M130_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf

PDF 460 KB Posted

Attached to
RFP for Ridgeland High School Renovations
Solicitation number
PE-55462-NONST-2026-000000017
Issued by
Wilcox County, Georgia

About this file

This is a mechanical renovation plan document for Ridgeland High School, prepared by Southern A&E, LLC for Walker County Schools located in Lafayette, Georgia. The document is a detailed architectural drawing (Drawing Number M130) that illustrates mechanical system renovations across Wings K and J at multiple levels, including Level 1, Level 2, and roof areas. The plan specifies HVAC work in various spaces including lecture rooms, locker rooms, restrooms, offices, storage areas, and other facility spaces, with designated mechanical equipment locations and ductwork routing. The drawing includes keynote references for specific mechanical work requirements, such as condensate drain line specifications requiring 1% slope, full insulation per specification section 230719, and cleanouts every 25 feet. The document was issued for construction with a copyright date of January 31, 2025, and contains revision information dated November 21, 2025 (Revision AD2). Multiple scope of work notes indicate that certain mechanical work will only be performed if alternate bid options are selected by the owner.

The document specifies detailed mechanical system components identified by code designations (such as ERU-K1, RTHP-K2, RTHP-K3, and various other equipment markers) distributed throughout the facility layout. The plan notes that no HVAC work is required in certain designated areas. The engineer firm responsible for this work is Southern A&E, LLC, holding Professional Engineers and Land Surveyors License No. PEF003374, with expiration date June 30, 2026. This drawing is part of Bid Package BP-1 for the overall Ridgeland High School renovations project and represents preliminary design documentation issued for construction purposes to guide contractors in executing the mechanical renovation work.

View the file

Other files

File Type Posted
P203_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
E003_R2_AD2___MECHANICAL_EQUIPMENT_CONNECTION.pdf PDF
M113_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M126_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E123_R2_AD2___WING_G__ELECTRICAL_DEMOLITION_P.pdf PDF
Advertisement _ RHS Renovations.pdf PDF
E135_R2_AD2___WING_F_G_K__ROOF__POWER_PLAN.pdf PDF
P106_R1_AD2___PLUMBING_ROOF_PLAN__ALTERNATE.pdf PDF
E117_R1_AD2___WING_E__POWER_PLAN.pdf PDF
ADDENDUM_2__COMPLETE.pdf PDF
E103_R2_AD2___WING_A__POWER_PLAN.pdf PDF
M128_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M112_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
P102_R1_AD2___PLUMBING_RENOVATION_PLAN__PHASE.pdf PDF
P201_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
M115_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M127_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M125_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
E129_R2_AD2___MEZZ_LEVEL__WING_G__POWER_PLAN.pdf PDF
M129_R2_AD2_MECHANICAL_RENOVATION_PLAN__WING_.pdf PDF
M602_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
M110_R2_AD2_MECHANICAL_DEMOLITION_PLAN__WING_.pdf PDF
M601_R2_AD2_MECHANICAL_EQUIPMENT_SCHEDULES.pdf PDF
E125_R2_AD2___WING_G__POWER_PLAN.pdf PDF
P202_R1_AD2___PLUMBING_ENLARGED_PLANS.pdf PDF
P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf PDF
M503_R2_AD2_MECHANICAL_EQUIPMENT_DETAILS.pdf PDF
Project Award Recommendation _ RHS HVAC.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T H

D

TH

UP

T

T

T

LECTURE ROOM

MECH.

STOR.

BOYS TOILET

GIRLS TOILET

GIRLS TOILET

VEST.

BOYS LOCKER ROOM

CONCESSIONS

OFFICE

OFFICE

REFEREE LOUNGE

STAIR

VEST.

STOR.

STOR.

STOR.

PASSAGE

TOILET

GIRLS LOCKER ROOM

B O

Y S

T O

IL

E

T

E2

E2

E2

490E2

E2

300 E2

S2

S3

S3

S4

400S4

S3

S3

S3

S3

S3

S3

S3

S1

S2

S2

S2

S2

E1

26"x14"

14"x14"

18"x12"

"x

"x

"Ø

"Ø

"Ø

10"Ø

"Ø

8"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

6"Ø

S2

S2

"Ø

"Ø

"Ø

"Ø

8"x10"

16"x14"

"x

12"Ø

12"Ø "Ø

"Ø

"x

"x

18"x18" 10"x10"

E2

E2

E2

E1

UP TO

ERU-K1

UP TO

RTHP-K2

UP TO

RTHP-K3

12"Ø

12"Ø

"x

E1

E2

8"Ø

12"Ø

"Ø

10"Ø

S2

10"x10"

16"Ø

16"Ø

22"x14"

NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.

STOR.

TOILET

OFFICE

PASSAGE

LOCKER ROOM

CORRIDOR

CONFERENCE ROOM

STOR.

