M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf
PDF 423 KB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is a Mechanical Renovation Plan document prepared by Southern A&E, LLC for Ridgeland High School Renovations, a project undertaken by Walker County Schools in LaFayette, Georgia. The plan details mechanical system renovations for Wing G of the school facility located at 2478 Happy Valley Road, Rossville, GA 30741. The document, dated October 31, 2025, is part of Bid Package BP-1 and includes architectural floor plan drawings with mechanical system designations across multiple rooms and spaces including gymnasiums, locker rooms, offices, classrooms, and mechanical rooms. Key mechanical components identified on the plan include Air Handling Units (AHU 1 and AHU 3), boiler equipment, return ducts, and existing high wall mini-split units designated to remain. The sealed proposal deadline for general contractors is 2:00 PM on Thursday, December 11, 2025, with a mandatory pre-proposal meeting scheduled for Thursday, November 20, 2025 at 9:00 AM on the project site; failure to attend the mandatory meeting will result in rejection of any submitted proposal.
The mechanical renovation plan serves as a technical reference document for bidders and does not independently establish pricing terms, set-asides, or funding information. Additional contract details including budgetary constraints, funding sources, insurance requirements, and specific scope specifications are contained in supplementary contract documents and the formal RFP issued by Walker County Board of Education. Contractors must reference related documents including the Scopes of Work and supporting exhibits to obtain complete project requirements and bid parameters for submission.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T T
T T
T
T
T
D D
T
T
AHU
AHU
GDF
GDF
BOILER
COLONNADE
STAIR
LOBBY
STAIR
STOR.
CONCESSIONS
STOR.
ELEC.
SUP.S
C.B.V.I.
R.O.T.C.
A.F.J.R.O.T.C.
OFFICE
STOR.
DARK ROOM
OFFICE
LIB.
OFFICE
ART
CORRIDOR
STOR.
JAN.
MENS
WOMEN
STAIR
LOCKERS
LOCKERS
LOCKERS
LOCKERS
STAIR
EQUIP. STOR.
OFFICE
PASS.
WEIGHT ROOM
STOR.
EQUIP. STOR.
PASS.
VEST.
OFFICE
LAUNDRY
VEST.
TOILET
TOILET
GIRLS VARSITY
TOILET
BOYS VARSITY
STOR.
GYMNASIUM
MENS
VEST.
500F
CORRIDOR
500A
WOMENS
EH
EH
SR3
SR3
E2
E2
E2
E2
E2
E2
SR4
SR4
SR4
SR4
E2
S4
SR4
SR4
SR4
SR4
E2
E2
E2
E2
350 E2
E2
E2
E2
E2
E2
E2
S3
G5
G5
G5
G5
G5
695---
SR5
SR5
S2
S2
S2
S2
S2
S2
S2
S2
S3
E2
E2
E2
E2
E2
E2
D17
D17
E2
G5
E2
E2
S2
S2
S2
S2
S3
TO F-3
TO F-2
TO F-1
TO F-4
E2
TO F-6
M502
SEE
DETAIL
TYP
E2
TO F-8
E2
G6
G6
G6
G6
G6
G6
G6
G6
G6
G6
G6
G6
F O
R C
O N
T
IN
U A
T
IO
N
R E
F E
R T
O
M
FOR CONTINUATION REFER TO: 1/ M125
DG2
EUH
E4
E4
E4
E4
E4
E4
E4
E4
RETURN
DUCT TO
MAH-1
RETURN
DUCT TO
MAH-2
MECH.
MAHU10
MAHU
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
M127
MECHANICAL RENOVATION PLAN - WING G
SCALE: = 1'-0"
0 8 168
1/8"
1/8" = 1'-0"M127
1 MECHANICAL RENOVATION PLAN - WING G
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D17 EXISTING HIGH WALL MINI-SPLIT TO REMAIN.
# Doc # Date
1 AD1 11-13-2025
2 AD2 11-21-2025
File details come from the government source that posted it. Updated .