P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf
PDF 833 KB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is a plumbing renovation plan for Ridgeland High School prepared by Southern A&E, LLC for Walker County Schools, located in Lafayette, Georgia. The project encompasses Phase 1 renovations to the football and baseball fieldhouse facilities and includes detailed plumbing floor plans and demolition plans for both upper and lower levels. The scope of work involves replacement of plumbing fixtures including water closets (WC-2), lavatories (LAV-1), showers (SH-3), and urinals (UR-2) with ADA-compliant models, along with associated flush valves, faucets, and trim components. Work also includes removal of existing plumbing fixtures and piping back to main lines with caps, replacement of floor drain grates with extension kits as necessary, and field verification of exact sizes and locations. The document was issued for construction on October 31, 2025, and notes that certain scope of work will only be performed if alternates are taken.
The document does not contain information regarding pricing terms, set asides, contract incumbents, response dates, due dates, or funding sources. The plan is intended as a technical reference document showing the locations and specifications of plumbing work across multiple rooms including lecture rooms, mechanical spaces, toilet facilities, locker rooms, offices, and storage areas. The project is managed under the Southern A&E, LLC engineering firm (License No. PEF003374, expiration June 30, 2026) and is part of a larger bidding package designated BP-1 with project number 01-920-045.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
P203
P2 P2
P6
P6
P8
WC-1
SH-3
LAV-2
LAV-2
SH-3
WC-1
D27D27
P8
D21
D21
D21
D21
D21
D21
D21
D21
D29
D29 D29
D29
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
P202
P2
P6
P8
D27
WC-2
LAV-1
SH-3
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
P2
P2
P4
P6 P6
WC-2
WC-2
LAV-1
UR-2
LAV-1
LECTURE ROOM
MECH.
STOR.
BOYS TOILET
GIRLS TOILET
GIRLS TOILET
VEST.
BOYS LOCKER ROOM
CONCESSIONS
OFFICE
OFFICE
REFEREE LOUNGE
STAIR
VEST.
BOYS TOILET
STOR.
STOR.
PASSAGE
STOR.
TOILET
P202
2 3
P202
WC-2
LAV-1
SH-3
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
P2
P6
P8
D27
SCALE: = 1'-0"
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
0 8 168
1/8"
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
P102
PLUMBING RENOVATION PLAN - PHASE 1 -
FOOTBALL AND BASEBALL FEILDHOUSE
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D21 REMOVE PLUMBING FIXTURE AND TRIM. REMOVE ALL ASSOCIATED CW AND HW PIPE BACK TO
MAIN AND CAP. REMOVE CW AND HW PIPING IN A WAY THAT THERE IS NO MORE THAN 1 FOOT
OF DEAD LEG PIPING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
D27 REPLACE EXISTING SHOWER WITH NEW SH-3.
D29 EXISTING FLOOR DRAIN TO REMAIN. DISCONNECT ASSOCIATED SANITARY WASTE AND TRAP
PRIMER LINE AND CAP AT MAIN. FIELD VERIFY EXACT SIZE AND LOCATION.
P2 REPLACE EXISTING ADA WATER CLOSET AND ASSOCIATED FLUSH VALVE WITH NEW WC-2
AND WFV-1. PROVIDE NEW FLANGE, WAX BOWL RING, TOILET FLANGE EXTENSION KIT (FOAM
GASKET, SPACER, FLANGE EXTENDER, MECHANICAL FASTENERS).
P4 REPLACE EXISTING ADA URINAL AND ASSOCIATED FLUSH VALVE WITH NEW UR-2 AND UFV-1
AND TRAP ADAPTER FITTING.
P6 REPLACE EXISTING ADA LAVATORY AND ASSOCIATED FAUCET WITH NEW LAV-1 AND LFT-1.
FURNISH AND INSTALL NEW TRAP, DOUBLE OUTLET STOP, TRAP ADAPTER FITTING, TRAP
GUARD, AND SUPPLY LINES. FIELD VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF
EXISTING.
P8 REPLACE EXISTING FLOOR DRAIN GRATE WITH NEW. PROVIDE PROVIDE FLOOR DRAIN
EXTENSION KIT AS NECESSARY - COORDINATE WITH NEW FLOORING. FIELD VERIFY EXACT
LOCATION AND EXTENSION HEIGHT. IF FLOOR DRAIN GRATE CANNOT BE REPLACED,
THOUROUGHLY CLEAN GRATE AND REINSTALL.
1/8" = 1'-0"P102
1 ALTERNATE: PLUMBING FLOOR PLAN - PHASE 1 - FOOTBALL FIELDHOUSE - UPPER LEVEL
1/8" = 1'-0"P102
2 ALTERNATE: PLUMBING DEMOLITION PLAN - PHASE 1 - FOOTBALL FIELDHOUSE - LOWER LEVEL
1/8" = 1'-0"P102
4 PLUMBING FLOOR PLAN - PHASE 1 - BASEBALL FIELDHOUSE
1/8" = 1'-0"P102
3 ALTERNATE: PLUMBING DEMOLITION PLAN - PHASE 1 - FOOTBALL FIELDHOUSE - LOWER LEVEL
# Doc # Date
1 AD2 11-21-2025
File details come from the government source that posted it. Updated .