STAIR

MECH.

MENS RESTROOM

WOMENS RESTROOM

LOCKER ROOM

LOCKER ROOM

LOCKER ROOM

CORRIDOR

TRAINER OFFICE

TOILET

UNIFORM ROOM

LAUNDRY

CORRIDOR

5030 CORRIDOR

UNIFORM ROOM

SECURITY

E2

E2

E2

S2

S2

S2

S2

S2

S2

S1

S2

S3

S3

S1

S1

S1

E2

E2

S2

E1

E1

S2

S2

S2

S2

S1

S3

S3

"x

26"x14"

22"x14"

"x

12"x14"

14"x14"

"x

12"Ø

"Ø

6"Ø

"Ø

8"Ø

12"Ø 12"Ø

"x

8"Ø

8"Ø

8"Ø

8"Ø

8"Ø

8"Ø

"x

8"x10"

"Ø

"Ø

"Ø

"Ø

"Ø

16"x14"

10"x10"8 "Ø

6"Ø

"Ø

6"Ø

"Ø

"x

16"x12"14"x14"

"x

"x

8"Ø

"x

"x

"x

10"Ø 10"Ø

8"Ø

E2

S2

8"Ø

"x

18"x18"

UP TO

ERU-K1

UP TO

RTHP-K2

UP TO

RTHP-K3UP TO

RTHP-K1

14"x10"

12"x10"

"x

8"Ø

6"Ø

E1

E1

"Ø

16"x18"

14"x14"

"x

E2

E2

"Ø 1 "Ø

E1

10"Ø

E1

"Ø

E2

"Ø

G7

G7

NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.

STORAGE

STORAGE

CONCESSIONS

TOILET

TOILET

NO HVAC WORK IN THIS AREA

MHP

MHP

M503

SEE

DETAIL

TYP

M6

AUDIO/ VISUAL

STORAGE

LOUNGE

MAHU

6B

MAHU

6A

MAHU

D40

CD

CD

CD

R

R

R M6

K1

RTHP

K2

RTHP

K3

RTHP

K1

ERU 10

M503

M503

SEE

DETAIL

TYP

SEE

DETAIL

NOTE: SCOPE OF WORK WILL ONLY BE PERFORMED IF ALTERNATE IS TAKEN.

DRAWING NUMBER

REVISIONS

COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.

THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL

NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT

EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.

10-31-2025

BID PACKAGE BP-1

SA&E PROJECT NUMBER

ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")

A

TRUE

NORTH

2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

B

C

D

E

F

G

H

I

J

K

L

M

N

KEYPLAN

RIDGELAND HIGH SCHOOL

RENOVATIONS TO:

WALKER COUNTY SCHOOLS

301 N CHEROKEE ST, LAFAYETTE, GA 30728

2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741

746-0190

01-920-045

ISSUED FOR CONSTRUCTION

STATE BOARD OF REGISTRATION

FOR PROFESSIONAL ENGINEERS AND

LAND SURVEYORS

SOUTHERN A & E, LLC

ENGINEER FIRM

LICENSE NO: PEF003374

EXP. DATE - 06/30/2026

B

A

C

D E

F

G

H

J

K

M130

MECHANICAL RENOVATION PLAN - WING K

AND J

SCALE: = 1'-0"

0 8 168

1/8"

1/8" = 1'-0"M130

1 MECHANICAL RENOVATION PLAN - WING K LEVEL 1

1/8" = 1'-0"M130

2 MECHANICAL RENOVATION PLAN - WING K LEVEL 2

1/8" = 1'-0"M130

4 MECHANICAL RENOVATION PLAN - WING J LEVEL 1

1/8" = 1'-0"M130

5 MECHANICAL RENOVATION PLAN - WING K LEVEL 2

1/8" = 1'-0"M130

3 MECHANICAL RENOVATION PLAN - WING K ROOF

KEYNOTE SCHEDULE

# KEYNOTE DESCRIPTION

D40 REMOVE EXISTING WINDOW UNIT AND TURN OVER TO OWENER.

M6 CONDENSATE MAIN DRAIN LINE: ENSURE 1% SLOPE FOR ALL CONDENSATE LINES. INSULATE

PER SPECIFICATION SECTION 230719. INSULATE ENTIRE LENGTH OF CONDENSATE PIPING.

PROVIDE A CLEANOUT EVERY 25FT. CONDENSATE FROM INDOOR UNITS TO MAIN LINE SHALL

BE SIZED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. ROUTE CONDENSATE DRAIN

LINE ABOVE CEILING TO EXTERIOR WALL DOWN TO SPLASH BLOCK.

# Doc # Date

1 AD1 11-13-2025

2 AD2 11-21-2025

File details come from the government source that posted it. Updated .