P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf
PDF 263 KB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is a plumbing and roofing plan document prepared by Southern A&E, LLC for Ridgeland High School Renovations commissioned by Walker County Schools in Lafayette, Georgia. The document comprises architectural drawings and specifications for plumbing and gas system work to be performed only if the alternate is selected as part of Bid Package BP-1. The scope includes removal and replacement of roof drains, modification of gas piping systems at varying pressures (7" water column and 5 PSI medium pressure), removal of gas pressure regulators, connection of new sanitary vents, and connection of new drainage components to existing infrastructure. The work is designated as Phase 2 and requires field verification of exact sizes and locations of existing systems prior to installation. The drawings are presented at a scale of 1/16" = 1'-0" on standard architectural E1 sheet size and include a detailed keynote schedule identifying specific alternate tasks and their corresponding locations on the roof plan. The document was issued for construction on January 20, 2025, with revisions documented on November 13, 2025 (AD1) and November 21, 2025 (AD2).
The document provides technical specifications and visual reference materials for contractors bidding on the alternate plumbing scope rather than pricing or financial terms. The project is registered with the State Board of Registration for Professional Engineers and Land Surveyors under engineer firm license number PEF003374, with an expiration date of June 30, 2026. All intellectual property rights are retained by Southern A&E, LLC, and reproduction of the document without express written consent is prohibited. The drawings serve as construction documents to guide contractors in executing the specified alternates for gas piping, drainage, and vent modifications at Ridgeland High School.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M G
P
S I
G - 7" W.C.G - 7" W.C.
G5
G5
G5 G7
G7
G6
G8
D32
D33 D33
D32
D32
D32
D32 D32
D32
D32
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
M G
P
S I
MG - 5 PSI
MG - 5 PSI
GPR-2A
GPR-2B
G9
3/4"
1 1/2"
2" G - 7" W.C.
1 1/4"
1 1/4"
1 1/4"
G10
G10
G - 7" W.C.
1 1/2"
RD-1
RD-1
RD-1
RD-1 RD-1
RD-1
RD-1
RD-1
P46 P46
P45 P45
P45
P45
P45P45
P45
P45
NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.
G15
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
P106
PLUMBING ROOF PLAN - ALTERNATE
1/16" = 1'-0"P106
1 ALTERNATE: PLUMBING DEMOLITION ROOF PLAN - PHASE 2
1/16" = 1'-0"P106
2 ALTERNATE: PLUMBING ROOF PLAN - PHASE 2
SCALE: = 1'-0"
0 16 3216
1/16"
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D32 ALTERNATE: REMOVE ROOF DRAIN AND REPLACE WITH NEW RD-1. FIELD VERIFY EXACT SIZE
AND LOCATION OF EXISTING.
D33 ALTERNATE: EXISTING SANITARY VENT TO REMAIN.
G5 ALTERNATE: REMOVE GAS PIPE - RE: RENOVATION PLANS FOR NEW GAS PIPING.
G6 ALTERNATE: REMOVE GAS PIPE BACK TO APPROX 1 FT BELOW ROOF LINE.
G7 ALTERNATE: EXISTING LOW PRESSURE (7" WC) GAS PIPE THROUGH ROOF TO REMAIN.
G8 ALTERNATE: REMOVE GAS PRESSURE REGULATOR.
G9 ALTERNATE: CONNECT NEW 1-1/4" MEDIUM PRESSURE (5 PSI) GAS PIPE TO EXISTING. FIELD
VERIFY EXACT SIZE OF EXISTING.
G10 ALTERNATE: NEW LOW PRESSURE (7" WC) DOWN THROUGH ROOF AND GAS PIPE CONNECT
TO EXISTING. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING.
G15 GAS PIPE SUPPORT - RE: DETAIL 3/P601. TYPICAL.
P45 ALTERNATE: CONNECT NEW RD-1 TO EXISTING 6" RAIN LEADER. FIELD VERIFY EXACT SIZE
AND LOCATION OF EXISTING.
P46 ALTERNATE: CONNECT NEW 4" SANITARY VENT TO EXISTING. EXTEND SANITARY VENT UP
THROUGH NEW ROOF APPROX 18" ABOVE ROOF. FIELD VERIFY EXACT SIZE AND LOCATION OF
EXISTING.
# Doc # Date
AD1 11-13-2025
1 AD2 11-21-2025
File details come from the government source that posted it. Updated .