E117_R1_AD2___WING_E__POWER_PLAN.pdf
PDF 2 MB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is an electrical power plan drawing for the Ridgeland High School Renovations project issued for construction by Southern A&E, LLC for Walker County Schools located in Lafayette, Georgia. The drawing, dated November 21, 2025, represents Bid Package BP-1 and depicts Level 01 Wing E power distribution and electrical connections. The plan includes detailed keynotes specifying electrical work requirements across multiple areas of the wing, including connections for mechanical equipment, replacement of electric hand dryers, modification of receptacle locations for new drink fountains, installation of GFCI-type receptacles, rework of electrical raceways for fresh air ductwork coordination, and removal or maintenance of existing 120V power systems beneath sinks. The drawing identifies numerous electrical components including disconnect switches, branch circuit conductors, raceways, and connections sized to match existing circuits while maintaining National Electrical Code (NEC) working clearances.
The electrical plan specifies precise technical requirements for each connection point, with branch circuits ranging from 20-amp to 50-amp, three-phase configurations, and conductor specifications including copper THWN wire in various gauges and conduit sizes. Work items include protecting existing mechanical equipment connections during construction, routing conductors overhead where possible with flexible raceway transitions limited to 18 inches of equipment connection points, and field verification of associated panels and circuits. The project documentation indicates coordination requirements with mechanical and architectural contractors, with references to related drawing sheets E113, E121, and E125 for continuation details. The drawing was prepared by Southern A&E, LLC under Engineer Firm License No. PEF003374, valid through June 30, 2026.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MM
M M
M
M M
M M
M M
M
M
M
J
J
J
J
J
M
CONF.
521 ASST. PRINCIPAL
STOR.
CORRIDOR
500D
WOMEN
MEN
RECORDS
JAN.
ASST. PRINCIPAL
ASST. PRINCIPAL
512 OFFICE
STOR.
CORRIDOR
200C
OFFICE
OFFICE
WAITING
TESTING
COUNSELOR
COUNSELOR
VAULT
RECEPTION
LOBBY
PRINCIPAL
TOILET
CLOSET
SECR.
ASST. PRINCIPAL
LOUNGE
TOILET
EXAM
CLINIC
530 OFFICE
WAIT.
532 MECH.
CORRIDOR
200B
MECH
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
BOYS
GIRLS
JAN
CORRIDOR
CLASSROOM
CLASSROOM
104 CLASSROOM
STOR.
RISER ROOM
SCIENCE
VEST.
500F
F O
R C
O N
T
IN
U A
T
IO
N
R E
F E
R T
O
E
F O
R C
O N
T
IN
U A
T
F E
R T
O
E
F O
R C
O N
T
IN
U A
T
F E
R T
O
E
HP
HP
HP
HP
AH
AH
AH
AH
AH
AH
AH
AH
AH
AH
AH
LPD1
LF1
AHU
IHP
IHP
OHP
OHP
E4 E4E4E4
E3
E3
E3
E3
E3
E3
E3
E1
E1
F
F
F
E2
EH
EH
E11
E21
E1
E3
E3
HPD- 38,40,42
E27
E11
E10 E10
E36
E36
E37
TOILET
106.1
EUH
HPD1- 25
E40
GDF
E3
E42 E42
SCALE: = 1'-0"
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
0 8 168
1/8"
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
E117
WING E - POWER PLAN
KEYNOTE SCHEDULE - THIS SHEET
# KEYNOTE DESCRIPTION
E1 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION
PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS
REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW DISCONNECT
SWITCH, SIZE PER SCHEDULE. COORDINATE SWITCH LOCATION TO MAINTAIN NEC
WORKING CLEARANCES. PROVIDE NEW LOAD SIDE CONDUCTORS/RACEWAY TO
EQUIPMENT CONNECTION POINT. WHERE POSSIBLE, ROUTE OVERHEAD AND ONLY
TRANSITION TO FLEXIBLE RACEWAY WITHIN 18" OF UNIT CONNECTION POINT.
