P103_R1_AD2___PLUMBING_RENOVATION_FLOOR_PLAN_.pdf
PDF 894 KB Posted
- Attached to
- RFP for Ridgeland High School Renovations
- Solicitation number
- PE-55462-NONST-2026-000000017
- Issued by
- Wilcox County, Georgia
About this file
This is a plumbing renovation floor plan for Ridgeland High School prepared by Southern A&E, LLC for the Walker County Board of Education in Georgia. The plan details Phase 2 plumbing renovations for the main building located at 2478 Happy Valley Road, Rossville, GA 30741. The project involves replacing existing drinking fountains with new EDF-1 and EDF-2 models, disconnecting and reconnecting gas lines to existing equipment, and retaining certain existing fixtures including drinking fountains, gas meters, and gas piping. A mandatory pre-proposal meeting is scheduled for November 20, 2025 at 9:00 AM at the project site, with sealed proposals due to the Walker County Board of Education's Facilities and Operations Department at 298 Culberson Avenue, LaFayette, GA 30728 by 2:00 PM on Thursday, December 11, 2025. Attendance at the mandatory pre-proposal meeting is required for bid eligibility, and any proposals submitted by entities that fail to attend will be returned unopened.
The floor plan identifies specific renovation locations throughout the school building using a keynote schedule system that marks drinking fountain replacements (P9 and P10) and gas line work (G11 through G14) at designated areas. Gas input specifications are noted for various equipment, ranging from 150,000 to 1,180,000 Btu/h. The document is issued for construction purposes and carries a copyright by Southern A&E, LLC with an engineer firm license number PEF003374 expiring June 30, 2026. No pricing information, set-asides, funding sources, or contract award details are provided in this floor plan document.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G M
P202
P202
P202
P202
P203
SERVING
CLASSROOM
RISER ROOM
MECH.
WAIT.
OFFICE
ASST. PRINCIPAL
ASST. PRINCIPAL
STOR.
OFFICE
TESTING
COUNSELOR
CLOSET
SECR.
ASST. PRINCIPAL
LOUNGE
CLINIC
EXAM
STOR.
209A
MECH.
STOR.
215A
CLASSROOM
TOILET
809A
STOR.
STOR.
MECH.
CAN WASH
OFFICE
MECH.
JAN.
DRY STOR.
FREEZER
901.2
COOLER
901.1
STOR.
OFFICE
LIB.
OFFICE
DARK ROOM
OFFICE
STAIR
STOR.
OFFICE
UNIF.
MECH
JAN
BOYS
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
113 CLASSROOM
LOUNGE
TOILET
TOILET
VEST.
STAIR
VEST.
BOYS P.E.
TOILET
GIRLS VARSITY
TOILET
OFFICE
WAITING
COUNSELOR
504VAULT
INSTRUMENTS
MECH.
SERVING
STOR.
SOUND
ATTENDANCE OFFICE
TOILET
808A
DRESSING
ELEC.
806 MECH.
RECEPTION
TOILET
TOILET
CONF.
PRINCIPAL
CORRIDOR
200C
OFFICE
GIRLS
CORRIDOR
200B
ELEC.
CLASSROOM
SCIENCE
CLASSROOM
CLASSROOM
CLASSROOM
STOR.
CORRIDOR
STOR.
CONCESSIONS
STOR.
STOR.
R.O.T.C.
SUP.S
ELEC.
DISH WASH
KITCHEN
CORRIDOR
800B
STAGE
CORRIDOR
200A
LOCKERS
LOCKERS
LOCKERS
LOCKERS
SALAD
ART
A.F.J.R.O.T.C.
MECH.
C.B.V.I.
MECH.
LAUNDRY
OFFICE
EQUIP. STOR.
STOR.
WEIGHT ROOM
OFFICE
EQUIP. STOR.
COLONNADE
DISH RETURN
DINNING
COLONNADE
C.B.V.I.
CORRIDOR
800A
CORRIDOR
810A
BAND
CORRIDOR
810AB
THEATER
CORRIDOR
801A
LOBBY
PASS.
PASS.
GYMNASIUM
STOR.
MENS
STAIR
STAIR
STOR.
JAN.
CORRIDOR
500A
WOMENS
MENS
CORRIDOR
WOMEN
COMMONS
VEST.
500F
BOILER
STOR.
ASST. PRINCIPAL
520 MEN
JAN.
ELEC.
RECORDS
WOMEN
LOBBY
CORRIDOR
500E
CORRIDOR
500D
ENTRY
500G
GIRLS P.E.
SHOWERS
SHOWERS
SHOWERS
SHOWERS
BOYS VARSITY
TOILET
TOILET
EDF-1
EDF-2
EDF-1P9 D31
EDF-1 P9D31
TOILET
106.1 P203
P203
P203
P203
G11
G12
GAS INPUT:GDF
10 200000 Btu/h
GAS INPUT: AH
1180000 Btu/h
GAS INPUT: AH
1080000 Btu/h
GAS INPUT: GDF
9200000 Btu/h
GAS INPUT: GDF
8400000 Btu/h
PRATICE ROOM
G13
G14
G14
G14
GAS INPUT:GDF
11 200000 Btu/h
GAS INPUT: GDF
12150000 Btu/h
G14 G14G13 G13
G
W .C
GAS INPUT: GDF
4150000 Btu/h
GAS INPUT: GDF
3175000 Btu/h
P10
P9
D31
P9
G14
G14
G13
D31
EDF-1
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL
NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT
EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC.
10-31-2025
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
RIDGELAND HIGH SCHOOL
RENOVATIONS TO:
WALKER COUNTY SCHOOLS
301 N CHEROKEE ST, LAFAYETTE, GA 30728
2478 HAPPY VALLEY RD, ROSSVILLE, GA 30741
746-0190
01-920-045
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND
LAND SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
B
A
C
D E
F
G
H
J
K
P103
PLUMBING RENOVATION FLOOR PLAN -
PHASE 2 - MAIN BUILDING
SCALE: = 1'-0"
0 16 3216
1/16"
KEYNOTE SCHEDULE
# KEYNOTE DESCRIPTION
D31 EXISTING DRINKING FOUNTAIN TO REMAIN.
G11 EXISTING GAS METER TO REMAIN.
G12 EXISTING EXTERIOR MEDIUM PRESSURE (5 PSI) GAS PIPE TO REMAIN.
G13 EXISTING LOW PRESSURE (7" WC) GAS LINE TO REMAIN.
G14 DISCONNECT GAS LINE FROM EXISTING GAS EQUIPMENT AND RECONNECT TO NEW. FIELD
VERIFY EXACT LOCATION OF EXISTING EQUIPMENT AND GAS LINE.
P9 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-1. PROVIDE AND INSTALL WITH NEW
OUTLET STOP. RETURN EXISTING EXTERNAL WATER FILTER TO OWNER.
P10 REPLACE EXISTING DRINKING FOUNTAIN WITH NEW EDF-2. PROVIDE AND INSTALL WITH NEW
OUTLET STOP. RETURN EXISTING EXTERNAL WATER FILTER TO OWNER.
1/16" = 1'-0"P103
1 PLUMBING RENOVATION FLOOR PLAN - PHASE 2
# Doc # Date
1 AD2 11-21-2025
File details come from the government source that posted it. Updated .