This is a mechanical demolition plan for the Ridgeland High School Renovations project, issued by Southern A&E, LLC for Walker County Schools in Georgia. The plan details the removal and preparation of existing mechanical systems in Wing G Mezzanine, including exhaust fans, ductwork, condensing units, heat pumps, gas furnaces, air handlers, makeup air units, damper actuators, and water-source heat pump piping. Specific keynotes designate which components are to be removed, which are to remain, and which require modification or preparation for new installation. The drawing is dated October 31, 2025, and issued for construction as part of Bid Package BP-1. The mandatory pre-proposal meeting for general contractors is scheduled for Thursday, November 20, 2025, at 9:00 AM at the project site located at 2478 Happy Valley Road, Rossville, Georgia 30741. Sealed proposals from general contractors must be submitted to the Walker County Board of Education's Facilities and Operations Department at 298 Culberson Avenue, LaFayette, Georgia 30728 by 2:00 PM on Thursday, December 11, 2025. Failure to attend the mandatory pre-proposal meeting will result in rejection of any submitted proposals without consideration.
No pricing terms, set-aside provisions, incumbent contractor information, or specific funding amounts are detailed within this mechanical demolition plan document. The plan serves as a technical specification and guide for contractors performing the mechanical demolition and preparation work as part of the overall high school renovation project. Southern A&E, LLC holds Professional Engineer Firm License No. PEF003374, valid through June 30, 2026, and retains all copyright and proprietary rights to the document.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD
D1
D1
D1
D1
D1
D8
D8
D9
D13 D13
D12 D12
D1
WEIGHT ROOM
MECH.
MECH.
WALKWAY
WALKWAY
BALCONY
D10
D24
D3
D3
D3 D3
D3 D3
D3D3
D29
D29
D29 D29
FOR CONTINUATION REFER TO: 1/ M111
F O
R C
O N
T
IN
U A
T
IO
N
R E
F E
R T
O
M
D33
D34 D34
D39
D41 D41
D4D4
D44D44
D45D45 22
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
M113
MECHANICAL DEMOLITION PLAN - WING G
MEZZANINE
SCALE: = 1'-0"
0 8 168
1/8"
1/8" = 1'-0"M113
1 MECHANICAL DEMOLITION PLAN - WING G MEZZANINE
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D1 REMOVE EXISTING EXHAUST FAN. PREPARE EXISTING ROOF CURB FOR NEW EXHAUST FAN.
NEW FAN CAP TO MATCH EXISTING CURB OR PROVIDE ADAPTER CURB.
D3 EXISTING DUCTWORK IN SHOWN SOLID LINES TO REMAIN.
D4 REMOVE EXISTING AIR DISTRIBUTION DEVICES SHOWN IN DASHED LINES.
D8 REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED REFRIGERANT PIPING. EXISTING
STEEP SUPPORT STAND SHALL REMAIN. SAND AND PAINT EXISTING STEEL SUPPORT STAND
IN PREPARATION FOR INSTALLATION OF NEW CONDENSING UNIT. PROVIDE ADDITIONAL
STEEL SUPPORT STAND IF REQUIRED TO ACCOMMODATE NEW UNIT AND MAINTAIN SERVICE
CLEARANCES.
D9 REMOVE EXISTING HEAT PUMP.
D10 EXISTING GRAVITY INTAKE/RELIFE HOOD TO REMAIN.
D12 REMOVE EXISTING GAS DUCT FURNACE. DISCONNECT GAS LINES AND CAP TEMPORARILY.
DISCONNECT ASSOCIATED DUCTWORK AND PREPARE FOR NEW UNIT. EXISTING FLUE VENTS
SHALL BE REUSED FOR NEW GAS DUCT FURNACE. REFER TO MANUFACTURER’S IOM FOR
COMPATIBILITY WITH EXISTING FLUE VENTS. MODIFY AS NECESSARY.
D13 REMOVE EXISTING AIR HANDLER AND ASSOCIATED ACCESSORIES. DISCONNECT ASSOCIATED
DUCTWORK AND PREPARE FOR NEW UNIT.
D24 EXSITING TO REMAIN.
D29 EXISTING AIR DISTRIBUTION DEVICES SHOWN IN SOLID LINES TO REMAIN.
D33 EXISTING PIPE CHASE HOUSING TO REMAIN.
D34 REMOVE EXISTING MAKE UP AIR UNIT AND ASSOCIATED ACCESSORIES EXISTING DUCTWORK
AND CONTROLS SHALL REMAIN. DISCONNECT ASSOCIATED DUCTWORK AND PREPARE FOR
NEW UNIT, EXISTING FLUE VENTS SHALL BE REUSED FOR NEW UNIT.
D39 REPLACE EXISTING DAMPER ACTUATOR WITH NEW. MATCH EXISTING. INTERLOCK WITH
EXISTING CONTROLS.
D41 DRAIN AND REMOVE EXISTING ABANDONED WATER-SOURCE HEAT PUMP PIPING IN
MECHANICAL ROOMS. TRIM AND CAP PIPING AT WALL PENETRATIONS.
D44 EXISTING LOUVER TO REMAIN.
D45 EXISTING WALL PROPELLER FAN TO BE ABANDONED IN PLACE.
# Doc # Date
1 AD1 11-13-2025
2 AD2 11-21-2025