M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf

PDF 423 KB Posted

Attached to
RFP for Ridgeland High School Renovations
Solicitation number
PE-55462-NONST-2026-000000017
Issued by
Wilcox County, Georgia

About this file

This is a Mechanical Renovation Plan document prepared by Southern A&E, LLC for Ridgeland High School Renovations, a project undertaken by Walker County Schools in LaFayette, Georgia. The plan details mechanical system renovations for Wing G of the school facility located at 2478 Happy Valley Road, Rossville, GA 30741. The document, dated October 31, 2025, is part of Bid Package BP-1 and includes architectural floor plan drawings with mechanical system designations across multiple rooms and spaces including gymnasiums, locker rooms, offices, classrooms, and mechanical rooms. Key mechanical components identified on the plan include Air Handling Units (AHU 1 and AHU 3), boiler equipment, return ducts, and existing high wall mini-split units designated to remain. The sealed proposal deadline for general contractors is 2:00 PM on Thursday, December 11, 2025, with a mandatory pre-proposal meeting scheduled for Thursday, November 20, 2025 at 9:00 AM on the project site; failure to attend the mandatory meeting will result in rejection of any submitted proposal.

The mechanical renovation plan serves as a technical reference document for bidders and does not independently establish pricing terms, set-asides, or funding information. Additional contract details including budgetary constraints, funding sources, insurance requirements, and specific scope specifications are contained in supplementary contract documents and the formal RFP issued by Walker County Board of Education. Contractors must reference related documents including the Scopes of Work and supporting exhibits to obtain complete project requirements and bid parameters for submission.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T T

T T

T

T

T

D D

T

T

AHU

AHU

GDF

GDF

BOILER

COLONNADE

STAIR

LOBBY

STAIR

STOR.

CONCESSIONS

STOR.

ELEC.

SUP.S

C.B.V.I.

R.O.T.C.

A.F.J.R.O.T.C.

OFFICE

STOR.

DARK ROOM

OFFICE

LIB.

OFFICE

ART

CORRIDOR

STOR.

JAN.

MENS

WOMEN

STAIR

LOCKERS

LOCKERS

LOCKERS

LOCKERS

STAIR

EQUIP. STOR.

OFFICE

PASS.

WEIGHT ROOM

STOR.

EQUIP. STOR.

PASS.

VEST.

OFFICE

LAUNDRY

VEST.

TOILET

TOILET

GIRLS VARSITY

TOILET

BOYS VARSITY

STOR.

GYMNASIUM

MENS

VEST.

500F

CORRIDOR

500A

WOMENS

EH

EH

SR3

SR3

E2

E2

E2

E2

E2

E2

SR4

SR4

SR4

SR4

E2

S4

SR4

SR4

SR4

SR4

E2

E2

E2

E2

350 E2

E2

E2

E2

E2

E2

E2

S3

G5

G5

G5

G5

G5

695---

SR5

SR5

S2

S2

S2

S2

S2

S2

S2

S2

S3

E2

E2

E2

E2

E2

E2

D17

D17

E2

G5

E2

E2

S2

S2

S2

S2

S3

TO F-3

TO F-2

TO F-1

TO F-4

E2

TO F-6

M502

SEE

DETAIL

TYP

E2

TO F-8

E2

G6

G6

G6

G6

G6

G6

G6

G6

G6

G6

G6

G6

F O

R C

O N

T

IN

U A

T

IO

N

R E

F E

R T

O

M

FOR CONTINUATION REFER TO: 1/ M125

DG2

EUH

E4

E4

E4

E4

E4

E4

E4

E4

RETURN

DUCT TO

MAH-1

RETURN

DUCT TO

MAH-2

MECH.

MAHU10

MAHU

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

KEYPLAN

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

B

A

C

D E

F

G

H

J

K

M127

MECHANICAL RENOVATION PLAN - WING G

SCALE: = 1'-0"

0 8 168

1/8"

1/8" = 1'-0"M127

1 MECHANICAL RENOVATION PLAN - WING G

KEYNOTE SCHEDULE

# KEYNOTE DESCRIPTION

D17 EXISTING HIGH WALL MINI-SPLIT TO REMAIN.

# Doc # Date

1 AD1 11-13-2025

2 AD2 11-21-2025

File details come from the government source that posted it. Updated .