTE LINE BACK TO THIS POINT. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.

D18 EXISTING FLOOR CLEANOUT TO REMAIN.

D19 EXISTING FLOOR DRAIN TO REMAIN. REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT LOCATION AND EXTENSION HEIGHT. IF

FLOOR DRAIN GRATE CANNOT BE REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.

D20 EXISTING SANITARY WASTE LINE TO REMAIN.

D22 EXISTING CW LINE TO REMAIN.

D23 EXISTING HW LINE TO REMAIN.

D24 EXISTING MOP SINK TO REMAIN.

D25 EXISTING 2" SANITARY VENT TO REMAIN.

D26 REPLACE EXISTING HOSE BIBB WITH NEW HB-1. FIELD VERIFY EXACT LOCATION OF EXISTING.

D30 EXISTING FLOOR CLEANOUT TO REMAIN. REPLACE EXISTING CLEANOUT COVER WITH NEW. IF CLEANOUT COVER CANNOT BE

REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.

D34 EXISTING FLOOR DRAIN TO REMAIN.

D35 REMOVE EXISTING SANITARY VENT BACK TO THIS POINT AND CAP.

D36 REMOVE FLOOR DRAIN. REMOVE ALL ASSOCIATED SANITARY WASTE PIPE.

D37 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ALL ASSOCIATED SANITARY WASTE PIPE ABOVE AND BELOW SLAB. REMOVE ASSOCIATED SANITARY VENT PIPE BACK TO MAIN AND CAP. REMOVE ASSOCIATED COLD AND HOT WATER PIPE BACK TO ABOVE CEILING. CAP COLD WATER PIPE BACK AT BALL VALVE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING PIPE.

D38 EXISTING 4" VENT UP TO REMAIN.

D39 REMOVE EXISTING CLEANOUT AND ASSOCIATED SANITARY WASTE PIPE.

D40 EXISTING MOP SINK TO REMAIN.

G11 EXISTING GAS METER TO REMAIN.

G13 EXISTING LOW PRESSURE (7" WC) GAS LINE TO REMAIN.

G14 DISCONNECT GAS LINE FROM EXISTING GAS EQUIPMENT AND RECONNECT TO NEW. FIELD VERIFY EXACT LOCATION OF EXISTING

EQUIPMENT AND GAS LINE.

P1 REPLACE EXISTING WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-1 AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).

P2 REPLACE EXISTING ADA WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-2 AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).

P3 REPLACE EXISTING URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-1 AND UFV-1 AND TRAP ADAPTER FITTING.

P4 REPLACE EXISTING ADA URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-2 AND UFV-1 AND TRAP ADAPTER FITTING.

P5 REPLACE EXISTING LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-2 AND LFT-1. FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF

EXISTING.

P6 REPLACE EXISTING ADA LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-1 AND LFT-1. FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF

EXISTING.

P7 REMOVE EXPOSED LAVATORY SANITARY WASTE LINES AND INSTALL NEW SANITARY WASTE LINES IN CHASE. CONNECT TO EXISTING

SANITARY WASTE LINE. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P8 REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT LOCATION AND EXTENSION HEIGHT. IF FLOOR DRAIN GRATE CANNOT BE REPLACED, THOUROUGHLY CLEAN GRATE AND REINSTALL.

P9 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-1. PROVIDE AND INSTALL WITH NEW OUTLET STOP. RETURN EXISTING

EXTERNAL WATER FILTER TO OWNER.

P10 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-2. PROVIDE AND INSTALL WITH NEW OUTLET STOP. RETURN EXISTING

EXTERNAL WATER FILTER TO OWNER.

P13 EXISTING WATER HEATER TO REMAIN.

P14 FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP GUARD, AND SUPPLY LINES. FIELD VERIFY

EXACT LOCATION AND MOUNTING HEIGHT OF EXISTING.

P15 CONNECT NEW 3/4" CW AND HW PIPE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P16 CONNECT NEW 4" SANITARY WASTE LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P18 3/4" HWR LINE DOWN TO CP-1. CONNECT NEW HWR FROM CP-1 TO EXISTING CW LINE - RE: DETAIL 2/P601.

P21 4" SANITARY WASTE DOWN FROM FLOOR CLEANOUT.

P22 3" SANITARY WASTE DOWN FROM FLOOR DRAIN.

P23 3" SANITARY WASTE DOWN FROM WALL CLEANOUT.

P24 4" SANITARY WASTE DOWN FROM WATER CLOSET.

P25 4" SANITARY WASTE DOWN.

P26 3" SANITARY WASTE DOWN.

P27 3" SANITARY WASTE DOWN AND 2" SANITARY VENT UP.

P28 3" SANITARY WASTE DOWN AND 3" SANITARY VENT UP.

P29 3" SANITARY VENT UP.

P31 CONNECT NEW 2" CW LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P32 CONNECT NEW 3/4" HW TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P33 CONNECT NEW 2" SANITARY WASTE TO EXISTING SANITARY WASTE STACK. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P34 CONNECT NEW 3" SANITARY VENT LINE TO EXISTING. FEILD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P35 CW DOWN.

P36 HW DOWN.

P37 HW UP.

P38 HWR UP.

P39 CW AND HW DOWN.

P40 3/4" CW, 3/4" HW, AND 2" SANITARY WASTE PIPE DOWN TO WM-1.

P41 CONNECT NEW 3" SANITARY WASTE LINE TO EXISTING 4". FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P44 4" SANITARY WASTE DOWN FROM WALL CLEANOUT.

P47 4" SANITARY VENT UP.

P48 CONNECT NEW 1-1/4" CW LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P49 CONNECT NEW 3/4" CW LINE TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P50 CONNECT NEW 1" HW TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P51 CONNECT NEW 1/2" HW TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.

P52 3" SANITARY WASTE DOWN AND 2" SANITARY VENT UP. CONNECT NEW 2" SANITARY VENT TO EXISTING. FIELD VERIFY EXACT SIZE AND

LOCATION OF EXISTING.

# Doc # Date

AD1 11-13-2025

1 AD2 11-21-2025

1/4" = 1'-0"P201

ENLARGED PLUMBING BELOW FLOOR

PLAN - TOILET 233.2

1/4" = 1'-0"P201

ENLARGED PLUMBING ABOVE FLOOR

PLAN - TOILET 233.2

File details come from the government source that posted it. Updated .