E2 EXISTING MECHANICAL EQUIPMENT TO REMAIN, PROTECT ELECTRICAL CONNECTIONS
AND/OR EQUIPMENT FROM DAMAGE THROUGH ALL PHASES OF CONSTRUCTION.
E3 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION
PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS
REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW MOTOR
RATED SWITCH. COORDINATE SWITCH LOCATION TO MAINTAIN NEC WORKING
CLEARANCES. PROVIDE NEW LOAD SIDE CONDUCTORS/RACEWAY TO EQUIPMENT
CONNECTION POINT. WHERE POSSIBLE, ROUTE OVERHEAD AND ONLY TRANSITION TO
FLEXIBLE RACEWAY WITHIN 18" OF UNIT CONNECTION POINT.
E4 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION
PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS
REQUIRED, SIZED TO MATCH EXISTING BRANCH CIRCUIT. PROVIDE NEW DISCONNECT
SWITCH LOCATED ABOVE CEILING, SIZE PER SCHEDULE. COORDINATE SWITCH
LOCATION TO MAINTAIN NEC WORKING CLEARANCES. PROVIDE NEW LOAD SIDE
CONDUCTORS/RACEWAY TO EQUIPMENT CONNECTION POINT. REFER TO INDOOR
HEAT PUMP DETAIL.
E10 ELECTRIC HAND DRYER TO BE REPLACED AT THIS LOCATION. EXTEND\/TRIM
CONDUCTORS/RACEWAY AS REQUIRED FOR CONNECTION TO NEW EQUIPMENT.
COORDINATE W/ ARCH DRAWINGS.
E11 CONNECT MECHANICAL EQUIPMENT TO CIRCUIT MAINTAINED FROM DEMOLITION
PHASE. EXTEND ASSOCIATED BRANCH CIRCUIT CONDUCTORS/RACEWAY AS
REQUIRED FOR CONNECTION TO NEW EQUIPMENT. SIZE CONDUCTORS TO MATCH
EXISTING BRANCH CIRCUIT.
E21 MODIFIY RECEPTACLE LOCATION AS REQUIRED FOR RECEPTACLE TO BE CONCEALED
WITHIN NEW DRINK FOUNTAIN SHROUD. RECEPTACLE SHALL BE PROTECTED VIA A
NEW 20A/1P GFCI BREAKER. FIELD VERIFY ASSOCIATED PANEL AND CIRCUIT.
E27 ROUTE TO PANEL AND BREAKER POSITION INDICATED. TERMINATE ON NEW 50/3P
BREAKER. NEW BRANCH CIRCUIT SHALL BE 3#6 CU THWN +#10CU GND IN A 1"C.
PROVIDE NEW DISCONNECT AND LOAD SIDE CONDUCTORS/RACEWAY.
E36 REPLACE ALL RECEPTACLE IN THIS SPACE WITH NEW GFCI TYPE RECEPTACLE.
E37 REWORK ELECTRICAL RACEWAYS/CONDUCTORS ROUTED THROUGH THIS AREA AS
REQUIRED FOR INSTALLATION OF NEW FRESH AIR DUCTWORK. COORDINATE
LOCATION WITH MECHANICAL CONTRACTOR.
E40 ROUTE TO PANEL AND LOCATE BREAKER IN NEXT AVAILABLE POLE . TERMINATE ON
NEW 30/1P BREAKER. NEW BRANCH CIRCUIT SHALL BE 3#10 CU THWN IN A 1/2"C.
E42 WHERE PRESENT, REMOVE 120V POWER & JUNCTION BOX LOCATED BENEATH SINKS.
MAINTAIN CIRCUIT INTEGRITY TO DOWNSTREAM DEVICES.
1/8" = 1'-0"E117
1 LEVEL 01 - WING E - POWER PLAN
# Doc # Date
1 AD2 11/21/25
File details come from the government source that posted it. Updated .