This is an electrical power plan drawing for the mezzanine level, Wing G of Ridgeland High School, prepared by Southern A&E, LLC for Walker County Schools in Lafayette, Georgia. The drawing, dated January 2025 and issued for construction, details the power distribution and electrical connections required for mechanical equipment including air handling units (AHU 107 and AHU 108), lockers, weight room, and associated building systems on the mezzanine level. The plan specifies connection requirements for both new equipment connections and existing equipment to remain, with detailed keynotes addressing branch circuit extensions, disconnect switches, conductor sizing, raceway routing, and NEC compliance requirements. A mandatory pre-proposal meeting for general contractors was held on November 20, 2025, with sealed proposals due by 2:00 PM on December 11, 2025 to Walker County Board of Education's Facilities and Operations Department at 298 Culberson Avenue, LaFayette, Georgia. The project is located at 2478 Happy Valley Road, Rossville, Georgia 30741.

The drawing includes specific technical specifications such as conductor types (3#12 CU THWN), raceway specifications (1/2" conduit, GRS on roof), rooftop support requirements for power and control raceways, and breaker specifications (20/1P breaker). The plan incorporates two addendums issued on November 13, 2025 and November 21, 2025. All work must comply with National Electrical Code (NEC) standards regarding working clearances and equipment spacing. The design preserves existing electrical connections where equipment remains in place and provides coordinated transition points for flexible raceway connections within 18 inches of unit connection points to minimize equipment exposure during construction phases.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M M

M

J

J

J

M

M

GDF

AHU

AHU

GDF

LOCKERS

MECH.

MECH.

LOCKERS

WEIGHT ROOM

BALCONY

E3

E3

E1

E1

MAH

MAH

E2 E2

TO CU-107

E22

TO MHP-10

E22

TO CU-108

E22

E1

E1

WALKWAY

WALKWAY

STAIR

STAIR

GDF

GDF

To LPA

E38

SCALE: = 1'-0"

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

0 8 168

1/8"

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

KEYPLAN

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

B

A

C

D E

F

G

H

J

K

E129

MEZZ LEVEL - WING G - POWER PLAN

1/8" = 1'-0"E129

1 MEZZ LEVEL - WING G - POWER PLAN

KEYNOTE SCHEDULE - THIS SHEET

# KEYNOTE DESCRIPTION

E1 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION

PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS

REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW DISCONNECT

SWITCH, SIZE PER SCHEDULE. COORDINATE SWITCH LOCATION TO MAINTAIN NEC

WORKING CLEARANCES. PROVIDE NEW LOAD SIDE CONDUCTORS/RACEWAY TO

EQUIPMENT CONNECTION POINT. WHERE POSSIBLE, ROUTE OVERHEAD AND ONLY

TRANSITION TO FLEXIBLE RACEWAY WITHIN 18" OF UNIT CONNECTION POINT.

E2 EXISTING MECHANICAL EQUIPMENT TO REMAIN, PROTECT ELECTRICAL CONNECTIONS

AND/OR EQUIPMENT FROM DAMAGE THROUGH ALL PHASES OF CONSTRUCTION.

E3 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION

PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS

REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW MOTOR

RATED SWITCH. COORDINATE SWITCH LOCATION TO MAINTAIN NEC WORKING

CLEARANCES. PROVIDE NEW LOAD SIDE CONDUCTORS/RACEWAY TO EQUIPMENT

CONNECTION POINT. WHERE POSSIBLE, ROUTE OVERHEAD AND ONLY TRANSITION TO

FLEXIBLE RACEWAY WITHIN 18" OF UNIT CONNECTION POINT.

E22 INTERCEPT EXISTING MECHANICAL EQUIPMENT BRANCH CIRCUIT AT THIS LOCATION

AND EXTEND TO EQUIPMENT ON ROOF. CONDUCTOR TYPE ON ROOF SHALL BE 'XHHW'

AND RACEWAY TYPE ON ROOF SHALL BE GRS (EXCEPT FOR WITHIN 18" OF

CONNECTION TO UNIT). PROVIDE RUBBER ROOFTOP SUPPORTS FOR SUPPORT OF

POWER & CONTROL RACEWAYS.

E38 ROUTE TO PANEL AND LOCATE BREAKER IN NEXT AVAILABLE POLE . TERMINATE ON

NEW 20/1P BREAKER. NEW BRANCH CIRCUIT SHALL BE 3#12 CU THWN IN A 1/2"C.

# Doc # Date

1 AD1 11/13/25

2 AD2 11/21/25