This is an electrical power plan drawing for the Ridgeland High School Renovations project prepared by Southern A&E, LLC for Walker County Schools located at 301 N Cherokee Street, Lafayette, Georgia 30728. The drawing, designated as E125 Wing G - Power Plan, is part of Bid Package BP-1 and was issued for construction on January 920-045. The document details electrical modifications and connections for mechanical equipment throughout Wing G of the facility, including power routing for HVAC units, electric hand dryers, drink fountains, and receptacles across multiple spaces such as the gymnasium, locker rooms, restrooms, offices, and storage areas. The drawing includes a comprehensive keynote schedule defining specific electrical work requirements, including connection procedures for mechanical equipment to maintained circuits, protective measures for existing equipment, new disconnect switch installations, motor-rated switch provisions, and GFCI breaker installations. The plan specifies conductor sizing, raceway routing preferences, and coordination requirements to maintain National Electrical Code (NEC) working clearances.

The document was prepared by Southern A&E, LLC, an engineering firm licensed by the State Board of Registration for Professional Engineers and Land Surveyors under License No. PEF003374, with an expiration date of June 30, 2026. The drawing was originally issued on October 31, 2025, for construction purposes, with revisions documented as Addendum 2 dated November 21, 2025. The sheet size is specified as ARCH E1 (30" x 42") at a scale of 1/8" = 1'-0", and includes detailed grid references and a key plan to orient specific electrical work locations within Wing G. No pricing information, set-aside provisions, funding sources, or contract award dates are included in this technical drawing document.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M M

J

J

JJ

J

J

JJ

J

J

JJ J J

J

M

M

MSB

XELPA

XLPA

LPA1

PRINCIPAL

TOILET

LOBBY

CONCESSIONS

STOR.

STAIR

STAIR

STOR.

WOMENS

MENS

MENS

WOMEN

CORRIDOR

R.O.T.C.

A.F.J.R.O.T.C.

C.B.V.I.

ART

STOR.

DARK ROOM

OFFICE

LIB.

OFFICE

OFFICE

MECH.

STOR.

JAN.

SUP.S

BOILER

ELEC.

COLONNADE

MECH.

LOCKERS

SHOWERS

SHOWERS

617 LOCKERS

514 LOCKERS

SHOWERS

SHOWERS

608 LOCKERS

TOILET

GIRLS P.E.

GIRLS VARSITY

TOILET

TOILET

BOYS P.E.

BOYS VARSITY

TOILET

STAIR

EQUIP. STOR.

STOR.

OFFICE

VEST.

PASS.

WEIGHT ROOM

STOR.

EQUIP. STOR.

VEST.

PASS.

OFFICE

LAUNDRY

MECH.

GYMNASIUM

STOR.

VEST.

500F

STAIR

F O

R C

O N

T

IN

U A

T

IO

N

R E

F E

R T

O

E

FOR CONTINUATION REFER TO: 1/ E121

ATS EHPA

LPA

HPA1

HPA

ELPA

LPA2

E2

AHU

GDF

GDF

AHU

E1

E3

E3

E1

EH

E11

EH

E11

E21 E21

E21

E10

E10 E10

E10

E10 E10 E10 E10

To LPA1

E38

EUH

To HPA1

E40

MAHU

MAHU

EUH-10 REMOVED

IHP-4 REMOVED

E6

IHP-3 REMOVED

E6

E42

E42 E42

E42

SCALE: = 1'-0"

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

0 8 168

1/8"

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

KEYPLAN

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

B

A

C

D E

F

G

H

J

K

E125

WING G - POWER PLAN

KEYNOTE SCHEDULE - THIS SHEET

# KEYNOTE DESCRIPTION

E1 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION

PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS

REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW DISCONNECT

SWITCH, SIZE PER SCHEDULE. COORDINATE SWITCH LOCATION TO MAINTAIN NEC

WORKING CLEARANCES. PROVIDE NEW LOAD SIDE CONDUCTORS/RACEWAY TO

EQUIPMENT CONNECTION POINT. WHERE POSSIBLE, ROUTE OVERHEAD AND ONLY

TRANSITION TO FLEXIBLE RACEWAY WITHIN 18" OF UNIT CONNECTION POINT.

E2 EXISTING MECHANICAL EQUIPMENT TO REMAIN, PROTECT ELECTRICAL CONNECTIONS

AND/OR EQUIPMENT FROM DAMAGE THROUGH ALL PHASES OF CONSTRUCTION.

E3 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION

PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS

REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW MOTOR

RATED SWITCH. COORDINATE SWITCH LOCATION TO MAINTAIN NEC WORKING

CLEARANCES. PROVIDE NEW LOAD SIDE CONDUCTORS/RACEWAY TO EQUIPMENT

CONNECTION POINT. WHERE POSSIBLE, ROUTE OVERHEAD AND ONLY TRANSITION TO

FLEXIBLE RACEWAY WITHIN 18" OF UNIT CONNECTION POINT.

E6 PROVIDE CONNECTION FROM OUTDOOR UNIT TO INDOOR UNIT FOR POWER AND

CONTROL. REFER TO MINI-SPLIT DETAILS AND MANUFACTURERS INSTALLATION

INSTRUCTIONS.

E10 ELECTRIC HAND DRYER TO BE REPLACED AT THIS LOCATION. EXTEND\/TRIM

CONDUCTORS/RACEWAY AS REQUIRED FOR CONNECTION TO NEW EQUIPMENT.

COORDINATE W/ ARCH DRAWINGS.

E11 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION

PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS

REQUIRED FOR CONNECTION TO NEW EQUIPMENT. SIZE CONDUCTORS TO MATCH

EXISTING BRANCH CIRCUIT.

E21 MODIFIY RECEPTACLE LOCATION AS REQUIRED FOR RECEPTACLE TO BE CONCEALED

WITHIN NEW DRINK FOUNTAIN SHROUD. RECEPTACLE SHALL BE PROTECTED VIA A

NEW 20A/1P GFCI BREAKER. FIELD VERIFY ASSOCIATED PANEL AND CIRCUIT.

E38 ROUTE TO PANEL AND LOCATE BREAKER IN NEXT AVAILABLE POLE . TERMINATE ON

NEW 20/1P BREAKER. NEW BRANCH CIRCUIT SHALL BE 3#12 CU THWN IN A 1/2"C.

E40 ROUTE TO PANEL AND LOCATE BREAKER IN NEXT AVAILABLE POLE . TERMINATE ON

NEW 30/1P BREAKER. NEW BRANCH CIRCUIT SHALL BE 3#10 CU THWN IN A 1/2"C.

E42 WHERE PRESENT, REMOVE 120V POWER & JUNCTION BOX LOCATED BENEATH SINKS.

MAINTAIN CIRCUIT INTEGRITY TO DOWNSTREAM DEVICES.

1/8" = 1'-0"E125

1 LEVEL 01 - WING G - POWER PLAN

# Doc # Date

1 AD1 11/13/25

2 AD2 11/21/25

File details come from the government source that posted it. Updated .